This document is an Attachment L - During Solicitation Substitution Request Form related to a custodial sink and floor mop basin renovation project for the Washington County and Bend City, Oregon school districts. The project requires a General Contractor to furnish, install, manage, and coordinate the work to remove raised utility sinks and install floor mop basins at 20 district buildings. The document outlines the requirements and procedures for proposing substitutions to the specified items during the bidding process, including providing detailed product information, assessing impacts on design and installation, and confirming availability of maintenance and service parts.
The related state and local contract opportunity, ITB 23-0032, does not provide specific details on pricing terms, funding requirements, or incumbent contractors. The project will be awarded to a qualified General Contractor through a competitive bidding process, with the work to be performed within the Washington County and Bend City school districts in Oregon.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BDS – WESTVIEW HIGH SCHOOL TEAM ROOMS Print Date:8/22/20
Issue Set: BID Package
Convergence Architecture 01 25 00-3 Substitution Procedure www.convergencearch.com
TO:
PROJECT:
SPECIFIED ITEM:
Section Page Paragraph Description
PROPOSED SUBSTITUTION:
Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of request including identification of applicable data portions. Attached data also includes description of changes to Contract Documents and proposed substitution requires for proper installation.
Undersigned certifies following items, unless modified by attachments, are correct:
1. Proposed substitution does not affect dimensions shown on drawings.
2. Undersigned pays for changes to building design, including engineering design, detailing, and construction costs caused by proposed substitution.
3. Proposed substitution has no adverse effect on other trades, construction schedule, or specified warranty requirements.
4. Maintenance and service parts available locally or readily obtainable for proposed substitution.
Undersigned further certifies function, appearance, and quality of proposed substitution are equivalent or superior to specified item.
Undersigned agrees, if this page is reproduced, terms and conditions for substitutions found in Bidding
Documents apply to this proposed substitution.
Submitted by:
Name (Printed or typed) General Contractor (if after award of Contract)
For use by A/E
Approved Approved as noted
Not Approved Received too late
By
Date
Remarks
The Construction Specifications Institute
September 1997
Northwest Region
Signature
Firm Name
Address
City, State, Zip
Date
Tel: Fax:
smithel Rectangle smithel Rectangle smithel Image
File details come from the government source that posted it. Updated .