ATTACHMENT - SOW- EHRM Infrastructure Upgrades - Tomah - Final 1-6-21.pdf

PDF 307 KB Posted

Attached to
C1DA--EHRM Infrastructure Upgrades Design Tomah, WI Federal contract opportunity
Solicitation number
36C77621R0024
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides details for an Architect-Engineer services solicitation to support infrastructure upgrades at the Tomah VA Medical Center in Tomah, Wisconsin. The scope of work involves upgrading electrical and IT closets to support a new Electronic Health Record Modernization system, including fiber optic cabling, redundant fiber runs, data centers, IT closets, HVAC, electrical, and physical security upgrades. The anticipated period of performance for design services is 144 calendar days with an estimated award date of March 31, 2021 and a funding limitation of $12.5-16 million. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Interested firms must submit Standard Form 330 qualifications by February 8, 2021 to be evaluated based on professional qualifications, specialized experience, past performance, capacity, locality, and construction period services experience. The highest rated firms will then be invited to provide written responses for final selection and negotiations.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--EHRM Infrastructure Upgrades Design Tomah, WI, newest first.
File Type Posted
36C77621R0024_2.docx DOCX document
ATTACHMENT - PPQ Tomah EHRM - Due 2-8-2021.docx DOCX document
36C77621R0024.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tomah VA Medical Center

500 East Veterans Street January 6, 2021

Tomah, WI 54660

Project 676-21-700 EHRM Infrastructure Upgrades – Tomah, WI

Project Design Scope of Work

1. GENERAL INTENT: The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the Tomah VA Medical Center, Tomah, WI in accordance with this design scope of work.

2. STATEMENT OF WORK: The intent of this project is for the Architect- Engineer (A-E) to provide construction documents for the EHRM Infrastructure Upgrade requirements. A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigations, conducting studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work.

This work is to include all trade disciplines to facilitate the construction project to upgrade the facilities electrical and IT closets to allow for the new Electronic Health Record Modernization (EHRM) system.

This project shall include, but is not limited to, upgrading the facilities fiber optic cabling (herein referred to as “fiber”) throughout the Tomah campus buildings into each IT closet. Also provide two designs for Data Centers, one in B32 and the other in B408. Provide redundant fiber runs throughout the facility to each IT closet. Provide a new main redundant fiber line coming into the buildings from the network provider point. This is for approximately 25 relocated IT closet spaces and approximately 6 expanded IT closets. Review HVAC requirements, and Physical Security upgrades. Install IT patch panels and new electrical outlets throughout the facility, provide additional outlets in each IT closet, data cables, server room upgrade, inspect grounding and bonding, HVAC systems, relocate limited number of IT closets, remake existing IT closet as needed, removal of abandoned cabling, Removing abandoned equipment, and upgrade facility power distribution as required. Add UPS backup power as required per SOW Attachment 7 - OIT Construction Standards, 9-9-2020.

A/E Part Two Services for this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, requirement to create independent cost estimates, for the VA, for any modifications, for the attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. See SOW Attachment 10 - Work Matrix for added notes. The A/E shall review the Contractor’s requests for information and cost proposals for construction change orders when requested by the COR. The A/E’s reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes.

The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the

500 East Veterans Street January 6, 2021 project site to determine the needs and conditions for the design of this project. Copies of Tomah VAMC complete record drawings will be provided to the highest rated A/E firm. SOW Attachment 13 – Tomah Campus Map will give AE firm a basic understanding of Tomah VAMC campus. The A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design.

The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project. See section 13.

PROJECT SCHEDULE/PERIOD OF PERFORMANCE for timeline.

The A/E firms’ representatives performing site investigations on Tomah VA campus must have the following additional requirements before starting site investigations on campus:

1. Negative TB Test, within the past calendar year

2. N95 fit tested and documented

3. Clear Face Shield

4. N95 mask with no vent. Must be replaced when damaged or soiled

5. Pre and weekly negative COVID test while working in patient care areas

6. Daily visit at check-in station for COVID and temperature screening

a. Sticker/device must be worn visibly

7. Annual influenza shot is required for all staff performing work on Tomah VA campus

8. Contractor badge must be obtained and worn by contractor or representative at all times while on campus The temperature checks are performed on the Tomah VA campus and must be performed immediately when the contractor arrives on site. Temperature checks are currently performed at Building 400, 402, 455, 407, and 408. If at any time an employee of the A/E firm is found in deficiency of the listed a stop work order will be issued for safety of Tomah VAMC patients. Any further questions please refence the below documents

▪ Seasonal influenza with Vaccines (SOW Attachment 12)

3. DESIGN WITHIN FUNDING LIMITATIONS: The design shall be prepared by the A/E so as to permit the award of a construction contract, using VA Acquisition Regulation procedures for a construction project with a Range of Magnitude of between $10M and $20M. However, the cost range of this project is $12.5M to $16M. The A/E is to provide cost proposal with required breakouts.

