Attachment No. 1- GARDEM 2 PM Apps SOW 26 MAR 2025.docx
DOCX document 95 KB Posted
- Solicitation number
- RFI-RIKF-B005
About this file
This document is a Draft Statement of Work (SOW) for the Global Application Research, Development, Engineering & Maintenance (GARDEM) 2 Platform and Mission Applications (P&M Apps) Research, Development, Enhancement and Sustainment effort, issued by the Air Force Research Laboratory (AFRL) in Rome, New York. The SOW outlines a comprehensive research and development contract to support software development for military intelligence and operations, focusing on a Data as a Service (DaaS) platform that enables data access, integration, visualization, and analysis across multiple intelligence sources.
The anticipated contract is a cost-plus-fixed-fee effort with a 60-month period of performance, valued at approximately $99 million. The work will support Air Force, Department of Defense, and other federal agencies, requiring up to 34 cleared personnel (80% Top Secret/SCI, 20% Secret/Collateral) within 30 days of award. Key technical requirements include developing software solutions for intelligence exploitation, mission management, data fusion, and enterprise visualization tools, with emphasis on agile development, system integration, and support for operational environments. The Request for Information (RFI) seeks responses by 3 PM EST on 02 April 2025, with no foreign participation allowed and strict export control and security requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE RESEARCH LABORATORY (AFRL)
ROME RESEARCH SITE (RRS)
ROME, NEW YORK
DRAFT STATEMENT OF WORK (SOW)
FOR
GLOBAL APPLICATION RESEARCH, DEVELOPMENT, ENGINEERING & MAINTENANCE (GARDEM) 2 PLATFORM AND MISSION APPLICATIONS (P&M APPS) RESEARCH, DEVELOPMENT, ENHANCEMENT AND SUSTAINMENT
26 MARCH 2025
(Reference No. RFI-RIKF-B005)
TABLE OF CONTENTS
| Paragraph |
| Subject |
| Page |
| 1.0 |
| OBJECTIVE |
| 3 |
| 2.0 |
| SCOPE |
| 3 |
| 3.0 |
| BACKGROUND |
| 3 |
| 4.0 |
| TECHNICAL REQUIREMENTS |
| 3 |
| 1.0 | OBJECTIVE: The objective of this effort is to perform research, development, design, prototyping, integration, testing, accreditation, installation, enhancement, sustainment, and demonstration of technologies and concepts in support for Global Application Research, Development, Engineering and Maintenance (GARDEM) 2 software baselines. This effort will support GARDEM 2 enterprise platform and mission application software baselines. | |
| 2.0 | SCOPE: The Contractor shall fulfill requirements of Research and Development (R&D), software sustainment, and maintenance activities supporting the functional and technical requirements of the Air Force, Department of Defense (DoD), and other federal agencies. The work may include, but is not limited to: hardware and software acquisition, analytical studies, system feasibility studies, system design, system trade-off studies, rapid prototyping, system demonstrations, software development, system(s) simulations, functional test and evaluation analyses, security test and evaluation analyses, software enhancements, rapid implementation, sustainment, installation support (hardware and software), training documentation, and technology integration technology transition, and program management. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Can we avoid use of procurement since only R&D and O&M funded |
| 3.0 | BACKGROUND: Access to information enables the rapid employment of the right military forces at the right place and time to achieve strategic objectives while preventing any adversary from doing the same. To achieve this position of dominance, GARDEM 2 customers require a never-ending flow of state-of-the-art technological capabilities to assemble actionable information from multiple data sources to establish and maintain battle space situational awareness and understanding. Technology development and maintenance will be focused on Data as a Service (DaaS) platform and enhancement functionality that integrates external systems and provides data visualization, data analysis, and multi-source data fusion to enable timely mission management, collections management, and intelligence exploitation and production. Emphasis will be placed on development that enables re-use across the above mission areas as well as in other domains. | |
| 4.0 | TECHNICAL REQUIREMENTS. The Contractor shall accomplish the following: | |
| 4.1 | R&D: Research, design, develop, engineer, implement, prototype, test and integrate software and hardware solutions, including prototypes, Commercial Open Source Software (COSS), Commercial-off-the-Shelf (COTS), Government-off-the -Shelf (GOTS), Government Open Source Software (GOSS), Non-Developmental Items (NDI), and Non-Materiel Solutions to meet Government approved objectives both inside this Task Order’s (TO’s) relevant technologies and other technologies as directed by the Government. This includes new mission Information Technology (IT) capabilities and tools as well as support to existing software and systems. These software and hardware solutions will integrate, correlate, and fuse intelligence, operational, mission management, and collections data from a variety of databases and requirements workflows to display the data and provide access to the data from external systems via application and enterprise services. | Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Spell out all acronyms the first time they are used. |
| Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Spell out acronym. | ||
| 4.1.1 | Tasks include but are not limited to system installations (para 4.2.4), testing (para 4.15), documentation (para 4.7), Problem Report / Change Request (PR/CR) management (para 4.4), systems engineering (para 4.6), Authorization and Assessment (A&A) (para 4.15.2), interface management (para 4.5), and integration. |
4.1.2 Visualization across the enterprise by leveraging the DaaS Platform. Visualizations will include, but are not limited to:
· A workflow tracking and monitoring dashboard (user interface) with data analytics
· A health and status of resource visualization for understanding the status of all collection assets across all Intelligence Sources (INTs) Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Spell out acronym.
