Attachments 26QA131.pdf

PDF 486 KB Posted

Attached to
Snow Removal and Sanding Services, Barre Falls Dam, Hubbardston, Barre, and Oakham, MA
Solicitation number
W912WJQA131
Issued by

About this file

This document is a Performance Work Statement (PWS) for snow removal and sanding services at Barre Falls Dam, operated by the U.S. Army Corps of Engineers in Hubbardston, Barre, and Oakham, Massachusetts.

The PWS defines snow removal and sanding service requirements across two compartments at the facility. Compartment 1 encompasses the primary dam operations area and includes multiple service locations: the Old Operator's Quarters, Stone Road Parking Lot, Overlook Parking Lot, Project Office, Picnic Area Parking Lot, and Cemetery Parking Lot, with access via the Tri Harding Hill & DCR Boundary Gate. Services required include plowing, sanding, and shoveling of designated areas, with snow piles to be located at specified positions shown on the detailed maps. The Project Office Area requires attention to the Spillway Bridge with caution regarding bridge seams, and includes gates requiring opening/closing and a dumpster gate. Compartment 2, located off Route 122 in Oakham, contains the Route 122 Parking Lot and associated Coldbrook Road approach; the PWS notes that the Department of Conservation and Recreation (DCR) may close the gate around January 1st depending on snow coverage, requiring contractor access flexibility either through key provision or alternative access via the main Barre Falls Project Area. The document provides detailed aerial maps and zoomed perspectives identifying plowing/sanding areas (shown in yellow), shoveling areas (diagonal striping), snow pile locations (blue), and gates, establishing clear visual parameters for service performance.

View the file

Other files

File Type Posted
Amendment W912WJ26QA131-0001.pdf PDF
Solicitation W912WJ26QA131.pdf PDF
Solicitation Survey 26QA131.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SNOW REMOVAL AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

BARRE FALLS DAM

HUBBARDSTON, BARRE, AND OAKHAM, MA

PERFORMANCE WORK STATEMENT

Figure 1: Plowing, sanding and shoveling areas in Compartment 1.

BARRE FALLS DAM

HUBBARDSTON, BARRE, AND OAKHAM, MA

PERFORMANCE WORK STATEMENT

Figure 2: Zoomed in perspective of Operator’s Quarters in Compartment 1 highlighting the plowing, sanding, shoveling areas, and desired snow pile locations.

BARRE FALLS DAM

HUBBARDSTON, BARRE, AND OAKHAM, MA

PERFORMANCE WORK STATEMENT

Figure 3: Zoomed in perspective of Project Office Area in Compartment 1 highlighting the plowing, sanding, shoveling areas, and desired snow pile locations.

BARRE FALLS DAM

HUBBARDSTON, BARRE, AND OAKHAM, MA

PERFORMANCE WORK STATEMENT

Figure 4: Plowing and sanding areas located in Compartment 2, situated off Route 122 in Oakham, MA.

File details come from the government source that posted it. Updated .