Attachment J-8 - NUREG 1757 Vol 1 and Vol 2 (latest versions).pdf

PDF 7 MB Posted

Attached to
EX-ENTERPRISE CVN 65 Dismantlement and Disposal
Solicitation number
N00024-25-R-4135
Issued by

About this file

This document is NUREG-1757 Vol. 1, Rev. 2, which provides consolidated decommissioning guidance from the U.S. Nuclear Regulatory Commission (NRC) for materials licensees. It takes a risk-informed, performance-based approach to decommissioning and consolidates previous guidance into a three-volume set.

Volume 1 addresses the decommissioning process for materials licensees, including timing of decommissioning, regulatory authority, radiological criteria, decommissioning groups, and other considerations. It classifies licensees into seven decommissioning groups based on factors such as residual radioactivity levels and location. For each group, the document outlines the required licensee actions and NRC review process. Key topics covered include financial assurance, decommissioning inspections, surveys, onsite disposal, and intentional mixing of contaminated soil. The guidance is intended for use by NRC staff, licensees, and the public to support safe and effective decommissioning of materials facilities.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NUREG-1757

Vol. 1, Rev. 2

Consolidated Decommissioning Guidance

Decommissioning Process for Materials Licensees

Final Report

U.S. Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

AVAILABILITY OF REFERENCE MATERIALS

IN NRC PUBLICATIONS

NRC Reference Material

As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC’s Public Electronic Reading Room at http://www.nrc.gov/reading-rm.html.

Publicly released records include, to name a few, NUREG-series publications; Federal Register notices;

applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices;

inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

NRC publications in the NUREG series, NRC regulations, and Title 10, Energy, in the Code of Federal Regulations may also be purchased from one of these two sources.

1. The Superintendent of Documents U.S. Government Printing Office Mail Stop SSOP Washington, DC 20402–0001 Internet: bookstore.gpo.gov Telephone: 202-512-1800 Fax: 202-512-2250

2. The National Technical Information Service Springfield, VA 22161–0002 www.ntis.gov 1–800–553–6847 or, locally, 703–605–6000

A single copy of each NRC draft report for comment is available free, to the extent of supply, upon written request as follows:

Address: U.S. Nuclear Regulatory Commission Office of Administration Mail, Distribution and Messenger Team Washington, DC 20555-0001 E-mail: DISTRIBUTION@nrc.gov Facsimile: 301–415–2289

Some publications in the NUREG series that are posted at NRC’s Web site address http://www.nrc.gov/reading-rm/doc-collections/nuregs are updated periodically and may differ from the last printed version. Although references to material found on a Web site bear the date the material was accessed, the material available on the date cited may subsequently be removed from the site.

Non-NRC Reference Material

Documents available from public and special technical libraries include all open literature items, such as books, journal articles, and transactions, Federal Register notices, Federal and State legislation, and congressional reports. Such documents as theses, dissertations, foreign reports and translations, and non-NRC conference proceedings may be purchased from their sponsoring organization.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are maintained at—

The NRC Technical Library Two White Flint North 11545 Rockville Pike Rockville, MD 20852–2738

These standards are available in the library for reference use by the public. Codes and standards are usually copyrighted and may be purchased from the originating organization or, if they are American National Standards, from—

American National Standards Institute 11 West 42nd Street New York, NY 10036–8002 www.ansi.org 212–642–4900

Legally binding regulatory requirements are stated only in laws; NRC regulations; licenses, including technical specifications; or orders, not in NUREG-series publications. The views expressed in contractor-prepared publications in this series are not necessarily those of the NRC.

The NUREG series comprises (1) technical and administrative reports and books prepared by the staff (NUREG–XXXX) or agency contractors (NUREG/CR–XXXX), (2) proceedings of conferences (NUREG/CP–XXXX), (3) reports resulting from international agreements (NUREG/IA–XXXX), (4) brochures (NUREG/BR–XXXX), and (5) compilations of legal decisions and orders of the Commission and Atomic and Safety Licensing Boards and of Directors’ decisions under Section 2.206 of NRC’s regulations

(NUREG–0750).

NUREG-1757

Vol. 1, Rev. 2

Consolidated Decommissioning Guidance

Decommissioning Process for Materials Licensees

Final Report

Manuscript Completed: September 2006 Date Published: September 2006

Prepared by K.L. Banovac, J.T. Buckley, R.L. Johnson, G.M. McCann, J.D. Parrott, D.W. Schmidt, J.C. Shepherd, T.B. Smith, P.A. Sobel, B.A. Watson, D.A. Widmayer, T.H. Youngblood

Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 iii NUREG–1757, Vol. 1, Rev. 2

ABSTRACT

As part of its redesign of the materials license program, the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Material Safety and Safeguards (NMSS) has consolidated and updated numerous decommissioning guidance documents into a three-volume NUREG.

Specifically, the three volumes address the following topics:

(1) “Decommissioning Process for Materials Licensees”;

(2) “Characterization, Survey, and Determination of Radiological Criteria”; and

(3) “Financial Assurance, Recordkeeping, and Timeliness.”

This three-volume NUREG series replaces NUREG-1727 (NMSS Decommissioning Standard Review Plan) and NUREG/BR-0241 (NMSS Handbook for Decommissioning Fuel Cycle and Materials Licensees). NUREG-1757 is intended for use by NRC staff, licensees, and others.

Volume 1 of this NUREG series, entitled “Consolidated Decommissioning Guidance:

Decommissioning Process for Materials Licensees,” takes a risk-informed, performance-based approach to the information needed to support an application for decommissioning a materials license and compliance with the radiological criteria for license termination in 10 CFR Part 20, Subpart E. The approaches to license termination described in this guidance will help to identify the information (subject matter and level of detail) needed to terminate a license by considering the specific circumstances of the wide range of radioactive materials users licensed by NRC.

Licensees should use this guidance in preparing license amendment requests. NRC staff will use this guidance in reviewing these amendment requests.

Volume 1 is intended to be applicable only to the decommissioning of materials facilities licensed under 10 CFR Parts 30, 40, 70, and 72 and to the ancillary surface facilities that support radioactive waste disposal activities licensed under 10 CFR Parts 60, 61, and 63. However, parts of this volume are applicable to reactor licensees, as described in the Foreword to this volume.

PAPERWORK REDUCTION ACT STATEMENT

The information collections contained in this NUREG are covered by the requirements of 10 CFR Parts 19, 20, 30, 33, 34, 35, 36, 39, 40, 51, 60, 61, 63, 70, 72, and 150 which were approved by the Office of Management and Budget, approval numbers 3150–0044, 0014, 0017, 0015, 0007, 0010, 0158, 0130, 0020, 0021, 0127, 0135, 0199, 0009, 0132, and 0032.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

v NUREG–1757, Vol. 1, Rev. 2

CONTENTS

ABSTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiii ACKNOWLEDGMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xix ABBREVIATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxi GLOSSARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxvii

PART I: DECOMMISSIONING PROCESS AND DECOMMISSIONING GROUPS

1 PURPOSE OF REPORT AND DOCUMENT ROADMAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

1.1 PURPOSE OF THIS REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

1.2 APPROACH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

1.3 DECOMMISSIONING ROADMAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2

1.4 FURTHER INFORMATION FOR LICENSEES AND REVIEWERS . . . . . . . . . . . . . . . . . . . . . . . . . 1-8

2 REGULATORY AUTHORITY: NRC AND AGREEMENT STATES . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

3 LICENSEE’S MANAGEMENT RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1

4 APPLICABLE REGULATIONS, GUIDANCE, AND REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1

4.1 DECOMMISSIONING REGULATORY HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1

4.2 STATUTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2

4.3 DECOMMISSIONING REGULATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2

4.4 DECOMMISSIONING INSPECTION MANUAL CHAPTERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3

4.5 DECOMMISSIONING INSPECTION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3

4.6 OTHER NRC DOCUMENTS REFERENCED IN THIS NUREG WITH APPLICATION OUTSIDE OF

DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3

4.7 DECOMMISSIONING DOCUMENTS REFERENCED IN THIS NUREG . . . . . . . . . . . . . . . . . . . . 4-6

4.8 PUBLIC INTERACTION DOCUMENTS REFERENCED IN THIS NUREG . . . . . . . . . . . . . . . . . . 4-8

4.9 OTHER DOCUMENTS REFERENCED IN THIS NUREG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8

4.10 DOCUMENTS SUPERSEDED BY THIS REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9

4.11 TO REQUEST COPIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10

5 THE DECOMMISSIONING PROCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

5.1 TIMING OF DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

5.2 DECOMMISSIONING PROCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5

5.3 DECOMMISSIONING PLAN REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9

6 RADIOLOGICAL CRITERIA FOR DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.1 UNRESTRICTED USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.2 RESTRICTED CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.3 ALTERNATE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2

6.4 RELEASE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2

6.5 GRANDFATHERED SITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2

NUREG–1757, Vol. 1, Rev. 2 vi

6.6 DECOMMISSIONING SCREENING CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3

6.6.1 TECHNICAL BASIS FOR SCREENING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3

6.6.2 BRIEF DESCRIPTION AND SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3

6.6.3 CRITERIA FOR CONDUCTING SCREENING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4

6.6.4 QUALIFICATION OF THE SITE FOR SCREENING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5

6.6.5 SCREENING DEFINITION AND APPROACHES FOR THE TRANSITION FROM

SCREENING TO SITE-SPECIFIC ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6

6.6.6 SITE SCREENING: QUALIFICATION OF ASSUMPTIONS . . . . . . . . . . . . . . . . . . . . . 6-6

6.6.7 ACCEPTABLE SCREENING TOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7

6.7 CHANGING DERIVED CONCENTRATION GUIDELINE LEVELS . . . . . . . . . . . . . . . . . . . . . . . . 6-7

7 DECOMMISSIONING GROUPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.2 CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.3 GROUP 1: UNRESTRICTED RELEASE; NO DECOMMISSIONING PLAN REQUIRED . . . . . . . 7-3

7.4 GROUP 2: UNRESTRICTED RELEASE USING SCREENING CRITERIA; NO

DECOMMISSIONING PLAN REQUIRED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3

7.5 GROUP 3: UNRESTRICTED RELEASE USING SCREENING CRITERIA; DECOMMISSIONING

PLAN REQUIRED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4

7.6 GROUP 4: UNRESTRICTED RELEASE WITH SITE-SPECIFIC DOSE ANALYSIS AND NO

GROUND WATER CONTAMINATION; DECOMMISSIONING PLAN REQUIRED . . . . . . . . . . . 7-4

7.7 GROUP 5: UNRESTRICTED RELEASE WITH GROUND WATER CONTAMINATION;

DECOMMISSIONING PLAN REQUIRED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5

7.8 GROUP 6: RESTRICTED RELEASE; DECOMMISSIONING PLAN REQUIRED . . . . . . . . . . . . . 7-5

7.9 GROUP 7: RESTRICTED RELEASE USING ALTERNATE CRITERIA; DECOMMISSIONING

PLAN REQUIRED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5

8 GROUP 1 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1

8.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1

8.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1

8.3 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2

9 GROUP 2 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1

9.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1

9.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

9.3 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

10 GROUP 3 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1

10.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1

10.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1

10.3 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3

10.3.1 UPON RECEIPT OF THE REQUIRED NOTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . 10-3

10.3.2 UPON RECEIPT OF THE DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . 10-4

10.4 DOSE MODELING INFORMATION TO BE SUBMITTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-5 vii NUREG–1757, Vol. 1, Rev. 2

11 GROUP 4 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1

11.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1

11.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1

11.3 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2

11.3.1 UPON RECEIPT OF THE REQUIRED NOTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . 11-2

11.3.2 UPON RECEIPT OF THE DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . 11-3

11.3.3 DURING REMEDIAL ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4

11.3.4 AFTER COMPLETION OF REMEDIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4

11.4 DOSE MODELING INFORMATION TO BE SUBMITTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5

12 GROUP 5 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1

12.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1

12.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1

12.3 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2

12.3.1 UPON RECEIPT OF THE REQUIRED NOTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . 12-2

12.3.2 UPON RECEIPT OF THE DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . 12-3

12.3.3 DURING REMEDIAL ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3

12.3.4 AFTER COMPLETION OF REMEDIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4

12.4 DOSE MODELING INFORMATION TO BE SUBMITTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4

13 GROUP 6 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1

13.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1

13.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1

13.3 DOSE MODELING INFORMATION TO BE SUBMITTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2

13.3.1 DOSE MODELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2

13.3.2 INSTITUTIONAL CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3

13.4 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5

13.4.1 UPON RECEIPT OF THE REQUIRED NOTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . 13-5

13.4.2 UPON RECEIPT OF THE DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . 13-5

13.4.3 DURING REMEDIAL ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6

13.4.4 AFTER COMPLETION OF REMEDIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6

14 GROUP 7 DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1

14.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1

14.2 LICENSEE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1

14.3 DOSE MODELING INFORMATION TO BE SUBMITTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3

14.4 NRC ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3

14.4.1 UPON RECEIPT OF THE REQUIRED NOTIFICATION . . . . . . . . . . . . . . . . . . . . . . . 14-3

14.4.2 UPON RECEIPT OF THE DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . 14-3

14.4.3 DURING REMEDIAL ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4

14.4.4 AFTER COMPLETION OF REMEDIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4

NUREG–1757, Vol. 1, Rev. 2 viii

15 OTHER DECOMMISSIONING CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1

15.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1

15.2 FINANCIAL ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2

15.2.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2

15.2.2 WHEN IS FINANCIAL ASSURANCE REQUIRED? . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2

15.2.3 DECOMMISSIONING PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-4

15.2.4 NRC REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-5

15.2.5 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-6

15.3 DECOMMISSIONING INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-6

15.3.1 INSPECTION POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-6

15.3.2 INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-7

15.4 DECOMMISSIONING SURVEYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-8

15.4.1 SITE CHARACTERIZATION SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-8

15.4.2 IN-PROCESS SURVEYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-8

15.4.3 FINAL STATUS SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-9

15.4.4 FINAL STATUS SURVEY REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10

15.4.5 CONFIRMATORY SURVEYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-11

15.5 PARTIAL SITE DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-11

15.5.1 RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12

15.5.2 SPECIFIC LICENSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12

15.5.3 BROAD SCOPE LICENSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12

15.6 SITE DECOMMISSIONING MANAGEMENT PLAN SITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-13

15.7 NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . 15-15

15.7.1 CATEGORICAL EXCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-18

15.7.2 ENVIRONMENTAL ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-18

15.7.3 ABBREVIATED ENVIRONMENTAL ASSESSMENT—RELYING ON THE LICENSE

TERMINATION RULE GENERIC ENVIRONMENTAL IMPACT STATEMENT . . . 15-19

15.7.4 ENVIRONMENTAL IMPACT STATEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-21

15.7.5 ENVIRONMENTAL ASSESSMENT AND ENVIRONMENTAL IMPACT STATEMENT

CONSIDERATIONS SPECIFIC TO DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . 15-21

15.8 NUCLEAR MATERIALS MANAGEMENT AND SAFEGUARDS SYSTEM . . . . . . . . . . . . . . . . 15-22

15.9 DECOMMISSIONING CONTRACTORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-23

15.10 DECOMMISSIONING COMMUNICATION PLANNING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-24

15.11 CONTROLLING THE DISPOSITION OF SOLID MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . 15-24

15.11.1 CURRENT NRC APPROACH TO RELEASES OF SOLID MATERIAL . . . . . . . . . . . 15-24

15.11.2 CASE-SPECIFIC LICENSING DECISIONS ON DISPOSITION OF SOLID MATERIALS

FROM LICENSED FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-27

15.11.3 REVIEW OF RETROSPECTIVE AND PROSPECTIVE CASES INVOLVING SOIL

DISPOSITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-28

15.11.4 CASE-SPECIFIC LICENSING DECISIONS ON DISPOSITION OF CONCRETE FROM

LICENSED FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-29

15.12 ONSITE DISPOSAL OF RADIOACTIVE MATERIALS UNDER 10 CFR 20.2002 . . . . . . . . . . . 15-30

15.12.1 OPTIONS FOR ONSITE DISPOSALS AT NRC LICENSED FACILITIES . . . . . . . . . 15-30

15.12.2 ACCEPTABLE ONSITE DISPOSAL DOSE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . 15-31 ix NUREG–1757, Vol. 1, Rev. 2