· Visualization of all data object, object details, object relationships and object status in user-interactive; list, geospatial, temporal, relationship/network, and metrics-based graphics
· Visualization of command direction and guidance as it relates to the prioritization of Request for Information (RFI), Collection, Exploitation, and Production requirements Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Spell out acronym.
· Providing awareness of command desired reporting and products via dynamically driven dashboard visualizations
· Visualize and assess intelligence data objects and their associations to determine whether final products meet original requirements. This includes comments associated with the objects through collaboration tools
4.1.2.1 Include development of functionality by scaling existing RFI, Intelligence, Surveillance, and Reconnaissance (ISR), Configuration Management (CM), and Mission Management (MM) systems for enterprise use by integrating them with common DaaS platform and eliminating system stovepipes in the existing CM/MM process.
4.1.2.2 Provide end-to-end traceability and management of Commander's Critical Information Requirements (CCIRs), Essential Elements of Information (EEI), etc.
4.1.3 Provide an Open System Architecture (OSA) based design to yield benefits in the form of a modular, interoperable system allowing components to be added, modified, replaced, removed, and supported by different vendors throughout the life cycle. Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Remove “and/or”
4.1.4 Leverage and integrate existing enterprise capabilities, to include but not limited to PACOM JIOC-IT C2 Intel Dashboard, C4I Learning Environment (C4ILE), DLE Dev tools and Reference Implementation, and legacy collection and mission management programs.
4.1.5 Provide a Data as a Service platform to include novel and automated approaches for data access, integration, curation, and query/search
4.1.6 Develop methods for securely extending and integrating capabilities that use Data as a Service to include application hosting and job scheduling functionality
| 4.1.7 | Capabilities/Technologies Assessments. Conduct and document research, studies, analysis, prototype development, and demonstration of new and emerging technologies that are, or may be, relevant to the GARDEM 2 user community. This will include, but not be limited to, the following: performing analytical studies, feasibility/impact studies, system analyses, system design, development, system trade-off studies, experimental design efforts, experimental/prototype software demonstration efforts, architecture analyses, system requirements analyses, system design studies, software requirements analyses, software design, software development efforts, system specification and planning, system integration, configuration management, security activities, advanced system developments, rapid prototyping, test and evaluation, and suitability testing of developmental systems. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Same comment as above is 4.19 specific to R&D? if so should be within 4.1 |
| 4.1.7.1 | Coordinate the investigation of new technologies and concepts with potential for use with the Government. (See CDRL, A032) | |
| 4.1.7.2 | Research potential technologies that will improve GARDEM 2 software capabilities. (See CDRL, A032) | |
| 4.1.7.3 | Research on-going and projected architectural efforts on GARDEM 2 software and document their impact on existing systems. (See CDRL, A032) | |
| 4.1.7.4 | Conduct system feasibility studies that include requirement definition and cost performance analysis. (See CDRL, A032) | |
| 4.1.7.5 | Conduct system trade-off studies that evaluates multiple solutions to problems and result in recommendations of the most technical and cost-effective solutions. (See CDRL, A032) | |
| 4.1.7.6 | Develop experimental/prototype software demonstrations to include acquiring, assembling, and integrating all software required to conduct verification/validation of the analytical study. | |
| 4.1.7.7 | Demonstrate the developed functional capabilities during exercises as required. |
4.2 Operations & Maintenance - System Engineering and Baseline Enhancements: Manage and maintain the operational enterprise platform and mission applications software baselines that support numerous missions within the Intelligence, Air, Space, and Cyber domains. Support will consist of field support, training, requirements collection and analysis, and reviewing, recommending changes to and revising intelligence and operations Standard Operating Procedures (SOPs) and Tactics, Techniques, and Procedures (TTPs). Support will include coordination with on-site teams and other component and application developers to identify requirements for enhancements, executing the design and development of the enhancements, and successfully integrating, testing, and deploying software baselines. Software enhancements shall enable incremental system improvement, functionality, and stability through upgrades of security patches, individual hardware and software modules with newer modular components without redesign of entire system or large portions thereof. The work will be performed in support of operational systems to include, but not limited to, the following GARDEM 2 platforms: Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: If this is an actual requirement of O&M and R&D we need within 4.0 Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: COTR moved
· Trusted Resources for Tactical & Lean Enterprises (TRESTLE)
· Combined Information Data Network Exchange (CIDNE)
· WebTAS Enterprise
· Command, Control, Communications, and Battle Management (C3BM) Advanced Battle Management System (ABMS)
· C3BM Architecture and Systems Engineering (ASE) Support will be deployed at but not limited to the following locations and additional locations as world events dictate:
· Program Executive Office (PEO)/C3BM, Hanscom AFB, Massachusetts
· PEO/C3BM, Joint Base Anacostia-Bolling, Washington DC
· PEO/C3BM, Nellis AFB, Nevada
· PEO/C3BM, Robins AFB, Georgia
4.2.1 Enhancement Development System Engineering: system engineering includes but is not limited to system installations (para 4.2.4), testing (para 4.15), documentation (para 4.7), PR/CR management (para 4.4), systems engineering (para 4.6), Configuration Management (4.9), Authorization and Assessment (A&A) (para 4.15.2), interface management (para 4.5), and integration.
