Attachment5_-_Subcontracting_Worksheet.docx
DOCX document 95 KB Posted
- Attached to
- Lagoon & Access Road Repair - Death Valley (DEVA) Federal contract opportunity
- Solicitation number
- 140PS125B0002
About this file
This document is a Subcontracting Worksheet for a National Park Service contract (Solicitation 140PS125B0002) for Lagoon & Access Road Repair at Death Valley National Park. The worksheet provides a detailed methodology for calculating subcontractor labor percentages, demonstrating compliance with Federal Acquisition Regulation (FAR) Clause 52.219-14. The document includes specific guidelines for calculating direct labor, fringe benefits, labor overhead, and subcontracting labor cost percentages, with a sample calculation showing a 21.43% subcontracting labor percentage. Key regulatory requirements include a mandate that prime contractors cannot pay more than 85% of the contract amount to subcontractors that are not similarly situated entities, and that prime or similarly situated entities must perform a minimum of 15% of the work, excluding material costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140PS125B0002_Amd_0002.pdf | ||
| Sol_140PS125B0002_Amd_0001.pdf | ||
| Site_Visit_Sign-In_0001.pdf | ||
| Attachment_2_-_DEVA_339146_SPECIFICATION_SECTION_312000_EARTH_MOVING.DOC | DOC document | |
| Sealed_Bidding_UCF.pdf | ||
| Attachment_4_-_Wage_Determination_CA20250020_07_04_2025.pdf | ||
| Attachment_3_-_DEVA_704_Aggregate_Spec.pdf | ||
| Attachment_1_-_Statement_of_Work.docx | DOCX document | |
| Sol_140PS125B0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - STRATEGIC
Washington, D.C., 20242
28 July 2025
SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET
SOLICITATION 140PS125B0002 – Lagoon & Access Rd Repair - DEVA
PRIME CONTRACTOR: _________________________ SOURCE: ________________________
SUBCONTRACTOR: ___________________________ SOURCE: ________________________
SAMPLE SAMPLE SAMPLE
To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).
a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
e) Next, using the formula below, calculate the subcontracting labor percentage.
____(D)____
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
In accordance with FAR Clause 52.219-14(e)(3), General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Therefore, the prime contractor or similarly situated entities shall perform a minimum of 15 percent of the work, excluding the cost of materials.
NPS-National Capital Area Page 1 of 1
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $250.00 $50.00
FRINGE BENEFITS $300.00 $100.00
SUB TOTAL (A)$550 (B)$150
LABOR G&A** @ 10.00% $55.00 10.00% $15.00
TOTAL LABOR COST (C)$605 (D)$165
Subcontracting Labor Percentage 21.43% image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .