Attachment SOW 9-11-2024.pdf
PDF 91 KB Posted
- Attached to
- Z1DA--ICU Renovation VAMC San Francisco Federal contract opportunity
- Solicitation number
- 36C26125R0009
About this file
This document is a Sources Sought Notice for a federal contract opportunity to renovate the Intensive Care Unit (ICU) at the San Francisco VA Medical Center. The general scope of the requirement is to construct a modern 10-12 bed ICU, with 4 dedicated airborne infection isolation rooms and 2 configurable isolation rooms, through an extensive renovation. The project has a total magnitude between $10-20 million and a period of performance of 420 days, including 60 days for scheduling and mobilization. The applicable NAICS code is 236220 Commercial and Institutional Building Construction. The government is seeking responses from qualified contractors, including small businesses, to assess industry capabilities and develop the acquisition strategy. Interested parties are requested to provide information on their ability to meet the requirements, past experience, business size, socioeconomic status, and bonding capability. Responses to this sources sought notice are due by October 22, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26125R0009_1.docx | DOCX document | |
| 36C26125R0009.docx | DOCX document | |
| Attachment Drawings.pdf | ||
| Attachment Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
San Francisco VA Medical Center 4150 Clement St
San Francisco, CA 94121
Date: September 11, 2024
Project: 662-23-101, Renovate ICU to Airborne Infection Isolation Standards
Scope of Work
The San Francisco VA Medical Center requires the services of a qualified General Contractor to construct Project
662-23-101, Renovate ICU to Airborne Infection Isolation Standards. The general scope of this requirement is to construct via extensive renovation a modern Intensive Care Unit comprising 10 patient rooms with surge capacity to
12. Four rooms that are dedicated Airborne Infection Isolation and two that are configurable, allowing for a maximum of eight such patients within the Unit. The nature and requirements of this construction are fully exhibited in the attached Construction Documents which include complete drawings and specifications.
The area of construction is located within the main hospital in Building 203 with area of work entirely on the 3rd floor B-Wing; effectively the east side of the building on the top floor. Infrastructure work extends beyond the normal areas of work to accommodate work to utility systems. Special care is to be taken as related to impact surrounding clinical areas, most significantly 2nd floor, and utility outages with impact to patients in occupied areas.
Noise, vibration, and dust control should be expected to be heavily managed with limitations strictly coordinated.
For purposes if pricing, total labor effort should be assumed to comprise roughly 30% of labor outside of normal business hours.
Construction Management software is to be used in the completion of this requirement and will be provided by the government absent an established and acceptable platform utilized by the awardee. The software currently in use is
Submittal Exchange. The government will grant access to all parties associated with the General Contractor as requested by the GC project manager.
The period of performance for this action is not more than 420 days and will comprise an administrative Notice to
Proceed which allows for up to 60 days to develop schedules, perform inspections, mobilize, advance submittals, and manage long lead items. This ensures a solid plan for performance is established before the current ward is impacted by demolition that would preclude returning to service. When the contractor is ready and the government is fully satisfied as related to a developed schedule and adequate completion of a differing site conditions report, the
Contracting Officer will provide a Construction Notice to Proceed, allowing physical work to begin. The duration to
Contract Completion is 360 calendar days from issued Construction Notice to Proceed. The contractor generated
Master Project Schedule shall meet the requirements of VAAR 852.232-71 to demonstrate critical path, identify float, and indicate costs by definable feature of work to facilitate timely and accurate progress payments.