4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment can be part of the design if it includes those items to meet code requirements for building occupancy, items covered in the VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.

500 East Veterans Street January 6, 2021

The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.

5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the following listed Department of Veterans Affairs References:

PG-18-1 Master Construction Specifications

SOW Attachment 1 EHRM Master Specifications

PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders]

PG-18-4 Standard Details and CAD Standards

PG-18-5 Equipment Guide List

H-18-8 Seismic Design Handbook

PG-18-9 Space Planning Criteria

PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]

PG-18-12 Design Guides (graphical, by function)

PG-18-13 Barrier Free Design Guides

PG-18-14 Room Finishes, Door, and Hardware Schedules

PG-18-15 Minimum Requirements for A/E Submissions

PG-18-17 Environmental Compliance Manual

H-7545 VA Cultural Resource Management Procedures

The following references should also be used to complete the design documents:

▪ VA Standards Alert 017 – Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference

▪ AE shall design to table 3 in HYPERLINK "https://www.cfm.va.gov/til/dguide/OIT-

InfrastrucStdTelecomSpaces.pdf" the Infrastructure Standard, Version 3.0.,

▪ Campus Support Center – standalone data center for a VA campus (example, VAMC) – Tier 3

▪ Network Support Center – local data centers (example CBOC) – Tier 1

▪ (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf)

▪ EHRM Master Spec (See SOW attachment 1)

▪ 00 VA OEHRM Site Infrastructure Requirements 1.8 (See SOW Attachment 2)

▪ SOCAMES 6 Design Alert 1 (See SOW Attachment 3)

▪ VHA Directive 1061 Prevention of Healthcare-Associated Legionella Disease and Scald Injury From

Potable Water Distribution Systems (See SOW Attachment 4)

▪ VISN 12 Facility condition assessment (FCA) (See SOW Attachment 5)

▪ Historical Resource Management Plan (HRMP)–VAMC Tomah, Wisconsin (See SOW Attachment 6) http://www.cfm.va.gov/til/index.asp http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/sDetail.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/cfm/til/dManual.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/CFM/TIL/accessibility.asp http://www.cfm.va.gov/cfm/til/room/RoomFinishes.pdf http://www.cfm.va.gov/til/aeDesSubReq.asp http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=584&FType=2

500 East Veterans Street January 6, 2021

▪ OIT Construction Standards, 9-9-2020 (See SOW Attachment 7)

▪ Sensitive Infrastructure Data Classification FOUO (See SOW Attachment 8)

▪ EHRM Design Schedule (CPM) (See SOW Attachment 9)

▪ Work Matrix (See SOW Attachment 10)

▪ Program guide, PG-18-15 Volume C – A/E Submission Instructions for Minor and NRM

Construction program dates November 2008 (See SOW Attachment 11)

▪ Seasonal influenza with vaccines (SOW Attachment 12)

▪ Tomah Campus Map (SOW attachment 13)

Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide.

6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 12 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or PCAC deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.

7. INDEPENDENT LIFE SAFETY REVIEW: The A/E shall incorporate any comments from the VA life safety review.

8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the Tomah VAMC. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.

9. PHYSICAL SECURITY: The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Life- Safety Protected located on the TIL (http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual Life-Safety Protected with Mission critical Utilities/Systems Redundancies are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VA. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary.

10. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008 (see Attachment 11 – PG-18-15 Volume C for EHRM). This document is available on http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf

500 East Veterans Street January 6, 2021 the TIL at http://www.cfm.va.gov/til/aeDesSubReq.asp. Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO). This memo is attached to this SOW as it is hosted on a non-public VHA site (https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949).

The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal.

The following submittals will be required for this project:

▪ Quality Assurance/Quality Control (QA/QC) Plan

▪ Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included.

▪ Schematic Design (SD)- 35%

▪ Design Development One (DD) – 65%

▪ Construction Documents (CD)- 95%

▪ Final Bid Documents (Bid)

11. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to Tomah VAMC.

The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination.

The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the Tomah VAMC Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.

