Attachment J.2. Travel Scope of Work.docx
DOCX document 39 KB Posted
- Attached to
- Randomized Controlled Trial on Interventions to Increase Electricity Grid Connections in Urban Burkina Faso
- Solicitation number
- RFQ95332420Q0019
- Issued by
-
Millennium Challenge Corporation
About this file
This combined synopsis/solicitation requests quotations for a randomized controlled trial in Burkina Faso. The Millennium Challenge Corporation seeks offers to design and implement an RCT to analyze interventions for increasing electricity grid connections among urban households. The study should address the potential of credit interventions and lowering administrative barriers to increase connections. The contractor will support MCC's Department for Policy and Evaluation and collaborate with MCC and the Government of Burkina Faso. Offerors must submit quotes by July 3, 2020. Evaluation criteria include technical capability, past performance, and price. Technical capability and past performance combined are more important than price. Questions are due by June 15, 2020, with a pre-submission webinar on June 18, 2020 to discuss the requirement. Interested parties should register by June 17, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Name, Organization
COUNTRY
Project/Activity
DATE
1. Travel Dates and Objective(s)
2. Team Roles/Responsibilities
3. Proposed Activities
4. Proposed Meetings
5. Expected Deliverables
6. Requested Background Documentation (from MCA or other stakeholders)
7. Itinerary
| Name(s) |
| Carrier and # |
| Mode |
(Air, Car, Train)
| Class (Business/Coach) |
| Departure Location |
| Departure Date/Time |
| Arrival Location |
| Arrival Date/Time |
Hotel Name
Justification for Premium Class (if applicable):
8. Estimated Budget (airfare, hotel, per diem)[footnoteRef:1] [1: All travel must be made in accordance with Federal Travel Regulations (FTR) available online here. In accordance with the Fly America Act, contractors must use a U.S. flag air carrier service for all travel funded by the government beginning or ending in the U.S. unless a specific exemption to the “Fly America” rule applies. Flights on U.S. air carrier pairings with foreign carriers (i.e., code share flights) are regarded as meeting Fly America requirements if the ticket is issued on the American carrier and there is an American carrier flight number.]
| Name(s) |
| Total Days |
| Airfare ($) |
| Hotel ($) |
| Per Diem ($) |
| Misc ($) |
| TOTAL ESTIMATE ($) |
TOTAL
9. Country clearance – MCC staff and contractors are required to receive country clearance through the embassy prior to travel. To complete the clearance form, travelers should provide their full itinerary and name of hotels (required in table 7), passport number, passport country of issue, and country of birth. These details can be provided separately to the M&E lead.
File details come from the government source that posted it. Updated .