Attachments.pdf
PDF 2 MB Posted
- Solicitation number
- W912WJ21Q0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ21Q0029.pdf | ||
| Bid Schedule - Western CT.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J._ _ _ _ c -e— 4.-7" —4-
5 8"--
Mech.
Storage
.. 10' 2" b
Test/Conf.
OF
4'-6
&) Sec. CI.
Station Cmdr.
19'-6"
U.S. Army Career Center 334 Main Street Ansonia, CT 06401 Approx. 1258 SF +/-
EXHIBIT A
STORAGE
OFFICE
ARMY
ELECTRIC
PANEL
MEN'S
LAV
WOMEN'S
LAV
STORAGE
oco
JAN
NAVY
STORAGE
8, 2 16116'
VAULT
DISPLAY
NAVY
STORAGE
ARMED FORCES CAREER CENTER
4490 MAIN STREET
BRIDGEPORT, CT 06606
APPROX 4,525 SQ FT
EXHIBIT "A"
UP
DF
Navy
Army
Air Force Marine Corps
Common Test Room
Armed Forces Career Center 65 Laurel Street Bristol, CT Approx 2400 Sq. Ft. +/-
N
PROJECT
NORTH
U.S. ARMED FORCES CAREER CENTER
PLUMTREES PLAZA
61 NEWTOWN ROAD, UNIT 13
DANBURY, CT 06810
APPROX. 3,360 SQ FT
18 5"
—8' 0" 3' 5"
LAV
STORAGE
'Haler F01111E1111
14'-2" to
8 STATION
— COMMANDER
Aga
TEST
co4'-0"
US ARMY CAREER CENTER
231 BEDFORD STREET
STAMFORD, CT
Approximately 1,400 SF
PLUS BASEMENT STORAGE
17-
UP—
rimmilftr
BASEMEN
EXHIBIT "
18'-5"
DISPLAY
AREA
r4:
514 11
.;1 zz!-0"
•1:
24-0' z4!4"
581 Wolcott Street Waterbury, CT 06705 Armed Forces Career Center ct.
In o tr"-c.,/ 6 n-, 13.'0 -
—R
D15PLAY AREA
I ;'\I
\ _r.s s
LAV
FANDARMY AFANDARMY LAV !
TORAGE TESTING
60 +/-SO. FT. 50+1- SQ. FT. i \:j Wt:<Lftr <~j .$1 ;
' L! .fovn+6•..,., fs)•
.hl.i AFOFFICE ll APPROX. 280+1- SO. FT.
ARMY t. OFFICE -.
APPROX. 373+/- SQ. FT. J_j
MARINE STORAGEITESTING AREA /'1:
lUI J
MARINE CORPS OFFICE
APPROX 280 SO .FT.
i
/6 . --?> Jl /l ;
( pq; ' t:::- /3, 3" .__;, ~---:l:f\ ... ,.
, / '· I· .......... nuu dr.r.t~ul{J ~S nul to scale
A&J PLAZA
453 WINSTED ROAD
TORRINGTON, CT 06790
APPROX. 1,416 SO. FT.
EXHtB,T 11A11
SERVICES TO BE PROVIDED: M T W T F TOTAL M T W T F TOTAL M T W T F TOTAL M T W T F TOTAL
NOTE: JANITORIAL CONTRACTORS MUST WEAR IDENTIFICATION BADGES
AT ALL TIMES WHILE CLEANING THE MILITARY FACILITIES.
To be accomplished on the first week of the Month
Insert Date when last provided
Insert Date if provided this month
SPOT CLEAN CARPETS
CHANGE HVAC FILTERS
WASH/DISINFECT ALL TRASH RECEPTACLES
Military Service Representative Name concurring that ALL required tasks were completed for each week (Please Print)
DAMP DUST ALL SURFACES****
CLEAN HVAC RETURN, DIFFUSER & GRILLES
CLEAN GLASS SURFACES (EXT & INT) INSIDE & OUT
DE-SCALE TOILET BOWLS & URINALS
REPLACE LIGHT BULBS AND TUBES (FLUORESCENT
OR LED) FOR LIGHT FIXTURES (RELAMPING)
Contractor Representative Name certifying that ALL required tasks were completed for each week (Please Print)
SHAMPOO ALL CARPETS, REMOVING ALL DIRT AND
NON-PERM SPOTS OR STAINS***
4x - Year
CLEAN LIGHT FIXTURES
HIGH DUSTING/CLEANING
1x - Month
As Required
SCAN & EMAIL Checklist at end of each month to the following POCs: JANITORIAL CHECKLIST FOR FACILITIES COE POC, Phone Number, and assigned territory Address___________________________
Recruiting Station ID:______________
MONTH/YEAR__________________
CALENDAR
DATES:
NOTATE "RATING" AND ANY COMMENTS
ON THE QUALITY OF THE WORK BELOW.
FREQUENCY
REQUIRED
TRASH REMOVAL & CHANGE LINERS *
CLEAN & DISINFECT ALL REST ROOM FIXTURES AND
FLOORS **
FURNISH RESTROOM SUPPLIES
VACUUM ALL FLOORS & UPHOLSTERED FURNITURE
DAMP MOP ALL HARD SURFACE FLOORS
CLEAN AND DISINFECT WATER FOUNTAIN, AND WIPE
DRY
CLEAN & DISINFECT ALL HIGH-TOUCH SURFACES
(HANDLES, KNOBS, BUTTONS, KEYPADS, SWITCHES)
SPOT CLEAN ENTRANCE DOOR & INTERIOR GLASS
TO REMOVE FINGERPRINTS & SMEARS
FORM UPDATED 4/30/2020 SIGNATURE
*** Steam clean if required to remove RECRUITER TELEPHONE__________________________________**** Damp dust in accordance with the PWS
I - Insufficient (Supplies)U - Unsatisfactory
RATING LEGEND:
** No rust, encrustation or water rings shall exist RECRUITER IN CHARGE___________________________________S - Satisfactory M - Marginal
* Change waste basket liners as necessary
2X or 3X - Week (USACE
TO SPECIFY)
1x - Year
To be accomplished ONCE each quarter in MAR, JUN, SEP and DEC
Insert Date if provided this month
To be accomplished TWICE each year in APR & OCT
To be accomplished ONCE each year in OCT
Insert Date when last provided
2x - Year
Quality Assurance Surveillance Plan (QASP)
Performance Objective
Performance
Standard
Quality Level
Methods of Inspection and
Frequency
Remedy
Schedule.
The contractor shall conduct tasking within the janitorial schedule provided with the
Performance Work
Statement (PWS).
PWS is performed without causing programmatic delay to the Government nor violating the schedule provided in the PWS.
Satisfactory:
Performance and products meet the standard with few exceptions, resulting in minimal delays.
Marginal: Performance and products result in moderate delay or impact to programs.
Unsatisfactory:
Performance and products result in unacceptable (the
Government may incur additional costs) delay or impact to programs.
Insufficient:
Restroom supplies are not being provided.
Each category will be evaluated upon deliverable submissions according the scope.
Inspections will be based upon Government teammates’ evaluation reports, verified customer complaints or 100% inspection method through the performance period.
Unscheduled inspections may be performed at any time. The overall performance rating will be assigned by the
Contracting Officer’s
Representative (COR).
Contractor teammates input and customer input/ surveys may also be considered at the discretion of the COR.
The contractor shall develop a plan for recovery.
Continuous review until performance is satisfactory or better.
Elevate to higher level of contract management if actions fail to result in improvement.
If the acceptable scheduling level falls below Satisfactory, payments may be affected, and/or a Cure
Notice and/or Show
Cause Letter may be issued which may result in contract termination.
| 2 - Ansonia, CT (334 Main Street) - Floor Plan.pdf |
| Page 1 |
| 3 - Bridgeport, CT - Floor Plan.pdf |
| Page 1 |
| 6 - Stamford, CT (231 BEDFORD ST) - Floor Plan.pdf |
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 |
| Page 15 |
| Page 16 |
| Page 17 |
| Page 18 |
| Page 19 |
| Page 20 |
| Page 21 |
| Page 22 |
| Page 23 |
| Page 24 |
| Page 25 |
| Page 26 |
| Page 27 |
| 8 - Waterbury, CT - Floor Plan.pdf |
| Page 1 |
File details come from the government source that posted it. Updated .