This document contains technical specifications and mapping details for boundary marking work at West Thompson Dam, managed by the U.S. Army Corps of Engineers New England District. The project involves marking approximately 4 miles of the USACE boundary line, commencing at point WTL-024 and concluding at point WTL-065J. The work is scheduled for completion in 2026 and is located in Connecticut, encompassing areas bounded by roads including Brickyard Road, Fabyan Road, Red Bridge Road, Gaumond Road, Cheney Road, and Kapitulik Road.
The boundary marking specifications require contractors to blaze trees within 4 feet of the property line with standardized markings consisting of 6-inch by 3-inch rectangular painted blazes in red and white. Blazes must be positioned 5 feet above ground level on trees located directly on the Corps property line (line trees) and on adjacent trees within the specified 4-foot buffer zone (face blaze trees). All signage must face toward adjacent private property to clearly demarcate the boundary between U.S. Army Corps of Engineers land and private property. Corner trees at boundary monuments require specific marking treatment with both line and face blazes. Figure 1 provides the overall project map, while Figures 2 and 3 present detailed technical drawings illustrating proper blaze placement, size specifications, and tree selection criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ26QA047.pdf | ||
| Amendment W912WJ26QA047-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Br ick ya rd
Rd
Fa by an Rd
Red Bridge Rd
Ga um on d R d
Cheney R d
Kapitul ik Rd
Fabyan Rd
Ravenelle Rd
START at
WTL-024
FINISH at
WTL-065J
WEST THOMPSON DAM U.S. ARMY CORPS OF ENGINEERS
BUILDING STRONG ®
FIGURE 1
2026 BOUNDARY MARKING
APPROXIMATELY 4 MILES
WEST THOMPSON DAM
USACE Boundary Line
Boundary Line to be Marked in 2026 Approximately 4 miles
0 0.25 0.5 0.75 10.125 Miles a a aaa a
Figure 2
US ARMY CORPS OF ENGINEERS LAND
PRIVATE PROPERTY
BOUNDARY
MONUMENT
LINE
TREESAME
FACE
BLAZE6"
3" REDWHITE
CORNER
TREE
BOUNDARY MARKING
SPECIFICATIONSBLAZE PLACEMENT
AND SIZE
BLM-01
ALL SIGNS
FACE
ADJACENT
PROPERTY
BLAZE SHOULD
BE 5 FEET OFF
THE GROUND
a aa aaa
BOUNDARY MARKING
SPECIFICATIONSTREES TO BE BLAZED
Figure 3
CORPS PROPERTY LINE
LINE TREE
FACE BLAZE
ONLY BLAZE
TREES WITHIN
4 FEET OF
BOUNDARY
PRIVATE PROPERTY