Attachment K - FAC AF573 Inspection Report 2017.pdf
PDF 5 MB Posted
- Attached to
- POL Tank Inspection HUA- Fort Huachuca, AZ
- Solicitation number
- W9128F22Q0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment D - Monthly Conctractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| W9128F22Q0064 Tank Inspection HUA.pdf | ||
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment B - Fuel Storage Tank List.xlsx | XLSX spreadsheet | |
| Attachment J - API External Inspection Template.pdf | ||
| Attachment C - Fuel Storage Tank Excel Document.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
Omaha District
API 653 In-Service
Inspection Report
Fort Huachuca, Arizona
Facility AF573
Tank 5
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
USACE POL-MCX
27 December 2017
API 653 In-Service Inspection Report Fort Huachuca, Arizona
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
THIS INSPECTION
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
3. Future Projects
B. TANK INSPECTION COMMENTS
1. Tank Construction
2. Tank Foundation
3. Tank Shell
4. Tank Appurtenances
5. Tank Coating
6. Tank Piping System
7. Fire Protection System
8. Secondary Containment
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, NFPA, or CFRs
2. SIGNIFICANT FINDINGS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
3. RECOMMENDED REPAIRS as Part of Regular Maintenance
5. REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY AND SETTLEMENT
SHELL THICKNESS CALCULATIONS
SHELL AND ROOF ULTRASONIC THICKNESS MEASUREMENTS
TANK DRAWINGS,
OSHA ACCESS STRUCTURE REPORT
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX C: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
AFFF Aqueous Film Forming Foam
ASME American Society of Mechanical Engineers
ASNT American Society of Non-Destructive Testing
ATG Automatic Tank Gauge
BBL Barrel
CC Carbon Steel
CFR Code of Federal Regulations
CP Cathodic Protection
CS Carbon Steel
DFT Dry Film Thickness
FAC Facility
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High-High Level Alarm
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NA Not Applicable
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
PTFE Polytetrafluoroethylene (e.g., TEFLON)
P/V Pressure/Vacuum
PST Product Saver Tank
SS Stainless Steel
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
UG Underground
UT Ultrasonic Testing
GENERAL SUMMARY
Austin Brockenbrough & Associates, LLP (Brockenbrough) was retained by Omaha District USACE under Contract
No. W9128F-12-D-0006 Delivery Order 0024 to perform SPCC Mandated AST/UST Inspections at various locations. As required by this task, Brockenbrough executed a tank inspection site visit to Fort Huachuca located just outside Sierra Vista, Arizona. An API 653 In-service (visual external) Inspection was conducted for Facility No.
AF573, locally known as Tank 5, on August 30, 2017. This inspection was performed in accordance with API
Standard 653, “Tank Inspection, Repair, Alteration, and Reconstruction,” and the referenced contract. In addition, the shell was ultrasonic thickness inspected and surveyed for roundness. All observations made during this in-service (visual external) inspection were made from the exterior of the tank.
Facility AF573 is a 19-foot diameter by 24-foot and 3-inch tall, single wall, vertical, field-erected tank with a nominal storage capacity of 1,000 barrels of jet fuel (F-24). The tank erector’s nameplate indicates the tank was constructed in 1992. The tank has an aluminum internal floating pan. The repair organization nameplate indicates two 8-inch and one 4-inch aluminum stilling wells were installed in 2011. The SPCC Plan dated February 2010, which was provided by the Base, does not appear to address this tank. Details of tank construction and appurtenances are included in the General Tank Information table on page 6 and comments in Section ‘B’.
There are no Mandatory Repairs noted that need immediate attention. Additional noted deficiencies are discussed in more detail in Section ‘C’, and should be addressed in a timely manner. Photographs of the tank are included in
Appendix ‘C’.
The next API Standard 653 In-service (visual external) Inspection should be performed by August 2022. The next ultrasonic thickness inspection of the shell should be performed by August 2032. The guidance provided in the current UFC 3-460-03 includes out-of-service inspection at least every 10 years of service. An upcoming revision allows the frequency to be extended as determined by a certified API 653 tank inspector. The 2011 out-of-service inspection report recommend the next API Standard 653 Out-of-service (internal and external) Inspection be performed by May 2031. This inspection should include an examination of the tank bottom by magnetic flux leakage (MFL or MFE) technology, and a thorough code compliance evaluation.
THIS INSPECTION
API In-Service (External) Inspection Date: 30 August 2017
Equipment Used:
Survey Equipment
Robotic/Reflectorless Total Station: Topcon QS X-Trac 8
Calibrated: December 2015
Field Data Collector: Topcon FC-2500
Ultrasonic Thickness Gauge
Manufacturer: NDT Systems
Model Number: Nova TG110-DL
Calibration Method: Calibration Block
NDT Technician (s): Mike O’Connor
Inspector(s): Mike O’Connor
PREVIOUS INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: May 2011
API In-Service (External) Inspection Date: NA
STATE REGULATIONS
State Regulation for API In-Service Tank Inspections NA
State Regulation for API Out-of-Service Tank Inspections NA
RECOMMENDED FUTURE INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: May 2031
API Ultrasonic Thickness Inspection of Shell Date: August 2032*
API In-Service (External) Inspection Date: August 2022
* It may be more cost effective to perform the next UT inspection of the shell during the next in-service inspection.
Mike O’Connor
Mechanical Designer
API 653 Inspector No. 6230
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner U.S. Army
Location Fort Huachuca
Facility Number AF573
Tank Number Tank 5
State / Country Arizona / U.S.A.
City Sierra Vista
Inspection Date August 30, 2017
Tank Manufacturer Brown Minneapolis Tank
Design Standard API 650 8th Edition
Date of Construction 1992
Tank Contents Jet Fuel (F-24)
Tank Serial Number 283101
Tank Diameter 19’-0”
Shell Height 24’-3”
Product Height 21’-0” (limited by overflow)
Tank Capacity 1,000 bbl nominal (tank bottom to overflow). 950 bbl useable.
Foundation Cone-down slab (assumed).
Construction
Bottom (8) 1/4-inch lap welded plate.
Shell
All three courses: 1/4" butt-welded plate;
3” roof-to-shell rim angle: butt welded to shell, leg-out.
Floating Roof Petrex aluminum honeycomb.
Fixed Roof Supported cone roof made of 1/4-inch lap welded plate.
Material
Bottom Carbon steel of unknown grade.
Shell A36 steel.
Floating Roof Aluminum honeycomb with flexible double wiper seals
Fixed Roof Carbon steel of unknown grade.
Cathodic Protection None
Interior Coating System Interior 100% coated, likely epoxy.
Exterior Coating System Epoxy/polyurethane assumed.
Level Gauging MTS ATG, manual gauging well.
Overfill Protection ATG Alarms, Float operated high level control valve.
Piping Receipt 4” Welded stainless steel
Issue 6” Welded stainless steel
Low Suction 3” Welded stainless steel
Water Draw-off None NA
Level Alarms ATG level alarms.
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
This project will perform API 653 Inspections of various tanks at facilities throughout the United States.
Additional consideration is given to federal, state, and local regulations as well as applicable military criteria and general industry standards.
For Facility AF573 an API Standard 653 In‐service (external) Inspection was performed, which included a shell settlement survey and a shell UT inspection. In addition, a shell roundness survey was performed.
2. Site Information
On August 30, 2017 Brockenbrough performed API 653 In‐Service (External) Inspection of Facility
AF573 (Tank 5) located at Fort Huachuca, Arizona. Fort Huachuca is a United States Army installation under the command of the United States Army Installation Management Command. It is located next to the town of Sierra Vista, Arizona, about 15 miles (24 km) north of the border with Mexico and at the northern end of the Huachuca Mountains. In the 2010 census, Fort Huachuca had a population of about
6,500 active duty soldiers, 7,400 military family members and 5,000 civilian employees. Fort Huachuca has over 18,000 people on post during the peak working hours of 0700 and 1600 on week days.
The major units are the United States Army Network Enterprise Technology Command (NETCOM) and the United States Army Intelligence Center. Libby Army Airfield is on post and shares its runway with
Sierra Vista Municipal Airport. Fort Huachuca is also the headquarters of Army Military Auxiliary Radio
System (MARS). Other units include the Joint Interoperability Test Command, the Information Systems
Engineering Command (ISEC) and the Electronic Proving Ground. The Fort has a radar-equipped aerostat, one of a series maintained for the Drug Enforcement Administration. The aerostat supports the DEA drug interdiction mission by detecting low-flying aircraft attempting to enter the United States from Mexico. Fort Huachuca also contains the Western Division of the Advanced Airlift Tactics Training
Center (AATTC) which is based at the 139th Airlift Wing, Rosecrans Air National Guard Base, Saint
Joseph, Missouri.
3. Future Projects
A project currently under construction will allow recirculating the fuel in the tank through the filter/separator.
B. TANK INSPECTION COMMENTS
1. Tank Construction
Tank Facility AF573 is a nominal 1,000 bbl, 19‐foot diameter by 24-foot and 3-inch tall, aboveground, vertical, jet fuel, storage tank. The tank has an aluminum internal floating pan, a lap welded steel cone roof, and a butt-welded steel cone-down bottom. The perimeter of the bottom rests on a concrete ringwall or slab that is even with the top of the foundation berm. The tank erector’s nameplate indicates the tank was constructed in 1992.
https://en.wikipedia.org/wiki/United_States_Army https://en.wikipedia.org/wiki/Military_base https://en.wikipedia.org/wiki/United_States_Army_Installation_Management_Command https://en.wikipedia.org/wiki/Arizona https://en.wikipedia.org/wiki/United_States_Army_Network_Enterprise_Technology_Command_(NETCOM) https://en.wikipedia.org/wiki/United_States_Army_Intelligence_Center https://en.wikipedia.org/wiki/Libby_Army_Airfield https://en.wikipedia.org/wiki/Sierra_Vista_Municipal_Airport https://en.wikipedia.org/wiki/Military_Auxiliary_Radio_System https://en.wikipedia.org/wiki/Military_Auxiliary_Radio_System https://en.wikipedia.org/wiki/JITC https://en.wikipedia.org/wiki/Radar https://en.wikipedia.org/wiki/Aerostat https://en.wikipedia.org/wiki/Drug_Enforcement_Administration https://en.wikipedia.org/wiki/DEA https://en.wikipedia.org/wiki/139th_Airlift_Wing https://en.wikipedia.org/wiki/Rosecrans_Air_National_Guard_Base
2. Tank Foundation
The perimeter of the tank bottom rests on a concrete ringwall or slab that is even with the top of a concrete foundation berm. The foundation was visually evaluated during the inspection for broken concrete, spalling, cracks, and vegetation against the bottom of the tank. General spider web cracking on the top of the concrete foundation was noted. A shell settlement survey was performed during the inspection in accordance with Appendix B of API Standard 653. The shell settlement evaluation indicates the settlement of the bottom of the shell and perimeter of the tank bottom is acceptable.
3. Tank Shell
The vertical and cylindrical shell consists of three butt‐welded courses. The ultrasonic thickness measurements of the shell and calculations included in Appendix A indicate the shell has more than 30 years of remaining life. API 653 recommends ultrasonic thickness measurements of the shell be taken at least every 15 years.
a. Plumbness, Roundness, Peaking, and Banding
The exterior of the shell was visually inspected and evaluated for plumbness, roundness, peaking and banding.
1) API 650, paragraph 7.5.2 allows a maximum out-of-plumb of the top of a new tank shell, relative to the bottom of the shell, of 1/200 of the height of the shell, a difference of 1 1/2 inches for this
24-foot and 3-inch tall tank. The maximum measured out-of-plumbness was 7/16 inch away from tank center as measured on the south side. The shell also leans toward the tank center
3/16 inch on the opposite side (the north side) of the tank. The out-of-plumbness of the shell is within the limits allowed by API 650 for new construction. The bottom of the shell measures higher on the south side than on the north side by 5/8 inches, which indicates some settlement of the foundation and is counter to the out-of-plumb of the shell.
2) The shape of the shell appears to slightly exceed the allowable API 650 tolerance of plus or minus 1/2-inch of a new tank shell radius. No localized shell distortions were noted. The tank bottom and roof should restrain the shell from deflection near the bottom and near the top.
That there did not appear to be any significant distortion of the shell, would seem to suggest the tank was built slightly out-of-round. As measuring the out-of-roundness using laser survey methods is not normally included in an API 653 Inspection of an existing and not reconstructed tank, and as the out-of-roundness does not appear to be a detriment to the structural integrity of the tank, no action is required or recommended at this time.
3) While some minor peaking and banding of the butt-welded shell seams was observed, the peaking-and-banding appeared to be within limits allowed by API 650.
