ATTACHMENT L During Solicitation Substitution Request Form~38.pdf

PDF 74 KB Posted

Attached to
MWVCAA is seeking services to restore and partially replace business pole sign.
Solicitation number
S-P00300-00009698
Issued by
Marion County, Oregon

About this file

This is a Substitution Request Form (Attachment L) used in the bidding process for the Westview High School Team Rooms project under Convergence Architecture's Bid Package 01 25 00-3. The form provides a standardized procedure for contractors to propose substitutions of specified items during the solicitation phase, requiring submission of comprehensive supporting documentation including product descriptions, specifications, drawings, photographs, and performance data. Contractors submitting substitution requests must certify that proposed items do not affect drawing dimensions, that they assume responsibility for any resulting changes to building design and construction costs, and that maintenance and service parts are locally available or readily obtainable. The form includes sections for contractor submission details, architect/engineer review and approval status (with options for approval, approval as noted, or rejection), and required signatures from the submitting firm with contact information and date of submission.

The substitution procedure, based on standards established by the Construction Specifications Institute's Northwest Region as of September 1997, requires that proposed substitutions maintain equivalence or superiority in function, appearance, and quality compared to specified items without adversely affecting other trades, construction schedules, or warranty requirements. The form explicitly states that if reproduced, all terms and conditions for substitutions contained in the bidding documents apply to any proposed substitution request. The A/E review section notes receipt date tracking to ensure timely evaluation, with notation capability for late submissions that may affect approval status.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDS – WESTVIEW HIGH SCHOOL TEAM ROOMS Print Date:8/22/20

Issue Set: BID Package

Convergence Architecture 01 25 00-3 Substitution Procedure www.convergencearch.com

TO:

PROJECT:

SPECIFIED ITEM:

Section Page Paragraph Description

PROPOSED SUBSTITUTION:

Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of request including identification of applicable data portions. Attached data also includes description of changes to Contract Documents and proposed substitution requires for proper installation.

Undersigned certifies following items, unless modified by attachments, are correct:

1. Proposed substitution does not affect dimensions shown on drawings.

2. Undersigned pays for changes to building design, including engineering design, detailing, and construction costs caused by proposed substitution.

3. Proposed substitution has no adverse effect on other trades, construction schedule, or specified warranty requirements.

4. Maintenance and service parts available locally or readily obtainable for proposed substitution.

Undersigned further certifies function, appearance, and quality of proposed substitution are equivalent or superior to specified item.

Undersigned agrees, if this page is reproduced, terms and conditions for substitutions found in Bidding

Documents apply to this proposed substitution.

Submitted by:

Name (Printed or typed) General Contractor (if after award of Contract)

For use by A/E

Approved Approved as noted

Not Approved Received too late

By

Date

Remarks

The Construction Specifications Institute

September 1997

Northwest Region

Signature

Firm Name

Address

City, State, Zip

Date

Tel: Fax: