Attachment III - Evaluation Criteria.pdf
PDF 11 KB Posted
- Solicitation number
- 36C25021R0183
About this file
This pre-solicitation announcement seeks architect-engineer services for an upgrade to the fire alarm system at the Cincinnati VA Medical Center. Key requirements include preparing drawings, specifications, and cost estimates to upgrade the existing fire alarm system for the entire facility. The project aims to provide an updated system that addresses all current aspects and allows for future expansion. Construction period services such as submittal review and site visits are also required. Interested firms must submit SF330 packages by September 2, 2021. The government will evaluate proposals based on professional qualifications, specialized experience, capacity, past performance, location, and experience with construction period services including inspections, submittal review, and support for contract changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment II - Submittal Instructions.pdf | ||
| Attachment I - Statement of Work.pdf | ||
| 36C25021R0183.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION CRITERIA:
The government will evaluate each potential contractor under the terms of its:
(1) Professional qualifications necessary for satisfactory performance of required services;
(2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials;
(3) Capacity to accomplish the work in the required time;
(4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules;
(5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; and
(6) Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates.
A selection board has been appointed to complete the functions required by FAR 36.602-3, under the selection process outlined at FAR 36.602.
END OF ANNOUNCEMENT
File details come from the government source that posted it. Updated .