Attachment III - Drawings updated.pdf
PDF 20 MB Posted
- Attached to
- 539-21-207 Relocate Infusion Clinic and Hemo
- Solicitation number
- 36C25026B0016
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A
R K
IN
G
G A
R A
G E
V
IN
E S
T
GOODMAN ST
SHIELD ST
Building Key
1 MAIN HOSPITAL
2 CLC BEDS
3 HR/ENGINEERING/LOGISTICS
8 BOILER PLANT
14 MAIN HOSPITAL - RESEARCH ADDITION
15 MAIN HOSPITAL - RESEARCH ADDITION
16 HOPTEL
V in e S t
Department of Veteran Affairs Medical Campus
Goodman St
Interstate 71
Martin Luther King Dr E
R ea di ng
R d
Je ffe rs on
A ve
E de n A ve
Albert Sabin Way
B u rn et
A ve
Shield St
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic & HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2 /2
:3
:0
P M
GI001
COVER SHEET/SHEET INDEX
11/24/2025 PQ SPS
GENERAL NOTES
SHEET
NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET/SHEET INDEX
GI002 CODE SHEET
GI003 WALL TYPES AND DETAILS
GI004 OVERALL FLOOR PLANS
GI005 ICRA PLAN
Structural
SF101 STRUCTURAL FRAMING AND DETAILS
ARCHITECTURE
AD101 DEMOLITION PLAN
AE101 FOURTH FLOOR NEW WORK PLAN
AE102 FOURTH FLOOR EQUIPMENT PLAN
AE103 FINISH PLAN
AE141 REFLECTED CEILING PLAN
AE601 ENLARGED PLANS AND ELEVATIONS
AE631 MILLWORK SECTIONS AND DETAILS
AE701 DOOR SCHEDULE AND DETAILS
FIRE PROTECTION
FX101 FIRE SUPPRESSION PLAN - FOURTH FLOOR
PLUMBING
P001 PLUMBING LEGEND SHEET
PD101 PLUMBING DEMOLITION PLAN - THIRD FLOOR
PD102 PLUMBING DEMOLITION PLAN - FOURTH FLOOR - SANITARY & VENT
PD103 PLUMBING DEMOLITION PLAN - FOURTH FLOOR - DOMESTIC WATER
PD104 PLUMBING DEMOLITION PLAN - FOURTH FLOOR - LAB GAS
PL101 PLUMBING NEW WORK PLAN - THIRD FLOOR
PL102 PLUMBING NEW WORK PLAN - FOURTH FLOOR - SANITARY & VENT
PL103 PLUMBING NEW WORK PLAN - FOURTH FLOOR - DOMESTIC WATER
PL104 PLUMBING NEW WORK PLAN - FOURTH FLOOR - MEDICAL GAS
PL501 PLUMBING SCHEDULES & DETAILS
PL901 PLUMBING ISOMETRIC DIAGRAMS
MECHANICAL
M001 INDEX, LEGEND, AND GENERAL NOTES
MD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS
MD104H PARTIAL FOURTH FLOOR PLAN - DUCT REMOVALS
MD104P PARTIAL FOURTH FLOOR PLAN - PIPING REMOVALS
M104 PARTIAL FOURTH FLOOR PLAN - NEW WORK
M105 FIFTH FLOOR PENTHOUSE PLAN - REMOVALS AND NEW WORK
M501 DETAILS
M502 DETAILS
M601 SCHEDULES, CONTROLS AND AUTOMATION
ELECTRICAL
E000 ELECTRICAL GENERAL INFORMATION
ED104 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR
EL104 ELECTRICAL LIGHTING PLAN - FOURTH FLOOR
EP104 ELECTRICAL POWER PLAN - FOURTH FLOOR
EY104 TECHNOLOGY & FIRE ALARM PLAN - FOURTH FLOOR
E500 ELECTRICAL DETAILS
E600 PANEL SCHEDULES
A. THE CONTRACT DRAWINGS AND SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER) ARE
COMPLEMENTARY. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) OF ANY
DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
B. DO NOT SCALE DIMENSIONED DRAWINGS; DIMENSIONS SHALL GOVERN.
C. VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF
PROVIDED, EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY
DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE.
D. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND CONSTRUCTION.
E. CONTRACTORS WORKING AT VA FACILITIES ARE REQUIRED TO PROVIDE A DOCUMENT STATING THAT ALL WORKERS, PRIME AND SUBS, HAVE HAD THE FLU SHOT FOR THE CURRENT YEAR OF THE CONTRACT. THIS IS IN COMPLIANCE WITH VA DIRECTIVE 1013, PREVENTION AND CONTROL OF SEASONAL INFLUENZA WITH VACCINES. ACCORDINGLY, THE CONTRACTOR SHALL PROVIDE A CERTIFICATION THAT ALL WORKERS ON
THIS CONTRACT HAVE BEEN IMMUNIZED IN ACCORDANCE WITH THIS DIRECTIVE.
F. MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES
MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
G. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE’D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH
DAY.
H. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES
AND REGULATIONS.
I. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND
TECHNIQUES FOR CONSTRUCTION AND EXPECTED QUALITY.
J. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.
K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. EXACT SIZE AND LOCATION OF ROOF, WALL, AND
FLOOR OPENINGS SHALL BE VERIFIED WITH CORRESPONDING CONTRACTING TRADES PRIOR TO
CONSTRUCTION.
L. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
M. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VARYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER AND
CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONSTRUCTION.
N. WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO RECEIVE THE
NEW MATERIALS FOR A LEVEL AND SMOOTH FINISH.
O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.
P. HOST WEB-BASED CONSTRUCTION ADMINISTRATION PLATFORM FOR THE DURATION OF THE PROJECT.
OWNER'S REPRESENTATIVES AND A/E SHALL BE GIVEN ACCESS TO THIS PLATFORM AT NO ADDITIONAL
COST.
Q. CONTRACTOR PARKING LOCATION AND LIMIT TO BE DETERMINED DURING PROJECT PRE-BID MEETING.
R. IF THE CONTRACTOR SHOULD DISCOVER ANY UNFORESEEN CONDITIONS DURING CONSTRUCTION, THE VA SHOULD BE NOTIFIED IMMEDIATELY AND THAT PARTICULAR WORK SHOULD BE DISCONTINUED UNTIL
NECESSARY REVISIONS CAN BE DECIDED UPON.
S. VERIFY CONTRACTOR STAGING AREA WITH COR PRIOR TO CONSTRUCTION.
CINCINNATI VAMC
RELOCATE INFUSION CLINIC
PROJECT NUMBER: 539-21-207
VA CINCINNATI MEDICAL CENTER
DEPARTMENT OF VETERANS AFFAIRS
3200 VINE ST,
CINCINNATI, OH 45220
CAMPUS MAP VICINITY MAP
TRUE
NORTH
TRUE
NORTH
Revisions: Date:
BID DOCUMENTS 11/24/2025
DN
REGULAR E.E.G.
