Attachments 26QA019.pdf
PDF 203 KB Posted
- Solicitation number
- W912WJ26QA019
About this file
This document is a Supply Requirement for Playground Equipment by the U.S. Army Corps of Engineers at Edward MacDowell Dam in Peterborough, New Hampshire. The file includes multiple example photos demonstrating playground structures that meet or do not meet the agency's design and color requirements.
The images showcase various playground equipment configurations, including a multi-level play structure with slides, climbing elements, and platforms (Example Photo 1A), a detailed technical drawing of the structure's layout (Example Photo 1B), alternative playground designs that do not meet color specifications (Example Photos 2A and 2B), and a swing set structure (Example Photo 3) that satisfies both design and color requirements. The playground equipment is primarily depicted in green and neutral colors, with specific design elements like guard walls, transfer stations, climbers, and multiple types of slides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA019-0002.pdf | ||
| Amendment W912WJ26QA019-0001.pdf | ||
| Solicitation W912WJ26QA019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAYGROUND EQUIPMENT
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL DAM
PETERBOROUGH, NH
SUPPLY REQUIREMENT
Example Photo 1A – Basic representation of a playground structure that would satisfy general design and color requirements.
EDWARD MACDOWELL DAM
Example Photo 1B: Basic drawing representation of a playground structure that would satisfy general design and color requirements.
EDWARD MACDOWELL DAM
Example Photo 2A: Basic representation of a playground structure that would satisfy general design requirements ONLY and does NOT meet color requirements.
EDWARD MACDOWELL DAM
Example Photo 2B: Basic representation of a playground structure that would satisfy general design requirements ONLY and does NOT meet color requirements.
EDWARD MACDOWELL DAM
Example Photo 3: Basic representation of a swing set structure that would satisfy design and color requirements.
File details come from the government source that posted it. Updated .