Attachment - Shop Layout and N2 Tank Location.pdf

PDF 90 KB Posted

Attached to
High Temperature Vacuum Furnace with Liquid Nitrogen Tank and Vaporizer
Solicitation number
23-35-1002
Issued by

About this file

This is a technical shop layout drawing showing the planned location and configuration of a high temperature vacuum furnace installation with an associated liquid nitrogen tank and vaporizer system. The drawing indicates a total estimated piping requirement of 200 feet and includes detailed specifications for a nitrogen tank and evaporator pad measuring 10'x20'x18'.

The layout shows key technical details including overhead piping requirements specified at 20' above road level to reach the B140 Heat Treat area, with internal shop piping also positioned 20' above ground level. The drawing includes specific equipment placement, measurements (like "50'-0.2915'" and "85'-6.1918'"), and safety features such as a "Flammable" sign on the chain link fence. The document is marked with distribution statement A indicating it is approved for public release with unlimited distribution, and bears the identifier #78ABW-2025-0022.

View the file

Other files

File Type Posted
23-35-1002_SAM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .