FY24: Station (PROJ: 548-24-155) Clean Laundry Area Roof
Solicitation number
36C24824Q1231
Issued by

About this file

This document appears to be a contract solicitation from the Department of Veterans Affairs (VA) for a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside roofing project at the West Palm Beach VA Medical Center. The project, titled "FY24: Station (PROJ: 548-24-155) Clean Laundry Area Roof", requires the installation of polyurethane foam roofing with a silicone coating. The solicitation includes detailed technical specifications, drawings, and product data sheets for the required materials. Offerors must complete a pricing breakdown by division and provide a formal certification of compliance with the limitations on subcontracting requirements. Proposals are due by 07/24/2023, and the award is anticipated on 09/01/2023. The government will not consider offers from offerors who do not provide the required certification.

View the file

Other files

File Type Posted
C01 SAM NOA 36C24824C0083_1.pdf PDF
36C24824Q1231 0001.docx DOCX document
36C24824Q1231.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

C.O.T.R.

Approved:

Location

8 9

Ve te ra ns

A ffa irs D ep ar tm en t o f

Offic e o f F ac iliti esA

VAMC West Palm Beach, Florida OFDWG.

LAYOUT DRAWING

B C

D E

F G

BASEMENT

SECTION B

CLEAN LAUNDRY

ISSUED FOR REVIEW 6-12-17

TMB 8-3-17

TMB 9-18-18

TMB 11-13-18

TMB 1-27-19

BAT 3-27-19

BAT 6-6-19

BAT 6-30-21

BEG 2-17-22

05-17-24

DETAIL

N

AOC

SCALE: A1/4" = 1'-0"

548-24-155

BGBLDG #1

TEMPORARY

FENCE

NOTES

1. THE CONTRACTOR SHALL SUPPLY

EMERGENCY EXIT SIGNAGE TO

REDIRECT THE TRAFFIC PATTERN

2. THE CONTRACTOR SHALL SUPPLY

A BARRIER BETWEEN THE MAIN

LAUNDRY AREA AND THE CLEAN

LAUNDRY AREA

3. FENCE SHALL BE A MIN. OF 6' TALL

4. FENCE SHALL HAVE SAFETY

NETTING ALL THE WAY AROUND

THE ENCLOSURE

5. THE CONTRACTOR SHALL POST A

SIGN ON THE FENCE STATING:

A. COMPANY NAME

B. PROJECT NAME

C. POC NAME

D. POC PHONE #

E. POC EMAIL

V V

V

V

R-5

R-4

R-4

R-3 R-4R-3

R-4

R-5

PROCESSING AREA

FOREMAN

BD-119

BD-119

TEXTILE

CARE

BD-119B

ASS'T

MNGR

BD-119A

REST & LUNCH AREA

CORR.

BD-C1

CORR.

BD-101

ADMIN.

SUPP.

ASSIST.

MECH. ROOM

BD-101A

LOUNDRY

STORAGE

899 SF

LAYDOWN

AREA

WORK

ZONE

DUMPSTER

WORK

ZONE

WORK

ZONE

ISOLATION

BARRIERREDIRECTION

SIGNAGE

EMERGENCY

EXITS

AutoCAD SHX Text Revisions

AutoCAD SHX Text Date

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Service Director

AutoCAD SHX Text Approved: Chief, Facilities Management Service

AutoCAD SHX Text Facilities Management Service

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawn

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Date

AutoCAD SHX Text Project No.

AutoCAD SHX Text West Palm Beach VA Medical Center 7305 N. Military Trail West Palm Beach, FL 33410-6400 Phone: 561-422-8262 or (800) 972-8262 Fax: 561-422-8613

AutoCAD SHX Text Revisions

AutoCAD SHX Text Date

VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF

COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating 18 U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement.

The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________

Printed Title of Signee: _____________

Signature: ____________

Date: ______________

Company Name and Address: _______________

(End of Clause)

Orlando Gonzales

Managing Principal

07/24/2023 AESUS Design Group 1050 E. Southern Ave, Suite D, Tempe, AZ 85282

852.219‐77 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.

As prescribed in 819.7009(c) insert the following clause:

VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND

CONSTRUCTION (SEP 2021) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.]

(i) [ X ] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP‐listed SDVOSBs as set forth in 852.219‐10 or VOSBs as set forth in 852.219‐11. Any work that a similarly situated VIP‐listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [ ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP‐listed SDVOSBs as set forth in 852.219‐10 or VOSBs as set forth in 852.219‐11. Any work that a similarly situated VIP‐ listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [ ] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP‐listed SDVOSBs as set forth in 852.219‐10 or VOSBs as set forth in 852.219‐11. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating section 1001 of title 18.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. The Contracting Officer may, at their discretion, require the Contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the Contracting Officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill‐in required. The formal certification must be completed, signed, and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification:

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: _________________________________

Printed Title of Signee: ________________________________

Signature: ______________________________________________

Date: ___________________________________________________

Company Name and Address: _______________________________

Orlando Gonzales

Managing Principal

07/24/2023 AESUS Design Group

1050 E. Southern Ave, Suite D, Tempe AZ 85282

Product Data Sheet: GacoFlex SF-2000 SeamSeal

May 2014 Supersedes 1/14

Made in the USA • gaco.com • 800.331.0196

GACOFLEX® SF2000 SEAMSEAL

SOLVENT-FREE 100% SILICONE SEALANT

DESCRIPTION:

GacoFlex SF2000 SeamSeal is a silicone-based, solvent-free, single-component waterproof elastomeric moisture-curing sealant combined with a reinforcing agent.

USAGE:

SeamSeal is intended for application over cleaned and primed roofs as a joint and fastener treatment in place of fabric and/or elastomeric sheet tape. It may also be used to repair blisters in spray polyurethane foam up to 4” in diameter, as a tape-seal over cracked polyurethane foam insulation, and as filler for applications over existing “alligatored” smooth BUR. SeamSeal is UV stable and may be used to repair most clean and dry roofing surfaces. It can also serve as a substitute for caulk on a variety of substrates.

LIMITATIONS: Not intended to be used to repair blisters in polyurethane foam larger than 4” in diameter.

COLOR:

White

APPLIED PRODUCT DATA

WEATHERABILITY:

Excellent durability, color stability and chalk resistance.

TOXICITY:

Not for use in contact with edible substances or potable water.

ADHESION: Adhesion is excellent to polyurethane foam. A primer may be required for adhesion to built-up roofing, modified bitumen capsheet, single ply roofing (EPDM, TPO, PVC and Hypalon®), masonry, concrete, and wood. A primer must be used on all ferrous metals to prevent corrosion.

Contact Gaco Western’s Technical Department for specific recommendations.

The following physical properties tests were performed in accordance with ASTM D-6694 with a film thickness of 20 dry mils.

TENSILE: ASTM D2370

Initial Tensile Strength:

Elongation:

306 ± 10 psi 130%

TEAR RESISTANCE: ASTM D624 Die C 25 lbs per square inch

HARDNESS: ASTM D2240 Shore A 55

WATER VAPOR

PERMEANCE:

• ASTM E96 Procedure B

• 7.0 perms

WET ADHESION TO

POLYURETHANE FOAM:

ASTM D903

• 3.5 lbs per linear inch

LOW TEMPERATURE

FLEX:

• ASTM D522 Method B

• Pass http://www.gaco.com/

SF2000

Made in the USA • gaco.com • 800.331.0196

PACKAGED PRODUCT DATA

SOLIDS:

By Weight By Volume

96% 95%

VOC:

35 g/l

FLASH POINT: ASTM D3278 178°F (81°C)

STORAGE STABILITY: Two years from date of manufacture when stored in sealed containers between 0°F - 80°F (-17°C - 26°C)

APPLICATION

MIXING: Mix before application to ensure uniform color and consistency.

THINNING: Product is not intended to be thinned.

PRIMER: Existing silicone coatings should not be primed. On all other substrates, apply GacoFlex E5320

2-Part Epoxy Primer/Filler according to label directions.

APPLICATION: Apply by brush, trowel, piping bag or roller as received. For application utilizing equipment contact Gaco Western. For cold weather application, keep material stored above 65°F (18°C). Do not apply if rain is expected within 1 hour. For application in temperatures below freezing or above 120°F (49°C) contact Gaco Western.

- Apply SeamSeal on all metal seams, joints, fasteners and penetrations at 75 to 100 linear feet of seams per gallon or 450 fasteners per gallon.

- Coat all surfaces including expansion joint covers and flashings. Extra material is required at all edges and penetrations if neoprene sheet flashing is not used.

NOTE: Application rate is job-specific. Additional material may be required due to surface profile, losses due to overspray and wind, and residual coating left in the container.

DRY TIME: Allow to dry a minimum of 4 hours at 55°F (13°C) or higher before coating with GacoFlex

Solvent-Free Silicone Coating (product is moisture cure, low humidity will result in longer dry times); coat within 4 to 48 hours.

CLEAN UP: Clean up application tools and equipment with GacoFlex Silicone Solvent. DO NOT USE WATER

OR RECLAIMED SOLVENTS.

For specific Safety and Health information please refer to Material Safety Data Sheet.

http://www.gaco.com/

Gaco.com | 800-331-0196

Product Data Sheet (PDS): GacoPrime Low VOC Primer

Revised: 08/2022

GACOPRIME

LOW VOC PRIMER

A. DESCRIPTION:

GacoPrime Low VOC Primer is a solvent-based primer designed to promote adhesion of GacoFlex™ roof coatings to approved substrates. GacoPrime Low VOC Primer meets ASQMD requirements with a VOC content < 250 g / L. Before using, verify that local and state regulations allow the use of the solvents as listed in this product’s specifications.

B. LIMITATIONS:

GacoPrime Low VOC Primer is intended as a surface preparation coating to promote adhesion of GacoFlex roof coatings to approved substrates. GacoPrime Low VOC Primer is not intended for continuous exposure to weather and application of a GacoFlex Coating must be completed within twenty-four (24) hours from the start of GacoPrime Low VOC Primer Application. Not intended for use over asphalt, concrete, or other rough or porous substrates.

C. PRECAUTIONS:

WARNING – EXTREMELY FLAMMABLE! FIRE HAZARD!

Keep away from open flame and other possible ignition sources during storage and use. Do not smoke when using. Keep away from children.

For professional use only - Use only in well ventilated areas. Use of neoprene or nitrile gloves and eye protection with side shields is recommended.

Do not thin. Mix thoroughly before and during use. A mechanical mixer is required to ensure proper consistency throughout application.

D. PACKAGED PRODUCT DATA:

PROPERTY DESCRIPTION

COLOR Light red

VISUAL APPEARANCE Fully-mixed, smooth with no lumps. Translucent when applied.

BASE Rubber Polymers

SOLVENT SYSTEM Naphtha, Acetone, PCBTF (Parachlorobenzotrifluoride)

THEORETICAL

COVERAGE

200 - 250 ft² / gal (18 - 23 m² / 3.8 L)

SOLIDS (% BY WT) 11.0 - 12.5%

VISCOSITY 200 cPs maximum, #2 Spindle @ 20 rpm

SPECIFIC GRAVITY 0.961 - 1.057

V.O.C. CONTENT (MAX) Does not exceed 250 g / L

FLASH POINT -4 °F (-20 °C)

PDS|GacoPrime – Low VOC Primer

Gaco.com | 800-813-1346

STORAGE STABILITY

Store out of direct sunlight. Shelf life of twelve (12) months can be expected if stored in original unopened container at temperatures between 60 °F - 80 °F (16 °C - 27 °C). Shelf life will be shortened if exposed to elevated temperatures.

E. APPLIED PRODUCT DATA:

PROPERTY DESCRIPTION

ADHESION

Excellent adhesion to:

• Weathered Single-Ply Membranes

• Galvanized Steel, Aluminum, Galvalume o Adhesion tests are strongly recommended, especially over previously coated or painted metal substrates.

o On rusty surfaces, remove loose rust and apply a rust-inhibiting metal primer before applying GacoPrime Low VOC Primer.

• Most existing elastomeric roof coatings.

o Existing silicone coatings should not be primed.

CHEMICAL

RESISTANCE

Enhanced chemical resistance when used in conjunction with GacoFlex Coatings.

FLAMMABILITY

GacoPrime Low VOC Primer is highly flammable. Keep away from flame and other ignition sources.

TOXICITY

Use only in well ventilated areas. Avoid skin contact and use neoprene or nitrile gloves. Wear safety glasses with side shields or goggles to prevent eye contact.

WEATHERABILITY

Not intended for continuous exposure to weather. Must be top coated after drying. Allow two (2) hour minimum for drying depending on ambient conditions.

