Attachment Q - Technical Offer Worksheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- USAF Prepo Vessel Time Charter Federal contract opportunity
- Solicitation number
- N32205-21-R-4172
About this file
This Technical Offer Worksheet attachment to a solicitation for a USAF Prepo Vessel Time Charter outlines the technical requirements offerors must address in their proposals. The vessel requirements include outfitting cargo holds with cell guides, maintaining draft and air draft specifications when laden, accommodating 25 government personnel, including drawings depicting hull perimeter lighting, decontamination stations, and weapon placements, extending examination intervals, fueling small boats, installing an incinerator, equipping with INMARSAT communications, fitting a countermeasures washdown system, providing a project plan and delivery date, drafting stowage plans for cargo, including stability calculations, supplying arrangement drawings, and certificates, as well as layouts for cargo hold environmental controls. Offerors must complete the worksheet in their proposals by describing how their vessels meet each technical requirement.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT Q: TECHNICAL OFFER WORKSHEET
| LINE | REQUIREMENT | LOCATION OF REQUIREMENT WITHIN THE PWS | OFFEROR'S REQUIRED RESPONSE | LOCATION OF OFFEROR'S RESPONSE WITHIN ITS TECHNICAL PROPOSAL |
| 1 | Offeror submitted a completed Technical Proposal Worksheet (Attachment Q). Requirements listed on lines 1-20 were answered through either detailed explanation, narrative, drawing or other supporting documentation included within the Offeror's Technical Proposal. | Dry Time Para II-9 (1) | Submit completed Attachment Q Worksheet. Within Section 3 and Section 4 of the Offeror's Technical Proposal, provide detailed explanation, narrative, drawing, mathematical calculation or Gantt Chart as to how requirement will be met. | |
| 2 | All 20-foot cargo holds used to stow the 900 containers of Mission Cargo shall be outfitted with cell guides. | PWS Para E-3.5.1 | Provide brief narrative of how Vessel will meet the requirement | |
| 3 | Vessel’s maximum summer mean draft when laden with the 900 containers of Mission Cargo identified at Attachment N, bunkered for 13,000 nautical miles, and using class constants is 34 feet in saltwater. | PWS Para E-3.5.1 | Identify Vessel's summer mean draft when laden with the 900 containers of Mission Cargo identified at Attachment N, bunkered for 13,000 nautical miles, and using class constants. | |
| 4 | Vessel's maximum allowable air draft when in a light or ballast condition shall not exceed 135 feet. | PWS Para E-3.5.1 | Identify Vessel's air draft when in a light or ballast condition | |
| 5 | Vessel shall be capable of messing and berthing a minimum of twenty-five (25) Government personnel (in addition to crew). | PWS Para E-3.5.1 | Provide detailed explanation of how Vessel will meet the requirement of messing and berthing a minimum of 25 Government personnel | |
| 6 | Offeror shall include within its Technical Proposal a drawing depicting the location of the Vessel’s Hull Perimeter Lighting. | PWS Para E-3.5.1 | Drawing | |
| 7 | Offeror shall include within its Technical Proposal a drawing depicting the location of the Vessel’s Decontamination Station. | PWS Para E-3.5.1 | Drawing | |
| 8 | Offeror shall provide a drawing depicting the proposed locations and types of weapon bases to be used to provide the Vessel 360-degree coverage and overlapping fields of fire. | PWS Para E-3.5.1 | Drawing | |
| 9 | Vessel shall conform to USCG regulations for extended tail shaft examination intervals found in 46 CFR 61.20-21 and for extended dry-dock examination interval found in 46 CFR 91.40-3(d) through (g). In addition, the Vessel shall not require dry-docking for credit during the Charter Period. | PWS Para E-3.5.5.1 | Provide detailed explanation of how Vessel will meet the requirement | |
| 10 | Vessel shall be capable of fueling a small boat alongside. Vessel shall have a diesel fuel system connected to one (1) on-deck fueling station with the necessary attached piping, pumps, hoses, tanks and filler nozzles. The fueling system shall be USCG-approved. | PWS Para E-3.5.6.2 | Provide detailed explanation of how Vessel will meet the requirement | |
| 11 | Vessel shall be fitted with an incinerator capable of burning both solid waste and waste oil. | PWS Para E-3.5.7.2 | Provide narrative of how Vessel will be fitted with an incinerator capable of burning both solid waste and waste oil | |
| 12 | Vessel shall be delivered equipped with INMARSAT Fleet Broadband 500 (FBB500) Ship Earth Station. | PWS Para E-11.2 | Provide narrative of how Vessel will be equipped with INMARSAT Fleet Broadband 500 | |
| 13 | Vessel will be fitted with a Counter Measures Water Wash Down System (CMWWDS) as specified in Attachment K. | PWS Para E-18.1.2 | Provide detailed explanation of how Vessel will be fitted with a CMWWDS | |
| 14 | Offeror shall include within its Technical Proposal an initial Plan of Action and Milestones (POAM). POAM Gantt chart shall include the major tasks affecting delivery of the vessel including all modifications or reflagging requirements if applicable. Each task shall provide the anticipated start date, end date and overall duration; task dependencies; and, the critical path. A projected vessel delivery date shall also be provided. | PWS Para E-19.1 | Gantt chart depicting major vessel modifications or reflagging efforts | |
| 15 | Offeror shall provide a draft stowage plan that depicts the below-deck stowage of the 900 20' containers of mission cargo identified in Attachment N and a second draft stow plan that depicts the stowage of 450 additional 20' GENNOS containers. Stowage of the 900 20’ containers of mission cargo identified in Attachment N must be in accordance with IMDG Code requirements. | PWS Para E-19.2 | Draft stow plans | |
| 16 | Offeror's Technical Proposal shall include documentation clearly depicting the Vessel is capable of maintaining a positive GM throughout mission cargo loading operations. | PWS Para E-19.2.1 | Trim and stability tables; GM diagram | |
| 17 | Offeror shall include within its Technical Proposal a complete set of General Arrangement drawings. | PWS Para E-19.3 | General arrangement drawings | |
| 18 | Offeror shall include within its Technical Proposal copies of current Certificates and Inspections as follows: International Ship Security Certificate, Safety Management Certificate, Applicable inspection and survey certificates (USCG, ABS, DNV, GL, etc.), An ISO 9001 Compliant QMS that has been certified by an accredited organization. | PWS Para E-19.5 | Vessel Certificates | |
| 19 | Offeror shall include within its Technical Proposal completed Ship’s Characteristics Card that includes all applicable information. | PWS Para E-19.6 | Ship's characteristics card | |
| 20 | Offeror shall include within its Technical Proposal General Layout drawings depicting cargo hold environmental control zones and the locations of all environmental equipment, to include sensor locations. Mathematical calculations used to determine size and quantity of AC/DH equipment needed to meet minimum contractual requirements shall also be provided. | PWS Para E-19.11 | Drawings; mathematical calculations |
File details come from the government source that posted it. Updated .