15.12.3 CONSIDERATIONS FOR REVIEW OF ONSITE DISPOSAL REQUESTS . . . . . . . . 15-32

15.13 USE OF INTENTIONAL MIXING OF CONTAMINATED SOIL . . . . . . . . . . . . . . . . . . . . . . . . . 15-34

15.13.1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-34

15.13.2 REVIEW PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-35

15.13.3 ACCEPTANCE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-37

15.13.4 EVALUATION FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-39

PART II: DECOMMISSIONING PLANS

16 DECOMMISSIONING PLANS: SITE DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1

16.1 DECOMMISSIONING PLAN: EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2

16.1.1 REVIEW PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2

16.1.2 ACCEPTANCE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3

16.1.3 EVALUATION FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-4

16.2 DECOMMISSIONING PLAN: FACILITY OPERATING HISTORY . . . . . . . . . . . . . . . . . . . . . . . 16-4

16.2.1 LICENSE NUMBER/STATUS/AUTHORIZED ACTIVITIES . . . . . . . . . . . . . . . . . . . . 16-5

16.2.2 LICENSE HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5

16.2.3 PREVIOUS DECOMMISSIONING ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6

16.2.4 SPILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7

16.2.5 PRIOR ONSITE BURIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7

16.2.6 EVALUATION FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8

16.3 DECOMMISSIONING PLAN: FACILITY DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9

16.3.1 SITE LOCATION AND DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10

16.3.2 POPULATION DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-11

16.3.3 CURRENT/FUTURE LAND USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-12

16.3.4 METEOROLOGY AND CLIMATOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-13

16.3.5 GEOLOGY AND SEISMOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-15

16.3.6 SURFACE WATER HYDROLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-17

16.3.7 GROUND WATER HYDROLOGY ACCEPTANCE CRITERIA . . . . . . . . . . . . . . . . . 16-18

16.3.8 NATURAL RESOURCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-21

16.4 DECOMMISSIONING PLAN: RADIOLOGICAL STATUS OF FACILITY . . . . . . . . . . . . . . . . . 16-22

16.4.1 CONTAMINATED STRUCTURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-23

16.4.2 CONTAMINATED SYSTEMS AND EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-24

16.4.3 SURFACE SOIL CONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-25

16.4.4 SUBSURFACE SOIL CONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-26

16.4.5 SURFACE WATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-27

16.4.6 GROUND WATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-28

17 DECOMMISSIONING PLANS: PROGRAM ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1

17.1 PLANNED DECOMMISSIONING ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1

17.1.1 CONTAMINATED STRUCTURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2

17.1.2 CONTAMINATED SYSTEMS AND EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-4

17.1.3 SOIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5

NUREG–1757, Vol. 1, Rev. 2 x

17.1.4 SURFACE AND GROUND WATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7

17.1.5 SCHEDULES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-9

17.2 DECOMMISSIONING PLAN: PROJECT MANAGEMENT AND ORGANIZATION . . . . . . . . . 17-10

17.2.1 DECOMMISSIONING MANAGEMENT ORGANIZATION . . . . . . . . . . . . . . . . . . . . 17-11

17.2.2 DECOMMISSIONING TASK MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12

17.2.3 DECOMMISSIONING MANAGEMENT POSITIONS AND QUALIFICATIONS . . . 17-14

17.2.4 TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17

17.2.5 CONTRACTOR SUPPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18

17.3 DECOMMISSIONING PLAN: RADIATION SAFETY AND HEALTH PROGRAM DURING

DECOMMISSIONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-20

17.3.1 RADIATION SAFETY CONTROLS AND MONITORING FOR WORKERS . . . . . . . 17-21

17.3.2 NUCLEAR CRITICALITY SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-37

17.3.3 HEALTH PHYSICS AUDITS, INSPECTIONS, AND RECORDKEEPING PROGRAM

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-39

17.4 DECOMMISSIONING PLAN: ENVIRONMENTAL MONITORING AND CONTROL PROGRAM

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-41

17.4.1 ENVIRONMENTAL ALARA EVALUATION PROGRAM . . . . . . . . . . . . . . . . . . . . 17-42

17.4.2 EFFLUENT MONITORING PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-43

17.4.3 EFFLUENT CONTROL PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-46

17.5 DECOMMISSIONING PLAN: RADIOACTIVE WASTE MANAGEMENT PROGRAM . . . . . . 17-48

17.5.1 SOLID RADIOACTIVE WASTE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-49

17.5.2 LIQUID RADIOACTIVE WASTE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-51

17.5.3 MIXED WASTE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-52

17.6 DECOMMISSIONING PLAN: QUALITY ASSURANCE PROGRAM . . . . . . . . . . . . . . . . . . . . . 17-54

17.6.1 ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-55

17.6.2 QUALITY ASSURANCE PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-57

17.6.3 DOCUMENT CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-58

17.6.4 CONTROL OF MEASURING AND TEST EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . 17-59

17.6.5 CORRECTIVE ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-61

17.6.6 QUALITY ASSURANCE RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-62

17.6.7 AUDITS AND SURVEILLANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-63

17.7 RESTRICTED USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-64

17.7.1 OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-64

17.7.2 INITIAL ELIGIBILITY DEMONSTRATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-70

17.7.3 INSTITUTIONAL CONTROLS AND ENGINEERED BARRIERS . . . . . . . . . . . . . . . 17-70

17.7.4 SITE MAINTENANCE AND LONG-TERM MONITORING . . . . . . . . . . . . . . . . . . . . 17-79

17.7.5 OBTAINING PUBLIC ADVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-85

17.7.6 DOSE MODELING AND ALARA DEMONSTRATION . . . . . . . . . . . . . . . . . . . . . . . 17-87

17.8 ALTERNATE CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-89

18 DECOMMISSIONING PLANS: MODIFICATIONS TO DECOMMISSIONING PROGRAMS AND

PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1 xi NUREG–1757, Vol. 1, Rev. 2

FIGURES

1.1 Determining the Appropriate Decommissioning Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

2.1 Locations of NRC Offices and Agreement States in the United States . . . . . . . . . . . . . . . . . . . . . . . 2-2

5.1 Do I Need to Decommission? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5.2a The Decommissioning Process (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5.2b The Decommissioning Process (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8

5.3 Is a Decommissioning Plan Required? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11

6.1 Groups 1–3 Exclusion Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5

7.1 Determining the Appropriate Decommissioning Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2

8.1 Simplified Survey Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2

15.1 Financial Assurance Mechanisms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-4

15.2 NEPA Screening Process (from NUREG–1748) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16

15.3 When to Prepare an Environmental Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-19

15.4 When to Prepare an Environmental Impact Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-21

17.1 Process for Selecting Institutional Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-69 B.1 Pathways for Generic Scenarios . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-5 B.2 Site Features and Conditions that May Be Incompatible with Those Assumed in DandD . . . . . . . . . B-7

TABLES

1.1 Description, Examples, and Reference Chapters in this Document for Each Decommissioning Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5

1.2 Principal Regulatory Features of Decommissioning Groups . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7

2.1 Who Regulates the Activity? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

4.1 List of Documents Superseded by this Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10

15.1 Minimum License Thresholds to Demonstrate Financial Assurance . . . . . . . . . . . . . . . . . . . . . . . . 15-3

15.2 Financial Assurance Needs by Decommissioning Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-5

15.3 Decommissioning Groups and Associated NEPA Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17

15.4 NMMSS Reportable Quantities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-23

15.5 NRC Contact Information for Requests Concerning the Disposition of Solid Materials . . . . . . . . 15-28 B.1 Acceptable License Termination Screening Values of Common Radionuclides for Building-Surface

Contamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 B.2 Screening Values (pCi/g) of Common Radionuclides for Soil Surface Contamination Levels . . . . . B-2 D.1 Application of Checklist to Decommissioning Groups . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-2 E.1 Facility Characteristics Applicable to Dose Modeling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-3 H.1 Consultation Triggers for Residential and Commercial/Industrial Soil Contamination (MOU Table 1)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-7