F. APPLICATION:

STEP DESCRIPTION

THINNING Product should not be thinned.

MIXING

Mix thoroughly before and during use. A mechanical mixer should be used to ensure sufficient mixing of contents. Product will appear uniform after mixing and free of lumps.

SURFACE

PREPARATION

Surfaces to receive GacoPrime Low VOC Primer must be clean, dry and free of dust dirt and debris. Clean with a stiff bristle broom or rags to remove contaminants. Clean single-ply membrane and metal substrates with GacoWash Concentrated Cleaner and allow to dry completely prior to applying GacoPrime Low VOC Primer.

APPLICATION

Coverage Rate: Approximately 200 - 250 ft² / gal (18 - 23 m² / 3.8 L). Avoid puddling of primer on the surface. Required Minimum Wet Film Thickness (WFT) is 6 - 8 mils.

(1) BRUSH: Use solvent resistant brush and apply.

(2) ROLLER: Apply with a solvent resistant short nap roller

(3) SPRAY: Do not thin. Use pressure pot or airless sprayer to apply primer. Avoid puddling of primer on surface when spraying.

DRY TIME Allow GacoPrime Low VOC Primer to dry completely (approximately two (2) hours – dependent on ambient conditions). GacoPrime will dry to a slightly tacky film. Test the primer film by pressing firmly with a finger and removing. Properly dried film will be well-bonded to the substrate. If the film of applied product is able to be removed from the substrate, allow additional

PDS|GacoPrime – Low VOC Primer

Gaco.com | 800-813-1346 drying time. Application of GacoFlex Coating must be completed within twenty-four (24) hours from the start of GacoPrime Low VOC Primer Application.

IF GACOPRIME LOW VOC PRIMER IS LEFT EXPOSED TO THE

ENVIRONMENT LONGER THAN TWENTY-FOUR (24) HOURS, IT MUST

BE RE-APPLIED IN ORDER FOR A WARRANTABLE APPLICATION TO

OCCUR. Clean surface with GacoWash and allow to dry thoroughly. Re-apply GacoPrime Low VOC Primer at the specified coverage rate before applying a GacoFlex Roof Coating.

CLEAN UP Clean up tools and other item using GacoFlex T5110 Compliant Solvent or GacoFlex T5112 Thinner.

* For specific Health and Safety information, please refer to Safety Data Sheet (SDS).

Product Data Sheet (PDS): GacoRoofFoam™ F2733 Revised: 11/2023

Gaco.com 0196-331-800 |

GACOROOFFOAM™ F2733

SPRAY-APPLIED POLYURETHANE FOAM

A. PRODUCT DESCRIPTION:

GacoRoofFoam F2733 is an HFC blown (zero-ozone depleting) liquid spray system that cures to a medium-density rigid polyurethane insulation for roofing applications. GacoRoofFoam 2733 does not contain CFCs, HCFCs or other gases harmful to the ozone layer.

B. APPROVALS:

GacoRoofFoam 2733 meets ASTM E108 Class A rating for external fire exposure and exceeds the requirements of ASTM C1029 (Type III). This product is part of multiple system approval by UL and FM 4470 – Class 1. GacoRoofFoam F2733 has a severe hail rating when combined with GacoFlex S2100.

C. PACKAGED PRODUCT DATA*:

PROPERTY STANDARD / METHOD OBSERVED VALUE / DESCRIPTION

CHEMICAL

CLASSIFICATION

N/A

"A" Component: Contains polymeric isocyanate "B" Component: Contains polyol, catalysts and blowing agents

VISCOSITY

ASTM D2196 @ 77 °F

(25 °C)

“A” Component: 200 ± 50 cps “B” Component: 1150 ± 50 cps

SPECIFIC GRAVITY

ASTM D1638 @ 77 °F

(25 °C)

“A” Component: 1.23 S.G.

“B” Component: 1.17 S.G.

DENSITY

When measured @ 77 °F (25 °C)

“A” Component: 10.34 lb/gal (1.24 kg/L) “B” Component: 9.8 lb/gal (1.20 kg/L)

MIXING RATIO N/A “A” & “B” Component: 1:1 (by volume)

STORAGE STABILITY

When stored between 50 – 70 °F (10 – 21 °C)

“A” Component: 6 months “B” Component: 6 months

D. APPLIED PRODUCT DATA*:

PROPERTY STANDARD / METHOD OBSERVED VALUE / DESCRIPTION

NOMINAL DENSITY

(SPRAYED-IN-PLACE)

ASTM D1622

@ 77 °F (25 °C) 2.7 – 3.4 lb/ft³ (43.2 – 54.5 kg/L³)

R-VALUE (AGED) ASTM C518 R-6.5 h·ft²·°F/Btu @ 1 in (25 mm) R-25 h·ft²·°F/Btu @ 3.5 in (89 mm)

COMPRESSIVE

STRENGTH:

(PARALLEL TO RISE)

ASTM D1621

@ 77 °F (25 °C) 53.7 psi (370 kPa)

PDS | GACOROOFFOAM™ F2733 – SPRAY-APPLIED POLYURETHANE FOAM

Gaco.com 0196-331-800 |

TENSILE STRENGTH

ASTM D1623 @ 77 °F

(25 °C) 60.2 psi (415 kPa)

SHEER ASTM C273 44.1 psi (304 kPa)

WATER VAPOR

TRANSMISSION

ASTM E96 Desiccant Method @ 77 °F (25 °C)

0.98 perm-in

DIMENSIONAL

STABILITY

(28 DAYS)

ASTM D2126 @ 158 °F

(70 °C), 97 % RH

Width: 0.01 % (linear change) Length: 0.00 % (linear change) Depth: 0.00 % (linear change)

WATER ABSORPTION ASTM D2842 0.5 % (Passed)

CLOSED CELL

CONTENT

ASTM D2856C @ 77 °F

(25 °C) 98.2 %

SPREAD OF FLAME

ASTM E84 /

UL723 35 (Flame Spread Index)

RECOMMENDED

SERVICE

TEMPERATURE

RANGE

N/A -40 – 200 °F (-40 – 93°C)

AUTO-IGNITION TEMP N/A > 200 °F (> 93 °C)

E. PRODUCT INSTALLATION:

STEP INSTRUCTIONS

GENERAL

RECOMMENDATIONS

& APPLICATION

To ensure optimum performance, a minimum pass thickness of 0.75 in (19 mm) is recommended with the maximum not to exceed 1.5 in (38 mm) per pass. It is recommended that the resin side pre-heater be set 10 – 15 °F (-12 – -9 °C) warmer than the Isocyanate side to equalize component viscosities. Maximum spray equipment temperature setting is 130 °F (54 °C).

NOTE: This system can be sprayed on clean dry substrates down to 45 °F (7°C). GacoRoofFoam 2733 must not be applied if the temperature during application is less than 5 degrees above the dew point.

NOTE: All hot work, i.e. welding, torches and open flame work must be completed prior to installation of the polyurethane foam insulation.

Smoking in the same area while the spray polyurethane foam insulation is being applied shall be strictly prohibited.

* For specific Safety and Health information please refer to the appropriate Safety Data Sheet that is associated with this product.

Project Number: Date:

Project Title Project Location Offeror Name Offeror Street Offeror City State Zip

Item Labor Cost Material Cost Total Cost Division 1 $ - $ - $ - Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - - Division 8 - - - Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - - Division 14 - - - Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - - Division 27 - - - Division 28 - - - Division 31 - - - Division 32 - - - Division 33 - - - Division 34 - - -

Overhead % - Profit % - Bond % -

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

Total Base Offer Cost

Overhead/Profit Subtotals :

Division Subtotals :

0.00% 0.00% 0.00%

Exterior Improvements Utilities Transportation Subtotal

Communications Electronic Safety & Security Earthwork

Plumbing

HVAC

Electrical

Special Construction Conveying Equipment Fire Suppression

Specialties Equipment Furnishings

Thermal & Moisture Protect Doors and Windows Finishes

Masonry Metals Wood and Plastic

General Requirements Existing Conditions Concrete

Description

Base Offer Cost Breakdown

����0'� ������1� ��&�� �2��3#�

��4 ������$�������"��5������� �������������6�$��������5������������-7� ���2��*���������8� ��-7� ���2��*�������8�9'%������� ����&����&����-7� ���2��*����������"��

2����

2���������&���������1� ��&�� �2��3#�

��4

������1� ��&�� �2��3#�

��+�������4 ��&�����;� �+��'�.�0.�0'<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<=)/��&��

����������������='�-7� ���2��*���������8������==���

�'������������������==����6��� ���7�������.�'$':����='�!&��

������7�� ����0�

2�����6 �����6�$���������==������������������������������=��������� ���&���6�$���������==������������������������������=������������� �:��/����������==������������������������������=��&�$&��0�/

��6����6������ �='�-7� ���2��*�������8�9������== �����6����,�����"��:���������=��$�������"����������

������6���

���������"����==�7�������

2�����6 �����6�$�������������==������������������������������=�� ���&���6�$������������� �:==������������������������������=���/�������&�$&��0�/

�����-7� ���2��*�������������6�$�������6��������1�������������"'�)/��&���

2������"� /��&�-7� ���2��*������������

/�6

���&��6�$�������������

����5����'4�����

����5��������������6 ����������&��-7� ���2��*����������2����������&������666'� 2�6&��$

��'A

"#���$$$$$$$$$$$$$$$$$$$$$$$$%��&$&'�������������&$�&�����������������������������������������������������������������(�)�'��������'�������
��������������������������������������������������������(�)�!���*�) #�+� ,��-!$$$$$$$$$%���$����������������$�
������������������������������������������������������������������#�(�&�'������������������������������������������������������������������������#�(�� (!�. �/012���#34���,30�����������5$$$$$$$$$$$$$$$$$$%��&$����������������$
�����������������������������������������������������������������6��#�,��&�������������������������������������������������������������������������#�,����-�(�! ($$$$$$$$$$$$$$$$%���$����������&$''�7�78����!���*�������*���9:03;���/3����81����'<�8���/�=31�0;������>3����;�����3���93���3>����?�/��3��

<�8���/�=31�0;������>3�� �93��=���3����;�����3>����?�/�����,�/���3��)�;�(��2��@��8$�)��2��30�2�;�*��!�4�A���B��+�;@�-�93���0�+�;@� �2�:��2��/���+�;@�#�83��+�;@�,������B��+�;@��=��C���?����+�;@�:01���=������2�;��>�����=��C���?���@���2�(=����9���+�;$������������������������������������������������������������������!D ��'&������&�����������������������������������������������������������������)�� ���*������/C=3���E/�?��3�����/C=3�$$$$$$$%��&$����������������$��������������������������������������������������������������������!D ��'&������&�����������������������������������������������������������������)�� ���*��(3�/�����)19:$$$$$$$$$%���$&���������������$��������������������������������������������������������������������!D ��'&������&�����������������������������������������������������������������)�� ���*��(����������� 00�(������&���3�����2������8�034$$$$$$$$$$$$$$$$$$$$$$$%��&$�&��������������$������� 00�(�������?��������3�F�������0�/���/��34��F�#1>>����������339�(�����$$$$$$$$$$$$$$$$$%���$����������������$��

� ����������������������������������������������������� ����!�+!�,���-!���.����&���/���0��1)�1��&2���������������������������������������������������������������������������������������������������������������"34(

� ����������������������������������������������������� ��"�"��������-��)&1/���56#����"�7�8�4������/���.7����1������ ��2������������ ��������������������������������������������������������������������������������������"34(

� ����������������������������������������������������� ��"34(9������������������������������ ��������������������������������������������������������������������������������������0��3

������������������������������������������������������� ��0"���,3����������-�������07���%&���2��������������������������
��������������

������������������������������������������������������������������05��

� ����������������������������������������������������� ��05����(��#3�+!�,��8���)&1/�����56#��:1)�������&&��� ���������������������������������������������������������������������������������;��04�3� ������������������������������������������������������� ���#�"�����8���)&1/�����#) 1���)�&����&�� ��������&&��� �8�:�<=�&&��������*�� ���7�� 8�:�<=�&&���5�� �� 8�� �%8�(���&���0�1/������&&���

����(����(#0!���!�����������05�������� � ����!�+!�,��8������!�����������������������������������

��3#9!���$��� ��������&8�����)&1/�� ���.����(��

��3#9!���$��"�7�&�<������������������� ����;;������������ �

������'����()��*������������������������������������������������!��������+������������������������������� ������������������������"���(�������������������������������������������������������,-.�/�"0�����/ 1)��� 23�����������!� ������������� �� ����,-.�/�"0������ 23����������� ������������������66666666666666666666666666666666666666666666666666666666666666667��/��(�6���2�89����:��)��$2�85���;

��2��;:�)��;

�18'< )���:8 �4%82%�4���8'<�8$�8'28��':���================================================================���7 �3��$�8'�:%8$�2��$$8;82�:8 '�1�*�5���':8:����:

���%8<%��18'81 1�4�<�� '�����>�2 :89����������� ��?���� �@� ;�:%��4�<���:��18'�:8 ��1 ���8';

�1�:8 :��:%�:�:%�18'81 1�4�<����A 8��1�':$� ;��>�2 :89����������� ������' :2 ���':�*�5�8'<��';

�2����$�:

��'*�2 ':��2:� ':��2:�:

4%82%�:%��$:�:�$� 8$8�'�&� ��B8$$8$$8))8&�8'2� �8'<:%�8���<�'28�$&�������)��:*�# :����>�2 :89��������?��@��!���&��$:�5�8$%8'<���8��(823����9�;

':��2:

�$��))�8�$�:

�����2 ':��2:$�$ 5C�2:�:

�:%�/�98$6 �2 '��2:�;

��4%82%�:%��2 ':��2:�8$��4������?�'���'*$ �828:�:8 '�4�$�8$$ ���;:���D�' ��*��&� ������";�:%8$2 ':��2:�8$�2 9�����5*�:%����&�:%��2 ':��2:

��1 98���1)� *��$�48:%���% ;�)�8��$823����9��;

���9��*�!��% �$:%�*�4 �3&� ;�)�8��$823����9����2%�*�����1)� *��$�1 $:�5��)��18::���:

$��)�8��$823����9��;

��:%�8� 4'�8��'�$$&�8'C :%���%���:%6����:���'���$&�8'2� �8'<)��9�':89��2���E�:

��$$8$:���;�18�*�1�15���?

'�4% �8$�83��;�18�*�:

�:%���1)� *��@�4% �8$�8��&�8'C :%��%���:%6����:���'���$&�8'2� �8'<�)��9�':89��2���E� �:8'<�;� 1&� ��$$8$:���;�18�*�1�15���?

'�4% �8$�83��;�18�*�:

�:%���1)� *��@�4% �8$���982:81� 1�$:8298 ��'2�&�$�> ��$:��38'<������8:8 '���8';

�1�:8 '�2 ':��2:

����A 8��1�':$��'��4 �3���)� :�2:8 '����:%����8$��9�8��5����:%::)$���444�� 9��<�'28�$�4%��< 9��'1�':62 ':��2:$�,'�8$:���2��$$8;82�:8 ��4 �3�' :�8'2� ����48:%8':%��$2 ;�:%��2��$$8;82�:8 '$��8$:���1�*�5���������;:���4���� 98����8'�:%����5 ��$:�'����$�2 ':��2:�2�� $�$? �-+������?�@�?�@�?888@@�6666666666666666666666666666666666666666666666666666666666666666�%��5 ;���2%�4�<����:��18'�:8 '��8$:$�:%��2��$$8;82�:8 '�'��4�<����:�$�:%�:�%�9��5��'�;

�5��)��9�8�8'<�;

�������$%�����&'(�)*+,-.**/�*01*+12*+3��'(�)��

���������������������������*01*+12*+3��

�4����+�2*+3��������������������������� ���������������������������������������� 56 ��������������

5��

��$%�����&�!�( 2*+2.**0�/1+712*+3��!���������� ���������������8���������� ������2*+2��

����������%����������**0��������%�������� ���������������������������������������/1+712*+3���������

5��

��������8���������������������

9����������+**:��

�������������$; )'($&�� "#.<=.**+**-12,12*+3��� "#��������� ���������������������������������������*-12,12*+3���������

���������4�������� ����������������������156 �������

���
��)&���������������������)��

�������0��0�� �������� 1���������

������������������������������������
���

�%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%�������������������2�3&�4&.&!)56�.576��88&�9��8!7�&��#���:������������ �����������0�.������

;����2�����

�: ���4�����

�7 �������������2�����

�: ��6��� ���7��������������6��� ���7��������������

���������������4����%=��
����������������5����������
������������
�������������/����
������������
�$�������
���������

�2���������

����
��������������
������������������������������

�2����4������

����2������(������������=��
������

�2����4������ �������������2�����

�: ���4����� ������������>����4������� �� ��9�� ��������������**�� ��/�6�2�������������2���� /�4���*�#*����5�������

��� ������2�����

������ ���������� !�8����#�?��

����� !�8����+���2������ (������������2�����

�������������������>����4�������
����9����������������**��

��/�6�2�������������2����

/�4���*�#*.�����<���������
����������

���/��� A���� ��� �����������$���5������

�����������
����������/��
���������!������=��
��������������2������������=��
����2������(�������������

������������>����4������� �� ��9�� ��������������**��

��/�6�2�

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A101

Fi le

P at h

/9 /2

:5

3:

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Chkd ByDate:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A101

A

Fi le

P at h

FOR REFERENCE ONLY

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Chkd By BGRevisions: Date: BG

WPB VAHCS CAMPUS MAP

AREA OF CONSTRUCTION CAMPUS MAP 2024

WEST PALM BEACH VA MEDICAL CTR

04/12/2024

7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262

WEST PALM BEACH VA MEDICAL CENTER

N

Date:Revisions: Date:

BEG 3-18-22

CONTRACTOR

TRAILERS

AREA OF CONSTRUCTION

Building #1

548-24-155

BEE LINE HIGHW

AY

N 53° 41'32" E 1046.16'

N

1°3

'4

" E

.5 7'

L A

K E

LAKE # 4

LAK

E

EXISTING WETLANDS

N

1°4

'2

" E

.5 7'

LAKE #3

WATER TOWER

LOT#10

L

O T

#16

LOT # 17

LOT #14

LOT # 13

LOT #20

Catch Basin

LOT #12

LO

T#21

LOT#18 / 19

L O

T

C1-

B

CORR.

RAMP

LAKE # 2

PARKING

UPPER LEVEL

PARKING

GARAGE

PARKING

PARKING

PARKING

GARAGE

20.3020

LAKE # 6

LOT # 22

LOT # 11

MAIN HOSPITAL

CLC - COMMUNITY LIVING CENTER

FISHER HOUSE4

EMERGENCY WELL (PUMP HOUSE)5

VETERAN RESOURCE CENTER6

OFFICE OF HIGH RELIABILITY12

WAREHOUSE13

SUBSTANCE/MENTAL HEALTH (PTSD CLINIC)14

CANCER CENTER15

MENTAL HEALTH OUT PATIENT (2500 SQFT CSI 16

BUILDING

NUMBER BUILDING

PROJECT MENTAL HEALTH/HOMELESS PROGRAM)

BUILDING

NUMBER BUILDING

PET/CT ADDITION18

HOSPICE19

MAINTENANCE BUILDING20

MRI BUILDING21

DOMICILIARY22

DECON (IN TUNNEL)17

BUILDING

NUMBER BUILDING

8 MCCR (WOODBINE - LEASE NOT ON THIS MAP)

M/C STORAGE

VBA/VSO BLDG.

TRANSPORTATION TRAILER11

UNDER CONSTRUCTION7

BUILDING

NUMBER BUILDING

0 64' 128' 192' 256' 320'32'

16' 48'

AutoCAD SHX Text

BLUE HERON BLVD.

AutoCAD SHX Text

MILITARY TRAIL

AutoCAD SHX Text

ASPHALT ROAD

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Planter

AutoCAD SHX Text Planter

AutoCAD SHX Text Plant.

AutoCAD SHX Text Drop-off

AutoCAD SHX Text Plant.

AutoCAD SHX Text Planter

AutoCAD SHX Text

7" OAK

AutoCAD SHX Text

7" OAK

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

10" PALM

AutoCAD SHX Text

10" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

Bldg_1_Basement Clean Laundry-Section
Sheets and Views
Bldg_1_Basement Clean Laundry-Section B Laundry CLN
LOS1 (2 pages)
VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)
LOS2
PDS-GACOFLEX™-SF2000-SEAMSEAL™-SOLVENT-FREE-SILICONE-SEALANT
PDS-GACOPRIME-LOW-VOC-PRIMER
PDS-GACOROOFFOAM™-F2733-SPRAY-APPLIED-POLYURETHANE-FOAM
S02 Base Offer Price Breakdown
Base Offer
S02 WD FL20240220 05.31.2024
Site Plan 2023 - AOC-General
Sheets and Views
Site Plan 2023 - AOC-General

File details come from the government source that posted it. Updated .