Attachments.pdf
PDF 1 MB Posted
- Attached to
- Chemical Vegetation Spraying, Blackwater Dam, Webster, NH and Franklin Falls Dam, Franklin, NH
- Solicitation number
- W912WJ23Q0138
About this file
This performance work statement outlines chemical vegetation control services required at two dam locations in New Hampshire. The U.S. Army Corps of Engineers seeks a contractor to treat various invasive plant species such as Japanese knotweed, sumac and woody vegetation at Franklin Falls Dam and Blackwater Dam. The document provides maps and photos specifying treatment areas at each location, with some areas only accessible by foot. The related solicitation seeks these services for one base year and four option years, with an anticipated award date in late 2023. The opportunity is set aside for small businesses and involves the Department of the Army Corps of Engineers Engineering District New England.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ23Q0138-0001.pdf | ||
| Solicitation W912WJ23Q0138.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHEMICAL VEGETATION CONTROL SERVICES
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS AND BLACKWATER DAMS
PERFORMANCE WORK STATEMENT
Informational Map
Informational Map 1: Franklin Falls Dam
Informational Map 2: How to access areas to be treated at the Franklin Falls Dam Area.
PLEASE NOTE: The pink area is only accessible by foot. The Contractor must provide their own means of access and egress to this area.
Informational Map 3: Overlook Recreation Area, Access from Route 3 in Franklin NH.
Woody Vegetation to be sprayed (Sumac).
Informational Map 4: Coolidge Woods Recreation Area. Access from town-maintained road, Coolidge Woods Road. Japanese Knotweed to be treated.
Less than an acre
Informational Photo
Informational Photo 1: Reference View of Spillway at Franklin Falls Dam.
Informational Map 5: Blackwater Dam
PLEASE NOTE: The pink area is only accessible by foot. The Contractor must provide their own means of access and egress to this area.
Informational Map 6: Little Hill Dike
File details come from the government source that posted it. Updated .