Attachment Q - Technical Offer Worksheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
USAF Prepo Vessel Time Charter Federal contract opportunity
Solicitation number
N32205-21-R-4172
Issued by
Department of the Navy Military Sealift Command

About this file

This Technical Offer Worksheet attachment to a solicitation for a USAF Prepo Vessel Time Charter outlines the technical requirements offerors must address in their proposals. The vessel requirements include outfitting cargo holds with cell guides, maintaining draft and air draft specifications when laden, accommodating 25 government personnel, including drawings depicting hull perimeter lighting, decontamination stations, and weapon placements, extending examination intervals, fueling small boats, installing an incinerator, equipping with INMARSAT communications, fitting a countermeasures washdown system, providing a project plan and delivery date, drafting stowage plans for cargo, including stability calculations, supplying arrangement drawings, and certificates, as well as layouts for cargo hold environmental controls. Offerors must complete the worksheet in their proposals by describing how their vessels meet each technical requirement.

View the file

Other files for this federal contract opportunity

Other files attached to USAF Prepo Vessel Time Charter, newest first.
File Type Posted
A0003.pdf PDF
21R4172 Attachment B - Basic Pricing Data Rev 2.xlsx XLSX spreadsheet
A0002.pdf PDF
A0001.pdf PDF
Attachment B - Basic Pricing Data Rev 1.xlsx XLSX spreadsheet
Attachment T - Ship Characteristics Card.docx DOCX document
Attachment J - Shipboard Security System (SSS) Requirements.pdf PDF
Attachment H - Anti-Terrorism Force Protection (ATFP) Requirements.pdf PDF
Attachment A - Government Furnished Property (GFP).xlsx XLSX spreadsheet
Attachment N - Mission Cargo Data.pdf PDF
Attachment I - Specifications for CBR-D Decontamination Station.pdf PDF
Attachment G - Wage Determination.pdf PDF
Attachment E- Performance Work Statement (PWS).pdf PDF
Attachment F - Clarification and Question Form.docx DOCX document
Attachment D - DD Form 254.pdf PDF
Attachment M - Contract Data Requirement List (CDRL).pdf PDF
N32205-21-R-4172 USAF Prepo RFP.pdf PDF
Attachment L - MSC Standard Operating Manual (SOM).pdf PDF
Attachment S - Drawings Decon Station.pdf PDF
Attachment O - Disclosure of Lobbying Activities (SFLLL).pdf PDF
Attachment K - CBRN Requirements.pdf PDF
Attachment C - Crew Complement.docx DOCX document
Attachment B - Basic Pricing Data.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT Q: TECHNICAL OFFER WORKSHEET

LINEREQUIREMENTLOCATION OF REQUIREMENT WITHIN THE PWSOFFEROR'S REQUIRED RESPONSELOCATION OF OFFEROR'S RESPONSE WITHIN ITS TECHNICAL PROPOSAL
1Offeror submitted a completed Technical Proposal Worksheet (Attachment Q). Requirements listed on lines 1-20 were answered through either detailed explanation, narrative, drawing or other supporting documentation included within the Offeror's Technical Proposal.Dry Time Para II-9 (1)Submit completed Attachment Q Worksheet. Within Section 3 and Section 4 of the Offeror's Technical Proposal, provide detailed explanation, narrative, drawing, mathematical calculation or Gantt Chart as to how requirement will be met.
2All 20-foot cargo holds used to stow the 900 containers of Mission Cargo shall be outfitted with cell guides.PWS Para E-3.5.1Provide brief narrative of how Vessel will meet the requirement
3Vessel’s maximum summer mean draft when laden with the 900 containers of Mission Cargo identified at Attachment N, bunkered for 13,000 nautical miles, and using class constants is 34 feet in saltwater.PWS Para E-3.5.1Identify Vessel's summer mean draft when laden with the 900 containers of Mission Cargo identified at Attachment N, bunkered for 13,000 nautical miles, and using class constants.
4Vessel's maximum allowable air draft when in a light or ballast condition shall not exceed 135 feet.PWS Para E-3.5.1Identify Vessel's air draft when in a light or ballast condition
5Vessel shall be capable of messing and berthing a minimum of twenty-five (25) Government personnel (in addition to crew).PWS Para E-3.5.1Provide detailed explanation of how Vessel will meet the requirement of messing and berthing a minimum of 25 Government personnel
6Offeror shall include within its Technical Proposal a drawing depicting the location of the Vessel’s Hull Perimeter Lighting.PWS Para E-3.5.1Drawing
7Offeror shall include within its Technical Proposal a drawing depicting the location of the Vessel’s Decontamination Station.PWS Para E-3.5.1Drawing
8Offeror shall provide a drawing depicting the proposed locations and types of weapon bases to be used to provide the Vessel 360-degree coverage and overlapping fields of fire.PWS Para E-3.5.1Drawing
9Vessel shall conform to USCG regulations for extended tail shaft examination intervals found in 46 CFR 61.20-21 and for extended dry-dock examination interval found in 46 CFR 91.40-3(d) through (g). In addition, the Vessel shall not require dry-docking for credit during the Charter Period.PWS Para E-3.5.5.1Provide detailed explanation of how Vessel will meet the requirement
10Vessel shall be capable of fueling a small boat alongside. Vessel shall have a diesel fuel system connected to one (1) on-deck fueling station with the necessary attached piping, pumps, hoses, tanks and filler nozzles. The fueling system shall be USCG-approved.PWS Para E-3.5.6.2Provide detailed explanation of how Vessel will meet the requirement
11Vessel shall be fitted with an incinerator capable of burning both solid waste and waste oil.PWS Para E-3.5.7.2Provide narrative of how Vessel will be fitted with an incinerator capable of burning both solid waste and waste oil
12Vessel shall be delivered equipped with INMARSAT Fleet Broadband 500 (FBB500) Ship Earth Station.PWS Para E-11.2Provide narrative of how Vessel will be equipped with INMARSAT Fleet Broadband 500
13Vessel will be fitted with a Counter Measures Water Wash Down System (CMWWDS) as specified in Attachment K.PWS Para E-18.1.2Provide detailed explanation of how Vessel will be fitted with a CMWWDS
14Offeror shall include within its Technical Proposal an initial Plan of Action and Milestones (POAM). POAM Gantt chart shall include the major tasks affecting delivery of the vessel including all modifications or reflagging requirements if applicable. Each task shall provide the anticipated start date, end date and overall duration; task dependencies; and, the critical path. A projected vessel delivery date shall also be provided.PWS Para E-19.1Gantt chart depicting major vessel modifications or reflagging efforts
15Offeror shall provide a draft stowage plan that depicts the below-deck stowage of the 900 20' containers of mission cargo identified in Attachment N and a second draft stow plan that depicts the stowage of 450 additional 20' GENNOS containers. Stowage of the 900 20’ containers of mission cargo identified in Attachment N must be in accordance with IMDG Code requirements.PWS Para E-19.2Draft stow plans
16Offeror's Technical Proposal shall include documentation clearly depicting the Vessel is capable of maintaining a positive GM throughout mission cargo loading operations.PWS Para E-19.2.1Trim and stability tables; GM diagram
17Offeror shall include within its Technical Proposal a complete set of General Arrangement drawings.PWS Para E-19.3General arrangement drawings
18Offeror shall include within its Technical Proposal copies of current Certificates and Inspections as follows: International Ship Security Certificate, Safety Management Certificate, Applicable inspection and survey certificates (USCG, ABS, DNV, GL, etc.), An ISO 9001 Compliant QMS that has been certified by an accredited organization.PWS Para E-19.5Vessel Certificates
19Offeror shall include within its Technical Proposal completed Ship’s Characteristics Card that includes all applicable information.PWS Para E-19.6Ship's characteristics card
20Offeror shall include within its Technical Proposal General Layout drawings depicting cargo hold environmental control zones and the locations of all environmental equipment, to include sensor locations. Mathematical calculations used to determine size and quantity of AC/DH equipment needed to meet minimum contractual requirements shall also be provided.PWS Para E-19.11Drawings; mathematical calculations

File details come from the government source that posted it. Updated .