Attachment J.1 -Tank 964 Inspection Report.pdf
PDF 1 MB Posted
- Solicitation number
- W9128F23Q0065
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - SHH Fuel Storage Tank List (Version 2).xlsx | XLSX spreadsheet | |
| Solicitation Amendment - W9128F23Q0065 0001.pdf | ||
| Attachment J.2 -Tank 967 Inspection Report.pdf | ||
| Solicitation - W9128F23Q0065.pdf | ||
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment F - API Internal Inspection Template.docx | DOCX document | |
| Attachment E - API Internal Inspection Telecon Briefing Template.docx | DOCX document | |
| Attachment C - Tank Data Sheet.xlsx | XLSX spreadsheet | |
| Attachment G - Return To Service Letter.docx | DOCX document | |
| Attachment B - SHH Fuel Storage Tank List.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gilbane Tanks K1002 and W0003 – Post Repair API 653 Inspections
June 19, 2019
All Pond marketing materials are printed on papers containing post-consumer recycled fibers and are FSC Certified.
June 4, 2020
Ronald J. Weiser
Project Manager ronald.j.wieser@usace.army.mil
USACE, Omaha District
Contract Number: W9128F-17-D-0016
Task Order Number: W9128F20F0026
Submittal Number: 021
Per SOW para 2.4.1 & 2.4.1.2, see attached for the following documents:
1. Savannah ANG – Tank 964 – In-Service API 653 Inspection Report (Final)
2. Savannah ANG – Tank 964 Attachment C
Respectfully submitted, Pond
Anthony E, Chinn, EIT
Program Manager | Mechanical Integrity chinna@pondco.com
678-591-5242
CC: Perrie Kreger – perrie.r.kreger.mil@mail.mil
US Army Corps of Engineers Omaha District
API 653 In-Service Inspection Report
Savannah Air National Guard Facility 964
Tank 964
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants 3/24/2020
API 653 In-Service Inspection Report Savannah ANG, Georgia
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
INSPECTION DATE
STATE REGULATIONS
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 IN-SERVICE (EXTERNAL) INSPECTION
2. SITE INFORMATION
B. TANK INSPECTION COMMENTS
1. TANK CONSTRUCTION
2. TANK FOUNDATION
3. CATHODIC PROTECTION
4. TANK SHELL
5. FIXED ROOF
6. TANK APPURTENANCES
7. TANK AND PIPING COATING
8. TANK PIPING SYSTEM
9. FIRE PROTECTION SYSTEM
10. SECONDARY CONTAINMENT
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS PER API 653, UFC 3-460-01, OR DoD AW 78-24-27 STANDARDS
2. SHORT-TERM RECOMMENDED REPAIRS
3. LONG-TERM RECOMMENDED REPAIRS
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
NEXT INSPECTION
OSHA ACCESS STRUCTURE REPORT
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX C: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
AFFF Aqueous Film Forming Foam
ANG Air National Guard
API American Petroleum Institute
ATG Automatic Tank Gauge
AW Airlift Wing
BBL Barrel
BMP Best Management Practice
CP Cathodic Protection
DFT Dry Film Thickness
DoD Department of Defense
HHLA High-High Level Alarm
HLA High Level Alarm
HLCV High Level Control Valve
IAW In Accordance With
ICCP Impressed Current Cathodic Protection
IFR Internal Floating Roof
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MT Magnetic Particle Testing
NDT Non-Destructive Testing
NFPA National Fire Protection Association
OSHA Occupational Health and Safety Administration
PRT Product Recovery Tank
PT Dye Penetrant Testing
TLG Tape Level Gauge
UFC Unified Facilities Criteria
USACE United States Army Corps of Engineers
UTT Ultrasonic Thickness Testing
VT Visual Testing
GENERAL SUMMARY
Pond was retained by the United States Army Corps of Engineers (USACE) to provide an in-service tank inspection for Tank 964 at Savannah Air National Guard (ANG) in Savannah, Georgia.
The in-service inspection was performed 23-24 March 2020. Results of this inspection identified recommended repairs/upgrades to fully comply with applicable sections of American Petroleum Institute (API) 650/653, Unified
Facilities Criteria (UFC) 3-460-01/3-460-03, Department of Defense (DoD) design standard AW 78-24-27, National
Fire Protection Association (NFPA) 407, Occupational Health and Safety Administration (OSHA) guidelines, best management practices (BMP), and industry standards.
Tank 964 is a welded, steel, vertical, aboveground Jet A (F-24) storage tank. The tank was constructed by an unknown manufacturer in 1969. The tank is 35’-0” in diameter and 27’-`0” high with a nominal capacity of 3,698 barrels (BBL)
(155, 316 gallons).
Testing and inspection activities were performed in accordance with (IAW) applicable sections of API 653, 5th
Edition. This report contains a detailed account of the tank inspection, non-destructive testing (NDT) methods, and conclusions derived from the inspection and testing activities. Findings from this inspection are further detailed in
Section B – Tank Inspection Comments. Recommended repairs and upgrades identified in Section B are further classified and listed in Section C – Findings and Recommendations.
INSPECTION DATE
API In-Service (External) Inspection Date: 23-24 March 2020
Equipment Used:
Manufacturer: GE Krautkramer Ultrasonic Thickness Gauge
Model Number: DMS GO+
Calibration Method: One-Point Calibration
Manufacturer: Fischer Technologies Dry Film Thickness (DFT) Gauge
Model Number: Dual Scope MPOR
Calibration Method: Calibration to Known Thickness Standard
Manufacturer: Technidea Corporation
Model Number: ZipLevel Pro 2000
Calibration Method: Manufacturer Calibrated
Inspector(s):
Andrew D. Morrissette
Christopher R. Peterson
STATE REGULATIONS
State Regulation for API In-Service Tank Inspections: N/A
State Regulation for API Out-of-Service Tank Inspections: N/A
PREVIOUS INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: July 2015
API In-Service (External) Inspection Date: July 2015
RECOMMENDED FUTURE INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: July 2025*
API In-Service (External) Inspection Date: March 2025
*Out-of-service (OOS) inspection date based on the previous OOS inspection report dated July 2015.
Andrew D. Morrissette Christopher R. Peterson
Integrity Engineer Integrity Engineer
API 653 Inspector # 80109
ASNT NDT Level I/II
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner Georgia ANG
Location Savannah ANG
Facility Number 964
Tank Number 964
State / Country Georgia, USA
City Savannah
Inspection Date 23-24 March 2020
Tank Manufacturer Unknown
Design Standard Unknown
Date of Construction 1960*
Tank Contents Jet-A (F-24)
Tank Serial Number N/A
Tank Diameter 35’-0”
Shell Height 27’-10”
Product Height 21’-7” *
Tank Capacity 3,698 BBL (155,316 Gallons)
Foundation Concrete Ring Wall
Construction
Bottom: Cone-Down/Lap-Welded/Double Bottom*
Shell: Butt-Welded
Fixed Roof: Lap-Welded
Floating Roof: Aluminum Honeycomb Pan*
Material
Bottom: Carbon Steel (Unknown Grade) *
Shell: Carbon Steel (Unknown Grade)
Fixed Roof: Carbon Steel (Unknown Grade)
Floating Roof: Aluminum Pontoon with Foam Log Seals*
Cathodic Protection (CP) Impressed Current Cathodic Protection (ICCP)
Interior Coating System Unknown
Exterior Coating System Epoxy with Polyurethane Topcoat (Assumed)
Level Gauging Cameron Automatic Tank Gauge (ATG) and Shand & Jurs Tape Level Gauge
(TLG)
Overfill Protection High Level Alarm (HLA) / High-High Level Alarm (HHLA) / High-Level Control
Valve (HLCV) Float Pilot Assembly
Piping Receipt 6-inches Carbon Steel
Main Suction 6-inches Carbon Steel
Low Suction 4-inches Carbon Steel
Water Draw-Off 2-inches Carbon Steel
Product Recovery Tank (PRT)
Return 2-inches
Carbon Steel
Level Alarms HLA/HHLA Assembly and Low Level Alarm (LLA) / Low-Low Level Alarm
(LLLA) Assembly
Notes:
*Based on previous OOS inspection report dated July 2015.
A. GENERAL PROJECT INFORMATION
1. API 653 IN-SERVICE (EXTERNAL) INSPECTION
The in-service inspection was performed 23-24 March 2020. Results of this inspection identified recommended repairs/upgrades to fully comply with applicable sections of API 650/653, UFC 3-460-
01/3-460-03, DoD standard AW 78-24-27, NFPA 407, and industry standards.
2. SITE INFORMATION
The 165th Airlift Wing (AW) is located at Savannah/Hilton Head International Airport, Georgia. The
165th AW, which currently flies the C-130H cargo aircraft, was created after World War II in 1946. The unit was officially mobilized first for the Korean War and then again for Operation Iraqi Freedom. The
165th provides air transport for airborne forces, their equipment and supplies with delivery by airdrop or airland, and to provide strategic airlift of personnel, equipment and supplies.
B. TANK INSPECTION COMMENTS
1. TANK CONSTRUCTION
Tank 964 is a welded, steel, vertical, aboveground Jet-A (F-24) storage tank. The tank was constructed in
1960 by an unknown manufacturer. The tank is 35’-0” in diameter and 27’-10” high with a nominal capacity of 3,698 BBL (155,316 gallons).
2. TANK FOUNDATION
Tank 964 is provided a double bottom with leak detection ports between the original and secondary tank bottom. Leak detection ports are provided valves left in the normally closed position. The original tank bottom rests on a concrete ring wall foundation. The foundation-to-walkway joint is not provided with sealant.
A settlement evaluation was performed during the inspection. The settlement evaluation was unsatisfactory based on data collected, however, no visual signs of excessive shell stress or settlement were observed. Settlement should be monitored during future inspections.
See Appendix A for settlement results.
3. CATHODIC PROTECTION
The tank is equipped with an ICCP system for protecting the tank bottom from soil-side corrosion.
According to the previous CP survey report dated July 2018, the tank is receiving adequate CP based on
NACE International -850 millivolt polarized potential criteria.
4. TANK SHELL
The tank shell is equipped with four (4) fully coated, butt-welded, steel courses. Shell plates were examined using ultrasonic thickness testing (UTT) and visual testing (VT) methods. Nine (9) UTT measurements were taken on each plate of the 1st shell course. Ten (10) UTT measurements were taken on each of the 2nd through 4th shell courses using the spiral staircase for access. UTT measurements indicated no significant signs of metal loss on shell plates.
Two (2) insert plates on Tank 964 are provided with square corners. Square corners should be avoided as they are potential stress risers. No visual sign of stress cracking was observed at the time of inspection.
Deformations were observed adjacent to insert plates on the upper shell courses. For the deformations on the spiral staircase, none of the deformations were determined to be out of API allowable tolerances.
The sizes and tolerances for the inaccessible deformation were not determined. Each deformation should be monitored in future inspections.
Refer to Drawing A-1 in Appendix A for shell layout and UTT readings at accessible deformations and
Table 1 for tank shell UTT measurements.
5. FIXED ROOF
The tank fixed roof was examined using UTT and VT methods. Five (5) UTT measurements were taken on each fixed roof plate. UTT measurements indicated no significant signs of metal loss on fixed roof plates. The tank fixed roof is provided a ladder to access the internal floating roof (IFR). Insect nests were observed on the ladder.
Refer to Drawing A-2 in Appendix A for roof layout and Table 2 for fixed roof plate UTT measurements.
6. TANK APPURTENANCES
a. TANK SHELL
The tank shell nozzles were examined using UTT and VT methods. Two (2) to four (4) UTT measurements were taken on each shell nozzle as accessible. Tank 964 is equipped with eighteen (18) shell nozzle penetrations: one (1) 30” manway, one (1) 36” manway, one (1) 6” main suction, one (1) 4” low suction, two (2) threaded plugs, one (1) 6” receipt, two (2) 1”
HLA/HHLA penetrations, one (1) 1” blind flange, three (3) 1 ½” threaded plugs, one (1) 2” water draw off, one (1) 2” PRT return, two (2) 1” LLA / LLLA penetrations, and one (1) aqueous film forming foam (AFFF) chamber.
Refer to Drawing A-1 in Appendix A for shell layout and Table 3 for nozzle UTT measurements.
b. FIXED ROOF
The tank fixed roof nozzles were examined using UTT and VT methods. Four (4) UTT measurements were taken on each roof nozzle. The fixed roof is provided thirteen (13) nozzle penetrations: one (1) 10” sampling hatch, one (1) 36” x 48” inspection hatch, one (1)
10” Cameron ATG, one (1) 30” x 72” IFR installation hatch, one (1) 24” center vent, one (1) 8” stilling well nozzle, two (2) 4” scaffold supports, two (2) 2 ½” IFR grounding cables, two (2)
3” IFR anti rotation cables, and one (1) 1 ½” Shand & Jurs TLG.
Coating for the center vent, Cameron ATG, and stilling well nozzle exhibit corrosion staining and base metal exposure with surface corrosion. Insect nests were observed on the ladder to access the IFR.
Refer to Drawing A-2 in Appendix A for roof layout and Table 3 in Appendix A.
c. GAUGING
The tank is provided with a manual gauging hatch on the roof manway for manual gauging and sampling operations. A Cameron ATG system is provided for automatic tank gauging.
