US Army Corps of Engineers
Omaha District
API 653 In-Service
Inspection Report
Fort Lewis, Washington
FAC 09650
Tank 1
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
USACE POL-TCX
5 July 2017
API 653 In-Service Inspection Report Fort Lewis, Washington
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
THIS INSPECTION
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
B. TANK INSPECTION COMMENTS
1. Tank Construction
2. Tank Foundation
3. Tank Shell
4. Tank Appurtenances
5. Tank Coating
6. Tank Piping System
7. Fire Protection System
8. Secondary Containment
C. FINDINGS AND RECOMMENDATIONS
1. Mandatory Repairs per API 653, UFC 3-460-01, or AW 78-24-27 Standards
2. Significant Findings per API 653, UFC 3-460-01, or AW 78-24-27 Standards
3. Repairs to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
4. Recommended Repairs as Part of Regular Maintenance
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY & SETTLEMENT
SHELL SETTLEMENT SURVEY
SHELL THICKNESS CALCULATIONS
SHELL/ROOF ULTRASONIC THICKNESS MEASUREMENTS
TANK DRAWINGS
OSHA ACCESS STRUCTURE REPORT
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX C: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASNT American Society of Non-Destructive Testing
ATG Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
FAC Facility
HLA High Level Alarm
HLCV High Level Control Valve
HHLA High-High Level Alarm
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MFL Magnetic Flux Leakage
MFE Magnetic Flux Exclusion
MT Magnetic Particle Testing
NA Not Applicable
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
RT Radiography Testing
TML Thickness Measurement Location
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
UT Ultrasonic Testing
VT Visual Testing
GENERAL SUMMARY
Austin Brockenbrough & Associates, LLP (Brockenbrough) was retained by Omaha District USACE under Contract No. W9128F-12-D-0006 Delivery Order No. 0024 to perform API Standard 653 In-Service Inspections. As required by this task, Brockenbrough executed a tank inspection site visit to Fort Lewis, located at Tacoma, Washington. An API 653 In-Service (visual external) Inspection was conducted for Tank Facility No. 09650 (Tank 1) on February 28, 2017. This inspection was performed in accordance with API Standard 653, “Tank Inspection, Repair, Alteration, and Reconstruction,” and the referenced contract. The confined space between the internal floating roof and the fixed roof was not entered during the inspection. All observations made during this in-service (visual external) inspection were made from the exterior of the tank.
Tank Facility 09650 is a 31-foot diameter by 22-foot tall, single wall, vertical, field erected tank with a nominal storage capacity of 3,000 barrels of jet fuel (F-24). Since, the tank did not have a data plate attached to the tank shell, the tank manufacturer and construction date of the tank are unknown. However, based on the previous tank inspection report, it is known that the tank was fabricated by Morse Construction Group, Inc. in 1997. Secondary containment is provided by a concrete containment area with vertical concrete dike walls shared by adjacent Tank 2 (Facility 09651). The previous API 653 Out-of-Service Inspection report indicates that this tank is built on a concrete ringwall and a sand pad with a thick, non-conductive film liner underneath the tank bottom which serves as a release prevention barrier. Since there are no as-built drawings of the tank available at this time, the presence of a release prevention barrier could not be confirmed. Also, the tank is equipped with a typical under tank impressed current cathodic protection system. Details of the tank construction and appurtenances are included in Section ‘B’.
There are no mandatory repairs noted that need immediate attention. Additional noted deficiencies are discussed in more detail in Section ‘C’, and should be addressed in a timely manner. Photographs of the tank are included in Appendix ‘C’.
There is a FY18 MILCON project to relocate the aviation fuel system. As part of this project, this tank will be demolished. However, if the project to relocate the tanks does not move forward, perform future inspections per this report. The next API Standard 653 In-Service (visual external) Inspection should be performed by an API 653 Inspector by February 2022. The next ultrasonic thickness inspection of the shell should be performed by February 2032. A previous out-of-service inspection report indicates that the tank was inspected in October 2006.
While the current version of UFC 3-460-03 requires the next out-of-service inspection occur after 10 years, an upcoming revision allows the frequency to be extended as determined by a certified API 653 tank inspector. As the tank was inspected in October 2006, we recommend the next API Standard 653 Out-Of-Service (internal and external) Inspection should be performed by October 2026. This inspection should include an external and internal inspection and include an examination of the tank bottom by magnetic flux leakage (MFL or MFE) technology and an ultrasonic thickness inspection of the tank shell. This inspection should include a thorough code compliance evaluation as well.
THIS INSPECTION
API In-Service (External) Inspection Date: 28 February 2017 Equipment Used: Ultrasonic Thickness Gauge Manufacturer: NDT Systems Model Number: Nova TG110-DL Calibration Method: Calibration Block Inspector(s): Jeffrey W. King
Survey Equipment Automatic Level: Topcon AT-BS Calibration: June 2016
Robotic/Reflectorless Total Station: Topcon QS X-Trac 8 Calibrated: December 2015
Field Data Collector: Topcon FC-2500
PREVIOUS INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: October 2006 API In-Service (External) Inspection Date: Not Available
RECOMMENDED FUTURE INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: October 2026 API Ultrasonic Thickness Inspection of Shell Date: February 2032 API In-Service (External) Inspection Date: February 2022
It may be more cost effective to perform the internal inspection to coincide with the UT inspection. A reasonable compromise may be to perform both inspections, and the repairs recommended in the previous inspection report, in 2026.
Jeffrey W. King, PE Mechanical Engineer API 653 Inspector No. 54102
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner U.S. Army
Location Fort Lewis
Facility Number Facility 09650
Tank Number Tank 1
State / Country Washington / U.S.A.