4. Tank Appurtenances
a. Tank Roof
The roof is supported by eight rafters spaced approximately 7 feet and 5 1/2 inches apart. As early as 1996, API 650 required rafter spacing at the perimeter of the tank roof to be no greater than 6 feet and 3 inches apart. Earlier API requirements may have been more stringent. Later editions of
API 650, paragraph 5.10.4.4 increased the maximum allowable spacing to 7 feet. There is evidence of water ponding around the perimeter of the tank roof. However, the scarcity of rain, makes the ponding less significant and will not likely result in significant corrosion. A guardrail made of 2-inch steel angle extends all around the perimeter of the lap-welded cone roof.
b. Internal Floating Pan
Facility records indicate the perimeter seal was replaced in 2011. The floating pan penetration seals are deteriorated or missing. The difference in vertical distances as measured from the roof inspection hatches down to the floating pan indicates the pan was higher at the time of inspection on one side than on the other by approximately 2 1/4 inches. This demonstrates the tendency for floating pans with perimeter seals to hang up in smaller tanks. Recent advances in seal materials and installation techniques reduce the tendency for perimeter seals to hang up in smaller tanks.
c. Venting
The tank has an internal floating pan, three roof perimeter vents, three shell overflow/vents, and a
12-inch diameter roof center vent. While API 650 requires 1/2-inch minimum size openings in vent screen, and the center vent screen has 1/4-inch openings, there is little chance of the screen clogging due to ice or moss.
d. Gauging
The tank has an MTS ATG and a water probe installed in separate aluminum wells and an 8-inch aluminum manual gauging well with a floating plug retriever.
e. Level Alarms
The tank has only ATG level alarms.
f. Stairs and Platforms
The tank’s steel cone roof is accessible by a circumferential stairway, which also includes a lower landing for accessing the upper shell manhole. The circumferential stairway step rise is generally 8 inches continuously from the bottom step to the roof landing, while the bottom step is only 4 inches above the foundation berm. OSHA requires the rise and run of stair steps to be continuous. The width of the stair steps is 30 inches. However, clearance between the stairway handrail and one of the upper shell manhole handles is only 19 inches; OSHA requires 22 inches of clearance.
g. Grounding and Bonding
The tank has eight grounding cables, which are bolted to steel angles, which are welded to the tank bottom extension. The grounding appeared to be in good condition.
5. Tank Coating
The coating was evaluated for deterioration. The coating on the exterior of the roof was spot repaired in 2011 at the locations of the welded repairs. The exterior coating is in good condition. The interior appears to be 100% coated.
6. Tank Piping System
Tank Facility AF573 is a combination bulk and issue tank. The tank’s nominal capacity is approximately half of the nominal capacity for the Base. Fuel is received into the tank filtered via aboveground piping from the adjacent truck off-load stand. Fuel is issued from the tank filtered to an adjacent truck fillstand via aboveground piping. After site modifications are complete, it may be possible to recirculate the fuel through the filter/separators. There is no product saver tank. However, water in the fuel does not appear to be a problem.
7. Fire Protection System
There are three fire hydrants within 300 feet of this tank.
8. Secondary Containment
The tank sits on top of a concrete foundation berm surrounded by a below-grade concrete secondary containment. The secondary containment is connected by a 23-inch deep concrete trench to supplemental remote secondary containment. The secondary containment was visually evaluated during the inspection. The drainage control valve is located just outside the below grade dike area and would not likely be accessible in the event of a fire. The secondary containment basin is sloped away from the tank, but not away from the piping, which is routed over the swale at the edge of the secondary containment. The expansion joint seals in the remote containment basin appear to have failed. The secondary containment appears otherwise to be in good condition. A conservative evaluation of the volume of the secondary containment indicates it is sufficient to hold the contents of the tank full to the bottom of the overflow as required by NFPA 30 plus approximately 12 inches of freeboard. The secondary containment drain was hydrotested and found to be adequate to control drainage.
C. FINDINGS AND RECOMMENDATIONS
Tank Facility AF573 was found to be in generally good condition. The tank is fully serviceable, with no mandatory deficiencies that would require immediate removal of the tank from service. However, there were several items observed that could be addressed to reduce long term maintenance, to improve operability, and to more clearly comply with federal, state, and local regulations or military criteria.
1. MANDATORY REPAIRS per API 653, NFPA, or CFRs
Mandatory repairs represent items that require immediate attention to prevent imminent risk to system operators, equipment, or the adjacent environment. The tank would have to be taken out-of-service to complete these repairs. No Mandatory Repairs are required to be performed.
2. SIGNIFICANT FINDINGS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
The following information identifies the significant findings found during the tank inspection.
a. Replace Thermal Relief Valves and Piping
OBSERVATION: The issue piping thermal relief valve data plate indicates a set pressure of 150 psig.
The receipt piping thermal relief valve data plate is unreadable. The receipt thermal relief valve is installed horizontally. Both the receipt and issue thermal relief piping is threaded and includes sight flow indicators. The thermal relief piping does not include isolation valves or testing tees, which inhibits performance of maintenance on the thermal relief valves.
REFERENCE: Guidance for new construction provided in UFC 3-460-01 paragraph 9-3.5.1 recommends a set pressure of 10% above pump deadhead and prohibit installing sight flow indicators on new thermal relief piping. Paragraph 9-8. e) prohibits installing threaded piping on new fuel piping. The manufacturers of thermal relief valves recommend installing the valves in the vertical position to prevent debris from settling in the valve seats. DoD Standard Design AW 78-24-
27 includes isolation valves and testing tees for new thermal relief piping. Due to the environment, maintenance and function of thermal relief valves at this location may be more critical than at some other locations.
RECOMMENDATION: Replace the thermal relief valves and piping around the receipt and issue nozzle isolation valves with valves and piping that comply with UFC and manufacturer recommendations.
b. Replace Expansion Joint Seals
OBSERVATION: The remote secondary containment concrete expansion joint seals are deteriorated.
REFERENCE: NFPA 30 paragraph 22.11.2.4 and CFR 112.7(c)(1) require dikes to be liquid tight.
RECOMMENDATION: Replace the expansion joint seals in the remote secondary containment.
c. Provide Stairs to Access Dikes
OBSERVATION: The dike access ladder is not substantial or stable enough to use safely. In addition, animals often get trapped in the below grade secondary containment. As a result, a wooden pallet is leaned against the dike wall to provide more stable access and to allow animals to escape.
REFERENCE: Guidance for new construction provided in UFC 3-460-01 paragraph 8-14.8 and DoD
Standard Design AW 78-24-27 includes steps with handrails for accessing dike areas.
RECOMMENDATION: Replace the ladders currently installed for accessing the dike and supplementary remote secondary containment, with stair steps and handrails.
d. Replace Low Melting Point Valve
OBSERVATION: The level control valve is made of aluminum. There is no isolation valve adjacent and upstream of the level control valve.
REFERENCE: NFPA 30 paragraph 27.4.3 and UFC 3-460-01 paragraph 3-6.7.1 prohibit valves made of aluminum and other low melting point materials. Guidance for rehabilitation of fuel facilities provided in UFC 3-460-01 paragraph 12-9 and guidance for new construction provided in DoD
Design Standard AW-78-24-27 include isolation valves adjacent and upstream of control valves.
RECOMMENDATION: Replace the aluminum level control valve with a steel valve. Provide an isolation valve adjacent to and upstream of the level control valve.
e. Re-plumb Integral Body Cavity Relief Valves
OBSERVATION: The body cavity integral thermal relief valves on the shell nozzle isolation valves are plumbed to relieve away from the tank. The integral thermal relief are differential (not balanced) type and open only when upstream pressure exceeds downstream pressure by a set amount. As the thermal relief for the piping is set at 200 psi, the integral relief valves may not open until the internal pressure in the valve exceeds the sum of the set pressures. This could shorten the life of the seals in the valve and/or could result in damage to the valve.
REFERENCE: Guidance for new construction included in UFC 3-460-01 recommends using balanced thermal relief valves where cascading cannot be avoided.
RECOMMENDATION: Eliminate cascading by replumbing the integral body cavity thermal relief valves on the tank shell nozzle isolation valves to relieve into the tank.
f. Replace Floating Pan Penetration Seals
OBSERVATION: Facility records indicate the perimeter seal was replaced in 2011. However, the floating pan penetration seals are deteriorated or missing.
REFERENCE: Guidance for new construction provided in DoD Standard Design AW 78-24-27 includes floating pan penetration seals.
RECOMMENDATION: Replace the floating pan penetration seals.
g. Relocate the Dike Drain Valve
OBSERVATION: The dike drain valve is located where it could not safely be accessed during a fire.
REFERENCE: NFPA 30 paragraph 22.11.2.7.1. requires the dike drain valve controls to be assessible under fire conditions.
RECOMMENDATION: Provide means to operate the dike drain valve that would be accessible under fire conditions.
Dike Drain Valve
h. Provide Landing
OBSERVATION: The rise of the circumferential stairway is approximately 8 inches. However, the rise of the bottom step above the foundation berm is only 4 inches.
REFERENCE: OSHA regulation 29 CFR 1910.24 (f) requires the step rise to be uniform throughout any flight of stairs including any foundation structure used as one or more treads of the stairs.
RECOMMENDATION: Extend the bottom step of the circumferential stairway to provide a landing at the bottom of the stairs approximately 4 inches above the foundation berm.
i. Provide OSHA Compliant Ladder Access Hatch
OBSERVATION: The internal ladder access hatch provides less than 18 inches of clearance on the climbing side of the ladder, and there are sharp projections on the climbing side.
REFERENCE: OSHA regulation 29 CFR 1910.27 (c) requires 30 inches of clearance on the climbing side of a ladder including at access hatches.
RECOMMENDATION: Provide an OSHA compliant internal ladder access hatch on the tank roof.
j. Modify Stilling Wells Guides
OBSERVATION: The manual and ATG stilling wells were installed in 2011. Facility personnel indicated the sample bottles get hung up on the bolts installed in the bottom of the manual gauging well. This would seem to suggest the stilling wells (Manual and ATG) are attached to the bottom of the tank.
REFERENCE: API 650 paragraph 5.10.4.7 c) does not allow vertical columns to be fastened at both ends (e.g.: to the roof and the tank bottom).
RECOMMENDATION: Modify the stilling well guides at the bottom ends of the Manual and ATG stilling wells to allow the bottom ends of the wells to be guided but not restrained vertically and so that there are no bolts protruding inside the wells that could hang up a sample bottle or an
ATG probe/displacer.
3. RECOMMENDED REPAIRS as Part of Regular Maintenance
Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
a. Seal Cracks in Foundation
OBSERVATION: The top of the foundation has spiderweb cracks, possibly due to the dry conditions.
If precipitation enters the foundation through the cracks, the water could promote corrosion of the reinforcing steel in the concrete, especially if it froze an expanded. Deterioration of the foundation could lead to inadequate support for the tank.
Reference: API 650 paragraph 5.3.1 and API 653 Appendix B require foundations to provide adequate support.
RECOMMENDATION: Seal the exposed top of the tank foundation.
b. Remove Flammable Material
OBSERVATION: The dike access ladder is not substantial or stable enough to use safely. In addition, animals have a history of getting trapped in the below grade secondary containment. As a result, a wooden pallet is leaned against the dike wall to provide more stable access and allow the animals to escape.
REFERENCE: NFPA 30 paragraph 22.11.2.8 prohibits storing combustible material in the dike area.
RECOMMENDATION: Remove the wooden pallet from the dike area. Provide a non-combustible, stable, temporary means of accessing the dike areas that also allow animals to escape.
c. Continue to Remove Debris and Sand
Observation: The location is generally hot, dry and subject to sand storms. As a result, there is dried plant debris and sand on the tank bottom extension, foundation and in the dike area.
Reference: Guidance for maintenance of fuel storage facilities provided in UFC 3-460-03 paragraph 8-10.3.1 includes inspection of concrete secondary containment for cleanliness and removal of vegetation. NFPA 30 paragraph 22.11.2.8 prohibits storing combustible material in the dike area.
RECOMMENDATION: Continue to remove the dried plant debris and sand from the tank bottom extension, foundation, and in the dike areas.
d. Provide Labels
Observation: The tank is not labeled to indicate the tank number or facility (real property) number.
Reference: Guidance for design of new fuel storage facilities provided in UFC 3-460-01 paragraph
2-18 b) includes marking tanks to indicate the tank number and facility number.
RECOMMENDATION: Provide labels on the exterior of the tank shell to indicate the tank number and facility number.
e. Pressure Wash Roof
OBSERVATION: Facility personnel indicated the animal feces on the tank roof is from a coatimundi.
REFERENCE: API 570 paragraph 4.3.2.3.h) reads, “bird turds can also cause accelerated corrosion and unsightly stains.”
RECOMMENDATION: Include pressure washing of the tank roof to remove loose debris and animal feces in the periodic maintenance checklist.
f. Update the SPCC Plan
OBSERVATION: The SPCC Plan dated February 2010, which was provided by the Base, does not appear to address this tank.
REFERENCE: 40 CFR 112.1 (a) (2) and 40 CFR 112.7 (3) requires the plan to address each oil container with capacity of 55 gallons or greater.
RECOMMENDATION: Update the Fort’s SPCC Plan to address Tank Facility AF573.
4. REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
These items represent repairs and/or upgrades that could be performed to bring the tank into full compliance with current standards, but that do not represent potential risks to system operators, equipment integrity, or the adjacent environment. Our recommendations to perform, or not to perform these repairs and/or upgrades, take into consideration the cost of the repair, the operational benefit of the repairs, the age of the tank/system, operator safety, environmental risks, and equipment integrity.
a. Provide an Autogauge/Tape Gauge
OBSERVATION: The tank is not equipped with an autogauge (mechanical tape gauge).
REFERENCE: Guidance for new construction provided in UFC 3-460-01, Table 8-1, Item o, and DoD
Standard Design AW 78-24-27 includes a mechanical tape liquid level gauge (autogauge). Some branches of the military do not include autogauges due to a history of failure when installed directly to the floating pan.
RECOMMENDATION: As an accurate installation would require providing an additional penetration in the small diameter floating pan, providing an autogauge is not recommended.
b. Modify Secondary Containment
OBSERVATION: The secondary containment is not sloped away from the piping.
REFERENCE: NFPA 30 paragraph 22.12.2.1 requires secondary containment to be sloped away from the piping.
RECOMMENDATION: Modify the secondary containment to slope way from the piping.
c. Modify the Roof Support Structure
OBSERVATION: As noted in previous inspection reports, the tank’s steel, lap welded, cone roof shows sign of water ponding around the perimeter. There are only eight rafters. The rafters are spaced approximately 7 feet and 6 inches apart at the perimeter of the roof.
REFERENCE: As early as 1996, API 650 required rafter spacing at the perimeter of the tank roof to be no greater than 75 inches apart. Earlier API requirements may have been more stringent. Later editions of API 650, paragraph 5.10.4.4 increased the maximum allowable spacing to 84 inches.
RECOMMENDATION: As rain water and corrosion are not issues at this location, modifying the roof support structure to eliminate the water ponding and bring the roof into compliance with API 650 is not recommended.
d. Provide a Water Bottom Sensor
OBSERVATION: A well for a water bottom sensor was installed in 2011. However, there is no water bottom sensor. There is no water draw-off nozzle or product saver tank.
REFERENCE: Guidance for new construction provided in UFC 3-460-01 Table 8-1 item s includes a well for a water bottom sensor.
RECOMMENDATION: The upgrade is not recommended, as the fuel is received from trucks through a filter/separator system; issued to trucks through a second filter/separator system; and Fort personnel reported little water is ever found in the separator sumps.
e. Replace the Center Vent Screen
OBSERVATION: The 12-inch roof center vent screen has only 1/4-inch openings. There is little chance of the screen clogging due to ice or moss.
REFERENCE: API 650 paragraph H.5.2.2 requires the roof center vent to have a course-mesh screen with 1/2-inch openings.
RECOMMENDATION: As there is little chance of the screen clogging due to ice or moss at this location, modification is not recommended.
f. Modify Stairway
OBSERVATION: Clearance between the stairway handrail and one of the upper shell manhole handles is only 19 inches.
REFERENCE: OSHA regulation 29 CFR 1610.24 (d) requires clearance at a stairway of at least 22 inches. The minimum width of stairs required in API 650 Table 5.18 has increased over the years, from 24 inches in 1993 to 28 inches in the latest edition.
RECOMMENDATION: Modify the stairway and intermediate landing to provide 28 inches of clearance between the stairway handrail and the upper shell manhole handles.
g. Provide Independent Level Alarms
OBSERVATION: The tank does not have shell mounted independent level alarms. The level control valve float pilot is not accessible from the stairway.
REFERENCE: Guidance for new construction provided in UFC 3-460-01, Table 8-1, Item l includes high, high-high, low and low-low level alarms, independent from the tank gauging system, and accessible from the stairway or ground level. Table 8-1 Item k also includes stairs and platforms for accessing the level alarms and controls (float pilot).
RECOMMENDATION: Provide high, high-high, low, and low-low level alarms independent of the tank gauging system. Relocate the high-level control float pilot so it can be accessed from the stairway.
Modify the stairway to provide access to the new independent alarms and relocated float pilot.
Float Pilot
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY AND SETTLEMENT
The shape of the shell appears to slightly exceed the allowable API 650 tolerance of plus or minus 1/2-inch of a new tank shell radius. Based on the circumference of the shell measured near the bottom, the radius of the shell should be 9 feet and 6 inches. However, the measured radii of the shell, varies at the bottom from 9 feet and 5 1/2 inches in the northeast to 9 feet and 7 inches in the southwest. Also, the measured radii of the shell, varies at the top from 9 feet and 5 1/2 inches in the northeast to 9 feet and 6 5/8 inches in the south and southwest. The tank bottom and roof should restrain the shell from deflection near the bottom and near the top. That there did not appear to be any significant distortion of the shell, would seem to suggest the tank was built slightly out-of-round.
It is noted that the tolerance for out-of-roundness has been included in API 650 since at least before 1993. API 650
1st Edition was published in 1960. However, it has not been until later years that the industry has had the laser surveying technology and methods available to it to measure it in the upper shell courses. It should be noted that
API 653,10.5.3 – 3rd Edition (published in 2001), and later editions, allow the shell out-of-roundness (radial deviation), at higher than one foot above a bottom of a reconstructed tank, to be as much as three times greater (1
1/2 inches), a subject not addressed in API 653 prior to the year 2001. As measuring the out-of-roundness using such methods is not normally included in an API 653 Inspection of an existing and not reconstructed tank, and as the out-of-roundness does not appear to be a detriment to the structural integrity of the tank, no action is required or recommended.
Austin Brockenbrough & Associates, L.L.P. Job No. 17-095.02
Location: Fort Huachuca Date: 10/10/2017
Subject: Tank AF573 - Shell Settlement Evaluation By: Mike O'Connor
API 653 Appendix B
Optimum cosine curve, B 2.2.4.e) Z = a + b x cos(theta + c)
Diameter (D) = 19 (ft)
Number of equally spaced data points (ft)= 8
L = Arc length between measurement points (ft) = 7.46
Tank Height (H) = 24.3 (ft)
Relative elevation of lowest horizontal weld seam.
* Z U S
0 100.00 0.00 0.00 0.00 0.00
1 100.01 0.01 0.00 -0.01 -0.01
2 100.01 0.01 0.02 0.01 0.02
3 100.04 0.04 0.03 -0.01 -0.01
4 100.05 0.05 0.03 -0.02 -0.02
5 100.01 0.01 0.03 0.02 0.02
6 100.00 0.00 0.02 0.02 0.01
7 100.01 0.01 0.00 -0.01 -0.01
8 100.00 0.00 0.00 0.00 0.00
Maximum out-of-plane deflection = 0.02
* = measured elevation
*HI (Height of Instrument)
Z = calculated ridged body tilt (in)
U = out-of-plane settlement =
S = out-of-plane deflection z-y
Y = yield sterength of shell material (PSI) = 36,000 (A36)
E = Youngs modulas of elasticity (lbf/in2) = 29*10^6
S allowable (in) (API 653 B.3.2.1) = (L^2*Y*11)/(2EH)*12 = 0.19 in
R^2 = (Syy - SSE) / Syy = 0.57 not >=0.9 therefore cosine curve is invalid.
Evaluation by the Arc Length Method described in API 653 B.2.2.5.1 is required.
Austin Brockenbrough & Associates, L.L.P. Job No. 17-095.02
Location: Fort Huachuca Date: 10/10/2017
Subject: Tank AF573 - Shell Settlement Evaluation By: Mike O'Connor
API 653 B.2.2.5.1 Evaluation by Settlement Arc Length Method
Open top (yes/no) = no Per B.3.2.2, K = 10.5
Settlement arc length (ft), Sarc
Out of plate settlement at Point i (Si)
Allowable settlement at point i (Smax) = MIN[K*Sarc*(D/H)*(Y/E), 4]
Point Sarc (ft) Si (in) Smax
0 14.9 0.01 0.15 OK
2 14.9 0.02 0.15 OK
6 22.4 0.02 0.23 OK
Si < Smax →
Si < Smax →
Evaluation of the settlement by the arc length method indicates the settlement is within acceptable limits.
Si < Smax →
-0.01
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0 2 4 6 8 10
Measured Elevation (in)
Si0
Si2 Si2
Austin Brockenbrough & Associates, L.L.P. 16-095.02
Location: Ft. Huachuca Date: 9/14/17
Subject: FAC AF573 Shell Survey Page 1 of 4
Measured Circumference at Bottom = 59.69 ft
Calculated Diameter = 19.00 ft
Calculated Radius = 9.50 ft
Distance Height
From Radial Radial Above Out
Centerline Deviation Deviation Bottom of
(ft) (ft) (in) (ft) Plumb (in)
South 9.55 0.05 0.66 24.0 S+N 0.54 0.43
9.56 0.06 0.68 21.0 0.86
9.56 0.06 0.68 18.0 0.89
9.55 0.05 0.55 15.0 0.77
9.55 0.05 0.64 12.0 0.88
9.55 0.05 0.62 9.0 0.85
9.54 0.04 0.44 6.0 0.56
9.54 0.04 0.48 3.0 0.61
9.52 0.02 0.23 0.2 0.26
100.05
Southeast 9.53 0.03 0.42 24.0 SE+NW 0.54 0.22
9.52 0.02 0.28 21.0 0.53
9.51 0.01 0.08 18.0 0.52
9.53 0.03 0.31 15.0 0.57
9.55 0.05 0.56 12.0 0.92
9.55 0.05 0.65 9.0 1.15
9.55 0.05 0.59 6.0 1.12
9.54 0.04 0.48 3.0 1.00
9.52 0.02 0.20 0.2 0.43
100.01
Diameter Deviation
(in)
Bottom-of-Shell Elevation
Subject: FAC AF573 Shell Survey Page 2 of 4
Distance Height
From Radial Above Out
Centerline Deviation Deviation Bottom of
(ft) (ft) (in) (ft) Plumb (in)
East 9.48 -0.02 -0.26 24.0 E+W 0.08 -0.32
9.49 -0.01 -0.16 21.0 0.07
9.49 -0.01 -0.18 18.0 0.08
9.47 -0.03 -0.34 15.0 0.31
9.47 -0.03 -0.40 12.0 0.37
9.46 -0.04 -0.48 9.0 0.55
9.48 -0.02 -0.30 6.0 0.18
9.46 -0.04 -0.48 3.0 0.18
9.51 0.00 0.06 0.2 0.34
100.00
Northeast 9.46 -0.04 -0.45 24.0 NE+SW 0.11 0.10
9.47 -0.03 -0.38 21.0 0.54
9.47 -0.03 -0.31 18.0 0.93
9.48 -0.02 -0.29 15.0 1.13
9.47 -0.03 -0.37 12.0 0.99
9.47 -0.03 -0.37 9.0 0.95
9.46 -0.04 -0.50 6.0 0.71
9.46 -0.04 -0.43 3.0 0.72
9.45 -0.05 -0.55 0.2 0.38
100.01
Diameter Deviation
(in)
Subject: FAC AF573 Shell Survey Page 3 of 4
Distance Height
From Radial Above Out
Centerline Deviation Deviation Bottom of
(ft) (ft) (in) (ft) Plumb (in)
North 9.49 -0.01 -0.12 24.0 -0.16
9.51 0.01 0.18 21.0
9.52 0.02 0.20 18.0
9.52 0.02 0.22 15.0
9.52 0.02 0.24 12.0
9.52 0.02 0.23 9.0
9.51 0.01 0.12 6.0
9.51 0.01 0.13 3.0
9.50 0.00 0.04 0.2
100.00
Northwest 9.51 0.01 0.13 24.0 -0.11
9.52 0.02 0.25 21.0
9.54 0.04 0.44 18.0
9.52 0.02 0.25 15.0
9.53 0.03 0.36 12.0
9.54 0.04 0.50 9.0
9.54 0.04 0.53 6.0
9.54 0.04 0.52 3.0
9.52 0.02 0.24 0.2
100.01
Subject: FAC AF573 Shell Survey Page 4 of 4
Distance Height
From Radial Above Out
Centerline Deviation Deviation Bottom of
(ft) (ft) (in) (ft) Plumb (in)
West 9.53 0.03 0.35 24.0 0.07
9.52 0.02 0.23 21.0
9.52 0.02 0.26 18.0
9.50 0.00 0.02 15.0
9.50 0.00 0.02 12.0
9.49 -0.01 -0.07 9.0
9.51 0.01 0.12 6.0
9.55 0.05 0.66 3.0
9.52 0.02 0.28 0.2
100.01
Southwest 9.55 0.05 0.56 24.0 -0.37
9.58 0.08 0.93 21.0
9.60 0.10 1.24 18.0
9.62 0.12 1.42 15.0
9.61 0.11 1.37 12.0
9.61 0.11 1.32 9.0
9.60 0.10 1.21 6.0
9.60 0.10 1.15 3.0
9.58 0.08 0.93 0.6
100.04
SHELL THICKNESS CALCULATIONS
Job No.: 16-095.02
Job Title: FAC AF573 (Tank 5) Fort Huachuca
Subject: Shell Calculations
By: Mike O'Connor Date: 9/20/2017
API-650 Appendix A
API 653
SHELL CALCULATIONS
Diameter 19 feet Wind Velocity 125 mph
Shell Height 24.25 feet
Freeboard 3.25 feet Nom Shell Thk 0.250
Design Fill Height 21.00 feet
Specific Gravity 1.00 API 650 Maximum height of unstiffened shell: 208.6 feet
0.84 API 653
Joint Efficiency 0.70 API 650
Material A36
Yield Strength 36,000 psi (assumed)
Tensile Strength 58,000 psi (assumed)
Original Design Corrosion Allowance
0.000 in (2mm)
Required thickness
Lower Upper
Two
CoursesCourses
Allowable Stress 23595 27376
Height Product Required Thickness
Course (feet) Depth 1/4" min
3 8.25 5.00 0.011 0.013
2 8.00 13.00 0.034 0.040
1 8.00 21.00 0.056 0.067 min 2017 Corrosion Estimated UTM Visual current net 1992 Rate Service Life Inspection Inspection
Course UTM* thick Thickness * in/yr yrs. Interval Interval
3 0.241 0.241 0.258 0.001 >30 15 5
2 0.252 0.252 0.254 0.000 >30 15 5
1 0.241 0.241 0.262 0.001 >30 15 5
The original thicknesses are assumed based on required design thicknessess, overtolerance and the range of the UTMs.
P.O. Box 4800 4800 W. Hundred Road Chester, Virginia 23831 Phone: 804-748-8746 Fax: 804-748-7849 www.brockenbrough.com
SE
2.6HDG
SE
(psi)
API-650
Original
Hydro
21000
API-653
Original
Design
0.100
21000
0.100
0.100
2.6(H-1)DG 2.6(H-1)D
SE
SHELL AND ROOF ULTRASONIC THICKNESS MEASUREMENTS
Job No.: 16-095.02
Job Title: FAC AF573 (Tank 5) Fort Huachuca
Subject: UT Data
By: Mike O'Connor Date: 9/20/2017
SHELL UTM DATA (0.001 inches)
DFT = 0.000 inches
UTM's include 0 inch DFT coating.
1 2 3
4 5 6
7 8 9
Typical Shell Plate UTMs.
1st course
1 2 3 4 5 6 7 8 9
1-1 260 265 258 265 268 264 275 277 275
1-2 279 259 260 256 258 253 281 258 252
1-3 266 268 263 260 269 267
1-4 242 244 242 268 243 241 268 272 256
1-5
1-6
UTMs Taken From Stairway
2nd course
2-1 252 257 253
2-2
2-3
2-4
2-5
2-6
3rd course
3-1 259 259 256
3-2
3-3
3-4
3-5
3-6
Roof UTMs
Non-slip surface prevented taking UTMs.
P.O. Box 4800 4800 W. Hundred Road Chester, Virginia 23831 Phone: 804-748-8746 Fax: 804-748-7849 www.brockenbrough.com
TANK DRAWINGS,
The following drawings are pages extracted from the 2011 inspection reports. The drawings do not show the modifications that were completed in 2011.
Remarks/Legend:
Owner/Operator:
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Ft. Huachuca, Sierra Vista, AZ
CAPE, Inc.
05/19/11 N/A N/A
Tank #5 B-1Bottom Layout
Measured Inside Diameter is 19 feet.
Tank bottom has 8 plates.
4210.50
GRAPHIC SCALE:
Dimensions are in feet.
y x
NW y x
NE
y x
SEy x
SW
XY Orientation
XY Orientation is in reference to Plan North
1 2
3 4
5 6
7 8
V1
V2
V3
A
Shell Nozzles in Course #1
A - 3" Low Point Suction
B
B - 1" Pressure Relief
C
C - 6" Product Issue
D
D - 36" Manway
F
F - 36" Floating Roof Manway
G
G - 24" Clean Out Manway
J
J - 1" Pressure Relief
M
M - 4" Product Receipt
V# - Vertical Seam Number of Shell Course #1
- Anti Rotation Device Anchor
- Floating Roof Leg Striker Plate
B -2
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Ft. Huachuca, Sierra Vista, AZ
CAPE, Inc.
05/19/11 N/A N/A
Tank #5 S-1Shell Layout
Seam #1 is the first seam left of the first manway left of the stairway in the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
10543210
GRAPHIC SCALE:
Dimensions are in feet.
1-1
A
B C
D
E
Overflow Vent
2-1
3-1
1-2
F
Overflow Vent
2-2
3-2
1 2 3
A - 3" Low Point Suction
B - 1" Pressure Relief
C - 6" Product Issue
D - 36" Manway
E - 1" Fire Detector
F - 36" Floating Roof Manway
Anchor Bolt
-3
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Ft. Huachuca, Sierra Vista, AZ
CAPE, Inc.
05/19/11 N/A N/A
Tank #5 S-2Shell Layout
Seam #1 is the first seam left of the first manway left of the stairway in the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
10543210
GRAPHIC SCALE:
Dimensions are in feet.
1-3
G
H I
J
K
L
M
Overflow Vent
INS-1
2-3
3-3
3 1
G - 24" Clean Out Manway
H - 1" Fire Detection
I - 1.5" Cap
J - 1" Pressure Relief
K - 1" High Level Control Shut Off
L - 1" High Level Control Shut Off
M - 4" Product Receipt
Anchor Bolt
-4
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Ft. Huachuca, Sierra Vista, AZ
CAPE, Inc.
05/19/11 N/A N/A
Tank #5 R-1Fixed Roof Layout
Measured Diameter is 19 feet.
Fixed roof has 8 plates.
4210.50
GRAPHIC SCALE:
Dimensions are in feet.
y x
NW y x
NE
y x
SEy x
SW
XY Orientation
XY Orientation is in reference to Plan North
15 16
17 18
19 20
21 22
A
B
C
D
A - 24" x 24" Manway
B - 8" Electronic Level Gauge
C - 12" Center Vent
D - 64" x 12" Access Hatch
E - 24" x 24 Light Hatch
F - 6" Sample Hatch
B -6
E
F
- 24" x 8" Roof Vent
OSHA ACCESS STRUCTURE REPORT
OSHA Circumferential Stairway Data
OSHA Rq’d Actual
(in) min (in) max (in)
Handrail Height 34 OK 30 34 Step Width 30 OK 22 NA
Step Rise 8 OK NA NA Bottom Step Rise 4 Not OK 7 9
BOTTOM STEP
RISE
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
UL SWRI
API Other
Protected
Type: Type:
Size: Date Installed:
stainless steel End Conn: Size: 4" Material: stainless steel End Conn: Size: 6"
Issue To:
Interior Coating:
Double Bottom
Brown Minneapolis Tank local and remote, both concrete
Local: 61' Dia by 44" Deep
Remote: 24.5' x 24.5' x 44"
Level Alarms:
Material: Welded
Coated
Plastic / Fiberglass
Other:
Tank Outside Dimensions: Useable Capacity:
(2) leak detection pipe
Original
Overfill Protection:
Tank Facility No.:
Local Tank ID No.:
August 30, 2017
AF573
Tank Manufacturer:
Tank Construction Date:
Tank 5 Tank Inspector Name:
Jet Fuel (F-24)
1,000 bbl
950 bbl
API 653 EXTERNAL INSPECTION CHECKLIST
Fort HuachucaProject Site:Project Name:
Project Location:
Brockenbrough Job No.:
SPCC Mandated AST Inspections
Various Locations
General Inspection Information
16-095.02
Submitted to:
Contract No.:
USACE - Omaha
W9128F-12-D-0006
Receipt From:
Inspector Certification Number:
Tank Construction and Configuration
Rectangular
Double Wall
Fire Resistant
Secondary Containment, Overfill, and CRDM
Welded
Truck fillstand
19'-0" dia by 24'-3"
NA
truck off-load
Concrete slab
Closed Top Dike
Change of Service:
Last Repair:
Tank Coatings:
[(2) 8" and (1) 4" aluminum stilling wells]
Insulated
Nominal Capacity:
Open Type DikeVertical
Single Wall
Release Prevention Barrier
Overfill Protection / Level Alarms:
ATG alarms 4" hydraulic operated OCV control valve
Receipt Piping Configuration Issue Piping Configuration
Tank Piping
Secondary Containment
May 2011
Tank Specifications
Previous Tank Inspection Date:
Continuous Release Detection Monitoring
Type:
Date Installed:
Current Product:
Inspection Date:
Design Std
Horizontal
Mike O'Connor
Exterior Coating:
Epoxy - Polyurethane
Epoxy
API 653 EXTERNAL INSPECTION CHECKLIST
Fort HuachucaProject Site:Project Name: SPCC Mandated AST Inspections
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A a) b)
C.1.1.6 Housekeeping
Buildup of trash, vegetation, and other inflammables
Settlements into the base
C.1.1.2 Asphalt d) a) b)
c) Cavities under foundation; vegetation against bottom of tank
Broken concrete, spalling, and cracks, especially under backup bars used in welding butt-welded annular rings under the shell
Leaching of oil which has left rock filler exposed indicating hydrocarbon leakage
Tank settlement into asphalt base
Review cathodic protection potential readings
Site drainage away from the tank, associated piping, and manifolds
Check for:
Presence of crushed rock under the steel bottom which usually results in severe underside corrosion.
C.1.1.4 Rock
C.1.1.5 Site Drainage
C.1.1.7 Cathodic Protection
Measure foundation levelness and bottom elevations (See Annex B) See settlement survey calcs.
ITEM
C.1.1 Foundation
TASK
Indications of bottom leakage at drain openings in ring, back of water-draw basins, and top surface of ring
Piping runs over swale.
Sand and dryed plant debris on tank bottom extension, top of foundation and in dike area.
a) b)
Check for:
Proper operation of dike drains
Check for:
Run-off rainwater from shell draining away from the tank
Check for :C.1.1.3 Oiled Dirt or Sand
e) Settlement around perimeter of tank
Check for:
STATUS
C.1.1.1 Concrete Ring
Spiderweb cracks in concrete foundation slab.
Check for:
Tank Settlement
COMMENTS
C.1.2.1 External Visual Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A No access
C.1.2.3 Riveted Shell Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A c) a)
Pitting on support welds to shell, especially on shell plates d) b)
Full fillet lap-welded vertical seams to increase joint efficiency b)
Corrosion loss and wear on the rivets
C.1.2.2 Internal (Floating Roof
Tank)
Bottom-to-Foundation Seal c)
Broken welds and corrosion damage
(paint failure, pitting, corrosion, product builup), especially where it occurs at tack-welded junction
Reinforcing pads welded to shell at supports
Leaks and identify the location by sketch or photo
C.1.2.4 Wind Girder (Floating
Roof Tanks) a)
Check for:
Rivet and seam leaks on external surface
Check for:
Corrosion and thinning on plate and weld after cleaning the bottom angle area a) b) c)
e) Drawings of riveted seams if available. Otherwise, dimension and sketch (or photograph) the rivet pattern: no. of rows, rivet size, pitch length, butt-riveted or lap-riveted joints
C.1.2. Shells
Check for:
Grooving, corrosion, pitting, and coating failures
Check for:
Paint failures, pitting, and corrosion
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Issue TRV set 150 psi. Receipt TRV tag not readible.
e) c)
Proper operation of regulators for tanks with purge gas systems e) f)
Check for:
c) d) a)
Leaks at sample connections and proper valve operation
Damage and test the accuracy of temperature indicators
Adequate manholes flange and cover thickness on mixer manholes
COMMENTS
Cracks or signs of leakage on weld joint at nozzles, manholes, and reinforcing plates
C.1.3.1 Manholes and Nozzles
Sealing of insulation…