NUREG–1757, Vol. 1, Rev. 2 xii

APPENDICES

A U.S. Nuclear Regulatory Commission Form 314 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 B Screening Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 C Notification Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1 D DP Evaluation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-1 E Checklist for Use of Generic Environmental Impact Statement for License Termination and Sample

Environmental Assessment for Sites that Use Screening Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-1 F Master Inspection Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1 G Safety Evaluation Report Outline and Template . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-1 H EPA/NRC Memorandum of Understanding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1 I Using the Internet to Obtain Copies of NRC Documents and Other Information . . . . . . . . . . . . . . . . . . . . . . I-1 J Sample Licenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-1 K Policy and Guidance Directive FC 94–02, Licensing Site Remediation Contractors for Work at Temporary Job

Sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K-1 L Decommissioning Process Checklists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L-1 M Overview of the Restricted Use and Alternate Criteria Provisions of 10 CFR Part 20, Subpart E . . . . . . . . . M-1 N MOU Between NRC and USACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N-1

1 As of September 2006, NRC is planning to reorganize NMSS and the Office of State and Tribal Programs (STP) to create two new offices: the Office of Federal and State Materials and Environmental Management Programs, which will focus on materials programs; and the new NMSS, which will focus on fuel cycle programs. This reorganization is scheduled to take effect on October 1, 2006. This document contains references to NMSS and STP. These references will be updated in future revisions of this document.

xiii NUREG–1757, Vol. 1, Rev. 2

FOREWORD

NRC staff suggests that licensees contact NRC or the appropriate Agreement State authority to assure understanding of what actions should be taken to initiate and complete decommissioning at facilities.

In September 2003, U.S. Nuclear Regulatory Commission (NRC) staff in the Office of Nuclear Material Safety and Safeguards (NMSS)1 consolidated and updated the policies and guidance of its decommissioning program in a three-volume NUREG series, NUREG-1757, “Consolidated Decommissioning Guidance.” This NUREG series provides guidance on: planning and implementing license termination under the NRC’s License Termination Rule (LTR), in the Code of Federal Regulations (CFR), Title 10, Part 20, Subpart E; complying with the radiological criteria for license termination; and complying with the requirements for financial assurance and recordkeeping for decommissioning and timeliness in decommissioning of materials facilities. The staff periodically updates NUREG-1757, so that it reflects current NRC decommissioning policy.

In September 2005, the staff issued, for public comment, draft Supplement 1 to NUREG-1757, which contained proposed updates to the three volumes of NUREG-1757. Draft Supplement 1 included new and revised decommissioning guidance that addresses some of the LTR implementation issues, which were analyzed by the staff in two Commission papers (SECY-03-0069, Results of the LTR Analysis; and SECY-04-0035, Results of the LTR Analysis of the Use of Intentional Mixing of Contaminated Soil). These issues include restricted use and institutional controls, onsite disposal of radioactive materials under 10 CFR 20.2002, selection and justification of exposure scenarios based on reasonably foreseeable future land use (realistic scenarios), intentional mixing of contaminated soil, and removal of material after license termination. The staff also developed new and revised guidance on other issues, including engineered barriers.

The staff received stakeholder comments on Draft Supplement 1 and prepared responses to these comments. The stakeholder comments are located on NRC’s decommissioning Web site, at http://www.nrc.gov/what-we-do/regulatory/decommissioning/reg-guides-comm.html, and the NRC staff responses are located on the same Web site and also in the Agencywide Documents Access and Management System at ML062370521. Supplement 1 has not been finalized as a separate document; instead, updated sections from Supplement 1 have been placed into the appropriate locations in revisions of Volumes 1 and 2 of NUREG-1757. The staff plans to revise Volume 3 of this NUREG series at a later date, and that revision will incorporate the Supplement 1 guidance that is related to Volume 3.