According to base personal, the ATG is functioning properly, however DLA ATG Installation
Policy requires that Tank 964 be equipped with an Enraf ATG and Vito temperature/water probe. A mechanical Shand & Jurs TLG is provided for monitoring product level from the ground. The TLG did not pass the field operability check. The gauge was pulled but did not adjust after being returned to the normal position, indicating the float is not resting on the product stored inside the tank.
d. LEVEL ALARMS
The tank is provided with independent, shell mounted alarms in the low, low-low, high, and high-high positions as well as a HLCV float pilot for overfill protection. According to facility personnel, all level alarms and the HLCV float pilot are functioning properly.
e. STAIRS AND PLATFORMS
The tank is provided a spiral staircase with one (1) upper platform for fixed roof access. Stair treads were extended at the HLA/HHLA/HLCV float pilot assembly to allow safe passage. An internal access ladder is provided at the roof inspection hatch for access to the IFR.
f. GROUNDING AND BONDING
The tank shell is equipped with five (5) grounding cables. Grounding cables are in good condition with no signs of damage or deterioration.
7. TANK AND PIPING COATING
Coating for the receipt, main suction, low suction, water draw-off, and PRT return exhibits widespread flaking, cracking, bio-growth, and base metal exposure with surface corrosion. A full recoat of the piping system should be programmed in the near future. Coating for the tank shell exhibits bio-growth and debris build-up. Coating for the stilling well nozzle, Cameron ATG, and fixed roof center vent exhibit corrosion staining and base metal exposure. The tank shell and piping exhibit widespread bio-growth.
8. TANK PIPING SYSTEM
Piping within the containment dike is constructed of carbon steel. Product designation labeling and flow arrows for the receipt and suction piping exhibit fading and peeling. One (1) pipe support for each of the receipt and main suction are not provided with lateral restraints.
9. FIRE PROTECTION SYSTEM
For internal fire protection, an aluminum honeycomb pan is provided. The tank is also equipped with an
AFFF system. The AFFF system is no longer needed and should be removed upon approval from base civil engineering.
10. SECONDARY CONTAINMENT
Tank 964 is located within a gravel covered geotextile liner dike with four (4) concrete sloped walls. A concrete walkway is provided around the tank perimeter. Control joints for the walkway and dike walls are not provided sealant. The containment dike exhibits widespread vegetation growth and the geotextile liner exhibits tearing and fraying.
C. FINDINGS AND RECOMMENDATIONS
Based on the in-service API 653 inspection of Tank 964 located at Savannah ANG in Savannah, Georgia, repair/upgrade recommendations have been identified. The following recommendations outline observations from this inspection. All repair recommendations are based on applicable sections of API
650/653, UFC 3-460-01/3-460-03, DoD Standard AW 78-24-27, NFPA 407, and industry standards.
1. MANDATORY REPAIRS PER API 653, UFC 3-460-01, OR DoD AW 78-24-27 STANDARDS
Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.
No mandatory repairs are required to remove Tank 964 from service.
2. SHORT-TERM RECOMMENDED REPAIRS
Short-term repairs that directly relate to the long-term preservation of the asset. Short-term repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by federal, state and local codes or by military criteria.
2.1 Fixed Roof Nozzles Coating
OBSERVATION: Coating on the stilling well nozzle, Cameron ATG, and fixed roof center vent exhibit corrosion staining and base metal exposure.
REFERENCE: UFC 3-460-03, Section 8-3.1
RECOMMENDATION: Provide approximately 20 ft2 of spot coating repair on the stilling well nozzle, Cameron ATG flange, and fixed roof center vent.
2.2 Tank Shell Nozzles and Appurtenances Coating
OBSERVATION: External coating on the main suction, low suction, water draw-off, PRT return, and receipt nozzles and piping exhibit corrosion staining, flaking, and base metal exposure with surface corrosion.
REFERENCE: UFC 3-460-03, Section 6-10.1.1
RECOMMENDATION: Provide approximately 75 ft2 of spot coating repair on tank shell nozzles, appurtenances, and piping.
2.3 Foundation-to-Walkway Joint
OBSERVATION: The foundation-to-walkway joint is not provided with sealant, allowing a pathway for fluid to escape in the event of a spill.
REFERENCE: UFC 3-460-03, Section 8-4.1 (b)
RECOMMENDATION: Provide approximately 115 linear feet of flexible, fuel-resistant, UV-resistant sealant at the foundation-to-walkway joint.
2.4 Pipe Supports
OBSERVATION: Two (2) pipe supports, one (1) for each of the main suction and receipt, are not provided with lateral restraints.
REFERENCE: AW 78-24-27, Sheet CD.13, Pipe Support Detail Type GS: Guided Support
RECOMMENDATION: Provide lateral restraints for two (2) pipe supports for the main suction and receipt.
2.5 Shand & Jurs TLG
OBSERVATION: The Shand & Jurs TLG did not pass the field operability test.
REFERENCE: UFC 3-460-03, Section 8-9.7
RECOMMENDATION: Repair or replace the Shand & Jurs TLG.
2.6 Tank Shell Insert Plates
OBSERVATION: The tank shell is provided with two (2) insert plates with square corners. Square corners should be avoided as they are potential stress risers.
REFERENCE: API 653 Section 9.2.2.1
RECOMMENDATION: Perform magnetic particle testing (MT) or dye penetrant testing (PT) at two (2) square-cornered insert plates on the fourth shell course.
2.7 Secondary Containment Control Joints
OBSERVATION: Walkway and dike sloped wall control joints are not provided with sealant.
REFERENCE: UFC 3-460-03, Section 8.10.2.2 (c); UFC 3-460-03, Section 8.10.2.1 (d)
RECOMMENDATION: Provide approximately 600 linear feet of flexible, fuel-resistant, UV-resistant sealant at walkway and sloped wall control joints.
2.8 Secondary Containment Cracking
OBSERVATION: Cracking was observed in the containment sloped walls. Cracking is not provided sealant.
REFERENCE: UFC 3-460-03, Section 8-10.2.1(c)
RECOMMENDATION: Provide approximately 50 linear feet of sealant to unsealed cracks.
2.9 ATG
OBSERVATION: Tank 964 is provided with a Cameron ATG.
REFERENCE: DLA ATG Installation Policy
RECOMMENDATION: Provide the tank with an Enraf ATG and Vito temperature/water probe.
3. LONG-TERM RECOMMENDED REPAIRS
Long-term repairs that directly relate to repair/upgrade of an asset to bring it up to the current standard from the standard at time of construction. Long-term repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
3.1 IFR Inspection Hatch Ladder
OBSERVATION: Insect nests were observed on the IFR inspection hatch ladder.
REFERENCE: BMP
RECOMMENDATION: Remove the insect nests on the IFR inspection hatch ladder.
3.2 Tank Shell Coating
OBSERVATION: Tank shell, nozzles, and appurtenances coatings exhibit bio-growth and debris build-up.
REFERENCE: BMP
RECOMMENDATION: Pressure wash bio-growth and debris on the shell, nozzles, and appurtenances coatings.
3.3 AFFF
OBSERVATION: Tank 964 is provided with an AFFF system, however, an IFR is provided for fire protection.
REFERENCE: UFC 3-460-01, Section 2-14.2.2
RECOMMENDATION: Remove the AFFF discharge chamber and associated piping upon approval from base civil engineering. If approval is not granted, coat piping red in accordance with MIL-STD-161H. Note that AFFF piping is constructed of galvanized steel and provided threaded connections.
3.4 Secondary Containment Geotextile Liner
OBSERVATION: The secondary containment geotextile liner exhibits tearing, fraying, and widespread vegetation growth.
REFERENCE: BMP
RECOMMENDATION: Repair approximately 50 square feet of tearing and fraying of the geotextile liner and remove vegetation growth from the secondary containment.
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
NOZZLE
SCHEDULE
NOZZLE SIZE SHELL LAYOUT
MW1 30" MANWAY
N1 6" MAIN SUCTION
N2 4" LOW SUCTION
N3 - THREADED PLUG
N4 - THREADED PLUG
N5 6" RECEIPT
N6 1" HLA/HHLA
N7 1" BLIND FLANGE
N8 1" HLA/HHLA
N9 1 1/2" THREADED PLUG
N10 1 1/2" THREADED PLUG
N11 1 1/2" THREADED PLUG
N12 2" WATER DRAW OFF
N13 2" PRT RETURN
N14 1" LLA/LLLA
N15 1" LLA/LLLA
MW2 36" MANWAY
N16 - AFFF
5'-10"
8'-0"
6'-0"
8'-0"
LEAK DETECTION
PORT (TYP. 5)
GROUNDING
CABLE (TYP. 6)
1-1 1-2 1-3 1-4
2-1 2-42-32-2
3-1 3-2 3-33-4
4-14-4
4-2 4-3
N1
N2
N3
N4
N5
AFFF PIPE
SUPPORT (TYP. 4)
N16
N14
N15
N10
N11
N9
N13N12
N8
N6
N7
SHEET OVERFLOW
VENT (TYP. 2)
ATG SUPPORT
(TYP. 3)
CONDUIT SUPPORT
(TYP. 9)
.247"
.249"
.252"
.250"
.248"
.249"
.248"
.250"
.240"
.241"
.237"
.229"
.235"
.242"
.245"
.179"
.129" - .177"
PERIMETER HANDRAIL
SPIRAL
STAIRCASE
STAIRCASE
UPPER
PLATFORM
HLA/HHLA
CHAMBER
SUPPORT (TYP. 6)
LLA/LLLA
CHAMBER
SUPPORT (TYP. 2)
TANK BOTTOM
C O
N T
R A
C T
N
O
F I L E
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
R
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
S A
V A
N N
A H
G
A
S A
V A
N N
H
G
T A
K
L A
Y O
U T
N T
S
N A
W F
D
W F
F
A N
S I
B a r k w a y
L a n e
S u i t e
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
A D
M
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 964
MANUFACTURER: UNKNOWN
YEAR BUILT: 1960
TANK DIAMETER: 35'-0"
TANK HEIGHT: 27'-10"
NOMINAL CAPACITY: 4,788 BBL
PRODUCT: JET-A
PRODUCT SPECIFIC GRAVITY: 0.82
GPS COORDINATES: 32.11332°, -81.1892°
N A
S H
E L L
L A
Y O
U T
A-1
LEGEND:
SHELL DEFORMATION
UTT READINGXXX"
NOTES:
1. REFER TO TABLE 1, "SHELL UTT MEASUREMENTS", IN
APPENDIX A FOR INDIVIDUAL SHELL PLATE UTT
READINGS.
2. REFER TO TABLE 2, "FIXED ROOF UTT MEASUREMENTS",
IN APPENDIX A FOR INDIVIDUAL ROOF PLATE UTT
READINGS.
3. REFER TO TABLE 3, "SHELL NOZZLE/REPAD UTT
MEASUREMENTS", FOR NOZZLE DATA.
SPIRAL
STAIRCASE
NOZZLE
SCHEDULE
NOZZLE SIZE FIXED ROOF LAYOUT
N17 10" SAMPLING HATCH
N18 36" x 48" INSPECTION HATCH
N19 10" CAMERON ATG
N20 30" x 72" IFR INSTALLATION HATCH
N21 24" CENTER VENT
N22 8" STILLING WELL
N23 4" SCAFFOLD SUPPORT
N24 2 1/2" IFR GROUNDING CABLE
N25 3" IFR ANTI-ROTATION CABLE
N26 3" IFR ANTI-ROTATION CABLE
N27 4" SCAFFOLD SUPPORT
N28 2 1/2" IFR GROUNDING CABLE
N29 1 1/2" SHAND & JURS TLG
N21
N18
PERIMETER ROOF
VENT (TYP. 4)
PERIMETER HAND RAIL
SUPPORT (TYP. 14)
N17
N19
N20
N22
N23
N24
N25
N26
N27
N28
N29
C O
N T
R A
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
S A
V A
N N
A H
G
A
S A
V A
N N
G
T A
L A
Y O
U T
N T
S
N A
W F
D
W F
F
A N
S I
B r k w a y
L a n e
S u i
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
A D
M
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 964
MANUFACTURER: UNKNOWN
YEAR BUILT: 1960
TANK DIAMETER: 35'-0"
TANK HEIGHT: 27'-10"
NOMINAL CAPACITY: 4,788 BBL
PRODUCT: JET-A
PRODUCT SPECIFIC GRAVITY: 0.82
GPS COORDINATES: 32.11332°, -81.1892°
N A
F I X
D
O
F
L A
Y O
U T
A-2
C O
N T
R A
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
S A
V A
N N
A H
G
A
S A
V A
N N
G
T A
L A
Y O
U T
N T
S
N A
W F
D
W F
F
A N
S I
B r k w a y
L a n e
S u i
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
A D
M
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 964
MANUFACTURER: UNKNOWN
YEAR BUILT: 1960
TANK DIAMETER: 35'-0"
TANK HEIGHT: 27'-10"
NOMINAL CAPACITY: 4,788 BBL
PRODUCT: JET-A
PRODUCT SPECIFIC GRAVITY: 0.82
GPS COORDINATES: 32.11332°, -81.1892°
N A
NOTES:
1. REFER TO TABLE 2, "FIXED ROOF UTT MEASUREMENTS",
IN APPENDIX A FOR INDIVIDUAL ROOF PLATE UTT
READINGS.
2. REFER TO TABLE 3, "SHELL NOZZLE/REPAD UTT
MEASUREMENTS", FOR NOZZLE DATA.
API-653 APPENDIX B SHELL SETTLEMENT EVALUATION
(para. B.2.2.4)
Report No Client Inspector Vessel Date Savannah ANG
Tank 964 USACE Andrew Morrissette (POND) Tank 964 04/13/2020
Base Elev Max Elev Elev
FT 1.833 2.021 0.187 R^2 = 0.901
IN 22.000 24.250 2.250
PetersonC Text Box The settlement evaluation criteria per API 653 paragraph B.2.2.4 is not satisfied at multiple points due to the maximum out-of-plane deflection being greater than the allowable out-of-plane deflection. As an alternative, the evaluation provided in API 653 paragraph B.2.2.5 was used in determining shell settlement. See next page.
(para. B.2.2.5) Report No. Client Inspector Vessel Date
Savannah ANG Tank 964 USACE Andrew Morrissette
(POND) Tank 964 4/13/2020
Base Elev Max Elev Elev
FT 1.833 2.021 0.187
IN 22.000 24.250 2.250
Report No.: Savannah ANG Tank 964
D H Roof Type 1st Crs Plt Spec Y E K
35 27.8 F Unknown 30000 29000000 10.500
Where:
D = Tank Diameter, in ft H = Tank Height, in ft Roof Type: F = fixed, O = Open Y = Yield strength of shell 1st course , in pounds per Sq.Inch (psi) E - Young's modulus, in pounds per Sq.Inch (psi) K = factor from table in B.3.2.2 (API-653 App. B) PE2 = Predicted elevation (for secondary evaluation), in ft Sarc = the effective settlement arc length, see B.2.2.5.1, in ft Si = out-of-plane settlement, in inch Smax = Maximum allowed out-of-plane settlement, in inch (min(K*Sarc*(D/H)*(Y/E), 4.0)
Point Elevation PE2 Sarc Si Smax Results
1 1.833 0 1.896 55 0.750 0.751 SAT
2 1.854 45 1.854 27.5 0.000 0.376 SAT
3 1.844 90 1.906 27.5 0.750 0.376 UNSAT
4 1.958 135 1.958 27.5 0.000 0.376 SAT
5 1.927 180 1.990 27.5 0.750 0.376 UNSAT
6 2.021 225 2.021 55 0.000 0.751 SAT
7 1.927 270 1.979 55 0.625 0.751 SAT
8 1.917 315 1.938 55 0.250 0.751 SAT
PetersonC Text Box The maximum measure out-of-plane deflection is .75 inches and maximum allowable deflection is 0.376 inches; therefore, the tank is not within API 653 acceptable limits. The allowable deflection of the tank is not accurately represented by the above analysis due to the small size of the tank which results in a small arc length. No visual settlement was identified during the inspection. It is recommended to monitor the tank settlement during future inspections.
SHELL MINIMUM THICKNESS CALCULATIONS
Tank Shell Minimum Thickness and Remaining Life Calculations Date 04/13/2020
File No. Report No. Client Tank No. Temp. (degF) Initials
3775 Savannah ANG Tank
USACE Tank 964 Andrew Mo tmin = 2.6(H-1)DG
SE
Where:
H = The height above the bottom of the course of study to the maximum liquid level height of the product, in ft. For corroded or pitted areas, H = the height from the bottom of the corroded or pitted area to the maximum liquid level height of the product, in ft.
tmin = The calculated minimum acceptable shell thickness, in inch (cannot be less than
0.10 inch for any course). The minimum acceptable shell thickness allowed by API-653 and STI-SP001 for tank size, in inch .
D = Nominal diameter of tank, in ft.
G = Highest specific gravity of the contents (including test water if tank will, or may, be tested in the future).
S = Maximum allowable stress, in psi. For welded tanks; use the smaller of 0.80Y of 0.429T for bottom and second course or the smaller of 0.88Y or 0.472T for all other courses. For riveted tanks; S = 21000 psi. For STI Tank Inspections S = 26000 psi (E = 1)
Y = Specified minimum yield strength of the plate, in psi; use 30000 psi if not known (N/A for riveted tanks).
T = The smaller of the specified minimum tensile strength of the plate or 80000 psi; use 55000 psi if not known (N/A for riveted tanks).
E = Original joint efficiency for the tank. For welded tanks; use API-653, Table 2-1 ; use E =
1.0 when evaluating the retirement thickness in a corroded plate, when away from welds or joints by at least the greater of one inch or twice the plate thickness. For riveted tanks; use E = 1.0 for shell plates greater than 1 inch away from rivets; use the value of E from API- 653 Table 2-1 when within 1 inch of rivets. For STI Tank Inspections E = 1 where S = 26000 psi.
D (ft) 35 G 0.82 E 0.85 Fill Height (ft) 27.8
Material Crs H (ft) H (ft) S (psi) tmin (inch) Course 1 Unknown 6 27.8 23600 0.100 Course 2 Unknown 8 21.8 23600 0.100 Course 3 Unknown 8 13.8 26000 0.100 Course 4 Unknown 5.83 5.8 26000 0.100
SHELL REMAINING LIFE CALCULATIONS
Tprev thicknesses were not included in the previous inspection report dated July 2015. Nominal plate thicknesses were used for Tprev.
Tank Shell Minimum Thickness and Remaining Life Calculations Date 04/13/2020
File No. Report No. Client Tank No. Temp. (degF) Initials
3775 Savannah ANG Tank
USACE Tank 964 Andrew Mo
Ca = tact-tmin = Remaining Corrosion Allowance (inch) Cr = tprev-tact / Y = Corrosion Rate (inch/Yr) RL = Ca / Cr = Remaining Life (year)
Y = 5 = Tank age (year)
Where:
Ca = Remaining corrosion allowance of the shell course under consideration, in inch.
Cr = Corrosion rate of the shell course under consideration, in inch per year.
FHc = Calculated fill Height = (SEtact/2.6DG+1) + (product height below course of interest), in ft.
tact = Minimum thickness measurement of the shell course under consideration, as recorded at the time of inspection, in inch.
tmin = minimum required thickness of shell course, at the maximum allowable fill height, in inch.
tprev = previous thickness measurement of shell course under consideration, as recorded at last inspection or nominal thickness if no previous thickness measurements, in inch.
RL = Estimated remaining life of the shell course under consideration, in year.
Y = Time span between thickness readings or age of the tank if nominal thickness is used for tprev, in year.
tprev tact tmin Ca Cr RL FHc Course 1 0.250 0.240 0.100 0.140 0.0020 70 65.52 Course 2 0.250 0.238 0.100 0.138 0.0024 58 70.98 Course 3 0.250 0.234 0.100 0.134 0.0032 42 84.30 Course 4 0.187 0.182 0.100 0.082 0.0010 82 76.90
AST ATMOSPHERIC STORAGE TANK FIXED ROOF EVALUATION
MINIMUM THICKNESS, REMAINING LIFE, PRESSURE CALCULATIONS
Date 04/13/2020
File No Report No Client Inspector Tank No Temp(degF)
Savannah ANG Tank
USACE
Andrew Morrissette
(POND)
Tank 964
Where;
Ca = remaining corrosion allowance of the tank component under consideration, in inch (t act - t min).
Cr = corrosion rate of the tank component under consideration, in inch per year (t prev - t act / Y).
oz = unit of measurement, (weight, in ounces, per square inch), (16 oz per pound) psi = unit of measurement, (weight, in pounds, per square inch) RL = estimated remaining life of the tank component under consideration, in year (Ca / Cr).
t act = actual thickness measurement of the tank component under consideration, as recorded at the time of inspection, in inch.
t min = minimum required thickness of tank component, at the design MAWP at the design temperature (200 degF for atm AST's), in inch (greater of psi/wt or 0.090").
t nom = design nominal thickness of tank component under consideration, in inch.
t prev = previous thickness measurement of the tank component under consideration, as recorded at last inspection or nominal thickness if no previous thickness measurements, in inch.
t yn = thickness of the tank component under consideration at the next inspection at twice the calculated corrosion rate, in inch (t act - (2*Cr*Yn).
wt = weight of plate per cubic inch.
wc = unit of measurement, (height, in inch, of water column bearing on 1 Sq.Inch area), (27.7 wc per pound) Y = time span between thickness readings or age of the tank component if tnom is used for tprev, in year.
Yn = estimated time span to next inspection of the tank component under consideration, in year.
ROOF PLATES - REMAINING LIFE
Y t prev (inch) t act (inch) t min (inch) Cr (inch/Yr) Ca (inch) RL
2015 0.187 0.189 0.090 0.00000 0.099 >20
PetersonC Snapshot
TABLE 1 - SHELL UTT MEASUREMENTS
Fixed Roof
Shell
Course
Plate 4-1 Plate 4-2 Plate 4-3 Plate 4-4
.179 .188 .181
.179 .184 .183
.186 .179 .181
.177
Avg. .182
Circumferential Weld C4
Shell
Course
Plate 3-1 Plate 3-2 Plate 3-3 Plate 3-4
.232 .236 .234
.232 .237 .237
.232 .237 .232
.237
Avg. .234
Circumferential Weld C3
Shell
Course
Plate 2-1 Plate 2-2 Plate 2-3 Plate 2-4
.237 .239 .237
.240 .240 .235
.241 .237 .237
.233
Avg. .238
Circumferential Weld C2
Shell
Course
Plate 1-1 Plate 1-2 Plate 1-3 Plate 1-4
.242 .244 .239 .233 .235 .231 .241 .238 .237 .237 .239 .243
.245 .245 .242 .236 .236 .234 .242 .240 .239 .240 .241 .245
.244 .246 .243 .236 .238 .235 .242 .240 .241 .240 .242 .244
Avg. .243 .235 .240 .241
Circumferential Weld C1
Thickness Represented in inches.
Average Shell Course 1 .240 Average Shell Course 2 .238 Average Shell Course 3 .234 Average Shell Course 4 .182 Refer to Drawing A-1 in Appendix for plate numbers.
TABLE 2 – FIXED ROOF UTT MEASUREMENTS
Plate 1 Plate 2 Plate 3 Plate 4 Plate 5
.189 .188 .188 .188 .188 .190 .189 .188 .190 .190
.189 .189 .190 .188 .189
.190 .188 .187 .189 .189 .189 .186 .188 .189 .189
Avg. .189 .188 .189 .188 .189
Plate 6 Plate 7 Plate 8 Plate 9 Plate 10
.191 .189 .190 .189 .193 .191 .190 .191 .190 .189
.189 .191 .192 .192 .190
.188 .189 .185 .191 .192 .190 .190 .190 .189 .189
Avg. .189 .189 .192 .191 .189
Plate 11 Plate 12 .189 .188 .189 .186 .190 .188 .190 .190 .190 .186
Avg. .189 .188 Thickness Represented in inches.
Average Roof Thickness .189
Refer to Drawing A-2 in Appendix for plate numbers.
TABLE 3 - SHELL NOZZLE / REPAD UTT MEASUREMENT
Nozzle Nozzle Size
(Diameter or Width/Height)
Repad Shape
Repad Size (W X H)
Repad Thickness
Nozzle Thickness H1 H2
Nozzle Location (Measured circumferentially from Manway 1)
Notes
0⁰ 90⁰ 180⁰ 270⁰ MW1 30" B 68" .254 .362 .362 .363 .361 3'-0" 2'-0" 0'-0" Manway
N1 6" B 18” .251 .421 .410 .404 .421 0'-11 ½” 0'-8 ½” 9'-1" Main Suction
N2 4" B 10” .372 .319 .338 .330 .313 1'-0" 0'-9 ½” 14'-2" Low Suction
N3 - - - - TH TH TH TH - - 16'-3" Threaded Plug
N4 - - - - TH TH TH TH - - 16'-3" Threaded Plug
N5 6" B 18” .254 .425 .410 .408 .413 0'-9" 0'-3" 16'-6" Receipt
N6 1" - - - .252 - .252 - 25'-0" 24'-11 ½” 43'-11" HLA/HHLA
N7 1" - - - .238 - .234 - 25'-6" 25'-5 ½” 48'-2" Blind Flange
N8 1" - - - .236 - .239 - 23'-9 ¾” 23'-9 ¼” 48'-2" HLA/HHLA
N9 1 ½” - - - TH TH TH TH 24'-5 ¾” 24'-5" 49'-0" Threaded Plug
N10 1 ½” - - - TH TH TH TH 24'-5 ¾” 24'-5" 53'-11" Threaded Plug
N11 1 ½” - - - TH TH TH TH 22'-6 ¼” 22'-5 ½” 53'-11" Threaded Plug
N12 2" - - - .209 - .215 - 0'-6 ½” 0'-5 ½” 54'-4" Water Draw-off
N13 2" - - - .218 - .214 - 0'-6 ½” 0'-5 ½” 56'-4" PRT Return
N14 1" - - - .247 - .241 - 4'- ½” 4'-0" 61'-8" LLA/LLLA
N15 1" - - - .237 - .236 - 31'-0" 30'- ½” 61'-8" LLA/LLLA
MW2 36" B 73" '' .364 .367 .363 .362 3'-6" 1’-11 ½” 66'-6" Manway
N16 - - - - - - - - - - 72'-3" AFFF
N17 10" B 23" .240 .331 .324 .328 .324 Fixed Roof Sampling Hatch
N18 36" x 48" F 56" x 71" .241/.155 .240 .241 .238 .241 Fixed Roof Inspection Hatch
N19 10" B 23" .239 .314 .320 .318 .320 Fixed Roof Cameron ATG
N20 30" x 72" - - - .385 .377 .373 .378 Fixed Roof IFR Installation Hatch
N21 24" B 55" .243 .247 .248 .246 .244 Fixed Roof Center Vent
N22 8" B 18" .235 .313 .314 .312 .314 Fixed Roof Stilling Well
N23 4" B 9" .363 .229 .235 .236 .242 Fixed Roof Scaffold Support
N24 2 ½” - - - TH TH TH TH Fixed Roof IFR Grounding Cable
N25 3" - - - TH TH TH TH Fixed Roof IFR Anti-Rotation Cable
N26 3" - - - TH TH TH TH Fixed Roof IFR Anti-Rotation Cable
N27 4" B 9" .364 .230 .231 .229 .226 Fixed Roof Scaffold Support
N28 2 ½” - - - TH TH TH TH Fixed Roof IFR Grounding Cable
N29 1 ½” - - - TH TH TH TH Fixed Roof Shand & Jurs TLG
Thickness measurements are in inches.
H1 = Centerline of pipe to edge of tank chime.
H2 = Edge of tank or chime to closest reinforcement pad edge.
TH = Threaded nozzle
Repad Shapes:
TABLE 4 – SHELL AND FIXED DFT MEASUREMENTS
External Shell Coating Thickness
Average Standard Deviation Number of Readings Minimum Maximum
11.84 2.658 20 7.35 16.38
Fixed Roof Coating Thickness
Average Standard Deviation Number of Readings Minimum Maximum
12.81 4.049 15 7.74 24
Thicknesses are represented in mils.
TABLE 5 - SHELL SETTLEMENT MEASUREMENTS
Point Arc Length (ft.) Tank Chime (ft.)
1 0.00 1.833
2 13.74 1.854
3 27.49 1.844
4 41.23 1.958
5 54.98 1.927
6 68.72 2.021
7 82.47 1.927
8 96.21 1.917
Settlement points were measured clockwise from MW1.
The listed data should be used in future API inspections for comparison.
NEXT INSPECTION
The interval between tank inspections (both internal and external) should be determined by the tank service history.
Inspection intervals can be adjusted based on known corrosion rates. Corrosion rates can only be determined when a comparison is made between UTT measurements taken over an interval of time. In this case, corrosion rates were determined using thicknesses provided by the internal inspection report dated July 2015 and UTT measurements taken during this inspection. Listed below are recommended inspection intervals:
1. Routine In-service Inspection
Facility personnel shall perform a visual inspection of the tank exterior surfaces and associated piping. Gross defects, leaks, shell distortions, signs of settlement, and corrosion should all be monitored along with the foundation condition (including tank chime-to-foundation joint), coating, and appurtenances.
a. Interval: Monthly
2. External Visual Inspection
Formal visual external inspection shall be performed by an API certified inspector every five (5) years or RCA/4N years (where RCA is the difference between the measured shell thickness and the minimum required thickness and
N is the shell corrosion rate), whichever is less. Based on the review of shell thickness measurements, the 5-year interval will govern the next external visual inspection. This inspection includes inspection requirements listed in a routine in-service inspection as well as a visual inspection of the tank grounding system.
b. Interval: Five (5) years; March 2025
3. External Visual Inspection with Ultrasonic Thickness Testing
An API certified inspector with the assistance of an NDT examiner shall perform this inspection. UTT measurements shall be taken to verify thickness of the tank shell and associated components. Obtained UTT measurements are used to determine corrosion rates and remaining life of the tank shell. UTT measurements of shell plates can be performed with the tank in service and scheduled at a maximum interval of fifteen (15) years or RCA/2N, whichever is less.
Based on shell thickness measurements and corrosion rates, the recommended interval for this inspection is fifteen
(15) years.
c. Interval: Fifteen (15) years 2035
4. Internal Inspection
An API certified inspector with the assistance of an NDT examiner shall perform this inspection. This inspection consists of verifying that the tank bottom is not severely corroded and/or leaking, identifying and evaluation tank bottom settlement, and inspection requirements listed in both external visual inspections. The next out-of-service
API 653 inspection is based on recommendations made in the report dated July 2015 for tank 964.
d. Interval: July 2025
OSHA ACCESS STRUCTURE REPORT
OSHA Stairway Data
OSHA Required
Handrail Actual (in) Min (in)
Max (in)
Pass/Fail
Height: 30 30 38 Pass
Width: 31 ½” 22 N/A Pass
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
Tank In-Service Inspection Checklist
Item Completed
X
C.1.1 Foundation
Measure foundation levelness and bottom elevations (see Appendix A for extent of measurements). X
C.1.1.1 Concrete Ring a Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell.
X b Inspect drain openings in ring, back of water draw basins and top surface of ring for indications of bottom leakage.
X c Inspect for cavities under foundation and vegetation against bottom of tank. X d Check that runoff rainwater from the shell drains away from tank. X e Check for settlement around perimeter of tank. X
C.1.1.2 Asphalt X a Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it.
N/A b Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage. N/A
C.1.1.3 Oiled Dirt or Sand
Check for settlement into the base which would direct runoff rain water under the tank rather than away from it.
N/A
C.1.1.4 Rock a Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.
N/A
C.1.1.5 Site Drainage a Check site for drainage away from the tank and associated piping and manifolds. X b Check operating condition of the dike drains. X
C.1.1.6 Housekeeping
Inspect the area for buildup of trash, vegetation, and other inflammables buildup. X
C.1.1.7 Cathodic Protection a Review cathodic protection potential readings. X
C.1.2 Shells
C.1.2.1 External Visual Inspection a Visually inspect for paint failures, pitting, and corrosion. X b Clean off the bottom angle area and inspect for corrosion and thinning on plate and weld. X c Inspect the bottom-to-foundation seal, if any. X
C.1.2.2 Internal (Floating Roof Tank)
Visually inspect for grooving, corrosion, pitting, and coating failures. X
C.1.2.3 Riveted Shell Inspection a Inspect external surface for rivet and seam leaks. N/A b Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting). N/A c Inspect rivets for corrosion loss and wear. N/A
Tank In-Service Inspection Checklist Continued
Item Completed
X d Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency. N/A e If no record exists of vertical riveted seams, dimension and sketch (or photograph) the rivet pattern:
number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.
N/A
C.1.2.4 Wind Girder (Floating Roof Tanks) a Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tack-welded junction, and for broken welds.
X b Check support welds to shell for pitting, especially on shell plates. X c Note whether supports have reinforcing pads welded to shell. X
C.1.3 Shell Appurtenances
C.1.3.1 Manways and Nozzles a Inspect for cracks or signs of leakage on weld joint at nozzles, manways, and reinforcing plates. X b Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection. X c Inspect for flange leaks and leaks around bolting. X d Inspect sealing of insulation around manways and nozzles. N/A e Check for inadequate manway flange and cover thickness on mixer manways. N/A
C.1.3.2 Tank Piping Manifolds a Inspect manifold piping, flanges, and valves for leaks. X b Inspect fire fighting system components. X c Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement.
X d Check for adequate thermal pressure relief of piping to the tank. X e Check operation of regulators for tanks with purge gas systems. X f Check sample connections for leaks and for proper valve operation. N/A g Check for damage and test the accuracy of temperature indicators. N/A h Check welds on shell-mounted davit clips above valves 6 in. and larger. N/A
C.1.3.3 Autogauge System a Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks. X b Inspect autogauge head for damage. X c Bump the checker on autogauge head for proper movement of tape. X d Identify size and construction material of autogauge tape guide (floating roof tanks). N/A e Ask operator if tape tends to hang up during tank roof movement (floating roof tanks). X f Compare actual product level to the reading on the autogauge (maximum variation is 2 in.). X g On floating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide.
N/A h Inspect condition of board and legibility of board-type autogauges. N/A i Test freedom of movement of marker and float. N/A
C.1.3.4 Shell-Mounted Sample Station a Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line.
N/A b Check circulation pump for leaks and operating problems. N/A
Completed
X c Test bracing and supports for sample lines and equipment. N/A
C.1.3.5 Heater (Shell Manway Mounted)
Inspect condensate drain for presence of oil indicating leakage. N/A
C.1.3.6 Mixer a Inspect for proper mounting flange and support. N/A b Inspect for leakage. N/A c Inspect condition of power lines and connections to mixer. N/A
C.1.3.7 Swing Lines: Winch Operation a Nonfloating. Raise, then lower the swing line with the winch, and check for cable tightness to confirm that swing line lowered properly.
b Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable tight, indicating that the winch is operating properly.
c
Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.
C.1.3.8 Swing Lines: External Guide System
Check for leaks at threaded and flanged joints. N/A
C.1.3.9 Swing Lines: Identify Ballast Varying Need
Check for significant difference in stock specific gravity. N/A
C.1.3.10 Swing Lines: Cable Material and Condition a For nonstainless steel cable, check for corrosion over entire length. N/A b All cable: check for wear or fraying. N/A
C.1.3.11 Swing Lines: Product Sample Comparison
Check for water or gravity differences that would indicate a leaking swing joint. N/A
C.1.3.12 Swing Lines: Target a Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support.
N/A
C.1.4 Roofs
C.1.4.1 Deck Plate Internal Corrosion
For safety, before accessing the roof, check with ultrasonic instrument or lightly use a ball peen hammer to test the deck plate near the edge of the roof for thinning. (Corrosion normally attacks the deck plate at the edge of a fixed roof and at the rafters in the center of the roof first.)
C.1.4.2 Deck Plate External Corrosion
Visually inspect for paint failure, holes, pitting, and corrosion product on the roof deck. X
C.1.4.3 Roof Deck Drainage
Look for indication of standing water. (Significant sagging of fixed roof deck indicates potential rafter failure. Large standing water areas on a floating roof indicate inadequate drainage design or, if to one side, a nonlevel roof with possible leaking pontoons.)
Completed
X
C.1.4.4 Level of Floating Roof a
At several locations, measure distance from roof rim to a horizontal weld seam above the roof. A variance in the readings indicates a nonlevel roof with possible shell out-of-round, out-of-plumb, leaking pontoons, or hang-up. On small diameter tanks, an unlevel condition can indicate unequal loading at that level.
N/A
C.1.4.5 Gas Test Internal Floating Roof a Test for explosive gas on top of the internal floating roof. Readings could indicate a leaking roof, leaking seal system, or inadequate ventilation of the area above the internal floating roof.
N/A
C.1.4.6 Roof Insulation a Visually inspect for cracks or leaks in the insulation weather coat where runoff rain water could penetrate the insulation.
N/A b Inspect for wet insulation under the weather coat. N/A c Remove small test sections of insulation and check roof deck for corrosion and holes near the edge of the insulated area.
N/A
C.1.4.7 Floating Roof Seal Systems a Inspect the condition of the seal, measure and record maximum rim spaces and seal-to-shell gaps around the full roof circumference at the level of inspection.
NOTE Inspection of the seal and measurement of the rim spaces and seal-to-shell gaps at more than one level may be necessary to more fully determine if any problems exist at other levels of tank operation).
b Measure and record annular space at 30-ft spacing (minimum of four quadrants) around roof and record. Measurements should be taken in directly opposite pairs.
N/A
1) _______ _______ Opposite pair 1. N/A
2) _______ _______ Opposite pair 2. N/A c Check if seal fabric on primary shoe seals is pulling shoes away from shell (fabric not wide enough). N/A d Inspect fabric for deterioration, holes, tears, and cracks. N/A e Inspect visible metallic parts for corrosion and wear. N/A f Inspect for openings in seals that would permit vapor emissions. N/A g Inspect for protruding bolt or rivet heads against the shell. N/A h Pull both primary and secondary seal systems back all around the shell to check their operation. N/A i Inspect secondary seals for signs of buckling or indications that their angle with the shell is too shallow.
N/A j Inspect wedge-type wiper seals for flexibility, resilience, cracks, and tears. N/A
C.1.5 Roof Appurtenances
C.1.5.1 Sample Hatch a Inspect condition and functioning of sample hatch cover. N/A b On tanks governed by Air Quality Monitoring District rules, check for the condition of seal inside hatch cover.
N/A c Check for corrosion and plugging on thief and gauge hatch cover. N/A d Where sample hatch is used to reel gauge stock level, check for marker and tab stating hold-off distance.
e Check for reinforcing pad where sample hatch pipe penetrates the roof deck. N/A
Completed
X f On floating roof sample hatch and recoil systems, inspect operation of recoil reel and condition of rope.
N/A g Test operation of system. N/A h On ultra clean stocks such as JP4, check for presence and condition of protective coating or liner inside sample hatch (preventing rust from pipe getting into sample).
N/A
C.1.5.2 Gauge Well a Inspect visible portion of the gauge well for thinning, size of slots, and cover condition. X b Check for a hold-off distance marker and tab with hold-off distance (legible). N/A c On floating roofs, inspect condition of roof guide for gauge well, particularly the condition of the rollers for grooving.
N/A d If accessible, check…