▪ Architectural/Interior Design

▪ Square Footage/Volume

▪ Room Names and Numbers

▪ Architectural Schedules

▪ Architectural Specialties and Woodwork

▪ Doors

▪ Windows

▪ Louvers http://www.cfm.va.gov/til/aeDesSubReq.asp https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949 http://www.cfm.va.gov/til/projReq.asp

500 East Veterans Street January 6, 2021

▪ Roof

▪ Floors

▪ Ceilings

▪ Vertical Circulation

▪ Walls/Curtain Wall Sizes, Shapes, & Material Data

▪ General Signage

▪ Schedules

▪ Furniture

▪ Equipment

▪ Structural

▪ Foundations

▪ Shafts and Pits

▪ Mechanical

▪ HVAC

▪ Plumbing

▪ Electrical/Telecommunications

▪ Power and Lighting

▪ Steam Distribution

▪ Other Engineering Data as Required

▪ Exterior Building Information

▪ Nurse Call System

▪ Asbestos/Hazardous Material Info

▪ Security System Information (Access Control, Security

Cameras, Panic Alarms, Overhead Paging)

▪ Life Safety Information (Fire Extinguishers, Wall

Ratings, Door Ratings, Fire Protection/Alarms)

▪ Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition)

12. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing:

Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.

Minimum meeting minutes requirements

• Project name, number, meeting host, Meeting Name

• Date, Time, meeting ID, call in number, Duration, and consecutive number of total related meetings

• Participant list (Name, Title, Phone number (office and Mobile), Email, Attended Meeting (yes/no Check box)

• Meeting purpose, Roll call, COVID-19, and Additional Items

• Agenda items (Decisions, action items, and fixes or next steps)

• Next meeting date and time

• Detailed attachment list

Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated February 1, 2019. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.

Quality Assurance/Quality Control (QA/QC) Plan

▪ All documents in any of the electronic formats listed above.

Basis of Design (BD) http://www.section508.gov/ http://www.cfm.va.gov/cost/index.asp

500 East Veterans Street January 6, 2021

▪ All documents in any of the electronic formats listed above.

▪ Two (2) full-size paper bond sets of drawings – 2 to VA

Schematic Design (SD)

▪ All documents in any of the electronic formats listed above.

▪ Two (2) full-size paper bond sets of drawings – 2 to VA Engineering team, 1 Network Office

▪ Two (2) paper bond sets of specifications – 2 to VA Engineering team, 1 Network Office

▪ Two (2) paper bond sets of investigation reports, design calculations, space planning data and cost estimate - 2 to VA

Design Development (DD), and Construction Documents (CD)

▪ All documents in any of the electronic formats listed above.

▪ Memo annotating what was not upgraded and corresponding justifications.

▪ One (1) full size paper bond sets of drawings - 2 to VA Engineering team, 1 Network Office

▪ Two (2) half-size paper bond sets of drawings – 2 to VA Engineering team, 1 Network Office

▪ Two (2) paper bond sets of specifications – 2 to VA Engineering team, 1 Network Office

▪ Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate - 2 to VA

Final Bid Documents (Bid)

▪ PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.

▪ Certified memo annotating what areas/times were not upgraded and the corresponding justifications.

▪ Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional.

▪ Word files of specifications.

▪ Revit and AutoCAD files of drawings.

▪ One (1) full size paper bond sets of drawings - 1 to VA

▪ Two (2) half-size paper bond sets of drawings – 2 to VA

▪ Two (2) paper bond sets of specifications – 2 to VA

▪ One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate - 1 to VA

Requests For Information (RFI) Requests For Information shall be submitted within three (3) calendar days of submittal to the A/E.

Submittal Reviews Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E.

Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.

Modification Requests

500 East Veterans Street January 6, 2021

Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E. All documents in any of the electronic formats listed above. Note - If major modification, VA will provide additional time and document format guidance.

Change Order/Modification Proposal Review & IGCE Formulation:

The A/E shall review the Contractor's change order/modification proposals for construction change orders when requested by the COR within 7 calendar days of receipt of the request. The A/E shall also formulate IGCEs for the modification within seven (7) calendar days of receipt.

Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.

Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Provide digital copies in PDF format, Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format.

13. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. The A/E is also responsible for following specification Section 01 32 16.10 Architectural And Engineering CPM Schedules, which is located in SOW Attachment 9 - EHRM Design Schedule (CPM). If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or Weekends.

Administrative Time 14 calendar days after receipt of Notice of Award

QA/QC Submittal & Basis of Design (BD) 10% Submittal

7 calendar days after end of Administrative Time

QA/QC and BD 10% Submittal Review Meeting

10 calendar days after VA receipt of QA/QC & BD 10%

Submittals

35% SD Submittal 21 calendar days after acceptance of QA/QC & BD 10%

Submittals

35% SD Review Meeting 10 calendar days after VA receipt of 35% SD Submittal

65% DD Submittal 21 calendar days after VA acceptance of 35% SD Submittal

65% DD Review Meeting 10 calendar days after VA receipt of 65% DD Submittal

95% CD Submittal 21 calendar days after VA acceptance of 65% DD Submittal

95% CD Review Meeting 10 calendar days after VA receipt of 95% CD Submittal

Final Bid Documents Submittal 10 calendar days after VA acceptance of 95% CD Submittal

500 East Veterans Street January 6, 2021

Final Bid Documents Acceptance Meeting 10 calendar days after VA receipt of Final Bid Documents

Submittal

Total Part One Services/Design Phase Schedule

144 calendar days

The 144 days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design requirements throughout the design period and additional time is deemed necessary. It is the responsibility of the AE firm to cover all costs associated with such delays.

Part Two Services/Construction Period Services (optional Line Items) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Construction Period Services.

14. OI&T Infrastructure Standard for Telecommunications Spaces: The current version for this standard is version 3.0, dated August 21, 2020 (https://www.cfm.va.gov/til/dguide/OIT- InfrastrucStdTelecomSpaces.pdf). The design for this project at The Tomah VA Medical Center Tomah, WI must meet the Campus Support Center (CSC) requirements of the Infrastructure Standard for Telecommunications Spaces.

The Infrastructure Standard for Telecommunications Spaces (The Standards) serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment, and supporting physical space and equipment.

This standard is owned and maintained by Solution Delivery (SD) Data Center and Infrastructure Engineering and questions or concerns should be directed to the following email group: OIT ITOPS SD Data Center and Infrastructure Engineering.

Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.

15. CONTRACT OVERSIGHT: All contracts for this project (shall be awarded by the Program Contracting Activity Central (PCAC); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work.

https://gcc01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cfm.va.gov%2Ftil%2Fdguide%2FOIT-InfrastrucStdTelecomSpaces.pdf&data=04%7C01%7C%7C227e288732184e40bf3808d8a14689f0%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637436671617005635%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=jZmAnn0RsxhviqCzoDtfG9MqjkO8qG4j8lRDApdgdw8%3D&reserved=0 https://gcc01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cfm.va.gov%2Ftil%2Fdguide%2FOIT-InfrastrucStdTelecomSpaces.pdf&data=04%7C01%7C%7C227e288732184e40bf3808d8a14689f0%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637436671617005635%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=jZmAnn0RsxhviqCzoDtfG9MqjkO8qG4j8lRDApdgdw8%3D&reserved=0

500 East Veterans Street January 6, 2021

The PCAC shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A/E’s performance under the design project contract. The COR shall be a representative from Tomah VAMC Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project. The COR’s only have authority listed in their delegation of authority letter, all other authority remains with the PCAC contracting Officer.

A COR from the Tomah VAMC Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.

The C&A requirement do not apply, and that a Security Accreditation Package is not required.

16. SOW and ATTACHMENTS:

▪ SOW - EHRM Infrastructure Upgrades – Tomah - Final The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:

▪ EHRM Master Spec (See SOW attachment 1)

▪ 00 VA OEHRM Site Infrastructure Requirements 1.8 (See SOW Attachment 2)

▪ SOCAMES 6 Design Alert 1 (See SOW Attachment 3)

▪ VHA Directive 1061 Prevention of Healthcare-Associated Legionella Disease and Scald Injury From

Potable Water Distribution Systems (See SOW Attachment 4)

▪ VISN 12 Facility condition assessment (FCA) (See SOW Attachment 5)

▪ Historical Resource Management Plan (HRMP)–VAMC Tomah, Wisconsin (See SOW Attachment 6)

▪ OIT Construction Standards, 9-9-2020 (See SOW Attachment 7)

▪ Sensitive Infrastructure Data Classification FOUO (See SOW Attachment 8)

▪ EHRM Design Schedule (CPM) (See SOW Attachment 9)

▪ Work Matrix (See SOW Attachment 10)

▪ Program guide, PG-18-15 Volume C – A/E Submission Instructions for Minor and NRM

Construction program dates November 2008 (See SOW Attachment 11)

▪ Seasonal influenza with vaccines (SOW Attachment 12)

▪ Tomah Campus Map (SOW attachment 13)

File details come from the government source that posted it. Updated .