This document is the Scope of Work for the replacement of the Guam (ZUA) Airport Traffic Control Tower (ATCT) Cab. The FAA is seeking the services of an architectural/engineering firm to design a replacement ATCT Cab, including new structural components, architectural features, roofing, windows, electrical, fire-life safety equipment, and control consoles. The design must be completed within 180 calendar days and submitted to the FAA for review at 35%, 70%, and 100% design stages. The final deliverables will be bid-ready drawings, construction specifications, and a construction cost estimate. The design must conform to FAA standards and building codes. After the 100% design review, the final design package will be submitted to the FAA for approval. The FAA may elect to utilize the design at other locations. A related federal contract opportunity has been posted for the Guam ATCT Cab Replacement project, with a proposal due date of January 22, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation Federal Aviation Administration
FEDERAL AVIATION
ADMINISTRATION
AIRPORT TRAFFIC CONTROL TOWER
(ATCT) CAB REPLACEMENT
SCOPE OF WORK
GUAM (ZUA) ATCT
Barrigada, Guam
JCN: 20012097
September 18, 2024
FEDERAL AVIATION ADMINISTRATION
Guam (ZUA) Airport Traffic control Tower Cab Replacement
1. BACKGROUND:
This is a “Design Bid Build” project to replace the existing Federal Aviation Administration (FAA) owned Guam (ZUA) Air Traffic Control Tower (ATCT) Cab.
The FAA acquired the existing facility from the US Navy as a result of the 1995 Base Realignment and Closure (BRAC). The Guam ATCT Tower/Cab and adjoining Center Radar Approach Control (CERAP) facility were constructed in the 1950s and has gone through various modifications including the addition of an exterior flight of stairs from the 5th Floor to the Cab, see Figures 1 and 2.
Figure 1 CAB and Enclosed Exterior Stairs Figure 2 CERAP and CAB
The Cab structure has suffered from severe corrosion from the extreme environmental effects of the salt air that has infiltrated into the Cab window framing and structural supports. Replacement will meet current codes to the extent that the existing structure is not impacted and will address the increasing wind and seismic events.
2. LOCATION:
The project is located at the FAA Guam CERAP (ZUA),1775 Admiral Sherman Blvd., Barrigada, GU
96913-1612 USA.
3. SCOPE OF WORK:
The FAA requests the services of an architectural/engineering (A/E) firm to design the replacement for the existing ATCT Cab located on the roof of the 5th floor of the ATCT Tower, and at a minimum complete with new structural components and architectural features, to include new roofing system, windows and window sprinklers, electrical, fire-life safety equipment, and control slat-wall consoles. The design of the ATCT Cab will be based on the existing approximate square footage of 166 square feet with eight column supports. The Contractor will verify the existing conditions prior to creating the design drawings and specifications, see Section M; Attachments:
Drawings 1-14.
The existing line of sight (LOS) and floor height will be designed to the current elevation. The Cab windows will be designed to the current dimensional shapes and angle. The mullions and roof support are internal structures to the Cab and will be assumed that they too will be designed similarly. These are attached to the octagonal concrete structure wall, atop of the 5th Floor Roof, see Figure 3.
Figure 3, Octagonal Concrete Structural Pedestal Wall
The A/E firms will be required to submit an Architect-Engineer Qualification Standard Form 330-21, Attachment (15). The proposal will conform to the requirements of the Request for Proposal (RFP) and this SOW.
The A/E will have 180 - calendar days from the date of the Notice-to-Proceed (NTP) to complete the design replacement. The design will be submitted to the FAA for review at the 35%, 70%, and 100% stages. After comments from the 100% review have been incorporated, the final design will be submitted to FAA. The FAA will require fifteen (15) calendar days to review and issue comments at each of the review stages. The time required for review is considered part of the 180 - calendar day performance time; therefore, the A/E should proceed with the design during the review periods to the extent possible.
At each review phase, the FAA Project Engineer will assemble the comments and send a copy to the A/E firm via electronic mail. Within ten (10) calendar days after receiving the comments, a design review meeting will be held. Meeting location will be determined upon selection of the A/E. If the A/E wishes to change the location, written approval by the FAA CO is required, in advance. Except for the FAA, the Kickoff meeting, site visits, and conference meeting expenses will be covered by the A/E. The A/E will ensure attendance by its project manager and lead engineer for each discipline at all design reviews.
Participation by teleconference is negotiable due to distance and time-zone differences.
All work under this contract will be performed in compliance with technical input from FAA personnel, FAA Standard Orders, and applicable Codes. The A/E will furnish sufficient skilled technical, supervisory, and administrative personnel to ensure the expeditious completion of the work specified herein within the allotted time frames.
The final deliverables under this contract will be bid-ready Drawings and Construction Specifications, and construction cost estimate that are thorough and provide sufficient detail to allow construction of all aspects of the project. All drafting will be completed in accordance with FAA standards.
At the conclusion of the design phase of this project, the entire design including all engineering drawings, specifications, reports, and studies will become the property of the FAA. The FAA may elect to utilize all, or a portion, of this design at other locations as they see fit; however, the A/E will be released from any liability/responsibility for the design beyond Guam.
The ATCT Cab design will conform to the requirements set forth in Terminal Facilities Design Standard V2.2. If a conflict arises between the Design Standard and this SOW, the A/E will notify the FAA Project Engineer for a resolution.
The A/E will provide a Cost Estimate for Construction and Construction Support. If the FAA decides to utilize the A/E services to administer construction support a change order to the design contract will be negotiated via the FAA Contracting Officer.
4. DESIGN REQUIREMENTS:
A. Administrative Design:
• All design sheets will be established at the first drawing milestone and exhibit an appropriate amount of progress at each consequent milestone.
• Qualifications: The A/E shall provide qualified designers for each portion of the project. The finalized drawings will be signed and stamped by a Registered Professional Engineer in the Territory of Guam or equivalent standard by examination.
• Fire and Life Safety drawings will be produced under the direction of a qualified designer demonstrating through training and experience expert knowledge of the FLS system or Life Safety Design.
• Qualifications will be submitted with this proposal. Personnel substitutions after award will require FAA approval and must be equivalent in qualifications.
• Design reviews: The A/E will submit designs for review to the FAA in accordance with the General project schedule. The FAA has final review authority in relation to the design.
• Modifications: Contract modifications will follow the General procedures of the project. All modifications come directly from FAA Contracting Officer.
B. Survey and Site Inspection:
• Provide hazardous materials survey report, to include asbestos/lead base paint, and propose abatement services as defined and identified in the survey report.
C. Demolition and/or Removal Design:
• All identified Air Traffic Control equipment interior and exterior of the Cab will be removed by others.
• Forensic inspection is anticipated to determine if the corrosive environment has penetrated the embedded re-bar of the 10-inch-thick circumferential concrete pedestal wall supporting the Cab.
• Demolition of the false ceiling above ATCT Radar Microwave Equipment Room on 5th Floor is required and removal of the electrical conductors, conduit and junction box from the distribution panel on 5th floor to the Cab.
• Cutting and plugging and removal of all existing utilities in the ATCT Cab to include communication conduits, electrical lighting and conduits, HVAC ducting, plumbing, window washer system, and fire protection systems will be necessary.
• National Airspace System (NAS) equipment including those present on the 5th floor will remain functional at all times. Spaces containing NAS equipment or FAA personnel will be protected from weather and the space will be cooled to ensure functionality.
D. Architectural/Structural Design:
• The Cab design will not deviate from the dimensions of the existing ATCT Cab but may be modified to meet current mandatory building code requirements; including but not limited to structural components, architectural features such as roofing and roofing insulation, Cab glass slope, mullions, stainless steel roof hatch and ladder, roof top guardrails, Slat-Wall console, windows and window sprinklers, and new raised flooring. The new sectioned covered floor will be located at the same exact elevation as the existing floor but built with new anti-static carpeting bonded to it and sized to allow for easy floor panel removal to provide access to equipment.
• Refer to Terminal Facilities Design Standard (TFDS) V2.2, Attachment (2).
• Structural analysis loading requirements for the replacement design of the three-dimensional
Cab structure will be referenced to the current editions of: ASCE 7-22 Minimum design loads for buildings.
• Construction of the ATCT Cab structure will be offsite and indoors to prevent any weathering to the structure before final protective coating. Designer to provide recommendations.
• An interior factory coating and curing system applied to the steel Cab frame is desired. A/E will provide the current recommendations for protective coatings.
• Match interior and exterior paint scheme.
• Design Cab glass using the wind load pressures as stated in ASCE 7-22 for this region of the
Pacific and use of low-E (low emissivity) glass is recommended. Refer TFDS V2.2, Chapter 7.
• Design a watertight barrier to prevent moisture infiltration into the exposed Cab structure during construction.
• Design a new metal drop ceiling framing and acoustic ceiling tiles.
• Design a corrugated sheet metal roof and install replacement built up roof system similar to existing system.
• Design an approved system of hung Cab shades.
• Design a new ATCT Slat Wall Consoles to include mounting, grounding, Cable racks/troughs, ducts/conduits, and powering. FAA will require penetrations thru the Cab floor for Cables; coring of the Cab floor for accessing cabling from equipment in the Tower will be necessary.
E. Plumbing/Mechanical Design:
• Design a new water lines and appurtenances as designed to be connected to the nearest existing waterline for the kitchen sink and window sprinklers.
• Design and install associated power, controls, devices, and appurtenances for a complete replacement plumbing system.
• Design and install new vertical HVAC ducting and insulation as designed to be connected to the existing vertical HVAC, to include electrical disconnect switches, volume dampers, air registers/grills, ductwork sheet metal materials, ductwork insulation, ductwork hangers and seismic bracing. HVAC ducting will be provided a separate support independent of the raised floor and other associated materials for mounting.
• Testing, adjusting, and balancing the new air distribution system in accordance with National Environmental Balancing Bureau or Associated Air Balance Council standard will be required.
• Maintain and protect existing stairwell pressurization system. The new system will be interconnected and operate in conjunction with the existing building fire protection system, and HVAC control system.
• Design and install new programmable thermostats for the existing air handling units, and HVAC control system, and fan coils units in the building.
• Perform balancing of the existing HVAC system and stairwell pressurization to ensure that intended results are achieved.
• Design an exterior window sprinkler system located centrally and above each window panel in accordance with ASTM E1886 and ASTM E1996, to include a downward window spray system, selector switch, sprinkler control Cabinet, relays, control board wiring conduits and other devices and accessories associated for the proper operation of the system inside the control tower Cab that can activate and terminate the sprinklers.
• Design a water softener for window sprinkler water supply, to include but not limited to electrical wirings, pipes, valves, fittings, hangers and supports.
F. Electrical Design:
• Design and install all light fixtures, essential duplex receptacles, critical twist lock receptacles, light switches, communications outlets (telephone & data outlets), branch circuit conduit and wiring, fire alarm visual/audio devices and other related materials, devices, and accessories associated with the electrical, communication and fire alarm system inside the ATCT Cab, including the void space beneath the Cab floor, exterior catwalk, and Cab roof.
• Design a new energy efficient 1’x4’ T-8 Light efficient (LED) fixtures and LED exist sign lights with battery backup including branch circuit conduit and wiring between fixtures and homerun to electrical panel board. The new light fixture will be 1’x 4’, parabolic type troffer with anti-glare diffuser, equipped with emergency battery. Light fixture T-8 LED lamps will be daylight type and will include a power supply. Design a new T-8 LED light fixtures per manufacturer’s recommendations. Design a new T-8 LED light fixtures per manufacturer’s recommendations. A/E will prepare Design calculations to ensure that new lighting system meets the required minimum illuminations level. Light fixtures will be controlled by the light switches. Final location of the switches will be determined by the FAA.
• Design a gradient dimming and separate control for each set of lights. Luminaries will comply with National energy Policy Act of 2005 and Energy Star requirements as well as FCC Part 15.
• Lighting in the cab, stairway and 5th floor including spacing of each fixture and illumination level will be designed in accordance with NFPA 101, IBC/IBF and OSHA as well as FAA requirements listed below in the Design References. Design an electrical load & voltage drop calculation and lighting calculation using the latest Illuminating Engineering Society of North America’s (IESNA) HB, IESNA Lighting Handbook. Light fixtures will be provided a separate support independent with false drop ceiling and other associated materials for mounting and will be in accordance with the latest Architectural Compatibility & Base Design Standards.
• For the cab the total number of critical and essential receptacles in the new design will exceed the existing. Location of receptacles to be determined by FAA, with a minimum of 12 critical receptacles and 6 essential receptacles (distributed such that there are two critical and one essential receptacle per position), each on a dedicated circuit. Receptacles on roof, catwalk, stairway and all other areas will not be reduced from what is at presently provided..
• The number of ground plates in the new design will match the existing, with location to be determined by FAA.
• Essential power: Design new 20 Amps, 120 volts, single-phase duplex receptacles including branch circuit conduit and wiring between devices and homerun to electrical panel board.
Design one new 50 Amp, 120 volts, single-phase duplex receptacle including branch circuit conduit and wiring between devices and home run to electrical panel board for new HVAC unit on the 5th floor. Additional breakers will be required to support other loads within this Scope of Work.
• Critical power: Design new 20 Amps, 120 volts, single-phase twistlock receptacles including branch circuit conduit and wiring between devices and homerun to electrical panel board.
Additional breakers may be required to support other loads within this Scope of Work.
• Design a Surge Protection Device (SPD) for the essential and the critical panelboards feeding the cab. SPD will be installed according to FAA-Standard-019G, Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Facilities and Electronic Equipment. Relocation of some existing wall mounted devices may be required to ensure the SPD is at mounted as close to its feeder breaker as possible.
• Design new communication (Telephone and Data) outlets including branch circuit and conduit wiring between devices and homerun.
• Design/install new eight (8) recessed down lights. New downlights will be LED type and controlled by four (4) dimmer type switches. Dimmer type switch will control two (2) fixtures and to be mounted on the front side of the slat-wall counter.
• The Lighting layout or location of the new light fixtures for both the LED and LED type will match the existing.
• Design two exterior convenience circuits for the Cab Roof and two exterior convenience circuits on the Catwalk. One convenience circuit in the stairway and one on the interior of the Cab ceiling.
• Design cable ladder, cable tray, conduit runs for conductors from the ATCT 5th floor to each Cab position, to the mullion in the Cab, and to communication junction boxes on the catwalk.
G. Fire Life Safety Design:
• Design drawings, narratives, phasing plans, calculations and specifications will be produced as necessary to demonstrate the following items.
• Design consideration will consider the demolition of the existing Cab.
• Coordinate with Architectural and Structural Demo plans.
• Decommission and temporary removal of fire alarm devices in the control cab. Anticipated devices include pull station, fire alarm annunciator, control relays for HVAC control and smoke detectors.
• Design procedures for the temporary decommission of the ATCT Cab exterior stairwell and HVAC return air passage while maintain pressurization to the enclosed portion of the Tower stairwell.
• Maintain active fire alarm system for remainder of facility during construction.
• Determine which areas of the ATCT may remain safely occupied during construction activities including AT Supervisor Office and NATCA union office in ATCT.
• Design firestops and schedules for penetrations into new Cab.
• Coordinate with electronics to establish penetration points and opening dimensions in the new
Cab floor (assume 2-hour rating for floor).
• Select suitable firestop products or solutions for maintaining the barrier rating at walls and floors where required. Consider future expansion needs and maintainability of firestop system products.
• Fire Alarm Installation.
• Design full fire alarm devices and services to the Cab including detection, notification, control and annunciation.
• Conceal fire alarm conduit pathways from line of sight in Control Cab.
• Restore and test Stairwell Pressurization System for ATCT Cab.
• The existing fire alarm and mass notification system will be extended to the new ATCT Cab.
The new alarm system in the ATCT Cab will be capable of delivering a general building alarm and notification to occupants in the event of fire. The system will have the features compatible with the FAA Standards.
H. Standards, Design References and Code References:
The following references are supplements to and shall be considered part of this SOW. Refer to the latest editions (and any supplements) in effect on the date of the contract. Current copies of the FAA Orders and Standards referenced within this SOW will be provided to the successful A/E upon request after contract award:
FAA Standards Attachments and Reference Appendices
(1) FAA-TFDS V2.2 Terminal Facilities Standard Design
(2) 08 88 58 ATCT Cab Glass Specification
(3) FAA-STD-019G Lightning and Surge Protection, Grounding, Bonding, and Shielding
Requirements for Facilities and Electronic Equipment
(4) FAA-C-1217H Chg. 1 Electrical Work Premises Wiring
(5) FAA-STD-002h FAA Standard Engineering Drawing Preparation and Support
(6) ZUA CERAP Barrigada GU FINAL Asbestos Report 12-16-20
National Fire Protection Association (NFPA)
NFPA 1 Fire Code, 2024 NFPA 10 Standard for Portable Fire Extinguishers, 2022 NFPA 70 National Electrical Code, 2023 NFPA 72 National Fire Alarm and Signaling Code, 2022
NFPA 75 Standard for The Fire Protection of Information Technology Equipment, NFPA 101 Life Safety Code, 2024
International Code Council (ICC)
IBC International Building Code, 2024 IEBC International Existing Building Code, 2024 IFC International Fire Code, 2024 IMC International Mechanical Code, 2024
IPC International Plumbing Code, 2021 SMACNA Sheet Metal and Air Conditioning Contractors' National Association
I. Design Considerations:
Due to age of the ATCT Cab, the existing As-Built drawings will not be solely relied upon for project information. The A/E will perform field surveys and field measurements to verify dimensions shown on FAA furnished As-Built drawings which will be provided electronically upon request.
J. Design Drawing Requirements:
The A/E will produce CAD, PDF and printed sheets meeting the requirements of the FAA CAD Standards (document FAA-STD-002H). Sheet numbers and sequences will follow the standard.
Provide drawings in Autodesk® AutoCAD format version R2010 (or later) in ANSI D (22”x34”) size format. Drawings will use the standard FAA title block on each sheet per and will comply with FAA- STD-002H. After completion of 100% Submittal Review or before Final Design Submittal, all drawing package submittals will be revised until the package receives final approval by the FAA.
• 35% Design submittal: 30 calendar days after award, submit five hard copies of the design drawings and specifications and a PDF copy in CD-ROM or USB drive to the FAA for review and approval. Allow 21 working days for FAA review.
o A complete set of design structural calculations for the tower frame structural performance are to be submitted at the 35% level for review by the FAA. Include all loading combinations as specified by the 2022 ASCE-7 code loading criteria. Only the Cab and concrete ring wall support structure above the Cab floor are required to be checked. That is the new Cab replacement framework of the tower for stresses and lateral drift criteria.
• 75% Design submittal: 30 calendar days following receipt of FAA approval and review comments on the 75% design. Provide native CADD files through digital transmission and CD ROM or USB drive. Submit five hard copies of the design drawings and specifications and a PDF copy through digital transmission and in CD-ROM or USB drive to the FAA for review and approval. Allow 21 working days for FAA review.
• 100% Design submittal: 30 calendar days following receipt of FAA approval and review comments on the100% design. Provide native CADD files through digital transmission and CD ROM or USB drive. Submit five hard copies of the design drawings and specifications and a PDF copy through digital transmission and in CD-ROM to the FAA for review and approval.
Allow 21 working days for FAA review.
• Final Design Submittal: Allow 14 working days following receipt of 100% FAA review comments and approval. Submit the originals and three hard copies of the Design Drawings and Specifications to the FAA for review and signature. Electronically seal and sign all Adobe® Acrobat® PDF drawings and other documents. The Electronic signature software utilized should meet the requirements of the National Council of Examiners for Engineering and Surveying (NCEES). The electronic signatures will be printable and viewable in Adobe Acrobat® and Adobe Reader® with no additional software. Provide native CADD files through digital transmission and CD ROM or USB drive. Allow 21 working days for FAA review.
o Submit all A/E firm(s) Final Designs with latest AUTOCAD.DWG (i.e. 2010 to latest software release) version that will be used by the Construction contractor.
o Insure the Final Designs drawings have any associated XREFs. DWGs applicable to drawing package.
K. Submittals:
In addition to the submittals required under this SOW, submit the following:
• Proposal requirements: Narrative of the proposal, indicating, in detail, and materials considered significant for this project for technical evaluation purposes.
• Signed Structural Calculations by the structural engineer of record.
• Construction Specifications.
• Detailed construction cost estimate.
• Detailed cost estimate for construction support.
• Catalog Cuts for materials and equipment considered significant for technical evaluation purposes to include but not limited to the following:
o Architectural – Design window type, window washer components, and slat-wall metal control console.
o Mechanical – Design electrical disconnect switches, volume dampers, air registers/grills, ductwork sheet metal materials, ductwork insulation, ductwork hangers and seismic bracing.
o Electrical –1’x4’ T-8 LED lamps parabolic type fixtures, 20 Amps 120 Volts duplex receptacles, 20 Amps 120 Volts twistlock receptacles, SPDs, communication (telephone & Data) outlets, breakers, conduits & wirings, and light switches.
o Fire Life Safety - Design fire alarm/visual devices, pull station, strobes, speakers, sprinkler heads, sprinkler pipe, pipe elbow, flexible coupling, pipe cap, exit signed light fixtures.
L. Performance Period:
• Total performance period for the A/E Design services is 180 - calendar days commencing on the date of contract award.
• The performance period for Construction services will be a maximum of 270 - calendar days.
The performance period includes all construction, testing, corrections, and other requirements necessary to deliver a complete and usable facility.
M. Attachments: Drawings and Standard Form 330
Att. (1) 597375 (1953) Operations Bldg. & Control Tower Att. (2) 597376 (1953) Exterior North & East Elevation Att. (3) 597377 (1953) South & West Exterior Elevation Att. (4) 597382 (1954) Ops Bldg. & Control Tower Att. (5) 597382 (2024) Ops Bldg. & Control Tower - A001 Att. (6) 597382 (2024) Ops Bldg. & Control Tower - A002 Att. (7) 597382 (2024) Ops Bldg. & Control Tower - A003 Att. (8) 597397 (1955) Control Tower Plans & Details Att. (9) 597397 (2024) Control Tower Plans & Details - A001 Att. (10) 597398 (1953) Interior Stair Detail Att. (11) CPDS Site Adaptation ZUA-D-CERAP-E102 Att. (12) CPDS Site Adaptation ZUA-D-CERAP-E103 Att. (13) CPDS Site Adaptation ZUA-D-CERAP-E104 Att. (14) WP-D-601-40064 (1998) ZUA-ATCT Modernization and Upgrade Att. (15) Standard Form 330 (REV. 7/2021) GSA Architect-Engineer Qualification
| FEDERAL AVIATION ADMINISTRATION |
| AIRPORT TRAFFIC CONTROL TOWER (ATCT) CAB REPLACEMENT |
| SCOPE OF WORK |
| GUAM (ZUA) ATCT |
| Barrigada, Guam |
| SOW GUM ATCT CAB 9-18-2024 Updated.pdf |
| 1. BACKGROUND: |
| 2. LOCATION: |
| 3. SCOPE OF WORK: |
| 4. DESIGN REQUIREMENTS: |
| A. Administrative Design: |
| C. Demolition and/or Removal Design: |
| E. Plumbing/Mechanical Design: |
| F. Electrical Design: |
| H. Standards, Design References and Code References: |
I. Design Considerations: