This resource distribution table (RDT) outlines work share details for the AN/SPY-6(V) Radar Hardware Production and Sustainment contract opportunity. The prime contractor will procure numerous radar components and manage their integration, assembly, testing and checkout. Key responsibilities include production and delivery of radomes, transmit/receive modules, beamforming and signal processing hardware, mechanical structures, cooling and power systems, software development, systems engineering, program management, testing and training facilities. Numerous subcontractors will support the prime in delivering these various radar elements and integrating them into functional systems over the five year period from FY2021 to FY2025.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDT

Resource Distribution Table (RDT)
AN/SPY-6(V) - TBD
Prime ContractorSubcontractors
Prime Contractor or Sub-ContractorTotalLeaderChallengerTotalSubSub
DescriptionElectronic System (Radar)
Contractor/Organization NameTBD
Contractor/Organization LocationTBD
Contract NumberN00024-20-R-5500
Total Program Office or Contract/Effort Value (Estimated), TY$M
Subtotal Software Contract Value (Estimated), TY$M
Government Organization or PARMPEO IWS 2
CSDR Direct Reporting per CWIPT (Yes/No)Yes
SRDR Direct Reporting per CWIPT (Yes/No)No
WBS NUMBERSWBS Element Name
L1L2L3L4L5L6
1.0AMDR and EASR Hardware Procurement and Sustainment (HP&S)
1.1HP&S Prime Mission Product (PMP)
1.1.1Radome / RF RadiatorXX
1.1.2Non-LRU RF HardwareXX
1.1.3T/R (TRIMM) Line Replaceable Units (LRUs)
1.1.3.1T/R Line Replaceable Units (LRUs) Hardware
1.1.3.1.1T/R Modules
1.1.3.1.1.1GaN MMICsXX
1.1.3.1.1.2GaAs MMICsXX
1.1.3.1.1.3Misc. TR Module HardwareXX
1.1.3.1.1.4T/R Module Assembly and TestXX
1.1.3.1.2DC-to-DC ConvertersXX
1.1.3.1.3Other Misc. HW Other TRIMM AssemblyXX
1.1.3.2T/R Line Replaceable Units (LRUs) SoftwareXX
1.1.3.3T/R Line Replaceable Units (LRUs) Integration, Assembly, Test, and CheckoutXX
1.1.4Receiver/ExcitersXX
1.1.5Digital Beamformer
1.1.5.1Digital Beamformer HardwareXX
1.1.5.2Digital Beamformer Software ReleasesXX
1.1.5.3Digital Beamformer Integration, Assembly, Test, and CheckoutXX
1.1.6Beam Steering Controller
1.1.6.1Beam Steering Controller HardwareXX
1.1.6.2Beam Steering Controller SoftwareXX
1.1.6.3Beam Steering Controller Integration, Assembly, Test, and CheckoutXX
1.1.7Data/Signal Processing Equipment
1.1.7.1Radar Control Processor
1.1.7.1.1Radar Control Processor HardwareXX
1.1.7.1.2Radar Control Processor Software ReleasesXX
1.1.7.1.3Radar Control Processor Integration, Assembly, Test, and CheckoutXX
1.1.7.2Radar Signal Processor
1.1.7.2.1Radar Signal Processor HardwareXX
1.1.7.2.2Radar Signal Processor Software ReleasesXX
1.1.7.2.3Radar Signal Processor Integration, Assembly, Test, and CheckoutXX
1.1.7.3Radar Suite Controller (RSC) Processing Equipment
1.1.7.1.1Radar Control Processor HardwareXX
1.1.7.1.2Radar Control Processor Software ReleasesXX
1.1.7.1.3Radar Control Processor Integration, Assembly, Test, and CheckoutXX
1.1.8Mechanical Structure
1.1.8.1Mechanical Structure Hardware
1.1.8.1.1AntennaXX
1.1.8.1.2PedestalXX
1.1.8.1.3Rotary JointXX
1.1.8.1.4Drive Motor(s)XX
1.1.8.1.5EnclosureXX
1.1.8.1.6Tech LeadsXX
1.1.8.4Mechanical Structure SoftwareXX
1.1.8.5Mechanical Structure Integration, Assembly, Test, and CheckoutXX
1.1.9Array Power SystemXX
1.1.10Array Cooling SystemXX
1.1.11Inertial Navigation UnitXX
1.1.12Other Equipment
1.1.12.1Other Equipment Hardware (Misc. cables & connectors)XX
1.1.12.2Other Equipment SoftwareXX
1.1.12.3Other Equipment Integration, Assembly, Test, and CheckoutXX
1.1.13PMP Software (Non-HW specific)XX
1.1.14PMP Integration, Assembly, Test, and CheckoutXX
1.2Platform Integration, Assembly, Test, and CheckoutXX
1.3Systems Engineering
1.3.1Software Systems EngineeringXX
1.3.2Integrated Logistics Support Systems EngineeringXX
1.3.3Cybersecurity Systems EngineeringXX
1.3.4Core Systems EngineeringXX
1.4Program Management
1.4.1Software Program ManagementXX
1.4.2Integrated Logistics Support Program ManagementXX
1.4.3Cybersecurity Program ManagementXX
1.4.4Core Program ManagementXX
1.5System Test and Evaluation
1.5.1Development Test and EvaluationXX
1.5.2Operational Test and EvaluationXX
1.5.3Cybersecurity Test and EvaluationXX
1.5.4Mock-ups / System Integration Laboratories (SIL)XX
1.5.5Test and Evaluation SupportXX
1.5.6Test FacilitiesXX
1.6Training
1.6.1EquipmentXX
1.6.2ServicesXX
1.6.3FacilitiesXX
1.6.4Training SoftwareXX
1.7Data
1.7.1Data Deliverables (Technical Publications)XX
1.7.2Data RepositoryXX
1.7.3Data RightsXX
1.8Peculiar Support EquipmentXX
1.9Common Support EquipmentXX
1.10Operational/Site Activation (System Assembly, Installation and Checkout on Site)XX
1.11Contractor Logistics Support (CLS)XX
1.12Industrial FacilitiesXX
1.13Initial Spares and Repair PartsXX
1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the
Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform
to the applicable rules established for the Program Plan RDT
2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.

&L&D&T&C&F&R&A

File details come from the government source that posted it. Updated .