This document is a draft Statement of Work (SOW) for a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery Indefinite Quantity (IDIQ) contract. The IDIQ will be a 5-year base period with four 1-year option periods, with a not-to-exceed value of $15,000,000.

The SOW outlines the requirements for the contractor to provide labor, materials, and equipment to perform numerous, concurrent sustainment, repair, maintenance, and minor construction projects at Arnold Air Force Base. The government will provide basic design information for each task order, with the contractor responsible for completing the design and providing construction services. The contractor must have in-house design capabilities, including registered professional engineers or architects, and meet specified experience levels for key personnel.

Pricing for the contract will be based on unit prices from a Construction Task Catalog, with a coefficient to cover the contractor's indirect costs and profit. The contractor will also be required to negotiate any non-priced items. The SOW provides details on the task order proposal and negotiation process, as well as requirements for construction scheduling, safety, quality control, and warranty work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIMPLIFIED ACQUISITION OF BASE ENGINEERING

REQUIREMENTS

SABER

AEDC/TSDCN

CIVIL ENGINEERING BRANCH

ARNOLD AFB, TN

STATEMENT OF WORK

29 March 2024

Attachment #1 - DRAFT Statement of Work

TABLE OF CONTENTS

SECTION:

1. Project Description

2. General Information

3. Work by the Government

4. Technical Design Support Capabilities

5. Performance Capabilities

6. Design/Construction Requirements

7. Key Personnel

8. Quality Control

9. Provisions On Contracting Officer’s Authority

10. Task Order Pricing

11. Coefficient

12. Government Furnished Facilities and Equipment

13. Contractor Storage Location

14. Housekeeping

15. Meetings

16. Equipment/Government Liability

17. Field Change(s)

18. Computer Requirements

19. Communication

20. Standard Hours of Work

21. Construction Start-Up Period

22. Pre-Performance Conference

23. Task Order Procedure

24. Commencement, Execution, Completion and Payment for Work

25. Record Drawing/Jobsite Verification

26. Submittal Logs

27. Material Submittals/Shop Drawings

28. Welding Permits

29. Work Clearance Request/Excavation Permits

30. Testing of Materials

31. Pre-Final and Final Inspection

32. Warranty

33. As-Built Drawings

34. Government Furnished Materials

35. Construction Scheduling, Elevators, Furniture, Delivery, Concurrent TOs and

Progress Schedules and Progress Reports:

36. Work in Occupied Areas

37. Coordinating with Government Activities

38. Noise Control

39. Construction Site Maintenance

40. Fencing of Construction Site

41. Barricades

42. Contractor Parking

43. Transportation of Construction Equipment

44. Refuse/Dumpsters

45. Unauthorized Reconnaissance

46. Paving and Roadwork

47. Inappropriate Worker Behavior

48. Environmental Laws and Regulations

49. Work in Special Security Areas

50. Airfield Requirements and Flight Line Access

51. Utility Outages

52. Energy Conservation Initiative

53. Green Procurement

54. Completion of Contract

55. Safety and Health

56. Explosive Operated Hand tools

57. Contractor’s Use of Electromagnetic Emission Devices

58. Recording and Preserving Historical and Archeological Finds

59. Deviations

60. Use of Tobacco

61. Abbreviations

SABER STATEMENT OF WORK

1. Project Description:

A. This Statement of Work is for the Simplified Acquisition of Base Engineering Requirements (SABER) efforts at Arnold AFB, TN. The Contractor shall provide all management, labor, material, equipment, (unless furnished by the Government), transportation, supervision, and minimal designs to accomplish numerous, concurrent projects for a broad range of sustainment, repair, maintenance (SRM) and minor construction (MC) work on real property at Arnold AFB, TN. Arnold AFB is comprised of Arnold Engineering Development Complex (AEDC) with multiple R&D test facilities with operations of 28 aerodynamic and propulsion wind tunnels, rocket, and turbine engine test cells, space environmental chambers, arc heaters, ballistic ranges and other specialized units. Other facilities not limited to but include maintenance, personnel and support facilities, lodging, and other service facilities.

B. Award of SABER projects will be executed in accordance with this Statement of Work (SOW) along with the terms and conditions of each individual Task Order (TO). The Government shall provide the statement of work that identifies the tasks required to complete each specific job, including concepts, sketches, and drawings, any statutory cost limitations, any special instructions or requirements, and required cost comparisons, justifications, and approvals. The Government will also assist in the timely closeout of completed projects. The Contracting Officer (CO) will issue the Contractor a Request for Proposal (RFP) describing requirements for each TO.

C. Normally, the Government will provide only basic (35%) design information for each RFP. However, the Government may provide full (up to 100%) design information for a given RFP, depending on the complexity of the project. For a normal basic (up to 35%) design, the Contractor shall complete the design. Whether 35% or up to 100% design, the Contractor will provide the construction services and complete as-built drawings. The Contractor shall provide sufficient technical support and project management to assure quality and completeness of designs and drawings, accuracy of estimates, accommodate fluctuation of projects, provide flexibility of design staff and subcontractor pool to handle rapid increases in work volume, perform according to schedule (including completion on time), and process submittals and payrolls in a timely manner. The Contractor shall be required to manage and execute the normal to heavy workload of concurrent projects.

The Contractor may occasionally be required to provide for large, unexpected fluctuations in the workload.

D. Commencement of the contract task order shall be within 10 days of Notice to Proceed (NTP) unless otherwise directed by the Contracting Officer.

E. If the Government’s requirements for services set forth in the solicitation does not result in orders totaling the amount described as “maximum”, this shall not constitute the basis for an equitable price adjustment under this contract.

2. General Information:

Attachment #1 - DRAFT Statement of Work

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

This leave no flexibility, recommend adding “...unless otherwise directed by the Contracting Officer.”

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

I would like to get a legal opinion on this paragraph. I’m not sure it is needed.

The following documents shall be used in the execution of work under this contract:

A. SABER Statement of Work (SOW).

B. SABER Technical Specifications: The Contractor shall utilize Unified Facilities Guide Specifications (UFGS). UFGS are published on the Whole Building Design Guide. All specifications are filed in Division 1 through 48 and are to be used in conjunction with any drawings which may be provided by the Government. Each specification section may apply to numerous individual line items. Other specifications may not have Pre-Priced Data base pricing information. Those items may be special ordered from the manufacturer or the items involved may be proprietary to each manufacturer’s own equipment. Specifications are intended to indicate the quality of materials and workmanship expected by the Government. If a specific line-item description is not included in the Guide Specifications, the Contractor shall provide a complete description of the item, including standards and salient features, of the selection of or approval for use of that line item. Most of the unedited specification sections contain several fill-in-the-blank passages for which there are given options. For each project, the Contractor shall tailor each applicable specification section by identifying in a project SOW the proposed selection for each of these passages, as applicable to the given project. These products are available online only at: https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs.

The intent of these specifications is to furnish concise industrial and/or commercial standards for SRM, demolition and construction of Government facilities.

3. Work by the Government:

A. The Government is not obligated to issue any particular type of work to the SABER Contractor and reserves the right to accomplish work using Government or other Contractor work forces, as the Government deems necessary or desirable, and to do so shall not breach or otherwise violate this contract.

4. Technical Design Support Capabilities:

A. Typically, the Government provides a minimum design for SABER of 35%. If the design requires the services of a registered architect or engineer, it is outside the parameters of minimum design. The contractor will be responsible for submitting documentation that substantiates the proposed approach, and if it is necessary to use the professional services of a registered architect or engineer.

B. Typically, supporting documents are requested from the Contractor. Documents may include a Statement of Work (SOW), Program Evaluation and Review Technique (PERT) chart, cost estimates, justification for non-pre-priced items (NPI), verified as-built drawings, manufacturer’s or technical drawings/schematics for fabrication and assembly of structural elements, form, fit and attachment details for installation of materials/equipment, and design calculations to substantiate proposed layout and sizing of utilities and structural elements (i.e. HVAC loads, lighting, platform supports, etc.).

C. The Contractor’s in-house minimal design capabilities are of utmost importance. Areas of required minimal design competence shall include, but are not limited to: architectural, structural, mechanical, electrical, and drafting/surveying capabilities. Minimal design effort is defined as the capability to provide builder’s plans of the type routinely developed in commercial practice and/or as provided and supplemented by industry such as pre-engineered building manufacturers, major heating ventilating and air conditioning equipment suppliers, fire suppression system suppliers and the like. The government recommends that the SABER Contractor’s staff include at least one registered Professional Engineer (PE) or architect well versed in multidiscipline design and construction supported by a Computer Aided Drafting/Design (CADD) operator(s) to support production of the minimal design efforts required. The Contractor’s designs must comply with the requirements of all building codes listed in Section 6 and UFGS.

D. The Government shall only provide basic concept design, sketches, and/or drawing(s) information for a specific work requirement. The Contractor must demonstrate design capabilities of providing quality, cost effective minimal design for multiple TOs simultaneously and within the time constraints stated in Section 24, Task Order Procedures, which shall comply with Government requirements and all applicable building codes and governing authorities. The Contractor will be provided with the Government’s initial concept design and SOW for each TO. The Contractor shall then be responsible for further development of the Government’s concept design to a point where the Contractor’s designs/drawings clearly indicate the proposed method of accomplishing the work, as well as the description, size, and location of all proposed elements of the work.

The Contractor’s design must fully comply with the Government’s concept design requirements as well as all governing codes (See Section 6 “Design/Construction Requirements”) and UFGS. The Contractor is expected to use recognized industry standard practice in determining proposed design materials and methods unless the Government specifies otherwise.

E. The Contractor shall perform limited surveying to layout the project work sites to perform required work and where grading or drainage is involved. Drawings shall clearly indicate both existing and new spot elevations.

F. If specifically required by the CO, on a particular TO, the Contractor shall be required to furnish documents/drawings bearing the stamp and signature of a registered architect or professional engineer.

G. SABER is not appropriate for large, complex construction projects that require extensive design effort.

5. Performance Capabilities:

Not sure we should or even can mandate that they directly employ a PE. Recommend changing this to state something similar to, “Recommend the contractor team include at least…” Also, the Key Personnel listed below don’t include a PE.

ROSE-NALIN, ASHLEY L CIV USAF AFMC AEDC/TSD

If we can’t require it, during the rating process can we give a higher weight to staffing if they have a PE?

ROSE-NALIN, ASHLEY L NH-03 USAF AFMC AEDC/TSD

I want to revise this and allow them to utilize the price book line items and charge specific task orders that require a stamp to charge to those, as necessary. I think having this blanket covered in the contract like this causes two problems: 1) Some prospective bidders will increase their coefficient to pad themselves to cover this requirement or 2) Other prospective bidders will hedge their bets hoping that enough work is given that they can roll the price of some jobs that require this into multiple task orders. I think if we just allow them to use the RSMeans line item that is appropriate for this, we’ll get more honest pricing on the coefficient and each task order. (Ashley’s Random Thoughts and Reflections)

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

100% agreed, I think we should revise this to reflect use of Means which will also make our IGEs more accurate and aid in price evaluation.

ROSE-NALIN, ASHLEY L CIV USAF AFMC AEDC/TSD

I have revised to remove “at no additional cost to the Government (a part of the coefficient).”

ROSE-NALIN, ASHLEY L NH-03 USAF AFMC AEDC/TSD

Same comment as previous references to AFFARS. It looks like AFFARS is now DAFFARS, and they have removed this entire section from DAFFARS.

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

Yes, recommend removing the reference.

ROSE-NALIN, ASHLEY L CIV USAF AFMC AEDC/TSD

Removed.

A. As a minimum, the Contractor shall maintain the following management and technical support capabilities at their Arnold AFB, SABER office (see section 13 below) throughout the duration of this contract for work exclusively on SABER TOs. An organization chart shall be provided fully depicting all staff members, their title, full or part time, and whether they are located on or off site and updated as changes occur.

1) Contractor’s Project Manager (CPM) - Provide overall contract management of the prime contract to include subcontract purchasing and administration, Contractor review of material submittals and shop drawings, full authority to develop cost proposals, negotiate and sign TOs, supervise individual project superintendents, and attend all joint Government/Contractor status meetings as well as site visits, pre-performance conferences, pre-final, and final inspections. The CPM shall be available during normal duty hours within 30 minutes after notification to meet with the Contracting Officer (CO) at a location selected by the CO. CPM must have a minimum of one (1) year previous experience as primary manager of a SABER, SABER type contract or general contracting firm engaged in similar multiple discipline commercial construction projects.

2) Site Superintendence (FAR Clause 52.236-6) - Provide on-site superintendence for each active project and employe enough superintendents to adequately oversee all work. Site supervision shall include submission of detailed semi-monthly progress reports for each TO, scheduling and coordination of subcontractors and material suppliers, and attendance at all site visits, pre-performance conferences, pre-final, and final inspections. Superintendents shall have a minimum of one (1) year previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects. When work is being performed, the assigned superintendent or an appointed alternate shall be available at any work site within 15 minutes of notification. The superintendent is responsible for the proper coordination and timeliness of the work and for the proper workmanship of all trades. The ability of the superintendent, based on their knowledge and experience, is essential to the proper execution of the work, as is their ability to communicate and direct the efforts of those performing the work.

Not later than one week prior to the start of work on any task order, the Contractor shall submit in writing to the contracting officer, or designated representative, the name of the individual(s) to serve as project superintendent(s) and the individual’s qualifications pursuant to FAR 52.236-6; if personnel change the Contractor shall re-submit.

3) Drafting - Drafting support shall be capable of producing accurate and complete proposal and construction computer aided design and drafting (CADD) drawings for several TOs simultaneously within the time constraints specified in Section 24, Task Order Procedures.

4) Cost Estimating/Negotiating - Provide estimating and negotiating support with experience in development of detailed quantity cost estimates and cost estimates for multi-discipline commercial construction projects. Contractor must provide the capability to negotiate multiple TOs simultaneously. Primary negotiator must have previous experience in line-item negotiation.

5) Quality Control and Safety Management: The Contractor shall provide a Quality Control Manager (QCM) to provide quality control and safety management for all active projects. The QCM shall perform a minimum of twice daily site visits to each active project site to ensure full compliance with all safety requirements, verification that the work and materials in place and stored on site are in accordance with the approved construction drawings, shop drawings, and material submittals. The QCM shall submit daily field notes recording activities at each project site, prepare and coordinate material submittal sheets and shop drawing submittals, prepare quality control reports, attend all pre-final and final inspections, and schedule and coordinate testing procedures. Quality control and safety management should be carried out by someone other than the CPM or site superintendent.

B. Design - Design support shall produce accurate and complete proposal and construction drawings for multiple TOs simultaneously within the time constraints specified in Section 24, Task Order Procedures. Design support shall have previous experience in building design and basic knowledge of architectural, civil, structural, mechanical, and electrical design and cost estimating. A registered PE or architect should be available to support work requiring their knowledge, skills, and abilities.

C. Required experience levels shall be maintained throughout the duration of the contract. When personnel changes are required, resumes and a revised organization chart shall be submitted to the CO for awareness.

D. As a minimum, the Contractor shall perform at least 15% of the cost of the contracted work, not including the cost of materials, using Contractor in-house work force (Ref: FAR Clause 52.219-14(e)(3)).

6. Design/Construction Requirements:

A. All design and construction under this contract shall comply with the latest edition of all applicable federal, state, and local laws and codes including, but not limited to the following list. Any exception must be approved in writing by the Government prior to construction start-up.

1) Executive Orders (EOs)

2) Air Force Engineering Technical Letters (AFETLs)

3) Air Force/Department of Defense (DoD) Instructions, Manuals, Handbooks, and

Regulations

4) Unified Facilities Criteria (UFCs)

5) American Society of Mechanical Engineers (ASME)

6) American National Standards Institutes (ANSI)

7) National Association of Corrosion Engineers (NACE)

Attachment #1 - DRAFT Statement of Work

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

The CO wouldn’t approve the contractor’s personnel hire. We can agree/disagree whether they meet the minimum requirements of the SOW.

I assumed this was just a requirement that they notify us of staffing changes. Let me know if this requires revision.

8) National Plumbing Code

9) National Fire Protection Association (NFPA)

10) National Electric Code (NEC)

11) International Building Code (IBC)

12) Life Safety Code

13) Environmental Protection Agency (EPA) Regulations

14) National Environmental Policy Act (NEPA)

15) Uniform Mechanical Code

16) Federal Register/Vol. 56, No 144/1991. Handicap Accessibility Standards

17) AEDC Safety, Health, and Environmental Standards*

18) Air Force Corporate Facility Standards

19) AEDC Asbestos and Lead Paint Abatement Standards*

20) Uniform Federal Accessibility Standards

21) Tennessee State and Local Laws

*NOTE: Electronic Copies Available upon Request.

B. The Contractor shall maintain current issues of the above documents (Para 6A) at local Contractor’s SABER office for use during the term of this contract.

C. If there is a conflict between these codes and UFGS, the most stringent requirements shall apply, unless specifically requested otherwise in writing to the Government.

7. Key Personnel:

A. Each existing/proposed key personnel capability must indicate the following minimum levels of expertise:

1) Owner - no less than three (3) years’ experience in their respective field.

2) Contractor’s Project Manager - no less than five (5) years’ experience in construction and a minimum of one (1) year previous experience as a primary manager of a SABER, SABER type contract or general contracting firm engaged in similar multiple discipline commercial construction projects.

3) Site Superintendent/Supervisor - no less than five (5) years’ experience in construction and a minimum of one (1) previous experience as a project superintendent for a general contracting firm overseeing one or more multi-discipline commercial construction projects.

4) AutoCAD Technician - Experience of the Drafting Technician must show training in an accredited drafting program and no less than two (2) years applied experience in generating and modifying construction drawings using AutoCAD software.

8. Quality Control:

A. The Contractor bears full responsibility for quality control, safety, and environmental stewardship on all project sites.

We should provide electronic links to all references.

ROSE-NALIN, ASHLEY L CIV USAF AFMC AEDC/TSD

Do you want me to work on an Appendix for links to references?

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

The experience requirements here conflict with those stated in para 5.

Revised to be consistent with section 5.

B. The successful Contractor shall be required to institute a comprehensive Quality Control Program to assure themselves and the Government that all materials and workmanship are in strict accordance with the provisions of the specifications and drawings and the job sites are safe and environmentally sound.

C. The Quality Control Program specifically and exclusively relates to the acceptable completion of work and subsequent Government inspections and approvals. It is the Contractor’s responsibility to provide, inspect, and document the level of quality that has been established by the minimum standards of the SOW and the individual TOs.

D. The Contractor shall submit a Quality Control Plan acceptable to the Government prior to commencement of work. This Quality Control Plan shall address all phases of the construction process to ensure all components of construction meet industry standards.

E. Quality Control Manager: The Quality Control Manager shall direct the execution of the Contractor’s Quality Control Plan with responsibility for administration of the plan and inspection of work. The Quality Control Manager shall be available during normal duty hours within 30 minutes after notification to meet with the CO at a location selected by the CO.

9. Provisions on Contracting Officer’s Authority:

No person other than a Contracting Officer (CO) shall have authority to modify the terms of the contract. The CO is the only person authorized to approve changes in any of the requirements under the contract and not withstanding any provisions contained elsewhere, the said authority remains solely with the CO. The Contractor shall not take direction from anyone other than the CO or CO Representative. In the event the Contractor effects any such changes at the direction of any person other than the CO, the change shall be considered to have been made without authority and no adjustment shall be made in the Contractor price to cover any increase in costs incurred as a result thereof.

10. Task Order Pricing:

A. Terms

1) Line-Item: An item or system denoted in the Construction Task Catalog® (CTC).

2) Contract Unit Price Book (UPB): The Contract Unit Price Book is composed of the CTC line items and the custom price book line items.

3) Arnold Construction Task Catalog® (CTC): A comprehensive listing of construction related tasks together with a specific unit of measure and a published unit price which is customer-specific and based on the local Davis-Bacon and prevailing wage rates, as well as local material and equipment costs. The CTC shall be updated annually.

4) Custom Price Book (CPB): A pre-priced line item book that will allow for the addition of recurring line items not included in the RS MEANS Price Book. Recurring Non- Priced Line Items may be added to the CPB after negotiation, and they are used on a task order at the discretion of the CO.

B. Non-Priced Items (NPI):

1) Any item of work not found in the UPB but required under an individual TO shall be negotiated by the CO or CO designated representative as a NPI. The negotiated price of a NPI shall be the “in-place” price to include material, equipment, and labor (exclusive of the Contractor’s or subcontractor’s indirect expenses such an overhead, profit, labor burden, etc.) multiplied by the applicable percentage factor (Coefficient) in affect at the time of submission.

2) Non-priced items once negotiated and used in a TO shall be added to the Custom Price Book. Uses of items previously added to the supplement in subsequent TOs shall be considered pre-priced items in those subsequent TOs.

3) The Contractor shall track the total non-priced dollar percentage for each TO and shall clearly indicate the percentage on each new TO or modification proposal.

4) If the Contractor’s TO proposal includes any non-priced items, the item’s cost must be negotiated. The burden of justification for the dollar value of the NPI falls on the Contractor, who must provide documentation from three independent sources of the actual installed cost of the item. The following documentation shall be provided at negotiations:

(a) A minimum of three (3) independent written price quotes which shall include;

material (s) description with unit prices and installation cost. The price quotes must be submitted on the independent Contractors’ letterhead stationery and be signed by the owner or authorized representative of the company.

C. Selective demolition line item: This is the removal of material or equipment with no concern for its replacement. If a line item can be found in the UPB for selective demolition, that line item will be used. If there is no line item for selective demolition, the Contractor will locate the material line item in the UPB. Then the Contractor will create an alternate pre-priced line item removing the cost for the material, and the remaining amounts in labor and equipment will be multiplied by 50%. This will be used as the means to demolish that item. This line item will be pre-priced. If the line item cannot be found in the UPB, the demolition will be a NPI.

D. Removal and replacement line item: An item that is to be removed and then replaced without damaging the item. If a line item can be found in the UPB for removal and replacement, that line item will be used. If there is no line item for removal and replacement, the Contractor will locate the material line item in the UPB. Then the Contractor will create an alternate pre-priced line item removing the cost for the material, Attachment #1 - DRAFT Statement of Work

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

Would this also change if using eGordian?

My interpretation is the UPB is comprised of the CTC in eGordian and then any NPIs that we choose to add and become part of the Custom Price Book and the remaining amounts in labor and equipment will be multiplied by 150%. This will be used as the means to remove and replace that UPB line item. This line item will be pre-priced. If the line item cannot be found in the UPB, the removal and replacement will be a NPI.

E. Although “non-priced” items of work shall be negotiated, this shall not be construed to include elements of work which are not separately priced, but which are incidental to or are customarily required for performance of a priced item of work.

11. Coefficient:

A. There shall be one price percentage factor (coefficient) for work at Arnold AFB covering Standard Hours (work during normal duty hours, i.e. Monday through Friday 7:00 am to 5:00 pm daily) and Non-Standard Hours (any work outside normal duty hours).

These percentage factors are to include all plant, labor, equipment, materials, sub-contracting, transportation, services, and incidentals necessary to perform all functions detailed in UFGS, at the prices specified in the UPB for normal duty or overtime hours.

The unit prices, as established by the UPB, are multiplied by the coefficient to arrive at the actual price for a unit of work. The Contractor shall consider the difference in labor rates, equipment, transportation, and material cost when developing coefficients.

B. Coefficient is defined as a numerical factor that compensates the Contractor for all costs (generally indirect costs) and profit not included in the UPB unit pricing. Coefficients shall include all costs not covered in the UPB line items. Coefficients shall include but not be limited to overhead, profit, labor burden for the prime Contractor and subcontractors, bond premiums, insurance, taxes, and any adjustment factors for average TO size, proposal preparation costs for withdrawn TOs, costs associated with procurement of required tools, equipment, software, specifications, computers, and compliance with environmental laws. Coefficients shall also include cost for drafting support, daily cleanup, protection or incidental moving of Government property, administrative and technical support. No allowance shall be considered later for these costs. The coefficient shall also include the Gordian usage fees for the Gordian JOC software referenced in Section 18. Hardware and Software Requirements.

C. Changes in applicable construction costs, wage rates and inflation costs during the contract period shall not affect the unit prices to be paid by the Government for work performed under the contract.

D. The Contractor shall consider the following factors which affect the calculation of the coefficients:

1) The coefficients are fixed for the term of the contract.

2) The UPB prices are for “in-place” quantities. There shall be no allowance added for waste, compaction, storage, shipping, staging, handling, etc.

3) Daily clean-up shall be performed at all active project sites. It shall not be a direct TO cost but shall be paid from the coefficient. Final clean-up, if applicable, shall be a direct cost added to each TO.

4) All vehicles, office supplies/set-up, administrative requirements, and equipment/tools which are customary to the trade shall be part of overhead and therefore included in the coefficients. Under normal circumstances, no equipment/tool rental shall be allowed as a direct cost to any TO. For example, the Contractor shall provide and maintain equipment/tools such as a generator, gasoline powered pump with hoses, laser level, flatbed trailer, etc. The cost of maintaining, operating, mobilizing, demobilizing, and transporting the Contractor’s equipment shall be included in the coefficient.

5) Equipment rental shall NOT be allowed as a direct cost to any TO, except under special circumstances such as performing work which is not normal for a given trade.

As an example, the installation of new light fixtures in a high bay hanger would require a scissor lift or bucket truck since this type of work is not routinely done by interior electricians, they wouldn’t be expected to have a scissor lift or bucket truck as standard tools.

6) Cost of tarpaulins, temporary controls, safety rails, safety nets, tethers, face and clothing protection, traffic and work site signs, barriers, flag persons, site security, required permits, licenses, submittals, drawings, and other risks to doing business shall be included in the coefficient.

7) Allowances for waste and lap in material quantities calculated for preparing estimates for TOs are allowable but shall be noted and verified by the Contractor. No more than 10% shall be added to material quantities for waste or lap. For example, when measuring a room, additional tile may need to be ordered to install so the maximum tile material allowed would be enough to cover the square footage of the room plus an additional 10%.

8) Typical SABER projects at AEDC have ranged from $10,000 to over $1,000,000.

Any cost adjustment for the lower or higher average SABER task order size shall be included in the Contractor’s coefficient. No adjustment for TO size shall be allowed as a direct TO cost.

9) Coefficients SHALL NOT be adjusted for the life of the contract to include Basic year and all option years.

12. Government Furnished Facilities and Equipment:

A. The Government has identified an office trailer location on Arnold Air Force Base for the Contractor to setup their office to conduct business on this SABER contract. No other business transaction, of any type, shall be operated out of that office. Power, water, and sewage connections are available to serve the Contractor's office trailer. The Contractor

Attachment #1 - DRAFT Statement of Work

EDWARDS, SHAWN D CIV USAF AFMC AFTC/PZIC

Are these utilities provided by the Government?

They are, and my understanding is we do not charge.

is responsible for obtaining, at Contractor expense, commercial telephone and internet service. Any other equipment, such as communications and material handling equipment, and administrative supplies necessary for Contractor operation shall be furnished by the Contractor at their expense. The office trailer shall be located within the AEDC secured perimeter.

B. The Contractor shall maintain their office area in a clean condition and free from clutter.

C. Compliance with the OSHA and other applicable laws and regulations for the protection of the Contractor’s employees is exclusively the obligation of the Contractor. The government will assume no liability for the Contractor’s compliance or non-compliance with such requirements. The CO shall approve any modification to the area in writing before any changes are initiated. Such modifications shall be at the Contractor’s expense.

Contractor shall provide security protection of their trailer area. This facility shall be used in performance of this contract only.

D. Upon contract conclusion or termination, the Contractor shall bring the site (or facility provided) to the state at which it was initially provided by the government, this includes removal of all temporary utility connections. Contractor is to return such facilities in same or better condition as when they were obtained, except for normal wear and tear. If government furnished property is to be furnished to the Contractor for use on a task order, that property will be identified on that task order.

13. Contractor Storage Location:

A. The Contractor may be provided an area to stage materials, store equipment and tools, and maintain miscellaneous items. This area shall be secured by the Contractor, and any losses to the contained equipment/materials shall be no fault of the Government.

B. The area shall be maintained in a neat and orderly appearance. The CO shall instruct the Contractor to clean the storage area if it is deemed necessary. The Contractor shall respond within two (2) hours of being notified by the CO, and immediately clean the area.

This cleanup is considered fulfillment of the basic contract and charges shall not be applied back to the Government.

C. The Contractor is solely responsible for securing equipment and/or materials used in the performance of this contract and stored on base. The Contractor assumes the risk and responsibility for loss or damage to government-furnished property.

D. Cover material stored within the area of contract operations and protect against mechanical and climatic damage or loss. The Contractor may NOT leave equipment or materials on any roof (or tower) without prior approval from the CO. Store equipment removed in performance of work where directed by the CO or CO representative and re-use in work as required by drawings and specifications. Equipment temporarily removed shall be protected, cleaned, and replaced in equal or better than its condition prior to starting work. Tie down all materials stored in an open area to prevent damage to government property particularly during unusual weather conditions, e.g., tornadoes, high winds.

E. If the Contractor cannot be notified of impending severe weather conditions or does not take appropriate action to secure materials and/or equipment, the government may secure the equipment and/or materials and bill the Contractor for the incurred cost.

F. The Contractor shall repair or replace, at Contractor’s expense, any damage to government property that occurs as a result of negligence. Do not store construction debris in the outside storage area or hold in this area for resale.

G. On all storage trailers and buildings, clearly post a notice of who to contact in case of emergency.

H. The Contractor shall remove all materials, equipment, and temporary buildings prior to termination of contract and final payment. Any materials, equipment, or temporary buildings discovered after contract final acceptance shall become the property of the government and disposed of as abandoned property.

14. Housekeeping:

The Contractor shall furnish their own housekeeping and janitorial services for their office space. The Contractor is required to always maintain their facilities in a neat appearance.

15. Meetings:

Meetings: The Contractor shall attend and/or support meetings and teleconferences to discuss technical requirements, issues and project progress and status. Meeting requirements will be identified with each TO. The Contractor shall prepare and submit for review, an agenda, presentation materials and minutes for meetings attended, as applicable. Meeting minutes shall include any action items and identify the responsible person for action items.

The Contractor shall host a weekly meeting with the contract administrators, government inspectors, and engineers to address the status of all projects in progress. The meeting shall cover the progress of all work with regard to their respective project schedule, any problems encountered and corrective actions taken, and anticipated delays, if any. The Contractor shall provide minutes of the meetings to the Contracting Officer and the SABER Program Manager within two (2) workdays after the meeting. Agreements or understandings made during meetings are not final; they must be followed up with memorandums of understanding, change orders, or other documents from the government to be binding. In all cases no agreement can be binding without the approval of the CO.

16. Equipment/Government Liability:

A. All Contractor-supplied equipment is the sole responsibility of the Contractor. The Government is not liable for the theft, vandalism, or damage of any Contractor supplies or equipment left on the job site. The Contractor shall secure their materials and protect all equipment from damage. Contractor’s equipment shall not be left unattended in the housing areas.

B. Any equipment/material which the Contractor removes (and reinstalls as part of the job requirements) shall be the responsibility of the Contractor unless otherwise stated in the TO or as directed by the CO. All damaged material shall be replaced by the Contractor at Contractor’s expense.

C. The Contractor shall protect Government equipment, which is to remain in place within the area of contract operations against damage or loss. Equipment temporarily removed shall be protected, cleaned and replaced equal to or better than its condition prior to starting work.

D. The government will not be liable for any loss or damage to the Contractor's property, including stock or for expense incidental to such loss or damage.

17. Field Changes:

The Contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. Examples of field changes are as follows: relocating a new door 2’ away from planned location; rerouting planned location of sidewalk to avoid a tree (when quantities are not significantly changed); installing wallpaper border at chair rail instead of at ceiling, etc. All field changes must be approved in advance by, as a minimum, the Contractor, Government Project Manager, and the CO prior to execution.

18. Hardware and Software Requirements:

A. The Contractor shall provide, install, and maintain at Contractor’s expense, their own computer hardware for operating the SABER TO estimating/proposal process.

B. The Government has selected Gordian SABER (JOC) Solution, hereinafter referred to as eGordian, as the required project management/cost estimating software package for all work completed under this contract. SABER office shall be provided access to the eGordian software. Gordian shall provide any program/tech support to remedy any problems associated with the use of their product/program and associated databases.

C. The SABER Contractor shall work with Gordian to provide the Government with two

(2) hard copies of the Arnold Construction Task Catalog® (CTC) book annually. Failure to deliver the updated price books shall result in awarded costs of negotiated proposals with the previous year’s UPB costs. These books shall be delivered to the SABER Program Manager’s office, annually, within 30 days of award.

D. Each TO proposal shall be prepared using the most current version of the eGordian program, provided the hard copies have been provided in accordance with Section 18. C.

E. The SABER Contractor shall ensure updates to the CTC are prepared each year at optional renewal throughout the term of the contract.

F. Gordian shall provide initial and annual training, from a certified instructor, for Government and Contractor personnel on the use of the database. This training will take place upon initial start-up of the contract. Both Government and Contractor personnel may attend the training seminars simultaneously. Gordian shall also provide additional training sessions for each subsequent option period that is exercised to the SABER office and contractor personnel for up to 8 people. All training classes shall be completed within the first 30 calendar days of the award and exercise of the option years or as coordinated with the Contracting Officer.

G. All drawings submitted by the Contractor shall be created using CADD software. These drawings files shall be compatible with the latest version of AutoCAD, without any need for translation or modification by the Government. NOTE: Custom menus, line types, and text styles shall not be used without prior approval of the Unit CAD/GIS Manager. All application software used by the Contractor to create all or part of the drawing files must be compatible with the latest version of AutoCAD (reference Section 34, “As-Built Drawings” for other CADD requirements).

H. The Contractor shall furnish, install, and maintain CADD hardware and software, which is compatible with the latest version of AutoCAD.

I. The Contractor must submit all drawings of a project on the same type media. The media must be compatible with current Government available hardware. A list of currently acceptable media is listed below; as technology advances and the Government upgrades, other media may become available for use.