FOREWORD

NUREG–1757, Vol. 1, Rev. 2 xiv

NRC is currently moving toward increasing the use of risk information in its regulation of nuclear materials and nuclear waste management, including the decommissioning of nuclear facilities. NRC’s risk-informed regulatory approach to the decommissioning of nuclear facilities represents a philosophy whereby risk insights are considered together with other factors to better focus the attention and resources of both the licensee and NRC on the more risk-significant aspects of the decommissioning process and on the elements of the facility and the site that will most affect risk to members of the public following decommissioning. This results in a more effective and efficient regulatory process.

The term "risk-informed," as used here, refers to the results and findings that come from risk assessments. A risk assessment is a systematic method for addressing risk. The end results of such assessments (e.g., the calculation of predicted doses from decommissioned sites) may relate directly or indirectly to public health effects. NRC staff has developed this guidance to implement the risk-informed approach and intends that the guidance be implemented in a risk-informed manner.

The primary decommissioning guidance documents used by licensees and NRC staff are NUREG-1757 and NUREG-1700, “Standard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans.” Table 1 below describes the general applicability of these documents. NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors,” contains guidance for non-power reactor licensees and NRC staff, which includes a section on decommissioning and license termination for non-power reactors.

xv NUREG–1757, Vol. 1, Rev. 2

Table 1. Contents and Applicability of Key Decommissioning Guidance Documents

Volume and Status 1 Title

Licensees to Which the Guidance Applies

NUREG-1757,

Vol. 1, Rev. 2;

September 2006

Consolidated Decommissioning Guidance: Decommissioning Process for Materials Licensees

Fuel cycle, fuel storage, and materials licensees.2 Limited applicability to reactor licensees (see text below).

NUREG-1757,

Vol. 2, Rev. 1;

September 2006

Consolidated Decommissioning Guidance: Characterization, Survey, and Determination of Radiological Criteria

All licensees that are subject to the LTR (fuel cycle, fuel storage, materials, and reactor licensees).

NUREG-1757,

Vol. 3;

September 2003

Consolidated NMSS Decommissioning Guidance:

Financial Assurance, Recordkeeping, and Timeliness

Fuel cycle, fuel storage, and materials licensees.2

NUREG-1700,

Rev. 1;

April 2003

Standard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans

Power reactor licensees.

1 Versions listed are current as of September 2006. Please refer to the NRC’s Public Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections/nuregs to obtain the most up-to-date version.

2 Licensees regulated under 10 CFR Parts 30, 40, 60, 61, 63, 70, and 72 (for 10 CFR Parts 60, 61, and 63, only the ancillary surface facilities that support radioactive waste disposal activities). Because uranium recovery facilities are not subject to 10 CFR Part 20, Subpart E, refer to NUREG-1620, Rev. 1, Section 5, for decommissioning guidance for uranium recovery facilities that are subject to 10 CFR 40, Appendix A.

The current document, NUREG-1757, Volume 1, Revision 2, was intended to be applicable only to materials licensees. However, parts of this Volume are also applicable to reactor licensees, and the most relevant sections are listed in Table 2.

NUREG–1757, Vol. 1, Rev. 2 xvi

Table 2. Sections of NUREG-1757, Volume 1, That Are Applicable to Reactor Licensees

Section Title

Chapter 6 Radiological Criteria for Decommissioning

Section 15.4 Decommissioning Surveys

Section 15.7 National Environmental Policy Act Compliance

Section 15.11.1 Current NRC Approach to Releases of Solid Materials

Section 15.12 Onsite Disposal of Radioactive Materials Under 10 CFR 20.2002

Section 15.13 Use of Intentional Mixing of Contaminated Soil

Section 17.7 Restricted Use

Section 17.8 Alternate Criteria

Appendix B Screening Values

Appendix H EPA/NRC Memorandum of Understanding

Appendix M Overview of the Restricted Use and Alternate Criteria Provisions of 10 CFR Part 20, Subpart E

Revision 1 of Volume 1 was published in September 2003. As mentioned above, the current document, Revision 2 of Volume 1, incorporates changes based on finalizing the guidance of draft Supplement 1. Table 3 describes the most significant changes to the guidance in this volume.

xvii NUREG–1757, Vol. 1, Rev. 2

Table 3. Summary of Major Changes to Volume 1, Revision 2

Subject Affected Sections

Restricted Use and Institutional Controls Section…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .