This document is a Performance Work Statement (PWS) that outlines the requirements for debris removal services at the log boom catchment area of the Franklin Falls Dam in Franklin, NH. The U.S. Army Corps of Engineers - New England District is seeking a contractor to provide all transportation, equipment, labor, and job planning to remove approximately 12.7 acres of woody and non-woody debris from the catchment area. All debris must be properly disposed of off government property in accordance with federal, state, and local regulations. The project area is located along the Pemigewasset River, and this procurement is set-aside for small business vendors under the NAICS code 561990 with a size standard of $16.5 million. The solicitation number is W912WJ24Q0115, and the applicable NAICS code is 561990 with a small business size standard of $16.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ24Q0115.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEBRIS REMOVAL – LOG BOOM CATCHMENT AREA
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS DAM
FRANKLIN, NH
PERFORMANCE WORK STATEMENT
Informational Photos
Informational Photo 1: This picture shows two debris piles within the log boom catchment area. The picture was taken April 9th 2024, with a Park Ranger truck (Dodge Ram 1500 Classic, 4-door pickup) near the debris piles to help depict scale.
Informational Photo 2: This picture taken April 9th, 2024, shows the same two debris piles in above photo with a different vantage point.
FRANKLIN FALLS DAM
Informational Photo 3: This picture was taken April 9th, 2024 and depicts the northeastern section of the catchment area that will need to be cleared of all woody and non-woody debris. Please note that some debris is disguised by vegetation that has grown in.
FRANKLIN FALLS DAM
Informational Photo 4: This picture was taken April 9th, 2024 and depicts a more detailed visual of the northeastern section of the catchment area (looking southeast from the access road) that will need to be cleared of all woody and non-woody debris. Please note that some debris is disguised by vegetation that has grown in.
FRANKLIN FALLS DAM
Informational Photo 5: This picture was taken April 9th, 2024 and depicts the southwestern section of the catchment area that will need to be cleared of all woody and non-woody debris. Please note that some debris is disguised by vegetation that has grown in.
FRANKLIN FALLS DAM
Informational Maps
Informational Map 1: Approximate locations of the service area and access roads. The blue shaded area is approximately 12.7 acres.
FRANKLIN FALLS DAM
Informational Maps
Informational Map 2: Depiction of the service area outlined in blue – approximately 12.7 acres.