1) CD ROM

19. Communication:

A. The Contractor shall provide and maintain a complete operable voice, two-way communication system (cell phone or two-way radio) for all key personnel throughout the period of this contract.

B. The Contractor shall submit daily construction reports for each active TO, indicating, at a minimum, the trade and number of personnel and a description of work performed.

20. Standard Work Hours:

A. Standard work hours shall be Monday through Friday from 7:00 A.M. to 5:00 P.M.

excepting days observed as Federal Holidays as listed below:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day Second Monday in November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

Holidays falling on Saturday are observed on the preceding Friday. Holidays falling on Sunday are observed on the succeeding Monday.

B. The Contractor may request to work on a weekend, after hours, or on a holiday. This request must be submitted in writing to the CO a minimum of three full workdays prior to the requested date, with a description of the type of work to be accomplished on that date.

The Government reserves the right to approve or deny the request. Contractor’s request to work outside standard work hours does not fall under the line items for non-standard pay.

21. Construction Start-Up Period:

A. The first 60-Calendar days following basic contract award shall be designated as a start-up period, after which the Contractor shall have all equipment and personnel in place to fully execute the requirements of this contract. The Contractor shall be allowed the first 30 calendar days of the start-up period to mobilize and establish their office trailer within the secure perimeter of AEDC without being notified by the CO of a performance requirement. During the remainder of the start-up period, the Contractor shall have the required capability to accept a volume of Government work in accordance with the following schedule:

Calendar Days After Required Capability Contract Implementation (Cumulative Value of Work)

1 to 30 $ 0.00 30 to 45 $ 250,000.00 45 to 60 $ 500,000.00 after 60 $1,000,000.00

B. The CO may request work over the above specified capability requirements; however, the Contractor shall be allowed to decline without penalty, if Contractor is not sufficiently mobilized to take on additional work.

22. Pre-Performance Conference:

Prior to issuance of the first TO under this contract; the CO may elect to host a pre-performance conference. The purpose of this conference shall be to acquaint the Contractor with Government policies and procedures that are to be observed during the execution of this work and to develop mutual understanding relative to the administration of the contract. The Contractor and subcontractors shall be represented at the scheduled conference and be prepared to discuss potential difficulties and obstacles.

23. Task Order Procedure:

A. Request for Proposal (RFP) - Site Visit

1) As the need exists for performance under the terms of the contract, the CO or CO authorized representative will provide the CPM an RFP that will include date and time for a scheduled site visit, a written SOW, a preliminary list of required shop drawings/material submittals, and concept design drawings at a minimum of 35%, but potentially up to 100% design, depending on the complexity of the project. The Contractor SHALL NOT be reimbursed for any Pre-Task Order costs including proposal preparation and attendance during negotiations or site visits. The CPM and subcontractors (if applicable) shall attend the site visit and obtain whatever measurements and information necessary to develop the design and produce a complete and accurate TO proposal, to be submitted to the CO within 10 working days from the date of the site visit. Due to mission requirements, it may be necessary to require the Contractor’s TO proposal in less than 10 working days. For more complex projects, additional time may be granted by the CO. The scope validation/site visit discussions will include:

(a) Site access;

(b) Methods and alternatives for accomplishing the work;

(c) Definition and refinement of requirements;

(d) Requirements for proposal (in addition to those enumerated in this SOW);

(e) Detailed scope of work; and

(f) Special time requirements for completion, and phasing requirements.

(g) The Contract Specialist (CS) will complete a Memorandum for Record of the site visit. Questions or clarifications should be directed to the CS or CO concerning the discussions above.

2) The Contractor shall respond to an RFP within four (4) working days and 24 hours in emergency conditions by visiting the proposed work site in the company of the CO or CO authorized representative, the SABER project manager/inspector, and a representative of the using agency. The purpose of a site visit shall be to establish a clear understanding between the Contractor and Government as to what work shall be required in the TO, the time requirements for completion, and phasing requirements.

On-site changes may be made to the SOW or drawings at this time if the Contractor or the Government identifies items of work that have been left out which needs to be accomplished as part of the TO. If Government’s SOW is modified at the site visit, the Government will provide Contractor a revised SOW within 5-days and Contractor shall submit cost proposal based on revised SOW.

B. Contractor’s Project (Task Order) Proposal:

1) Upon establishment of the scope of the individual requirement, the Contractor shall then prepare a detailed proposal by identifying tasks, refining quantities, developing a cost estimate, preparing construction drawings and or detailed engineering plans/drawings (as the requirements exists), and developing performance times. The TO proposal shall include a detailed statement of proposed work, drawings, detailed TO cost proposal, proposed timeline, and cover sheet describing the project scope.

2) The SABER unit price book shall serve as the basis for establishing the value of the work to be performed on a unit price basis.

3) The Contractor’s proposal, on every TO, must be supported by necessary documentation as required, to indicate that adequate engineering and planning to accomplish the requirement has been done so as to minimize any delays in the construction process.