BATHROOM DEMOLITION AND TRAILER PAD CONSTRUCTION

U.S. ARMY CORPS OF ENGINEERS

NORTHFIELD DAM

THOMASTON, CT

Performance Work Statement

Figure 1: Rough Site Plan

NORTHFIELD DAM

Figure 2: Overview of Area showing existing Bathroom and proposed Pad, Walkway and Drain location

NORTHFIELD DAM

Figure 3: Rough Site plan with Parking Pad details

NORTHFIELD DAM

Figure 4: View of Existing Bathroom from paved road showing gate and location of water vault and wood covered drain

NORTHFIELD DAM

Figure 5: View of Existing Bathroom from gravel road

NORTHFIELD DAM

Figure 6: South view of existing bathroom and area of proposed pad from gravel road. Note: Vault in right side of photo with cone on top

NORTHFIELD DAM

Figure 7: Inside of water vault

NORTHFIELD DAM

Figure 8: View of Existing 65’ Walkway

NORTHFIELD DAM

Figure 9: View of Existing 45’ Walkway

NORTHFIELD DAM

Figure 10: View of Existing Bathroom from South

NORTHFIELD DAM

Informational Photo 11: View of Existing Bathroom from East

NORTHFIELD DAM

Figure 12: View of Existing Bathroom from North

NORTHFIELD DAM

Figure 13: As Built Drawing of Bathroom

NORTHFIELD DAM

Figure 14: As Built Drawing of Bathroom