Attachment J01 Rate Schedule in Excel.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- IHS CAO IDIQ (SATOC) for A/E Design Projects
- Solicitation number
- 75H70322R00002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 75H70322R00002 P00001 Amendment 1.pdf | ||
| 75H70322R00002 with Attachs.pdf | ||
| Attachment J-02 SF330 AE Qualification Fillable.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment J01 RATE SCHEDULE (these rate cannot include travel expenses. Travel expenses will be negotated on each individual task order in accordance with the terms of G.5. Task Order Procedures.)
Please use a format similar to this example attachment J01. If there are additional disciples the firm would like to add, please list them below to the column: example wastewater/civil engineering manager, civil/wastewater engineer, accountant, AutoCAS/GIS, ect.
| Solictation No. 75H703-22-R-00001 |
| Firm's Name |
| Overhead Rate (%) | Discipline (s): Electrical, Structural and Architectural | |||||
| Profit (%) | ||||||
| Yearly Escalation Rate (%) | ||||||
| Hourly Unburdened Rate | Base Period of Performance (PoP) | Option 1 PoP | Option 2 PoP | Option 3 PoP | Option 4 PoP |
| Electrical Engineer |
| Structural Engineer |
| Seniro Architect |
| Junior Architect |
| electrical Designer-Drafter |
| Architectural Designer-Drafter |
| Structural Designer-Drafter |
| Administrative |
File details come from the government source that posted it. Updated .