4.2.2 Provide a modular open standards approach to enhancing/modifying applications and architecture changes.
4.2.3 Participate in site exercises and wargames and maintain software during special contingency situations as requested by the Government. The exercise or contingency shall be at or near an existing site, overseas, or remote location. Special contingency situations include, war, armed conflict, insurrection, civil or military strife. This support is designated as mission critical.
| 4.2.4 | Mission Application Installation. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: COTR: Is this O&M specific requirement, if so should be under 4.2 | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: COTR moved |
| 4.2.4.1 | Provide/perform/software/mission application installation, trouble shooting, and technical support upon Government approval and in collaboration with on-site teams. (See CDRLs, A021, B020, C020, D020, E020 and F020) | ||
| 4.2.4.2 | Maintain an inventory of all software and hardware that is either required, or to be delivered to support the installation process. (See CDRLs, A023, A028, B022, B030, C022, C030, D022, D030, E022, E030, F022, and F030) | ||
| 4.2.4.3 | Provide Subject Matter Expertise for site-required acceptance testing to include, functional, interoperability, security and A&A. | ||
| 4.2.4.4 | Perform installation rehearsals of enhanced software, hardware (if required) and COTS software (if required). Document and resolve issues found. | ||
| 4.2.4.5 | Support Deployment Readiness Review (DRR) five (5) working days prior to scheduled installation. The DRR will include relevant Government and Contactor POC, installation task list with anticipated task durations, installation risks, schedule, rollback procedures (in the case of an upgrade), and status of network and end-user installation approvals. | ||
| 4.2.4.6 | Support Go - No Go review one (1) working day prior to scheduled installation. The Go - No Go review will be a final review of the DRR information prior to installation with emphasis on any incomplete items from the DRR. | ||
| 4.2.4.7 | Install and configure enhanced software, hardware (if required) and COTS software (if required) to meet operational requirements. | ||
| 4.2.4.8 | Design, enhance, test, install, and maintain enhanced software internal data base(s). | ||
| 4.2.5 | Provide engineering support and test expertise for Government In-Plant Testing at the Contractor’s facility and specified Government locations | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: COTR: are these O&M specific tasks, if so should be within 4.2….should all of 4.16 be within 4.2?? | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: COTR confirmed O&M via move |
| 4.2.6 | Provide engineering support and testing expertise for Government A&A testing at the designated test facility. | ||
| 4.3 | Work Plans. | ||
| 4.3.1 | Perform the work required under this order in accordance with any detailed performance information provided by the Government during performance in the form of a Work Plan. “Detailed performance information” is information provided to the Contractor that fills in details of the work to be performed, identifies areas of inquiry to be emphasized or de-emphasized, or otherwise serves to accomplish the SOW. Detailed performance information will be issued to the Contractor in writing by the Government with a copy provided to the Contracting Officer. Work Plans shall not constitute assignment of new work, shall not change the terms or conditions of this order, and shall not constitute a basis for any increase in the amount of fixed fee or extension to the Contract Line-Item Number (CLIN) period of performance. |
4.3.2 Each Work Plan will include, as applicable, the following information:
· Detailed performance information for work to be performed, cross referenced to the applicable CLIN and paragraphs of the SOW.
· Government estimates of the number hours and duration of effort likely to be required to successfully pursue the detailed objectives provided.
· Breakdown of estimated costs including labor categories (include work location(s)), rates, man hours, fee, Other Direct Costs (ODCs), travel (including origin and destination, number of trips, number of personnel, duration, and purpose).
· Areas of inquiry previously detailed that the Government wishes to emphasize or de-emphasize either because of achievements to date, or because of changes in program priorities.
· Funding Summary: Financial data, Period of Performance, Appropriation Category.
· Executive Technical Summary of work effort.
· Descriptive Summary including government technical and programmatic points of contact. Entities responsible for each distinct work effort, including government stakeholders and Point of Contact information; including Contracting Officer Representative (COR) and Alternate COR, AFRL Technical Lead, Government Capability Customer, and Prime Contractor Program Manager.
· Required Base Support.
· Technical and non-technical dependencies.
· Technical and non-technical assumptions.
· Deliverables and updates
· Program, project name and overview.
· Technical Approach.
· Staffing plan including equivalent heads by labor categories, durations, subcontractors, and management percentage.
· Engineering description and break down of key tasks required to meet technical requirements and objectives including technical effort, design, and developmental detail integration methodology.
· Required GFI, GFE, GFP needs.
· Estimated contractor acquired property (CAP).
· Identify Risks and mitigation plans impacting cost, schedule, or performance.
· Identified Opportunities to save cost, schedule, or to improve performance.
· New hardware and software requirements, reuse identification, number of system components affected, software modules and the percentage of each module involved, estimated lines of code, documentation affected, and estimated pages of updated documentation.
· Methodologies applied including software design and integration methodology, support methodology, etc.
· Use cases, where applicable.
0. Detailed schedule to include milestones.
0. Security requirement needs considering personnel, systems, Industrial Security and DD254s, to include Special Access Program/Special Access Required (SAP/SAR).
4.3.3 Provide Government fiscal year in which issued, and a unique identifying number consecutively issued within each fiscal year (e.g., Work Plan No. 2025-03, Work Plan No. 2025-04).
4.3.4 Upon receipt of a Work Plan from the Government, perform an analysis and provide implementation strategies to define possible and recommended approaches, potential resolutions, effort required, characterizations of various approaches, relationships to other ongoing effort, advantages and disadvantages of approaches, schedule, risks, and cost of alternative courses of action. Present results to the Government via a Work Plan for review, discussion, disposition, coordination, and approval. If identified in the Work Plan, include in each Work Plan testable performance requirements, deliverable items, delivery schedule, and cost. The Government will analyze this Work Plan to ensure the Contractor’s approach is commensurate with the SOW, the Work Plan, and estimated hours. Approval will be provided by COR signature on the Work Plan. (See CDRLs, A025, B024, C024, D024, E024, and F024)
4.3.4.1 Provide to the Government the status of the effort to achieve the objective within budget, performance, and schedule. Participate in meetings to inform the Government as to progress and/or need for approval to change the hours, budget, scope, schedule, or deliverables required as the situation may warrant. Submit updates to Work Plans as requested by the Government due to scheduling, requirements, or other changes.
| 4.4 | Problem Reports (PRs)/Change Requests (CRs). |
| 4.4.1 | PRs. Provide software engineering (at Contractor facility) to maintain the baselined software by identifying, correcting, testing and documenting the resolution of the PRs. |
| 4.4.2 | CRs. Provide software engineering (at Contractor facility) to enhance the baselined software by designing, developing, integrating, testing and documenting the resolution of the CRs. |
| 4.4.3 | Implement a process for handling all PRs and CRs assigned for correction or enhancement against the various software baselines. (See CDRLs, A008, B007, C007, D007, E007 and F007) |
| 4.4.4 | Maintain a central repository for the processing of all PRs, CRs, and work plans. Log, track, validate, and monitor all PRs and CRs. Utilize system and software engineering metrics, procedures and practices to measure, track and review progress on PR and CR evaluation, technical resolution, coding, testing and completion. |
| 4.4.5 | PR/CRs are categorized as follows: |
· Category 1: Prevents the accomplishment of an essential capability or jeopardizes safety, security, or another requirement designated "critical".
· Category 2: Adversely affects the accomplishment of an essential capability and no work around solution is known or adversely affects technical, cost, or schedule risks to the project or to life cycle support of the system, and no work-around solution is known.
· Category 3: Adversely affects the accomplishment of an essential capability but a work-around solution is known or adversely affects technical, cost, or schedule risks to the project or to life cycle support of the system, but a work-around solution is known.
· Category 4: Results in user/operator inconvenience or annoyance but does not affect a required operational or mission-essential capability or result in inconvenience or annoyance for development or maintenance personnel but does not prevent the accomplishment of the responsibilities of those personnel.
· Category 5: Any other effect with less impact.
4.4.6 Each PR/CR shall include the following:
· Description on system problem or enhancement to include title, date, overview of functional requirement, use case, priority and impact
· Customer Point of Contact (POC) to include name, organization, phone number and e-mail address
· US Government customer’s signature
| 4.4.7 | After a PR/CR is approved by the Government Program Management Office (PMO), generate a PR/CR Work Plan and PR/CR Software Requirement Specification (SRS) with input and coordination from on-site team. (See CDRLs, A007, A026, B006, B025, C006, C025, D006, D025, E006, E025, F006, and F025) |
| 4.4.8 | Provide each work plan and PR/CR SRS to the Government within one (1) working day of receipt of category 1 PR/CRs, within two (2) working days of receipt of category 2 PR/CRs and within five (5) working days for category 3 through 5 PR/CRs. |
| 4.4.9 | PR/CR work plan shall include the following: |
· Total cost estimate to include the labor hours, travel, direct and indirect costs required to design, implement, test, document, and deliver to the Government
· Project schedule to include milestones like design, code, test and delivery phases
· Documentation affected
· PR/CR Software Requirement Specification that shall include the following:
· PR/CR purpose, scope, perspective, functions, user classes and characteristics
· Operating environment parameters and descriptions
· Assumptions and dependencies
· Software modules affected
· Specific requirements to include mock-ups and field tables
| 4.4.10 | Upon Government PMO approval of the PR/CR work plan, design, enhance, integrate, test, and deliver software with appropriate system and technical documentation. | |||
| 4.5 | External Interfaces. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: COTR; Is this O&M or R&D specific? Or does it apply to both? | Comment by LYTLE, RAYMOND C JR CIV USAF AFMC AFRL/RIEBB: It applies to both. | |
| 4.5.1 | Evaluate and assess any request for changes to external interfaces. Upon Government approval, provide maintenance and documentation required for continued mission application baseline software interfacing with external systems. This includes changes in machine-to-machine interfaces, data export/import, web services, Application Program Interfaces (APIs), Interface Design Documents (IDDs), message formats, data content, data providers and protocols that may affect interface software. (See CDRL, A010, B009, C009, D009, E009, and F009) | |||
| 4.6 | Systems Engineering. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Same question as above. Specific to certain type of work? | Comment by LYTLE, RAYMOND C JR CIV USAF AFMC AFRL/RIEBB: This would apply to both, as well. | |
| 4.6.1 | Provide system engineering analysis of software, hardware, databases, network interfaces and web application architecture in accordance with agile software methodology to include but not limited to (See CDRLs, A026, A027, A028, A029, A030, B025, B026, B027, B028, B029, B030, B031, C025, C026, C027, C028, C029, C030, C031, D025, D026, D027, D028, D029, D030, D031, E025, E026, E027, E028, E029, E030, E031, F025, F026, F027, F028, F029, F030, and F031): |
· Verification of vendor licenses
· Recommendation for changes/upgrades
· Traffic/Load analyses in support of enhanced network component allocation/design
· DoDAF views to include, but not limited to, Operational View (OV), System Views (SV), and Capability Views (CV)
· Network/communications configuration, systems test/validation, data base administration, workstation configuration (to include hardware/software version control)
· Demonstrate reuse and modularity of software components to DoD test organizations
· Application software modifications and enhancements
· List of deliverables include, but are not limited to:
· Software Design Description (SDD)
· Interface Control Document (ICD)
· System Requirements Specification (SRS)
4.6.2 Continuously analyze existing functional capabilities of the software baseline as well as information display requirements identified but not implemented.