City Tacoma
Inspection Date February 28, 2017
Tank Manufacturer Morse Construction Group, Inc. (Per previous tank inspection report)
Design Standard API Std 650 (Per previous tank inspection report)
Date of Construction 1997 (Per previous tank inspection report)
Tank Contents Jet Fuel (F-24)
Tank Serial Number Unknown
Tank Diameter 31’-0” (Per previous tank inspection report)
Shell Height 22’-0” (Per previous tank inspection report)
Product Height 2’ – 8 3/4” (Tape Level Gauge reading at the time of inspection)
Tank Capacity 3,000 barrels (Nominal capacity)
Foundation Sand filled Concrete Ringwall (Per previous tank inspection report)
Construction
Bottom Lap-welded cone down bottom with a butt-welded annular ring (Per previous tank inspection report)
Shell (3) butt-welded shell courses
Floating Roof N/A
Fixed Roof Self-supported, lap-welded, cone-up
Material
Bottom A36 Carbon steel (Per previous tank inspection report)
Shell A36 Carbon steel (Per previous tank inspection report)
Floating Roof N/A
Fixed Roof A36 Carbon steel (Per previous tank inspection report)
Cathodic Protection Impressed Current Cathodic Protection System
Interior Coating System Epoxy-Epoxy-Epoxy (assumed)
Exterior Coating System Epoxy-Epoxy-Polyurethane (assumed)
Level Gauging Varec Tape Level Gauge; MTS Automatic Tank Gauge (ATG)
Overfill Protection High Level Control Valve; Independent High-high and High Level Alarms
Piping Receipt 4” Stainless Steel
Issue 4” Stainless Steel
Low Suction 3” Stainless Steel
AFFF 2” Carbon Steel
Water Draw-Off 3/4” Stainless Steel
Level Alarms Independent High-high, High, and Low Level Alarms
Type of Internal Floating Roof N/A
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
This project will perform API 653 Inspections of various tanks at facilities throughout the United States.
Additional consideration is given to federal, state, and local regulations as well as applicable military criteria and general industry standards.
For Facility 09650, an API Standard 653 In‐service (visual external) Inspection was performed. This inspection also included an ultrasonic inspection of the shell and roof plates, a foundation settlement survey, and a shell roundness assessment.
2. Site Information
On February 28, 2017 Brockenbrough performed an API 653 In‐Service (visual external) Inspection of
Tank Facility 09650 located at Fort Lewis. Fort Lewis is a located 9.1 miles south-southwest of Tacoma, Washington, under the jurisdiction of the United States Army Joint Base Garrison, Joint Base Lewis–
McChord. Joint Base Lewis-McChord is a training and mobilization center for all services and is the only
Army power-projection base west of the Rocky Mountains. It has more than 25,000 soldiers and civilian workers. The strategic location of the base provides Air Force units with the ability to conduct combat and humanitarian airlift with the C-17 Globemaster III.
B. TANK INSPECTION COMMENTS
1. Tank Construction
Tank Facility 09650 is a nominal 3,000 barrel, 31-foot diameter by 22-foot tall, F-24, aboveground vertical storage tank. Per the previous tank inspection report, the tank was constructed by Morse
Construction Group, Inc. to API 650 design standard in 1997. Base personnel have strapping tables for determining tank volume, although the existing strapping tables are not certified by a professional engineer. However, they appear to be adequate for the operation of this tank.
2. Tank Foundation
The tank rests on an 18-inch high sand filled concrete ringwall foundation. Per the previous out-of-service tank inspection report, this tank is equipped with a release prevention barrier (thick film liner) underneath the tank. However, this could not be verified during the inspection. The foundation was visually evaluated during the inspection for broken concrete, spalling, cracks, and vegetation against the bottom of the tank. The concrete ringwall was found to be in good condition with only a few minor hairline cracks. The bottom-to-foundation seal appears to have failed. A shell settlement survey was performed during the inspection in accordance with Appendix B of API Standard 653 and was found to be acceptable. Settlement results are listed in Appendix A.
3. Tank Shell
The vertical and cylindrical shell consists of three butt‐welded courses. The exterior of the shell was visually inspected and evaluated for plumbness, roundness, peaking and banding. The coating was also evaluated for deterioration.
a. Shell Plumbness, Roundness, Peaking, and Banding
The exterior of the shell was visually inspected and evaluated for plumbness, roundness, peaking and banding.
1) API 650, section 7.5.2 allows a maximum out of plumb of the top of the shell relative to the tank bottom of 1/200 the height of the shell, a difference of 1-5/16 inches for this 22-foot tall tank.
The maximum measured out-of-plumbness was 1-3/16 inches away from the center of the tank measured on the south. The out-of-plumbness of the shell is within the tolerance that is allowed by API 650.
2) The shape of the shell appears to exceed the allowable API Standard 650 tolerance of plus or minus 1/2-inch of shell radius, as measured using laser surveying methods. Based on the circumference of the shell measured near the bottom, the radius of the shell should be 15 feet and 6 inches. However, the measured radius of the shell varies at the bottom from 15 feet and
5-5/16 inches in the south to 15 feet and 6-3/8 inches in the northwest. Also, the measured radii of the shell, varies near the top from 15 feet and 5-1/2 inches in the southwest and to 15 feet and 6-3/4 inches in north. The bottom and top of the shell are only slightly out of tolerance for a new tank. Since the shell did not appear to be significantly distorted and the out-of-roundness does not appear to be detrimental to the structural integrity of the tank, no action is required or recommended at this time.
3) While some minor peaking and banding of the butt-welded shell seams was observed, the shape of the shell plates appears to be within the limits allowed by API 650.
b. Shell Coatings
Minor coating failure and corrosion were observed on the tank bottom extension. Some mold and algae were also observed on the tank bottom extension. The shell-to-bottom weld appeared to be coated with a joint sealant. However, the exterior shell coating shows no signs of significant deterioration. As the tank is used to store oil and the interior is coated with epoxy, deterioration of the interior of the shell since the previous inspection was performed is extremely unlikely.
c. Shell Ultrasonic Thickness Measurements
The ultrasonic thickness measurements of the shell indicate the shell has more than 30 years of remaining life. API 653 recommends ultrasonic thickness measurements of the shell be taken at least every 15 years.
4. Tank Appurtenances
a. Tank Roof
The tank is constructed with a self-supported lap-welded fixed cone roof. Isolated areas of coating failure and corrosion were observed on the roof, center vent, flanges, manholes, nozzles and nozzle reinforcing pads, nuts, and bolts. There was moderate coating failure and corrosion from welded steel angle/treads to the center vent. Additionally, corrosion staining from nozzle reinforcing pads and angle/treads to the center vent was noted in several locations on the roof.
b. Venting
This tank features a 6-inch Varec pressure/vacuum center vent with a 4-inch nozzle and 24-inch
Varec emergency vent. These vent/hatches provide adequate venting capacity based on the size of the tank. This tank is not equipped with any overflow vents/inspection hatches.
c. Gauging
The tank’s MTS ATG is installed through a 6-inch nozzle mounted on the 36-inch roof manhole cover. The tank also has a Varec tape level gauge whose reading aligns closely with the MTS ATG reading. This tank is not equipped with a dedicated sample hatch/gauging well.
d. Level Alarms
The low and high level alarm chambers are mounted on the exterior of the tank shell. The tank is equipped with low-low, low, high and high-high level alarms independent of the tank gauging system as is required by military criteria.
e. Stairs and Platforms
The tank’s steel roof is accessible by a circumferential stairway mounted on the shell of the tank.
There are no reinforcing pads on the platform plate and on the stairway steps where they are welded to the tank shell. The circumferential stairway is directly welded to the shell. The coating system on the circumferential stairway appeared to be good condition. The width and rise of the stairway steps and the height of the handrails appear to be in general compliance with OSHA criteria.
f. Grounding and Bonding
There are two grounding cables connected to ground lugs welded to the tank shell.
5. Tank Coating
The interior coating system of the tank is assumed to be epoxy-epoxy-epoxy. The external coating system appeared to be a standard military coating system (epoxy-epoxy-polyurethane). Minor coating failure and corrosion were observed on several places on the tank bottom extension, tank roof, shell manhole covers, and bolts. There was some mold and algae growth observed on the tank bottom extension.
6. Tank Piping System
Fuel is received through 4‐inch stainless steel piping from an adjacent Truck Off-load Station and is issued through 4-inch stainless steel piping to the adjacent Truck Fillstands. Corrosion was observed on carbon steel bolts that are used on stainless steel pipe flanges.
7. Fire Protection System
There are several fire hydrants noted within 300 feet of this tank. There is also an Aqueous Film
Forming Foam (AFFF) system installed.
8. Secondary Containment
Secondary containment is provided by a concrete containment area with vertical concrete dike walls shared by adjacent Tank Facility 09651 (Tank 2). There is no intermediate dike wall present between the two tank containment areas. The secondary containment was visually evaluated during the inspection. There is a small amount of leaves and vegetation located in the secondary containment area. The product piping is located over the drainage swale and water tends to collect underneath it.
The containment is of sufficient size to contain a total tank loss plus one foot of freeboard.
C. FINDINGS AND RECOMMENDATIONS
Tank Facility 09650 was found to be in generally good condition. The tank is fully serviceable. However, there were also several items observed that are not in full compliance with federal, state, and local codes or military criteria. For basis of the estimated costs, the total for each repair is a rough order of magnitude cost that includes the cost to perform the repair and limited contractor mark-ups. These totals do not include mobilization to the site, supervision, inspection, and overhead, or other construction expenses.
1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed. No mandatory repairs are required to be performed.
2. SIGNIFICANT FINDINGS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
The following information identifies the significant findings found during the tank inspection.
a. Repair Hairline Cracks in Ringwall Foundation
OBSERVATION: Minor hairline cracking was present on several areas within the concrete ringwall foundation. Some sections of the ringwall appeared to have been previously repaired but have failed again.
CODE REFERENCE: UFC 3-460-03, Section 8-4.3.1 and 8-10.2.1 require all cracks to be cleaned and sealed with a fuel resistant sealant.
RECOMMENDATION: Clean and seal all the hairline cracks within the concrete ringwall and concrete dike wall with a fuel resistant sealant.
b. Repair Coating System on Tank and Tank Appurtenances
OBSERVATION: Localized coating failure and minor corrosion were observed on several places on the tank shell, tank roof, roof appurtenances, roof guardrail (at the base), tank bottom extension, and manhole covers and bolts. Several areas on the tank roof like the manhole covers, flanges, bolts and nuts, nozzle reinforcing pads, etc. were found to be corroded. Also, corrosion staining was observed at the welded steel angle/treads to the center vent on the tank roof.
CODE REFERENCE: UFC 3-460-03, Section 8-3.10, requires the exterior of fuel storage tanks and appurtenances to be coated.
RECOMMENDATION: Remove corrosion from all the isolated areas of deterioration. Clean and prep all the areas that require coating repairs and apply a compatible coating system that meets military
G6CDQASM
Sticky Note POL-MCX: Perform as part of regular maintenance if tank is to remain.
G6CDQASM
Sticky Note POL-MCX: Perform as part of regular maintenance if tank is to remain.
criteria. The nuts and bolts should be removed and replaced with corrosion resistant nuts and bolts.
c. Repair the Tank Bottom Extension and Bottom-to-Foundation Seal
OBSERVATION: The tank bottom extension does not promote positive drainage away from the tank shell. Joint sealant has been applied on the tank bottom extension to enable water to shed from the tank shell. This sealant is severely deteriorated and cracked. Also, the tank bottom-to-foundation seal has deteriorated and dry-rotted as well. It appears to have been pulled away from the steel annular plate. Evidence of corrosion and coating failure at the tank bottom extension was observed.
CODE REFERENCE: UFC 3-460-03, Section 8-4.10 B, requires the seal to be maintained in good working order to prevent corrosion of the underside of the tank bottom.
RECOMMENDATION: Remove the joint sealant from top of the tank bottom extension and the bottom-to-foundation seal. Prep and coat the chime per AST standards and replace the tank bottom-to-foundation seal. Apply new sealant on top of the tank bottom extension to provide proper drainage.
G6CDQASM
d. Provide Manufacturer’s Nameplate
OBSERVATION: The tank does not have a manufacturer’s nameplate installed on the tank shell.
CODE REFERENCE: UFC 3-460-01 paragraph 8-3.15 requires nameplates for all aboveground storage tanks in accordance with API Standard 650 Section 10.1 Nameplates.
RECOMMENDATION: Provide a manufacturer’s nameplate per the latest edition of DOD Standard
Design AW 78-24-27.
G6CDQASM
e. Replace Flexible Conduit
OBSERVATION: The conduit associated with the Varec tape level gauge is dry-rotted and cracked.
CODE REFERENCE: N/A
RECOMMENDATION: Replace the broken flexible conduit for the Varec tape level gauge.
f. Replace Carbon Steel Bolts
OBSERVATION: The carbon steel bolts used in several places on the stainless steel pipe flanges are heavily corroded. Carbon steels bolts have the potential to corrode rapidly when in contact with stainless steel.
CODE REFERENCE: N/A
RECOMMENDATION: Replace the carbon steel bolts with stainless steel bolts.
POL-MCX: Perform as part of regular maintenance if tank is to remain.
G6CDQASM
g. Repair ATG Water Probe
OBSERVATION: Based on information provided by facility personnel, it was found that the ATG water probe is not functioning correctly and sounds faulty alarms several times a day.
CODE REFERENCE: N/A
RECOMMENDATION: The reason for the faulty water probe needs to be investigated by the ATG manufacturer’s representative and the probe needs to be repaired or replaced.
3. REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
These items represent repairs and/or upgrades that could be performed to bring the tank into full compliance with current standards, but that do not represent potential risks to system operators, equipment integrity, or the adjacent environment. Our recommendations to perform or not to perform these repairs and/or upgrades take into consideration the cost of the repair, the operational benefit of the repairs, the age of the tank/system, operator safety, environmental risks, and equipment integrity.
a. Upgrade Thermal Relief System
OBSERVATION: The existing thermal relief valve piping on the tank receipt and issue piping have some threaded piping, include sight flow indicators, and do not have testing tees.
CODE REFERENCE: AW 78-24-27 requires the thermal relief piping to be equipped with isolation valves and testing tees. UFC 3-460-01, Section 9-3.5.1 does not allow sight flow indicators in thermal relief piping. UFC 3-460-01, Section 9-8 requires welded or flanged connections for joining steel pipes.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, replace all threaded piping and fittings in the thermal relief system with welded connections.
Upgrade the thermal relief piping at the tank shell to 2-inch and provide a 2-inch double block and bleed valve at the skin of the tank. Provide testing tees and remove sight flow indicators associated with the thermal relief system.
POL-MCX: Concur with recommendation.
b. Upgrade Water Draw-off Piping
OBSERVATION: The water draw-off piping consists of 1-inch pipe with a ball valve at the tank skin.
Also, the piping in the water draw-off system, including the tank nozzle, consists of threaded valves and fittings.
CODE REFERENCE: UFC 3-460-01, Section 9-8 requires welded or flanged connections for joining steel pipes. UFC 3-460-01, Table 8-1 z, requires water draw-off piping to include a 2-inch double block and bleed valve as the tank skin valve.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, upgrade the water draw-off piping to 2-inch and provide a 2-inch double block and bleed valve at the skin of the tank. Also, replace all threaded fittings and connections with welded or flanged connections.
c. Modify Secondary Containment Basin
OBSERVATION: The piping headers are routed directly over the dike low points and water tends to pond underneath the piping.
CODE REFERENCE: NFPA 30, paragraphs 22.11.1.1 & 22.12.2.1 require drainage to be provided to prevent accumulation of any liquid under piping by providing a slope of not less than 1 percent away from the piping for at least 50 feet or to the bottom of the dike.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, modify the secondary containment basin to provide drainage away from the piping and the tank as required by NFPA 30.
G6CDQASM
Sticky Note POL-MCX: Concur with recommendation.
G6CDQASM
POL-MCX: Leave as is
d. Provide Scaffold Supports
OBSERVATION: There are no scaffold cable supports present on the tank roof.
CODE REFERENCE: UFC 3-460-01, Table 8-1, Item ff requires two scaffold cable supports on the fixed roof in accordance with API 650.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, provide two scaffold cable supports in accordance with API 650.
e. Provide a Sample Hatch/Gauge Well
OBSERVATION: The tank does not have any stilling wells with a hatch for manual gauging/sampling.
CODE REFERENCE: UFC 3-460-01, Table 8-1, Item t requires one 10-inch (250 mm) roof nozzle and an 8-inch aluminum, slotted stilling well for gauging and sampling; AW 78-24-27 requires the manual gauging and sampling well to be near the perimeter.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, a sampling/gauging well with roof nozzle and hatch should be provided near the perimeter of the tank roof.
G6CDQASM
Sticky Note POL-MCX: Leave as is
G6CDQASM
f. Provide Low-low Level Alarm
OBSERVATION: The Scully level switches/alarms monitor high-high, high, and low levels only.
CODE REFERENCE: UFC 3-460-01, Table 8-1, Item l requires independent high-high, high, low, and low-low level alarms.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, make modifications to the Scully level alarm system to provide low-low level alarm as well.
g. Provide Intermediate Containment Wall
OBSERVATION: There is no intermediate containment wall between the two tanks – Facility
09650 and 09651.
CODE REFERENCE: NFPA 30 Section 22.11.2.6 requires that each diked area containing two or more tanks shall be subdivided, preferably by drainage channels or at least by intermediate dikes, in order to prevent minor spills from a tank from endangering adjacent tanks within the diked area.
RECOMMENDATION: Since there is a FY18 MILCON project in place to relocate the facility, along with the storage tanks, we do not recommend any modifications at this time. However, if this project does not move forward, when the tank is taken out-of-service for other major repairs/upgrades, provide an 18-inch high intermediate concrete containment wall between the two tanks.
G6CDQASM
Sticky Note POL-MCX: Concur with recommendation.
G6CDQASM
4. RECOMMENDED REPAIRS as Part of Regular Maintenance
Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
a. Remove Vegetation within the Dike Area
OBSERVATION: There is buildup of dried leaves and other vegetation in the dike area.
CODE REFERENCE: NFPA 30, paragraph 6.9.4 requires dike areas to be kept free of weeds and other unnecessary combustible materials. UFC 3-460-03, 8-4.3.1, 8-10.2.1, 8-10-3.1,8-10.5.1, and UFC 3-
460-03, Appendix C requires vegetation to be removed from dike areas in addition to applying an herbicide.
RECOMMENDATION: Remove all vegetation from the dike area and perform regular maintenance to prevent deterioration of the containment slab. Apply an herbicide on a regular basis to prevent any future growth/vegetation.
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY & SETTLEMENT
The shape of the shell appears to exceed the allowable API Standard 650 tolerance of plus or minus 1/2-inch of shell radius, as measured using laser surveying methods. Based on the circumference of the shell measured near the bottom, the radius of the shell should be 15 feet and 6 inches. However, the measured radius of the shell varies at the bottom from 15 feet and 5-5/16 inches in the south to 15 feet and 6-3/8 inches in the northwest. Also, the measured radii of the shell, varies near the top from 15 feet and 5-1/2 inches in the southwest and to 15 feet and 6-
3/4 inches in north. The bottom and top of the shell are only slightly out of tolerance for a new tank. Since the shell did not appear to be significantly distorted and the out-of-roundness does not appear to be detrimental to the structural integrity of the tank, no action is required or recommended at this time.
Austin Brockenbrough & Associates, L.L.P. Job No. 16-095.04
Location: Tank 1 (Fac 09650) Fort Lewis Date: 05/02/2017
Subject: Shell Radius Survey Page 1 of 3
Measured Circumference at Bottom = 97.39
Calculated Diameter = 31.00
Calculated Radius = 15.50
Distance
From Radial
Centerline Deviation Deviation (in)
South 15.44 -0.06 -0.77 0.177 S+N -0.50
15.46 -0.04 -0.47 3.191 0.11
15.49 -0.01 -0.13 6.199 0.66
15.51 0.01 0.06 9.2 0.97
15.49 -0.01 -0.13 12.202 0.62
15.49 -0.01 -0.12 15.204 0.60
15.52 0.02 0.20 18.191 0.95
15.53 0.03 0.40 21.178 1.08
Weld Elevation----> 107.95
Southeast 15.48 -0.02 -0.22 0.204 SE+NW 0.10
15.52 0.02 0.25 3.203 0.71
15.53 0.03 0.32 6.201 0.88
15.53 0.03 0.32 9.199 0.94
15.52 0.02 0.26 12.199 0.65
15.51 0.01 0.16 15.198 0.68
15.51 0.01 0.10 18.197 0.61
15.49 -0.01 -0.14 21.204 0.41
Weld Elevation----> 107.94
East 15.48 -0.02 -0.25 0.204 E+W -0.25
15.52 0.02 0.24 3.203 0.49
15.53 0.03 0.37 6.201 0.62
15.52 0.02 0.24 9.199 0.34
15.50 0.00 0.01 12.199 -0.10
15.52 0.02 0.18 15.198 -0.07
15.51 0.01 0.14 18.197 0.18
15.50 0.00 0.04 21.204 0.22
Weld Elevation----> 107.94
Height
Above
Chime
Diameter
Deviation (in)
Subject: Shell Radius Survey Page 2 of 3
Distance
From Radial
Centerline Deviation Deviation (in)
Northeast 15.52 0.02 0.18 0.203 NE+SW -0.31
15.53 0.03 0.30 3.204 0.11
15.52 0.02 0.24 6.201 0.07
15.52 0.02 0.19 9.199 0.11
15.51 0.01 0.10 12.2 -0.08
15.50 0.00 -0.05 15.2 -0.40
15.49 -0.01 -0.08 18.202 -0.38
15.47 -0.03 -0.37 21.213 -0.89
Weld Elevation----> 107.94
North 15.52 0.02 0.26 0.238
15.55 0.05 0.58 3.196
15.57 0.07 0.79 6.205
15.58 0.08 0.91 9.194
15.56 0.06 0.76 12.185
15.56 0.06 0.72 15.177
15.56 0.06 0.74 18.167
15.56 0.06 0.68 21.161
Weld Elevation----> 107.91
Northwest 15.53 0.03 0.31 0.206
15.54 0.04 0.46 3.328
15.55 0.05 0.55 6.202
15.55 0.05 0.61 9.197
15.53 0.03 0.38 12.195
15.54 0.04 0.53 15.188
15.54 0.04 0.52 18.185
15.55 0.05 0.55 21.178
Weld Elevation----> 107.93
Height
Above
Chime
Diameter
Deviation (in)
Subject: Shell Radius Survey Page 3 of 3
Distance
From Radial
Centerline Deviation Deviation (in)
West 15.50 0.00 0.00 0.2
15.52 0.02 0.25 3.205
15.52 0.02 0.25 6.202
15.51 0.01 0.10 9.199
15.49 -0.01 -0.11 12.203
15.48 -0.02 -0.25 15.209
15.50 0.00 0.04 18.198
15.52 0.02 0.18 21.176
Weld Elevation----> 107.92
Southwest 15.46 -0.04 -0.49 0.193
15.48 -0.02 -0.19 3.199
15.49 -0.01 -0.17 6.2
15.49 -0.01 -0.08 9.2
15.49 -0.02 -0.18 12.202
15.47 -0.03 -0.35 15.207
15.48 -0.03 -0.30 18.209
15.46 -0.04 -0.52 21.221
Weld Elevation----> 107.95
Height
Above
Chime
SHELL SETTLEMENT SURVEY
Austin Brockenbrough & Associates, L.L.P.
Job No. 16-095.04 Location: Fort Lewis
Date: 04/28/2017 Subject: Tank Facility 09650 Shell Settlement Calcs By: Jeffrey W. King
API 653 Appendix B Optimum cosine curve, B 2.2.4.e)
Z = a + b x cos (theta + c)
Diameter (D) = 31 (ft)
Number of equally spaced data points (ft)= 8 L = Arc length between measurement points (ft) = 12.17 Tank Height (H) = 22 (ft)
Survey Height of
Position Weld * Z U S 0 5 107.91 0.00 0.01 0.01 0.02 1 6 107.93 0.02 0.01 -0.01 -0.02 2 7 107.92 0.01 0.02 0.01 0.02 3 8 107.95 0.04 0.04 0.00 -0.01 4 1 107.95 0.04 0.04 0.00 0.00 5 2 107.94 0.03 0.04 0.01 0.01 6 3 107.94 0.03 0.02 -0.01 0.00 7 4 107.94 0.03 0.01 -0.02 -0.02 8 5 107.91 0.00 0.01 0.01 0.01
Maximum out-of-plane deflection = 0.02
* = measured elevation
*HI (Height of Instrument) Z = calculated rigid body tilt (in)
U = out-of-plane settlement = S = out-of-plane deflection = z-y
Y = yield strength of shell material (PSI) = 30,000 E = Young’s modulus of elasticity (lbf/in2) = 29000000.00 S allowable (in) (API 653 B.3.2.1) = (L^2*Y*11)/(2EH)*12 = 0.46 in
R^2 =(Syy - SSE)/Syy = 0.61 not >=0.9 therefore cosine curve is invalid.
Evaluation by the Arc Length Method described in API 653 B.2.2.5.1 is required.
Job No. 16-095.04 Location: Fort Lewis
Date: 04/28/2017 Subject: Tank Facility 09650 Shell Settlement Calcs By: Jeffrey W. King
API 653 B.2.2.5.1 Evaluation by Settlement Arc Length Method
Per B.3.2.2, K = 10.5
Settlement arc length (ft), Sarc
Out of plate settlement at Point i (Si)
Allowable settlement at point i (Smax) = MIN[K*Sarc*(D/H)*(Y/E), 4]
Point Sarc (ft) Si (in) Smax
0 24.3 0.025 0.37 Si < Smax → OK
2 24.3 0.020 0.37 Si < Smax → OK
5 24.3 0.005 0.37 Si < Smax → OK
Evaluation of the settlement by the arc length method indicates the settlement is within acceptable limits.
0.00
0.01
0.02
0.03
0.04
0.05
0 2 4 6 8 10
Measured Elevation (in)
Si2 Si5 Si0
SHELL THICKNESS CALCULATIONS
It is noted that because of the way technology has evolved, and as the exact location of the measurements vary, the measured minimum thickness of some of the shell plate may be less than, or even greater than, the previous measured thickness. Additionally, in some cases the measured thickness is greater than the nominal thickness due to steel plate tolerances, which allow plus or minus 30 thousandths of an inch. However, this may not indicate a corrosion rate, unless there is significant coating failure and corrosion, which is unlikely with oil storage. Thinning of coated steel is due to abrasive blasting and not deterioration. Therefore, since the interior and exterior of the shell are coated and the current measurements indicate the same nominal thickness as the previous measurements with no significant deviation, the current corrosion rate is zero. Also, since the remaining thickness is greater than the required thickness, the expected service life is greater than 30 years. Therefore, per API 653 the next ultrasonic thickness inspection of the shell should be performed in 15 years.
Job No.: 16-095.04
Job Title: Fort Lewis
Subject: Tank 1 (Fac 09650) Shell Thickness Evaluation
By: Jeffrey W. King Date:
API 653
SHELL CALCULATIONS
Diameter 31 feet
Shell Height 22.00 feet
Freeboard 0 feet
Design Fill Height 22.00 feet
Specific Gravity 1.00 API 650
0.84 API 653
Joint Efficiency 0.85 API 650 Appendix A 7th Edition Assumed
Material unknown
Yield Strength 30,000 psi (assumed)
Tensile Strength 55,000 psi (assumed)
Original Design Corrosion Allowance
0.000 in (0 mm)
Required thickness:
Lower Upper
Two
Courses Courses
23,600 26,000
Height Product Required Thickness
Course (feet) Depth 1/4" min
3 6.00 6.00
2 8.00 14.00
1 8.00 22.00 min 2016 Corrosion Estimated UTM current net 1954 Rate Service Life Inspection
Course UTM thickness thickness * in/yr yrs. Interval
3 0.189 0.189 0.190 0.00001 >30 15
2 0.198 0.198 0.202 0.00006 >30 15
1 0.187 0.187 0.218 0.00050 >30 15
* The original thicknesses are assumed based on required design thicknessess, overtolerance, and the range of the UTMs.
5/2/2017
Visual
Inspection
Interval
0.100
0.100
0.100
2.6(H-1)D
Hydro
2250020000
Design
Allowable Stress (psi)
API-653API-650
OriginalOriginal
0.089
0.021
0.055
0.020
0.084
2.6(H-1)DG
0.052
SE
2.6HDG
SESE
SHELL/ROOF ULTRASONIC THICKNESS MEASUREMENTS
Brockenbrough personnel recorded the ultrasonic thickness measurements, shown on the following page, on 28
February 2016. Refer to the tank drawings by others, which are included for reference in the pages that follow, for location of the shell plate measurements and layout of the tank. The values are in thousandths of an inch.
Job No.: 16-095.04
Job Title: Fort Lewis
Subject: Tank 1 (Fac 09650) Shell and Roof UTMs
By: Jeffrey W. King Date: 5/2/2017
SHELL UTM DATA (0.001 inches)
DFT = 0.000 inches
Course 3 190 190 189 at Stairs
Course 2 203 204 198 at Stairs
UTM's include 0 inch DFT coating.
1 4 7
2 5 8
3 6 9
Typical Shell Plate UTMs.
Course 1 1 2 3 4 5 6 7 8 9
1-1 189 193 189 189 195 189 187 191 188
1-2 193 200 193 193 195 189 189 192 187
1-3 195 195 192 196 199 196 198 201 196
1-4 197 199 194 197 198 195 195 195 190
Roof 314 314 313 315 316 322 315 315 314
UTs 314 317 315
TANK DRAWINGS
The following tank drawings are taken from a previous API 653 Out-of-Service Inspection Report prepared by
Environmental Technology, Inc. in October, 2006. This data is included as a reference and should be used for informational purposes only.
Remarks/Legend:
Owner/Operator:
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
U.S. Army, Ft. Lewis, Tacoma, WA
Environmental Technology, Inc.
10/31/06 N/A N/A
Tank #1 S-1Shell Layout
Seam #1 is the first seam left of the first manway left of the ladder in the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
10540
GRAPHIC SCALE:
Dimensions are in feet.
1-1
A
B
C
D
ATG
2-1
3-1
1-2
E
F
2-2
3-2
1 2 3
A - 4" Firefighting Foam Line B - 24" Manway C - 1" Low Level Indicator D - 1" Low Low Level Indicator E - 1" Plug F - 1" Plug
Client:
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Environmental Technology, Inc.
10/31/06 N/A N/A
Tank #1 S-2Shell Layout
Seam #1 is the first seam left of the first manway left of the ladder in the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
10540
GRAPHIC SCALE:
Dimensions are in feet.
1-3
G
H
I
J
K
L
M
N O P
2-3
3-3
1-4
Q R
S T
2-4
3-4
3 4 1
G - 1" High High Level Alarm H - 1" High Level Alarm I - 4" Firefighting Foam Line J - 24" Manway K - 3/4" Pressure Relief L - 1" High Float Control M - 1" Low Float Control N - 4" Product Reciept O - 1" Plug P - 1" Temprature Probe Q - 1" Water Draw R - 3/4" Pressure Relief S - 4" Product Issue T - 3" Crossover/Low Point Suction
Owner/Operator:
U.S. Army, Ft. Lewis, Tacoma, WA
Client:
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
Environmental Technology, Inc.
10/31/06 N/A N/A
Tank #1 R-1Fixed Roof Layout
Measured Diameter is 33.4 feet.
Layout Diameter is 31 feet.
Fixed roof has 14 plates.
10543210
GRAPHIC SCALE:
Dimensions are in feet.
y x NW y x
NE
y x
SEy x
SW
XY Orientation
XY Orientation is in reference to Plan North
2 3
6 7
8 9
11 12 13 14
A
B
C
D E F
G
A - 36" Manway B - 4" Vent C - 8" Electronic Level Indicator D - 1" ATG Float Guide Wire E - 1-1/2" ATG Float F - 1" ATG Float Guide Wire G - 24" Emergency Vent
Client:
Austin Brockenbrough & Associates, L.L.P.
Owner/Operator:
U.S. Army, Ft. Lewis, Tacoma, WA
OSHA ACCESS STRUCTURE REPORT
OSHA Stairway Data
Handrail Actual
(in)
OSHA Rq’d min (in) max (in)
Handrail Height 34 34 30 34 Step Width 24 24 22 NA Step Rise 9 9 NA NA
Bottom Step Rise 9 9 8 8
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
UL SWRI
API Other
Protected
31'-0" diameter by 22'-0" tall
Type: Type:
Size: Date Installed:
SS End Conn: Size: 4" Material: SS End Conn: Size: 4"
Issue To:Receipt From: Truck Off-Load
Interior Coating:
Double Bottom
Unknown
Unknown
Concrete Dike
120'-0" X 54'-0" X 4'-0"
Level Alarms:
Material:
Tank Outside Dimensions:
Nominal Capacity:
Secondary Containment, Overfill, and CRDM
Open Type Dike
Unknown
Jeffrey W. King
Vertical
Rectangular
Double Wall
Fire Resistant
Closed Top Dike
Change of Service:
Last Repair:
Tank Coatings:
Exterior Coating:
Epoxy/Epoxy/Polyurethane
Epoxy (assumed)
Tank Facility No.:
Local Tank ID No.:
February 28, 2017
Facility 09650
Tank Manufacturer:
Tank Construction Date:
Tank 1
API 653 EXTERNAL INSPECTION CHECKLIST
Fort Lewis, WAProject Site:Project Name:
Project Location:
Brockenbrough Job No.:
SPCC Mandated AST Inspections - Group 19
Various Locations
General Inspection Information
16-095.04
Submitted to:
Contract No.:
USACE - Omaha
W9128F-12-D-0006
Flanged
Truck Fillstand
Unknown
Inspector Certification Number:
Overfill Protection:
NA
NA
NA
Useable Capacity:
Tank Construction and Configuration
Insulated
Coated
Plastic / Fiberglass
Other:
Jet Fuel (F-24)
3,000 BBL
Unknown
Flanged
54102
Horizontal Single Wall
Release Prevention Barrier
Overfill Protection / Level Alarms:
Independent High-high, High, Low Level Alarm & ATG
Alarms
High Level Control Valve (HLCV)
Receipt Piping Configuration Issue Piping Configuration
Tank Piping
Secondary Containment
October 2006
Tank Specifications
Previous Tank Inspection Date:
Continuous Release Detection Monitoring
Type:
Date Installed:
Current Product: N/A
Inspection Date:
Design Std
Tank Inspector Name:
API 653 EXTERNAL INSPECTION CHECKLIST
Fort Lewis, WAProject Site:Project Name: SPCC Mandated AST Inspections - Group 19
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A 0 volts; 0.8 amps
Organic plant debris (leaves) found in the dike area.
There are minor hairline cracks in several areas of the ringwall.
Piping headers are located over dike low points. Water tends to collect underneath the piping.
a)
C.1.1.2 Asphalt a) b)
Run-off rainwater from shell draining away from the tank
Check for:
b)
Settlements into the base
C.1.1.5 Site Drainage
Proper operation of dike drains
Check for:
Presence of crushed rock under the steel bottom which usually results in severe underside corrosion.