| 4.7 | Reports and Documentation. | |
| 4.7.1 | Continually determine and document Project Information, Financial and Technical status toward accomplishment of requirements, including the identification of risk and plans to mitigate risks. (See CDRLs, A001, B001, C001, D001, E001, and F001) | |
| 4.7.1.1 | Provide effective delivery of the required deliverables and ensure that the Contractor performance is within Program Performance Objective targets. This includes continually determining the status of the effort, reporting progress towards the objectives, and ensuring performance with respect to technical quality, cost and schedule. (See CDRLs, A001, B001, C001, D001, E001, and F001) | |
| 4.7.2 | Continually determine the status of funding required for performance. (See CDRLs, A002, A003, B002, C002, D002, E002, and F002) | |
| 4.7.3 | Conduct oral presentations, conference agenda, and conference minutes to provide status of technical progress made to date. (See CDRLs, A004, A005, A006, B003, B004, B005, C003, C004, C005, D003, D004, D005, E003, E004, E005, F003, F004, and F005) | |
| 4.7.3.1 | Technical Interchange Meetings (TIMs) shall include, but not limited to, status, progress, performance, funding, schedule, personnel, security, assumptions, risks and other pertinent data. | |
| 4.7.3.2 | Program Management Reviews (PMRs) shall address cost, schedule, and performance progress/issues. |
4.7.4 Coordinate TO activities that cross stakeholder organizations and for providing representation on integrated project teams to ensure effective cross-organizational support, coordination, and collaboration.
4.7.5 Schedule, coordinate, and host a Project Kick-Off Meeting within fourteen calendar days of task TO award at a location approved by the Government. At a minimum, the attendees shall include key Contractor personnel, representatives from Government identified stakeholders, GPMO and the GARDEM 2 Contracting Officer (CO). The Contractor shall provide the following at the Kick-Off Meeting; (1) Introduction of Contractor team members and capabilities, (2) Overview of the TO scope, schedule, and deliverables Security Overview of the TO scope, schedule, and deliverables, (3) Security requirements/access procedures, (4) Invoice procedures, (5) Points of contact, (6) Additional issues or concerns, (7) AWS cost calculation worksheet, and (7) Draft Program Management Plan.
4.7.6 Develop and administer a Quality Control Plan. Ensure that all assigned products meet their specified design, format, functional and performance requirements. Assure the quality control process is integrated into all activities supported under the contract.
4.7.7 Perform continuous technical management to identify resources required for managing this order, and to resolve technical, system performance, cost, and schedule problems.
| 4.7.8 | Provide Government on-line access to program management data including PR, CR, PR/CR work plans, software inventories, program schedules and cost data. | |
| 4.7.9 | Provide, maintain, and implement System Engineering, and Configuration Management Plans. (See CDRLs, A009, B008, C008, D008, E008, and F008) | |
| 4.7.10 | Provide staffing to ensure appropriately cleared and qualified personnel are maintained for successful program performance throughout the period of performance. Identify and replace personnel who have left the program, acquire additional personnel to address new requirements. | |
| 4.7.10.1 | Ensure personnel comply with all Government policies, procedures and guidance for performance under this contract at any work location. | |
| 4.7.11 | Update existing Government Furnished Documentation in the form of revisions. Format and content of the changes shall not deviate from that of the existing documentation. (See CDRLs, A009, B008, C008, D008, E008, and F008) | |
| 4.7.11.1 | Anticipated documentation include: |
· Standard Operation Procedures (SOPs)/Working Procedures
· Collection, Collaboration, and Dissemination Process Documentation
· Training/Familiarization Materials
· System Requirements Specification (SRS)
· Interface Control Document (ICD)
· Tactics, Techniques, and Procedures (TTPs)
· Roles and Responsibilities of Agile Product Teams
· Management Plans
| 4.7.12 | Develop Project Work Plans as requested by the COR. (See CDRLs, A025, B024, C024, D024, E024, and F024) | |
| 4.7.13 | Document all technical work accomplished, and information gained during performance of this acquisition. Include all pertinent observations, nature of problems, positive and negative results. Document procedures followed, processes developed, “Lessons Learned”, etc. Document the details of all technical work to permit full understanding of the techniques and procedures used in processes developed. Cross-reference separate process specifications delivered to permit a full understanding of the total acquisition. (See CDRL, A035) | |
| 4.7.14 | Review, assess and track changes to Contractor generated documentation to include but not be limited to functional, installation, A&A, and test plans. | |
| 4.7.15 | Attend and present project briefings on technical and management issues related to the requirements of this effort to stakeholders, the GPMO, and others as authorized by the GPMO. | |
| 4.7.15.1 | Conduct presentations to the working group on GARDEM 2 related subjects coordinated with the Government. | |
| 4.7.15.2 | Conduct demonstrations of new software version releases or related functionality when available. |
4.7.16 Conduct Engineering Design Reviews and System Requirements Reviews as prescribed by the GPMO.
4.7.17 Provide written notice to the Contracting Officer at least thirty (30) calendar days prior to substituting or removing individuals occupying these key personnel positions: (1) Program Manager, (2) Data Team Lead, (3) Chief Architect, (4) Lead Software Engineer.
| 4.8 | Hardware and Software Delivery. | |||||
| 4.8.1 | Design, develop, evaluate, document, and deliver all software and hardware in accordance with an agile software development methodology as follows: (See CDRLs, A023, B022, C022, D022, E022, and F022) | |||||
| 4.8.1.1 Deliver all software developed, modified or enhanced under this effort as source and object (executable) code, API, Software Development Kit (SDK) and developer documentation including commented source code on electronic media and to the DLE or development environments and online software repositories as prescribed by the Government. Ensure all deliverables involving source code contains enough information for the Government to recreate the build environments to include, but not limited to the compiler, environment variables, Operating System (OS), OS patches, all run-time libraries, middleware, make files, as well as test code (i.e. stubs and scaffolding) and any other dependencies to assure a successful build upon delivery. Commercial tools for which the Government does not own a license need not be included. Source code shall not be delivered outside the Program Management Office (PMO) without written permission of the COR. Forward requests for source code releases to the COR. (See CDRLs, A011, A023, A024, A028, A030, B010, B022, B023, B030, B031, C010, C022, C023, C030, C031, D010, D022, D023, D030, D031, E010, E022, E023, E030, E031, F010, F022, F023, F030, and F031) | Comment by GAITHER, WHITNEY W CIV USAF AFMC AFRL/RIKF: Where is 4.7? | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: 4.7 would be a heading such as SOFTWARE AND HARDWARE | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: Addressed | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Similar to 4.6.7.5.1 | Comment by LYTLE, RAYMOND C JR CIV USAF AFMC AFRL/RIEBB: Duplicate, removed 4.6.7.5.1 so reference to software is under Software and Hardware heading. | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: Addressed |
| 4.8.2 | Developed, modified and enhanced software under this effort is to be completely maintainable and modifiable with no reliance on any non-delivered computer programs or documentation. (See CDRLs, A031, B032, C032, D032, E032, and F032) | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Is this duplicate of 4.6.7.5.2? | Comment by LYTLE, RAYMOND C JR CIV USAF AFMC AFRL/RIEBB: Duplicate, removed 4.6.7.5.2 so reference to software is under Software and Hardware heading. |
4.8.3 Provide and execute a proven agile methodology (such as Secure Agile Framework for Enterprises, Kanban, Sprints, etc.) for analysis, design, development (including use of prototyping and modeling), coding, integration, testing, demonstration, and installation of development software to support operational sites. The development methodology must be grounded in sound development processes and detailed reviews, ensuring justified progression to the next system engineering phases.
4.8.4 All software and documentation, currently baselined, modified or enhanced, shall be compliant with IC and AF community policies and focus on rapid, agile delivery, enterprise infrastructure, and data management. Ensure all baseline changes are tracked and reproducible from inception to completion.
| 4.8.5 | For all software purchased or licensed, arrangements shall be made for licensing and maintenance agreements to be transferred to the Government upon the completion of this effort. (See CDRLs, A024, B023, C023, D023, E023, and F023) | ||
| 4.8.6 | All software, unless directed otherwise shall be developed with an agile methodology while utilizing a Government owned system for functions pertaining to software development to include but not limited to document storage, software repositories, issue tracking, program increment management, sprint development management, backlog functions (creation, management, and execution), source code control, building, compiling, continuous integration, and software delivery. | ||
| 4.8.7 | Deliver and install any hardware acquired for this effort. Transfer all licensing and maintenance agreements to the Government upon acceptance. (See CDRLs, A024, B023, C023, D023, E023, and F023) | ||
| 4.8.8 | COTS/GOTS Software: As upgrades to COTS/GOTS software are released by vendors/Government agents, such upgrades must be assessed for impact to the environment in which they operate. Changes shall first be approved through the CM process established prior to adding to the baseline. Upon Government approval, apply the upgrades to the baseline. (See CDRLs, A024, B023, C023, D023, E023 and F023) | ||
| 4.8.9 | Acquire Hardware and Software: At the direction of the Government, acquire approved hardware and software to support the software baselines. Include licensing, maintenance and diagnostics support software. Arrange for delivery and installation of hardware, firmware, software and licenses to Government designated sites. (See CDRLs, A024, B023, C023, D023, E023 and F023) | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: TW: Is this our “CAP” language? Should be within a specific heading if so? Such as HW/SW section? | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: Moved |
| 4.8.10 | For any items purchased as contractor-acquired property (CAP) during the reporting period, please document the following information within the status report: Item Name, Description, Quantity, Unit of Measure, Serial Number, Manufacturer CAGE Code, Mfr Part Number, Mfr Model Number, Date of Acquisition, and Unit Acquisition Cost. This information may be included as an Excel spreadsheet attachment to the status report. (See CDRLs, A001, B001, C001, D001, E001, and F001) | ||
| 4.9 | Configuration Management (CM). |
4.9.1 Provide CM/Requirements Management (CM/RM) in accordance with current Institute of Electrical and Electronic Engineers (IEEE) and Electronics Industries Association (EIA) standards as further defined by DoD and AFRL guidance. Implement an integrated process for managing information and products associated with the deployment and acquisition of all deliverable software, hardware, and associated documentation. The CM/RM process shall support the full software lifecycle (i.e., System Requirements Analysis, Design, Software Requirements Analysis, Preliminary Design, Detailed Design, and System Integration and Testing). (See CDRLs, A011, B010, C010, D010, E010, and F010)
4.9.2 Maintain and enhance CM processes for all software activities within GARDEM 2. Establish and maintain development, test, and production baselines in accordance with the Government-approved CM process. Coordinate, evaluate, prioritize, and schedule updates to baselines. Administer software and database baseline media library. (See CDRLs, A011, B010, C010, D010, E010, and F010)
4.9.3 All program documentation should be created and maintained within Government Owned Tool Suite, such as DLE, to include design review minutes, design checklists; code review minutes, code checklists; unit test results, unit test checklist; software release list; final unit test plan with allocated requirements; test drivers/data, source code, script files, task tracking, and preliminary design data. (See CDRLs, A011, B010, C010, D010, E010, and F010)
4.9.4 Review and revise Installation Plans for CM system delivery to support all aspects of the installation to include procedures for verifying that the installation is successful. (See CDRLs, B026, C026, D026, E026, and F026)
| 4.10 | Help Desk Support: Provide help desk support for GARDEM 2 software baseline on a published forty (40) hour work week, for all operational, experimental and authorized evaluation installations. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Should this be GARDEM 2 software baseline? | Comment by GEORGE, DANIEL J CIV USAF AFMC AFRL/RIKA: Addressed |
| 4.11 | Training and Certification: Establish and execute a robust training baseline and continuing education program incorporating the latest required certifications to include but not limited to system administration, database certification, security certification, and operating system certification listed in paragraph 2.1. | ||
| 4.12 | Property Management: No known Government Furnished Property (GFP) is anticipated at this time, however if required during performance it will be addressed, and the Contractor will be responsible for providing “Property Management” to include updating and maintaining the listing/database of GFP to assure the accounting and status of all GFP under the contract. | ||
| 4.13 | Security Requirements. | ||
| 4.13.1 | Manage all aspects of security associated with performance to include personnel security access, security clearance information preparation, and liaison with Government Point of Contacts (POCs) for security related items. Capture and maintain information regarding all contract personnel and security related data. The personnel information maintained and provided to the COR shall include a list of all personnel performing under the contract, security clearance levels, sponsors, dates for performance, and Government identification materials (i.e. Common Access Cards (CACs), agency badges). Provide information supporting visit requests, CACs, personnel clearance, and other security related activities. Provide softcopy and hardcopy of managed information assuring proper privacy markings and controls are utilized. Format will be Contractor-suggested, Government-approved format. | ||
| 4.13.2 | Access to Private Information: Performance may require access to information covered by the Privacy Act of 1974; therefore, Contractor personnel shall safeguard all such information in accordance with the Privacy Act of 1974 at all times and shall not release such information to unauthorized persons. | ||
| 4.13.3 | Export Control: The Contractor may be required to carry out technical data/information exports in support of the requirements. Ensure all items have appropriate control markings to include Scientific and Technical INFOrmation (STINFO), export control and classification. Comply with applicable International Traffic in Arms Regulations (ITAR) requirements to meet the needs of the Government. Maintain compliance with all governing directives and policies. | ||
| 4.13.4 | Security Clearance: Employees with Top Secret/Special Compartmented Information (TS/SCI) access may be required to perform the tasking under this contract immediately upon award. Compliance with DoD 5200.2-R, Personnel Security Program, January 1987 for access to TS/SCI information, systems and facilities is mandatory. All Contractor personnel shall be citizens of the United States of America. | ||
| 4.13.5 | Safeguarding Classified Information. | ||
| 4.13.5.1 | Comply with the DD Form 254, DoD Contract Security Classification Specification and attachments. Potential security violations or incidents shall be reported immediately to the AFRL COR and in writing no later than the next workday after the incident occurred. Proper controls shall be utilized (i.e., secure telephone, classified fax, classified e-mail), based on the security classification of the information associated with the possible violation. | ||
| 4.13.5.2 | Conform to the provisions of DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), for safeguarding classified information and material contained on the controlled system(s)/network(s). Ensure access is provided only to those persons who have the proper security clearance, a need to know and have been trained in proper safeguarding procedures. | ||
| 4.13.5.3 | Participate in the management of security access, preparation of security clearance data/forms, access requests and coordination with Government security POCs. | ||
| 4.13.6 | Physical Security. | ||
| 4.13.6.1 | Comply with the requirements as specified in the order. | ||
| 4.13.6.2 | Safeguard all Government property provided. Ensure that all Government equipment and materials are secured. Follow regulatory guidance concerning maintenance, use, and safety. | ||
| 4.13.6.3 | For Performance of Support during Emergency Conditions, local procedures shall be followed. | ||
| 4.14 | Access to Computer Systems. | ||
| 4.14.1 | Request a User ID (and/or CAC) and Password from the designated Government representative. The request shall include the contract number, identification of the employee, including social security number. The request shall include the employee's signature and a statement that the employee understands and accepts the requirement to personally protect any password (and/or CAC) assigned to him or her because of the computer access request. | ||
| 4.14.2 | Ensure employees do not reveal their passwords to anyone. The obligation to enforce this requirement is a material element of the security requirement herein. | ||
| 4.14.3 | Notify the designated Government representative immediately of an employee’s termination from work on this effort. | ||
| 4.15 | Software Test and Validation. | ||
| 4.15.1 | Conduct Unit Test, Regression Test, System Integration Test, Factory Acceptance Test, Functional Test, Test Readiness Review (TRR), User Acceptance, Installation Performance Validation Test (IPVT) and A&A testing on all releases of software baselines to ensure that the changed software meets requirements and does not adversely impact existing systems, interfaces, or security accreditation. (See CDRLs, A012, A013, A014, A015, A016, A017, A018, A019, A020, A021, A022, A023, B011, B012, B013, B014, B015, B016, B017, B018, B019, B020, B021, B022, C011, C012, C013, C014, C015, C016, C017, C018, C019, C020, C021, C022, D011, D012, D013, D014, D015, D016, D017, D018, D019, D020, D021, D022, E011, E012, E013, E014, E015, E016, E017, E018, E019, E020, E021, E022, F011, F012, F013, F014, F015, F016, F017, F018, F019, F020, F021, and F022) | ||
| 4.15.2 | Implement Vulnerability Assessment, Information Assurance, and Security Readiness Reviews to meet Defense Information Systems Agency (DISA), Risk Management Framework (RMF), DoD Information Assurance Assessment and Authorization Process (DIACAP) Security Technical Implementation Guides (STIG), and North Atlantic Treaty Organization (NATO) STIG compliance. Implement security fixes to address system vulnerability, patch, and penetration scans. | ||
| 4.15.3 | Provide system engineering and testing expertise to Operational Test & Evaluation (OT&E) at the designated test facility. | ||
| 4.15.4 | Provide system engineering and testing expertise to Development Test & Evaluation (DT&E) at the designated test facility. | Comment by OGUNDADEGBE, ERICA L CIV USAF AFMC AFRL/RIKF: Is this R&D specific and 4.16.5 O&M specific? Or overall is 4.16 apply to both CLIN types and therefore ok to leave “out” here | Comment by LYTLE, RAYMOND C JR CIV USAF AFMC AFRL/RIEBB: This section applies to both. |
| 4.15.5 | Provide system engineering to implement Installation Performance Validation Test (IPVT) at designated test facility. | ||
| 4.15.6 | Support Government In-Plant Testing. For each software release, provide engineering support and test expertise for Government In-Plant Testing at the Contractor’s facility. (See CDRLs, A012, A013, A014, A015, A021, B011, B012, B013, B014, B020, C011, C012, C013, C014, C020, D011, D012, D013, D014, D020, E011, E012, E013, E014, E020, F011, F012, F013, F014, and F020) | ||
| 4.15.7 | Provide technical expertise for system interoperability testing at the designated test facility. | ||
| 4.16 | System A&A: All software shall conform to the A&A requirements and system security compliance as defined in the Federal Information Security Management Act (FISMA), RMF, DIACAP, Director of National Intelligence (DNI) Intelligence Community Directive (ICD) 503, National Institute of Standards and Technology (NIST) 800-53 for developing, coordinating, reviewing, and approving Information Technology (IT) and National Security System (NSS) Interoperability and Supportability (I&S), Defense Intelligence Agency’s (DIA) DoD Intelligence Information System (DODIIS) Information Integrators Guide (DIIG) for connecting to DoD and Air Force networks to including Unclassified but Sensitive Internet Protocol Router Network (NIPRNET), Secret Internet Protocol Routing Network (SIPRNET), and Joint Worldwide Intelligence Communication System (JWICS). (See CDRLs, A016, A017, A018, A019, A020, B015, B016, B017, B018, B019, C015, C016, C017, C018, C019, D015, D016, D017, D018, D019, E015, E016, E017, E018, E019, F015, F016, F017, F018, and F019) | ||
| 4.17 | Travel. | ||
| 4.17.1 | Conduct Technical Assistance Visits, Integration Visits, TEMs and Program Reviews. Unless otherwise specified by the Government, develop a Trip Report detailing, at a minimum, accomplished tasks, unaccomplished tasks, open issues, and new issues. Coordinate specific travel arrangements with COR to obtain advance, written approval for the travel about to be conducted. The contractor’s request for travel shall be in writing and contain the dates, locations and estimated costs of the travel. | ||
| 4.18 | Overseas Travel. | ||
| 4.18.1 | Comply with all Government foreign travel requirements as specified by this effort. Additional information and/or training maybe required on a country-by-country basis. Foreign travel is subject to the country-specific DoD Foreign Clearance Guide entry and exit procedures (https://apacs.milcloud.mil/fcg/index.html). As part of these procedures, depending on the country of travel, obtaining a Sponsor Company may be required to process a business license or business visas. The Contractor must also enter their employee information into the Aircraft and Personnel Automated Clearance System (APACS) in addition to the Synchronized Predeployment and Operational Tracker (SPOT), if applicable. The Contractor's responsibility to comply with all applicable laws and regulations regarding performance in country exists independent of, and is not established or limited by, the information provided by this requirement. | ||
| 4.19 | Reserved. | ||
| 4.20 | Adhere to Cloud Computing Requirements. Reference Section I clause DFARS 252.239-7010. |
4.20.1 Work on this effort will require or allow Contractor access to Privacy Information. Content contained within the cloud services is subject to the Privacy Act. As such, the Contractor shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a, and applicable agency rules and regulations.
4.20.2 Work on this effort will require or allow Contractor access to Level 2 Public or Non-Controlled Unclassified Information. Content contained within the cloud services is subject to the Freedom of Information Act (FOIA). As such, the Contractor shall adhere to the FOIA regulations, and applicable agency rules and regulations. This level accommodates Non-CUI information categorizations based on CNSSI (Committee on National Security Systems) Instruction 1253 up to low confidentiality and moderate integrity (L-M-x).
4.20.3 Work on this effort will require or allow Contractor access to Level 4 Controlled Unclassified Information, including “Export Controlled,” and “For Official Use Only” data, and non-National Security Systems (NSSs). Content contained within the cloud services is subject to the Freedom of Information Act (FOIA). As such, the Contractor shall adhere to the FOIA regulations, and applicable agency rules and regulations. This level accommodates CUI information categorizations based on CNSSI (Committee on National Security Systems) Instruction 1253 up to moderate confidentiality and moderate integrity (M-M-x).
4.20.4 Work on this effort will require or allow Contractor access to…
This is the start of the file's text. The full file is on GovTribe.