Check for :C.1.1.3 Oiled Dirt or Sand
C.1.1.7 Cathodic Protection
Cavities under foundation; vegetation against bottom of tank
Broken concrete, spalling, and cracks, especially under backup bars used in welding butt-welded annular rings under the shell
Indications of bottom leakage at drain openings in ring, back of water-draw basins, and top surface of ring
ITEM
C.1.1 Foundation
Settlement around perimeter of tank
Check for:
d) a) b)
C.1.1.6 Housekeeping
Build-up of trash, vegetation, and other inflammables
Leaching of oil which has left rock filler exposed indicating hydrocarbon leakage
Tank settlement into asphalt base
Site drainage away from the tank, associated piping, and manifolds
Measure foundation levelness and bottom elevations (See Annex B) See survey data.
STATUS COMMENTS
e)
C.1.1.4 Rock
Review cathodic protection potential readings
Check for:
c)
TASK
Check for:
Tank Settlement
C.1.1.1 Concrete Ring
C.1.2.1 External Visual Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
C.1.2.3 Riveted Shell Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Minor corrosion around the tank chime, manhole covers and bolts, etc.
Joint sealant is applied on top of the tank bottom extension.
Bottom-to-foundation seal has systematically failed.
C.1.2. Shells
Check for:
C.1.2.2 Internal (Floating Roof
Tank)
Pitting on support welds to shell, especially on shell plates a) b)
c) Bottom-to-Foundation Seal
e) Drawings of riveted seams if available. Otherwise, dimension and sketch (or photograph) the rivet pattern: no. of rows, rivet size, pitch length, butt-riveted or lap-riveted joints a)
Grooving, corrosion, pitting, and coating failures
Reinforcing pads welded to shell at supports
Leaks and identify the location by sketch or photo
Check for:
Check for:
Broken welds and corrosion damage
(paint failure, pitting, corrosion, product build-up), especially where it occurs at tack-welded junction d)
Corrosion loss and wear on the rivets
Corrosion and thinning on plate and weld after cleaning the bottom angle area
Paint failures, pitting, and corrosion
Full fillet lap-welded vertical seams to increase joint efficiency b) c) c) b)
C.1.2.4 Wind Girder (Floating Roof
Tanks) a)
Rivet and seam leaks on external surface
Check for:
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
STATUS
a) Leaks on autogauge tape guide and lower sheave housing (floating swings)
b) Damage on autogauge head a)
Check for:
d)
Damage and test the accuracy of temperature indicators h)
C.1.3.1 Manholes and Nozzles
C.1.3.2 Tank Piping Manifolds
C.1.3 Shell Appurtenances
Damage on welds on shell-mounted davit clips above valves 6 inches and larger
Sealing of insulation around manholes and nozzles
e) Adequate manholes flange and cover thickness on mixer manholes
C.1.3.3 Autogauge System Check for:
b)
COMMENTS
Cracks or signs of leakage on weld joint at nozzles, manholes, and reinforcing plates
Fire fighting system componentsb) c) d) e) f) g)
Anchored piping which would be hazardous to the tank shell or bottom connections during earth movement
Adequate thermal pressure relief of piping to the tank
Proper operation of regulators for tanks with purge gas systems
Leaks at sample connections and proper valve operation
Flange leaks and leaks around bolting
Shell plate dimpling around nozzles, caused by excessive pipe deflection c)
Check for:
ITEM TASK
a) Leaks at piping manifolds, flanges, and valves
Thermal relief piping is threaded in a few places.
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
c) Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
1 1/2"ø coated carbon steel.
e) f) g)
Proper movement of tape by bumping the checker on autogauge head
Size and construction material of the autogauge tape guide and make note
(floating roof tanks)
Proper movement of tape. Ask the operator if the tape tends to hang up during tank roof movement (floating roof tanks).
Actual product level compared to the reading on the autogauge. Make note. (max. variation is 2 in.)
No more than 2 feet of tape are exposed at the end of the tape guide when the roof is in lowest position
(floating roof tanks)
ITEM TASK STATUS COMMENTS
a) b)
Proper mounting flange and support
Leakage b)
Check for:
Function of valves and plugging in sample lines, including drain or return-to-tank line
Leaks in circulation pump and operating problems
Inspect condensate drain for presence of oil indicating leakage
C.1.3.5 Heater (Shell Manhole
Mounted)
C.1.3.6 Mixer Check for:
c) Condition of power lines and connections to mixer
Bracing and supports for sample lines and equipment
C.1.3.3 Autogauge System c) d)
C.1.3.4 Shell-mounted Sample
Station a)
h) Condition of board and legibility of board-type autogauges
Freedom of movement of marker and float i)
Varec = 2'-8 3/4" ,ATG= 2'-8 1/2"
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
b) Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
C.1.3.7 Swing Lines: Winch a)
Operation
Indicator: Check that the indicator moves in the proper direction.
Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite b) c)
C.1.3.8 Swing Lines: External
Guide System
Check for leaks at threaded and flanged joints
C.1.3.9 Swing Lines: Identify
Ballast Varying Need
Check for significant difference in stock specific gravity
Check for:C.1.3.10 Swing Lines: Cable
Material and Condition a) Corrosion over entire length, for non-stainless steel cable
Wear or fraying on all types of cable
C.1.3.11 Swing Lines: Product
Sample Comparison
Check for water or gravity differences that would indicate a leaking swing joint
C.1.3.12 Swing Lines: Target
STATUS
Non-floating: Raise, then lower the swing line with the winch and check for cable lightness to confirm the swing line lowered properly
TASK
Floating: With tank half full or more, lower the swing line, then let out the cable and check if the swing has pulled cable tight, indicating that the winch is operating properly
ITEM
Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support
COMMENTS
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
C.1.4.4 Level of Floating Roof At several locations, measure distance from roof rim to a horizontal weld seam above the roof. A variance in the readings indicates a nonlevel roof with possible shell out-of-round, out-of-plumb, leaking pontoons, or hang-up.