B403B
E.E.G. CONTROL AND
OBSERVATION
B403
WORK STATION
AREA
B414
NON-HAZARDOUS
COMPOUNDING
B414D
ANTE ROOM
B414C
HAZARDOUS
COMPOUNDING
B414B
HAZARDOUS
STORAGE
B414A
WOMEN'S RESTROOM
B406
MEN'S RESTROOM
B407
OFFICE
B413B
EXAM
B413A
C O
M M
O N
P A
T H
O F
E G
R E
S S
TRAVEL DISTANCE - 95' < 200'
OFFICE
B412C
ELEC
B410
SIG CLOSET
B416
ELEC
B417
STAIR 3
S*4*3
STAIR 4
S*4*4
INFUSION ROOM
B412
HAC
B412A
RESTROOM
B412B
ELEC
B431
REFRIG
B430
RESEARCH
COMPLIANCE OFFICE
B429A
RESEARCH
COMPLIANCE OFFICE
B429B
HAC
B429
OFFICE
B428
OPEN OFFICE
B433
INFORMATION
SECURITY
B438
COPIER ROOM
B437A
CHIEF IRM
B439
OFFICE
B437
RESEARCH ADMIN
OFFICE
B420
STAFF PHYSICIAN
B403A
CORRIDOR
C*4*6
CORRIDOR
C*4*1
CORRIDOR
C*4*1
INFUSION BAY 10
B412L
INFUSION BAY 9
B412K
INFUSION BAY 8
B412J
INFUSION BAY 7
B412I
INFUSION BAY 6
B412H
INFUSION BAY 5
B412G
INFUSION BAY 4
B412F
INFUSION BAY 3
B412E
INFUSION BAY 2
B412D
INFUSION BAY 1
B412C
FE
FE
185 OCCUPANTS
(CAPACITY)
TRAVEL DISTANCE -
95' < 200'
TISSUE CULTURE
B412B
HALLWAY
B412AA
LAB PROCEDURE
ROOM
B411
AUTO-CLAVE /
DISHWASHER
B408
COMMON PATH OF
EGRESS - 87'-0"
EXISTING 30 MINUTE SMOKE PARTITION
EXISTING 1 HOUR FIRE WALL
NEW WALL
EXISTING WALL TO REMAIN
EXISTING 2 HOUR FIRE WALL
NEW FIRE EXTINGUISHER CABINETFE
EXIT SIGN
TRAVEL DISTANCE / COMMON PATH
KEY PLAN - 4TH FLOOR
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic & HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:1
:1
GI002
CODE SHEET
11/24/2025 PQ SPS
CODE NOTES
1/8" = 1'-0"
FOURTH FLOOR - CODE PLAN
CODE PLAN LEGEND
PROJECT DESCRIPTION
PATIENT CARE NON-SLEEPING SUITE (HEALTH CARE OCCUPANCIES). EXISTING LAB SUITE ENVELOPE TO REMAIN REORGANIZED AS
INFUSION SUITE WITH INFUSION, PHARMACY, TREATMENT AREA, AND SUPPORTING OFFICES.
AUTHORITY HAVING JURISDICTION:
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA CODES, STANDARDS AND EXECUTIVE ORDERS
NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION.
THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE.
FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
APPLICABLE CODES & STANDARDS
• NFPA 101 LIFE SAFETY CODE 2021
• NFPA 220 LIFE SAFETY CODE 2024
• NFPA 13; 2025
• INTERNATIONAL BUILDING CODE (IBC) 2024
• OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATION (OSHA) STANDARDS
• NFPA 70, NATIONAL ELECTRIC CODE; 2020
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE; 2019
• INTERNATIONAL PLUMBING CODE; 2021
• ASHRAE 90.1, ENERGY STANDARD; 2013 AND 2016
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13), AMERICAN DISABILITY ACT 2010
• VA SUSTAINABLE DESIGN MANUAL
• PHYSICAL SECURITY RESILIENCY DESIGN MANUAL 2020 (REVISED 2023)
• VA SEISMIC DESIGN REQUIREMENT
• VA HVAC DESIGN MANUAL (REVISED 2022)
BUILDING GROSS SQUARE FEET
PROPOSED INTERIOR REMODEL
FOURTH FLOOR (AREA OF WORK) 2,056 GSF
USE GROUP CLASSIFICATIONS (NFPA 101, SECTION 38.1.2)
PROPOSED BUILDING BUSINESS, AMBULATORY CARE
TYPE OF CONSTRUCTION (NFPA 220, TABLE 4.1.1)
PROPOSED BUILDING TYPE II (000)
BUILDING HEIGHT & AREA LIMITATIONS - FULLY SPRINKLED (IBC, TABLE 504.4 & 506.2)
PROPOSED AREA FOURTH FLOOR (AREA OF WORK) 2,056 GSF
OCCUPANCY LOAD (NFPA 101, SECTION 7.3.1.2)
PROPOSED BUILDING 150 GSF
FOURTH FLOOR (AREA OF WORK): 2,056 / 150 = 13.70
TOTAL OCCUPANTS 14
FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (NFPA 220 TABLE 4.1.1)
PROPOSED BUILDING
EXTERIOR BEARING WALLS 0-HOUR RATING
INTERIOR BEARING WALLS 0-HOUR RATING
COLUMNS 0-HOUR RATING
BEAMS, GIRDERS, TRUSSES, AND ARCHES 0 HOUR RATING
FLOOR-CEILING CONSTRUCTION 0-HOUR RATING
ROOF-CEILING CONSTRUCTION 0-HOUR RATING
INTERIOR BEARING WALLS 0-HOUR RATING
EXTERIOR NONBEARING WALLS 0-HOUR RATING
MEANS OF EGRESS (NFPA 101, SECTION 7.1)
PROPOSED BUILDING
MINIMUM NUMBER OF EXITS
2 REQUIRED
2 PROVIDED
MINIMUM WIDTH OF DOOR CLEARANCE
REQUIRED = 32” MIN.
PROVIDED = 34" MIN. (FOR ALL SINGLE DOORS)
COMMON PATH OF EGRESS TRAVEL DISTANCE (NFPA 101, TABLE 38.2.5.2.1)
REQUIRED = 100' MAX
PROVIDED = 35’-0”
EXIT ACCESS TRAVEL DISTANCE (NFPA 101, TABLE 38.2.6.3)
REQUIRED = 300' MAX
PROVIDED FIRST FLOOR = 133’-0”
DEAD END CORRIDORS (NFPA 101, TABLE 38.2.5.3.1)
REQUIRED = 50' MAX
PROJECT HAS NO DEAD-END CORRIDORS
MINIMUM CORRIDOR WIDTH
REQUIRED = 44" REQUIRED
PROVIDED = 60" MINIMUM.
FIRE PROTECTION SYSTEMS
PROPOSED BUILDING
FULLY SPRINKLED IN ACCORDANCE WITH NFPA 13
FIRE ALARM SYSTEM WITH VOICE EVACUATION THROUGHOUT IN ACCORDANCE WITH NFPA 72.
PORTABLE FIRE EXTINGUISHERS IN COMPLIANCE WITH NFPA 10 FOR CLASS A
PROVIDED = TWO EXTINGUISHER INSTALLED, ONE PER FLOOR WITHIN 75’ OF TRAVEL.
ENERGY CODE COMPLIANCE
ENERGY CODE COMPLIANCE IS IN ACCORDANCE WITH ASHRAE 90.1, PER THE 2018
INTERNATIONAL ENERGY CONSERVATION CODE THE COMPLIANCE PATH IS ENVELOPE TRADE OFF (USING ENERGY
MODELING)
THE CONTRACTOR IS REQUIRED TO PROVIDE CONTINUOUS INSULATION AT ENTIRE BUILDING ENCLOSURE IN COMPLIANCE
WITH ENERGY CODE.
5/8" GYPSUM WALLBOARD
3" SOUND ATTENUATION BATTS
3-5/8" METAL STUDS
TYPE 1 (U.N.O.)
ONE LAYER OF 5/8" GYPSUM WALLBOARD ON EACH
SIDE OF 3-5/8" (UNLESS OTHERWISE NOTED) METAL
STUDS AT 16" O.C. WITH 3" SOUND ATTENUATION
BATTS IN STUD SPACE. EXTEND STUDS, BOARD,
AND BLANKETS FULL HEIGHT TO DECK ABOVE.
ATTACH TO STRUCTURE ABOVE WITH VERTICAL
SLIP CONNECTIONS. NOT RATED
TYPE 1A
SIMILAR TO ABOVE UL DESIGN U419 - 1 HR RATED
SLIP TRACK AT DECKING
TYPE 4
ONE LAYER OF 5/8" GYPSUM WALLBOARD ON EACH
SIDE OF 3-5/8" METAL STUDS AT 16" O.C. WITH 3"
SOUND ATTENUATION BATTS IN STUD SPACE.
EXTEND STUDS, BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE. ATTACH TO STRUCTURE
ABOVE WITH VERTICAL SLIP CONNECTIONS. NOT
RATED
NOT RATED SMOKE TIGHT
NOTE:
SEAL ALL PENETRATIONS WITH
NON-RATED SEALANT
TYPE 2
ONE LAYER OF 5/8" GYPSUM WALLBOARD ON
ROOM SIDE OF 3-5/8" METAL STUDS AT 16" O.C.
WITH 3" THERMAL INSULATION IN STUD SPACE.
EXTEND STUDS, BOARD AND INSULATION FULL
HEIGHT TO DECK ABOVE. ATTACH TO STRUCTURE
ABOVE W/ VERTICAL SLIP CONNECTIONS.
3" CLOSED CELL R-7 PER INCH
POLYUERTHANE INSULATION
TYPE 3
SAME AS TYPE 2 EXCEPT 3" BATT
STRUCTURAL DECKING
CEILING - SEE FINISH SCHEDULE
WALL BASE - SEE FINISH
SCHEDULE
STRUCTURAL DECKING
5/8" GYPSUM WALLBOARD
3-5/8" METAL STUDS
SLIP TRACK AT DECKING
CEILING - SEE FINISH SCHEDULE
WALL BASE - SEE FINISH
SCHEDULE
5/8" GYPSUM WALLBOARD
3" SOUND ATTENUATION BATTS
3-5/8" METAL STUDS
SLIP TRACK AT DECKING
STRUCTURAL DECKING
CEILING - SEE FINISH SCHEDULE
WALL BASE - SEE FINISH
SCHEDULE
O P
E R
A T
IN
G
M E
C H
A N
IS
M
M A
X T
O
POSTURE MIRRORPAPER TOWEL
DISPENSER WALL MTD
GARMENT HOOK SOAP DISH
RECESS
SANITARY NAPKIN
DISPOSAL
(WOMEN'S ONLY)
COMBINATION PAPER TOWEL
DISPENSER / WASTE RECEPTACLE
T O
C O
IN
S
L O
T
SANITARY NAPKIN/
TAMPON VENDOR
(WOMEN'S ONLY)
D
IS
P E
N S
E R
S L
O T
TOILET SEAT
COVER DISPENSER
T O
B O
T T
O M
M
A X
SOAP DISH
M
A X
M
IN
HAND DRYER
U F
C G
U
ID
E L
IN
E
M
A X
M
IN
M
A X
M
IN
M A
X A
F F
A
B O
V E
S
IN
K T
O B
/O R
E F
L S
U R
F A
C E
MIRROR TOILET PAPER
DISPENSER
M
A X
M
INVARIES FROM 3'-4" HEIGHT
FOR MAX 6" DEPTH, TO
4'-0" HEIGHT FOR MAX 1/2"
DEPTH
VARIES FROM 3'-0" HEIGHT
FOR MAX 9" DEPTH, TO
4'-0" HEIGHT FOR MAX 1/2"
DEPTH
CENTER OF OPERATING
MECHANISM
1' - 3"
MAX
1'-0" 3'-6" MIN
1' -7
M
A X
T O
S E
A T
1' -5
M
IN
T O
O U
T
LE
T O
F D
IS
P
E N
S E
R
1' -3
M
IN
T
O
'-0
M A
X A
F F
3' -0
M
A X
T O
B A
R
2' -9
M
IN
9" MAX
7" MIN
GRAB BAR
1"
SANITARY NAPKIN
DISPOSAL AT WOMEN OR
UNISEX, SUGGESTED
LOCATION
GRAB BAR
3' -0
M
A X
T O
B A
R
2' -9
M
IN
1'-6" MAX
1'-4" MIN
SANITARY NAPKIN DISPOSAL AT
WOMEN OR UNISEX, SUGGESTED
LOCATION
1 1/2"
3'-0" MIN
6" MAX
2'-0" MIN 1'-0" MIN.
3'-0" MAX
3' -5
M
A X
3' -3
M
IN
1'
-6
M
IN
3'-5" MAX
3'-3" MIN
VERTICAL GRAB BAR
TOILET PAPER
DISPENSER
4'-6" MIN
3' -5
M
A X
3' -3
M
IN
1'
-6
M
IN
SIDE WALL REAR WALL
VERTICAL GRAB BAR
FLOOR CLEARANCE
5'-0"
MIN
1'-3"
C
LR
K N
E E
S P
A C
E
2' -3
M
IN
M A
X T
O R
IM
2' -1
0"
R E
F
LE
C T
E D
S U
R F
A C
E O
F M
IR
R
O R
3' -4
M
A X
T O
B O
MIRROR - VERIFY SIZE WITH
PLANS AND ELEVATIONS
MIN
8" DEEP
T O
R
IM
2' -1
0" M
A X
2'-1" MAX
1'-5" MIN
9" M
IN
9" M
IN
SIDE VIEW FRONT VIEW
CLEARANCE
6" MAX TOE
1'-5" MIN
LAVATORY
PLUMBING LINES
WITHIN HATCHED
AREA REQUIRED
TO BE INSULATED
LINES OF REQUIRED
CLEARANCE
FINISH FLOOR
4'-0" MIN CLR
2'
-5
M
IN
5"
2' -3
M
IN
CLEAR SPACE
ALLOWABLE FOR
ACCESSIBILITY
MIRROR
2' -5
M
IN
LINES OF REQUIRED
CLEARANCE
5"
4' -0
M
IN
2'-6" MIN
1' -5
M
IN
1' -7
M
A X
SINK
CLEAR FLOOR
SPACE
4' -0
M
IN
2'-6" MIN
5'-0"
4' -1
1" F
LO
O
R M
O U
N T
4' -8
W
A
LL
H U
N G
1'-6" MAX
1'-4" MIN
1' -5
M
IN
1' -7
M
A X
WATER CLOSET
SINK
CLEAR FLOOR
SPACE
5'-0"
4' -1
1" F
LO
O
R M
O U
N T
4' -8
W
A
LL
H U
N G
1'-6" MAX
1'-4" MIN
4'-0" MIN
2' -6
M
IN
1'-7" MAX
WATER CLOSET
SINK
CLEAR FLOOR SPACE
CLEARANCE AT WATER CLOSET
CLEARANCE AT WATER CLOSET
CLEARANCE AT SINK
5'-6" TURNING RADIUS
A101
SIM
A101
SIM
A101
SIM
A101
SIM
ABBRIVATIONS
LEVEL NAME W/ ELEVATION
GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA & OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET NUMBER
WALL SECTION NUMBER W/ SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
CEILING TAG WITH HEIGHT
DETAIL SECTION NUMBER W/ SHEET NUMBER
NORTH ARROW
A.D.
A.C.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL CEILING TILE
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
CMU
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
(E)
ADJUSTABLEADJ.
LP
LC
LF
Ø
ABOVE FINISH FLOORAFF
CONTRACTOR FURNISH/
OWNER INSTALL
C.F.O.I.
C.F.C.I. CONTRACTOR FURNISH/
CONTRACTOR INSTALL
E.C. ELECTRICAL CONTRACTOR
C.HK. COAT HOOK
C.B.B. CEMENTITIOUS BACKER
BOARD
A.C.M. ASBESTOS CONTAINING
MATERIALS
CW. CURTAINWALL
DWG(S). DRAWING(S)
FACE OF BUILDINGF.O.B.
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
TREATED WOOD
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.T.W.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
HC.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LAG BOLT
LAVATORY
LAMINATE
J.H.
JAN.
L.B.
LAV.
LAM.
LAB.
KIT.
JT.
JST.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
GALV. GALVANIZED
HOLLOW STRUC. STL.H.S.S.
FLUORESCENTFLOUR.
GENERAL CONTRACTORG.C.
E.W.C. ELECTRIC WATER CLOSET
FIRE VALVE CABINETF.V.C.
FOOD SERVICE EQUIPMENT
CONTRACTOR
F.S.E.C.
H.V.A.C. CONTRACTORH.C.
FIRE SUPPRESSION
CONTRACTOR
F.S.C.
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD
APPROVAL)
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
REFLECTED CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
ROUGH OPENING
ROUND HEAD WOOD
SCREW
RDWD.
R.H.W.S.
R.W.L.
R.O.
RM.
R.H.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
MAT.
LT.
L.P.
L.L.
L.H.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
(N) NEW
PLAN
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
PLUMBING CONTRACTORP.C.
MECHANICAL, ELECTRICAL,
PLUMBING
M.E.P.
FRAMED MIRRORMR.
ROBE HOOKR.HK.
MOP HOLDERMP.H.
MOUNTEDMTD.
PAINTEDPTD.
TONGUE AND GROOVE
DRAWINGS
SOUTH
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE WOOD DOOR
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
S.BLKG.
S.A.D.
S.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
SCWD
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&B.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
TYPICAL
UNLESS NOTED OTHERWISE
URINAL
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.N.O.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
T.S. TUBE STEEL
SELF ADHERED SHEET
MEMBRANE
S.A.S.M.
SELF ADHERED FLEXIBLE
FLASHING
S.A.F.F.
WITHINW/IN
UNDERSIDEU/S
SANITARY NAPKIN
DISPOSAL
S.N.D.
T.S.C.D. TOILET SEAT COVER
DISPENSER
SANITARY NAPKIN
DISPENSER
S.N.V.
TOP OF SEATT.O.S.
SOUND ATTENUATION
BATT
S.A.B.
Name
Elevation
Room name
150 SF
X' - X"
SYMBOLS
V.A. FURNISHED / CONTRACTOR
INSTALLED
(VC)
V.A. FURNISHED AND INSTALLED(VV)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic & HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:1
:1
GI003
WALL TYPES AND DETAILS
11/24/2025 PQ SPS
1. TYPICAL PARTITION TYPE IS WALL TYPE "1" UNLESS NOTED OTHERWISE ON PLAN.
2. BUILD PARTITIONS IN ACCORDANCE WITH PARTITION SCHEDULE AND DESIGN REFERENCED. REFERENCES ARE TO LATEST EDITION OF GYPSUM ASSOCIATION (GA) FIRE RESISTANCE DESIGN MANUAL, OR TO UNDERWRITERS LABORATORY
(UL) FIRE RESISTANCE DIRECTORY.
3. ALL WALLBOARD SHALL BE TYPE "X" UNLESS NOTED OTHERWISE.
4. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, MAINTAIN A FLUSH SURFACE ON THE SIDE WHERE
FACES ARE STRAIGHT AND CONTINUOUS, UNLESS NOTED OTHERWISE.
5. METAL STUD GAUGES SCHEDULED ARE THE MINIMUM REQUIRED, AND SHALL BE INCREASED BY SPECIFICATIONS TO ACCOMMODATE LOADS, FINISHES, OR UNBRACED CEILING HEIGHT LIMITS. DO NOT CONSIDER CEILING SYSTEM(S) AS A
PARTITION BRACING ELEMENT.
6. SOUND ATTENUATION BATTS (SAB) SHALL BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS NOTED
OTHERWISE.
7. WOOD AND PLYWOOD BLOCKING SHALL BE FIRE RETARDANT TREATED (FRT).
8. EDGES OF GYPSUM WALL BOARD (GWB) LEFT EXPOSED TO VIEW, OR ABUTTING DISSIMILAR MATERIAL, SHALL BE
FINISHED WITH METAL "L" BEAD TRIM AND COMPOUND UNLESS NOTED OTHERWISE.
9. PARTITION SCHEDULE IS BASED ON THE USE OF GYPSUM WALL BOARD (GWB), BUT FACING BOARD MAY VARY, DEPENDENT ON FINAL FINISH SCHEDULED FOR THAT PARTITION: USE CEMENTITIOUS BACKER BOARD (CBB) WHERE CERAMIC TILE SCHEDULED IN "WET" AREAS; USE MOISTURE RESISTANT BOARD (MR) WHERE CERAMIC TILE SCHEDULED IN "DRY" AREAS; USE GYPSUM LATH (BLUE BOARD) WHERE VENEER PLASTER IS SCHEDULED. SEE FINISH SCHEDULE AND SPECIFICATIONS FOR PARTICULARS. AT ALL PLUMBING FIXTURES INSTALL 4X8 (MR) MOISTURE RESISTANT BOARD
CENTERED ON FIXTURE.
10. ALL FIRE RATED WALL AND FLOOR PENETRATION SHALL COMPLY WITH ASTM-E814
11. ALL DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR PARTITION TO OUTSIDE FACE OF FRAME, UNLESS NOTED OR
DETAILED OTHERWISE.
12. ALL PARTITIONS, INCL. STUDS, BOARD, SOUND ATTENUATION BLANKETS. TO EXTEND FROM TOP OF FLOOR SLAB TO
UNDERSIDE OF CONCRETE SLAB ABOVE UNLESS OTHERWISE NOTED.
13. CONTRACTOR SHALL CLOSE OFF ANY VOIDS LEFT AS A RESULT OF ANY REMOVALS AND NEW CONSTRUCTION, AS WELL AS INFILL ANY EXISTING VOIDS IN NEWLY DESIGNATED FIRE RATED PARTITIONS. ALL PATCHES SHALL MATCH AND ALIGN
WITH SURROUNDING MATERIALS AND SHALL BE IN ACCORDANCE WITH NFPA CODE.
14. REFER TO NEW ARCHITECTURAL FLOOR PLANS FOR PARTITION TYPE DESIGNATIONS.
15. CONTRACTOR SHALL SEAL PARTITION WALLS AROUND ALL M.E.P. PENETRATIONS OR OPENINGS, RESULTING FROM M.E.P.
INSTALLATIONS INCLUDING BUT NOT LIMITED TO THE SLAB, ABOVE AND BELOW CEILINGS.
16. ALL NEW MASONRY WORK INCLUDING NEW PARTITIONS, INFILL AND PATCHING; MATCH EXISTING COURSING AND TOOTH
IN WITH EXISTING ADJ. CONSTRUCTION.
17. NO EXISTING FIREPROOFING IS TO BE REMOVED FROM EXISTING BUILDING STRUCTURE FOR ANY NEW INSTALLATION FOR
ANY REASON.
18. IN AREAS OF TOILET ROOMS AND OTHER PLUMBING FIXTURES SUCH AS MOP BASINS, SINKS, SHOWERS, TOILETS, ETC. A TYPE 'X' MOISTURE RESISTANT GYPSUM WALLBOARD SHALL BE USED FOR THE WALL CONSTRUCTION. WHERE CERAMIC
TILE IS SCHEDULED; CEMENTITIOUS BOARD SHALL BE USED FOR THE WALL CONSTRUCTION.
19. UNLESS NOTED, THE CONNECTION AT THE TOP OF THE PARTITION TO THE STRUCTURE ABOVE SHALL ALLOW FOR 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. AT FIRE RATED METAL STUD PARTITIONS, THE TOP CONNECTION SHALL BE A FIRE STOP CONNECTION THAT ALLOWS 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. HOLD GYPSUM WALL BOARD AND STEEL STUDS 1" FROM THE BOTTOM OF THE STRUCTURE ABOVE. DO NOT SCREW-ATTACH STEEL VERTICAL STUDS OR GYPSUM WALL BOARD TO THE TOP TRACK. INSTALL BRIDGING 12" MINIMUM FROM THE TOP OF
THE STUDS.
20. ALL INTERIOR PARTITIONS ARE SHALL CONSTRUCTED FROM FLOOR TO DECK, AND ALL PENETRATIONS SEALED. THIS INCLUDES SEALING ABOUT PIPE/DUCT/CONDUIT PENETRATIONS. THE METHOD OF SEALING THE PENETRATIONS SHALL BE
CONSISTENT WITH THE RATING OF THE WALL.
21. LABEL ALL RATED PARTITIONS (FIRE & SMOKE) ABOVE THE CEILING, ON BOTH SIDES OF THE WALL.
1. PROVIDE MINIMUM 0.0312" STUDS AT WALLS TO RECEIVE FINISH (TILE, STONE, WOOD, ETC.)
2. PROVIDE DOUBLE STUDS AT JAMBS OF DOOR AND FIXED GLASS FRAMES, AT OPEN PARTITION ENDS, AND WHERE PARTITION IS TO RECEIVE WALL MOUNTED SHELVES, CASEWORK, PLUMBING FIXTURES, ETC.
3. USE 5/8" FIRE RETARDANT GYPSUM WALL BOARD AT ALL FIRE-RATED PARTITIONS, ANCHOR WITH SCREWS AT 8" OC ON
EDGES AT 12" OC IN FIELD PER UL DESIGN NUMBERS LISTED.
4. SEE ALL SPECIFICATIONS FOR GWB REQUIREMENTS AT TOILETS AND ALL WET AREAS.
5. FOR LOCATIONS OF EXISTING AND NEW FIRE-RATED PARTITIONS, SEE LIFE SAFETY PLANS.
6. PROVIDE ADDITIONAL BRACING AS REQUIRED AT ALL WALL STUD INSTALLATIONS EXCEEDING STUD MANUFACTURER
REQUIREMENTS FOR MAXIMUM ALLOWED HEIGHT AND DEFLECTION.
7. REFERENCE STEEL STUD MANUFACTURER ASSOCIATION'S STANDARDS FOR SECTION PROPERTIES AND DESIGN OF STUD SIZE
LISTED HERE
GENERAL PARTITION NOTES
WALL TYPES
1/2" = 1'-0"
TYP. RESTROOM FIXTURES AND ACCESSORIES
1/2" = 1'-0"
TYP. ACCESSIBLE TOILET CLEARANCES
1/2" = 1'-0"
TYP. ACCESSIBLE LAVATORY CLEARANCES
1/4" = 1'-0"
TYP. RESTROOM FLOOR CLEARANCES
STUD GUAGE NOTES
UP DNUP
DN
UP
DN
UP
UP
DN
DN
UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DNUP
DN
UP
UPDN
DN
A/C ShaftA/C Shaft
A/C Shaft
A400 A401
A401A A401B
A402A
A403 A404
A405
A406
A407
A408
A409
A410
A411A412
A413
A414
A415
A416
A417
A418
A418A
A420A421
A422A423 A424
A425
A425A
A427
S*4*2
A424A
A430 A431 A436
A437 A439
A440
A441
A442
S*4*1
A444
A445 A446A446A
A445A A449
A449A
S*4*5
A453 A454
A455
A456 A457A
A457B A457C A457D
A457E A457F
A457G
A458A458AA458BA458C
A459A460
A461
A462
A463
A464
A465
A466
A467
A468A469
A470
A471
A472
A473
A474
A475
A476 A477
A478
A457
A457H
A474A
A402B
A435
A436A
A436B
A437C
A444A
A464A A473A
A465A A471A
A467A A470A
C*4*2
A424EA424D
A424C
A424B A423A A422A
A406A
A424F A424G
A442A
B411B
A424H
A416A
A414A
A413A A410A
A408A
A407A
A463A
A439A
B403A
B439
B420
B420B
B421 B425
B425A
B426A
B426
B427
B428
B429
B430
B431
B433
B433A
B435 B436B437B438 B437A
B429A
B429B
S*4*4
B414C
S*4*3
B416
B417
B403B
B403
B406B407
EXISTING INFUSION LOCATION
NEW INFUSION AND OFFICES LOCATION
SEE SHEET AE101 FOR NEW WORK PLAN
A424
B414DB414B
B414A B414
B
A
B
B
B412A
B412
B411
B415 B415A
B412B
B412C
B408
B412AA
ARCHITECTURAL SCOPE IN DIAGONAL HATCHED
AREA IS IN FACILITATION OF HVAC AND PLUMBING
WORK. REFER TO MECH DRAWINGS FOR FULL
EXTENT OF SCOPE.
A/C Shaft A/C Shaft
A/C Shaft
B411B
B311A B311B B311C B311D B311E B311F B311G B311H
B311
S*3*4 C*3*5
B309 B308 B308A B307
B306
B305A
B305B B305C
B305D
B311I B312A
B312
S*3*3
B311M
B310
B312B
PLUMBING DEMOLITION AND
NEW WORK ABOVE CEILING. SEE
PLUMBING DRAWINGS.
STRUCTURAL SLAB INFILL IN
MECHANICAL ROOM FLOOR.
SEE STRUCTURAL DRAWINGS
ACCESS FROM STAIRS OR
ACROSS ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic &
HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:1
:2
GI004
OVERALL FLOOR PLANS
11/24/2025 PQ SPS
1/32" = 1'-0"
OVERALL FOURTH FLOOR PLAN
Revisions: Date:
BID DOCUMENTS 11/24/2025
1/32" = 1'-0"
THIRD FLOOR PLAN
1/32" = 1'-0"
OVERALL FIFTH FLOOR PLAN
L
5 5
6 6
7 7
8a 8a
11 11
12 12
13 13
16a
17a
19a
K J
Lb.2 Kb Jb
Jb
NbPbQbRbSb
Mb Lb
10a 10a
2 22
RESTROOM
B412B
EXAM
B413A
OFFICE
B413B
HAZARDOUS
COMPOUNDING
B414B
ANTE ROOM
B414C
NON-HAZARDOUS
COMPOUNDING
B414D
HAZARDOUS
STORAGE
B414A
WORK STATION
AREA
B414
LAB PROCEDURE
ROOM
B411
TISSUE CULTURE
B412B
OFFICE
B412C
HALLWAY
B412AA
AUTO-CLAVE /
DISHWASHER
B408
MEN'S RESTROOM
B407
WOMEN'S RESTROOM
B406
REGULAR E.E.G.
B403B
E.E.G. CONTROL AND
OBSERVATION
B403
COLD ROOM
B415A
OFFICE
B415
STAIR 3
S*4*3
INFUSION ROOM
B412
STAFF PHYSICIAN
B403A
IRM Network
Operation Center
A437
Comp. Programmer
Off.
A439
CHIEF IRM
B439
INFORMATION
SECURITY
B438
Computer Off.
A440
Chief Rm.
A441
Res. Off.
A442
Neuro. Res.
A442A
CORRIDOR
C*4*1
CORRIDOR
C*4*2
Reception
A400
KEY PLAN - 4TH FLOOR
N
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
Any materials and equipment being brought into the facility must be free of contaminants and loose material.
All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust
Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system.
5. Seal doors to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document. These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a distance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’
PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
DURING CONSTRUCTION AFTER CONSTRUCTION
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Water systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminants from the work area.
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.
Water systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
L E
V E
L I
L E
V E
L I
I L
E V
E L
I
II
L E
V E
L I
V
ICRA REQUIREMENTS
OFFICE
B311A
OFFICE
B311B
OFFICE
B311C
ASST CH
B311D
ASST CH
B311E
ADMIN OFFICE
B311F
WORD PROC
B311G
OFFICE
B311H
ADMIN OFFICE
B311
STORAGE
B310B
STORAGE
B310A
STAIR 4
S*3*4
CORRIDOR
C*3*5
N U
R S
E E
D U
C A
T O
R
B
CLASSROOM
B308
STORAGE
B308A
ANTE ROOM/CLEAN
EXIT
B307
STOR.
B311M
15 15
16a 16a
16.5 16.5
17a 17a
18 18
19a 19a
Pb
Pb
Qb
Qb
Rb
Rb
Sb
Sb
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic & HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:0
:4
GI005
ICRA PLAN
11/24/2025 PQ SPS
ICRA CLASSIFICATION
A. THIRD FLOOR - ICRA LEVEL III
B. FOURTH FLOOR - ICRA LEVEL IV
C. FIFTH FLOOR - ICRA LEVEL III
3/32" = 1'-0"
FOURTH FLOOR - ICRA PLAN
DRAWING NOTES:
1 SEAL DOOR ACCORDING TO FACILITY ICRA REQUIREMENTS IF NECESSARY FOR
CONSTRUCTION SCOPE IN ROOM. COORDINATE ROOM OCCUPATION WITH VA COR.
2 AVOID ANY WORK IN IMPACTING THESE SPACES - COORDINATE WITH VA WORK
SHOWN ADJACENT WITH VA TO MINIMIZE IMPACT AND ADJUST SCOPE AS
REQUIRED.
3 ICRA CONSTRUCTION BARRIER. SEE REQUIREMENTS ACCORDING TO ICRA CLASS.
SHOWN AS SUGGESTED LOCATION. LINE OF CONSTRUCTION BOUNDARY WILL
FLUCTUATE DUE TO ACCESS CONSTRAINTS AND SCOPE OF FLOORING AND CEILING
TIE IN TO EXISTING. TEMPORARILY MODIFY CORRIDOR HANDRAILS IN
COORDINATION WITH ICRA VESTIBUILE.
4 COORDINATE, REMOVE, ALTER WALL MOUNTED HANDRAILS AS NECESSARY FOR
CONSTRUCTION, ICRA BARRIER, AND RE-INSTALLATION IN CORRIDOR AT
COMPLETION OF PROJECT IN AREAS WHERE IT IS FEASIBLE.
5 MED-GAS WORK IN CEILING. ICRA LEVEL III. WORK PERFORMED OUTSIDE OF
BUSINESS HOURS.
6 PLUMBING WORK IN CEILING. ICRA LEVEL III. WORK PERFORMED OUTSIDE OF
BUSINESS HOURS.
7 DURING VA BUSINESS HOURS, STAIR IS PRIMARY MEANS OF ACCESSING PROJECT
LOCATION. COORDINATE OTHER MEANS IF NECESSARY WITH VA COR.
8 STRUCTURAL FRAMING AND CONCRETE OVER FOURTH FLOOR PROJECT AREA.
COORDINATE ACCESS WITH VA COR.
9 STRUCTURAL FRAMING AND CONCRETE OVER TISSUE CULTURE B412B.
COORDINATE ACCESS AND INFECTION CONTROL MEASURES WITH VA COR.
Revisions: Date:
BID DOCUMENTS 11/24/2025
3/32" = 1'-0"
THIRD FLOOR ICRA PLAN
3/32" = 1'-0"
FIFTH FLOOR ICRA PLAN
SITE ACCESS NOTES
A. WORK OUTSIDE OF THE FOURTH AND FIFTH FLOOR DESIGNATED PROJECT AREA SHOULD BE
COMPLETED OUTSIDE OF VA BUISINESS HOURS.
B. ACCESS TO FOURTH AND FIFTH FLOOR PROJECT AREAS IS LIMITED TO THE ADJACENT NORTH STAIR
DURING VA BUSINESS HOURS. COORDINATE OTHER ACCESS NEEDS WITH VA COR.
C. MAINTAIN ACCESS TO MENS AND WOMENS BATHROOM DURING ALL PHASES OF CONSTRUCTION .
D. CONTRACTOR SHALL MAINTAIN A CONSTRUCTION BARRIER ACCORDING TO ICRA REQUIREMENTS.
E. ACCESS TO PHARMACY SHALL BE UNOBSTRUCTED AT ALL TIMES - NO WORK IN PHARMACY. DURING NEW WORK IN THE CORRIDOR THAT CONNECTS TO THE PHARMACY - CONTRACTOR TO COORDINATE WITH VA
ON TEMPORARY SHUTDOWN AND HOURS OF SHUTDOWN.
16a
17a
19a
PbQb
19' - 6"
SF101
EXISTING DUCT, PIPE
AND CONDUIT TO
REMAIN
SF101
6X6-W1.4XW1.4 WWF
W/ 4" CONCRETE
.6C, CSV CONFORM
NON-COMPOSITE DECK
(ASTM A653)
/2
EXISTING SLAB
1/2" EPOXY ANCHOR
W/ 2-3/4" EMBED. @ 12" O.C.
(MIN. 2 ANCHORS EACH SIDE)
SEE PLAN
L4X3 (LLV)
/2
EXISTING CURB
17a
CONNECT TO SLAB W/ 1/2" EPOXY
ANCHORS W/ 2-3/4" EMBED. @ 12" O.C.
(TYP. @ PERIMETER)
OPENING TO REMAIN
2' - 0"
/2
/2
CURB TO REMAIN
L4X3X1/4 (LLV)
(TYP.)
OPENING TO REMAIN
3/16
TYP. @ OPEN
ENDS
SF101
TYP.
METAL DECK
CONNECT TO SLAB W/ 1/2" EPOXY
ANCHORS W/ 2-3/4" EMBED. @ 12" O.C.
(TYP. @ PERIMETER)
L4X3X1/2 LLV (TYP)
INFILL OPENING - REFER TO DETAIL 2
(TYP. 3 PLACES)
16a
Pb
(E) 4-1/2" CONCRETE.
L4X3X1/4 LLV - 4 PER OPENING
(TYP. EACH OPENING)
INFILL OPENING
REFER TO DETAIL 23
1' - 5"
EXISTING CONCRETE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic & HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:4
:5
SF101
STRUCTURAL FRAMING AND DETAILS
11/24/2025 KS CL
1/4" = 1'-0"
STRUCTURAL FRAMING PLAN - FIFTH FLOOR
A. ALL STEEL TO BE ASTM A36 UNLESS NOTED OTHERWISE.
B. STEEL DECKING TO BE ASTM A653.
C. CONCRETE STRENGTH = 4000 PSI
D. VERIFY ALL DIMENSIONS IN THE FIELD.
E. COORDINATE OPENING SIZES WITH MECHANICAL.
G E N E R A L N O T E S
3/4" = 1'-0"
SLAB INFILL DETAIL
1/2" = 1'-0"
ENLARGED PLAN
1/2" = 1'-0"
ENLARGED PLAN
16a
17a
19a
Lb.2 KbNbPbQbRbSb
Mb Lb
EXISTING
ELECTROPHORESIS CORE
B413A
EXISTING
RAM LAB
B412A
EXISTING RAM LAB
B414B
EXISTING W. LAB
B412
EXISTING
OFFICE
B412C
EXISTING TISSUE
CULTURE
B412B
EXISTING INFECTIOUS
DISEASE LAB
B414
EXISTING ANTE
ROOM
B414C
EXISTING LAB
PROCEDURE ROOM
B411
EXISTING
ELEC
B410 EXISTING HAC
B409
EXISTING AUTO-
CLAVE /
DISHWASHER
B408
EXISTING
MEN'S RR
B407
EXISTING
WOMEN'S RR
B406
EXISTING
OFFICE
B415
EXISTING
COLD ROOM
B415A
STAIR 3
S*4*3
EXISITING
REGULAR E.E.G.
B403B
EXISITING E.E.G.
CONTROL AND
OBSERVATION
B403
EXISTING SIG.
CLOSET
B416
EXISTING ELEC
B417
CORRIDOR
C*4*1
165 SF
STAIR 4
S*4*4
6 6
1 1
10 10
EXISTING FIRE
EXTINGUISHER CLOSET
EXISTING HAZARDOUS
COMPOUNDING
B414B
EXISTING HAZARDOUS
STORAGE
B414A
EXISTING WORK
STATION AREA
B414
EXISTING NON-HAZARDOUS
COMPOUNDING
B414D
14 14 14
6' - 2"
KEY PLAN - 4TH FLOOR
N
GENERAL DEMOLITION NOTES
A. REFER TO SHEET GI000 FOR GENERAL NOTES.
B. UNLESS NOTED OTHERWISE, DRAWINGS AND NOTES REFER TO ARCHITECTURAL DEMOLITION.
DEMOLITION CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION INFRASTRUCTURE TO BE REMOVED/ MODIFIED. SEE MEP DRAWINGS
FOR REMOVAL WORK ASSOCIATED WITH THOSE TRADES.
C. ALL EXISTING STRUCTURAL ELEMENTS AND WALLS ARE TO REMAIN.
D. FOR ALL REMOVALS, THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.
E. ALL ITEMS INDICATED AS DASHED SHALL BE REMOVED. THIS INCLUDES ALL FINISHES, MATERIALS, AND
ASSOCIATED FIXTURES NOT SPECIFICALLY CALLED OUT.
F. HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION AND SHALL BE PROTECTED & REMAIN.
G. SHADED AREAS IN GREY ARE OUT OF SCOPE.
H. PREPARE WALLS AND FLOOR SLAB AS REQUIRED TO RECEIVE NEW FINISH MATERIALS WHERE
EXISTING FINISH IS INDICATED TO BE REMOVED.
I. OWNER TO REMOVE EQUIPMENT PRIOR TO START OF CONSTRUCTION IN EACH PHASE.
SEE KEYNOTE FOR SCOPE CLARIFICATION
LEGEND
EXISTING 2 HOUR FIRE BARRIER
EXISTING 2 HOUR FIRE WALL
EXISTING WALL TO REMAIN
EXISTING 30 MINUTE SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic &
HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:0
:2
AD101
DEMOLITION PLAN
11/24/2025 PQ SPS
1/4" = 1'-0"
FOURTH FLOOR - DEMOLITION
DRAWING NOTES:
1 REMOVE EXISTING LAB CASEWORK AND ALL PLUMBING AND ELECTRICAL APPURTENANCES - SEE PLUMBING AND
ELECTRICAL DRAWINGS.
2 REMOVE EXISTING PLUMBING FIXTURE - SEE PLUMBING DRAWINGS.
3 REMOVE EXISTING FUME HOOD - SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS.
4 REMOVE EXISTING PAPER TOWEL DISPENSER.
5 REMOVE EXISTING BLACKBOARD.
6 REMOVE EXISTING ELECTRICAL PLUG MOULDING - SEE ELECTRICAL DRAWINGS.
7 REMOVE EXISTING SHELVES, STANDARDS, AND BRACKETS.
8 REMOVE EXISTING REFRIGERATOR.
9 REMOVE EXISTING VARIABLE SPEED LABORATORY MOTOR.
10 ARCHITECTURAL SCOPE IN THIS ROOM IS IN COORDINATION WITH MECHANICAL, ELECTRICAL, AND PLUMBING SCOPE.
THIS INCLUDES BUT IS NOT LIMITED TO REMOVAL OF DUCT, PIPE, AND CONDUIT. EXISTING CEILING TO REMAIN.
COORDINATE WORK HOURS WITH VA COR.
11 REMOVE EXISTING TACK BOARD.
12 REMOVE EXISTING METAL RACK SHELVING.
13 REMOVE EXISTING WALL MOUNTED CHEMICAL SPILL KIT, AND TURN OVER TO VA.
DRAWING NOTES:
14 AVOID ANY WORK IN IMPACTING THESE SPACES - COORDINATE WITH VA WORK SHOWN ADJACENT WITH VA TO MINIMIZE
IMPACT AND ADJUST SCOPE AS REQUIRED.
15 NO WORK IN THIS AREA.
16 REMOVE EXISTING MASONRY WALL.
17 REMOVE EXISTING FRAME
18 REMOVE EXISTING DOOR AND FRAME.
19 REMOVE EXISTING VCT FLOORING, RUBBER BASE AND ACOUSTICAL TILE CEILING IN THIS ROOM.
20 COORDINATE ABATEMENT OF AREA WITHIN WALL CAVITY PRIOR TO ENCLOSE OF NEW WALL
21 REMOVE EXISTING VCT FLOORING, RUBBER BASE AND ACOUSTICAL TILE CEILING IN THIS AREA IN COORDINATION WITH
LINE OF NEW SUITE DOOR.
22 ICRA CONSTRUCTION BARRIER. SEE REQUIREMENTS ACCORDING TO ICRA CLASS. SHOWN AS SUGGESTED LOCATION.
LINE OF CONSTRUCTION BOUNDARY WILL FLUCTUATE DUE TO ACCESS CONSTRAINTS AND SCOPE OF FLOORING AND
CEILING TIE IN TO EXISTING. TEMPORARILY MODIFY CORRIDOR HANDRAILS IN COORDINATION WITH ICRA VESTIBUILE.
23 COORDINATE, REMOVE, ALTER WALL MOUNTED HANDRAILS AS NECESSARY FOR CONSTRUCTION, ICRA BARRIER, AND
RE-INSTALLATION IN CORRIDOR AT COMPLETION OF PROJECT IN AREAS WHERE IT IS FEASIBLE.
24 EXISTING FLOOR IN THIS AREA TO REMAIN. PROTECT DURING CONSTRUCTION. COORDINATE REMOVAL OF EXISTING
BASE AT MATERIAL END LOCATIONS WITH NEW WORK CORRIDOR BASE INSTALLATION.
25 REMOVE GYPSUM BOARD SHEATHING FROM INTERIOR OF STUD PARTITION AND PREPARE FRAMING AND CAVITY FOR
NEW INSULATION AND SHEATHING IN NEW WORK.
16a
17a
19a
Lb.2 KbNbPbQbRbSb
Mb Lb
72 SF
ANTE ROOM
B414C
118 SF
WOMEN'S
RESTROOM
B406
125 SF
MEN'S RESTROOM
B407
22 SF
ELEC
B410
165 SF
STAIR 4
S*4*4
171 SF
STAIR 3
S*4*3
33 SF
SIG CLOSET
B416
10 SF
ELEC
B417
2,082 SF
CORRIDOR
C*4*1
133 SF
REGULAR E.E.G.
B403B
204 SF
E.E.G. CONTROL
AND OBSERVATION
B403
OFFICE
B413B
37' - 5 1/2" +/-
EXAM
B413A
121 SF
HAZARDOUS
COMPOUNDING
B414B
70 SF
NON-HAZARDOUS
COMPOUNDING
B414D
212 SF
WORK STATION
AREA
B414
73 SF
HAZARDOUS
STORAGE
B414A
OFFICE
B412C
B412A
B B
B412B
19 SF
HAC
B412A
71 SF
RESTROOM
B412B
INFUSION ROOM
B412
B412C
B D
8' - 6" 8' - 8" 8' - 9"29' - 11 3/4" +/-
INFUSION
BAY 10
AE601
AE601
AE601 4AE601
AE601
AE601
12' - 4"
INFUSION
BAY 9
INFUSION
BAY 8
INFUSION
BAY 7
INFUSION
BAY 6
INFUSION
BAY 5
INFUSION
BAY 4
INFUSION
BAY 3
INFUSION
BAY 2
INFUSION
BAY 1
AE701
8' - 3"
2 2
B A
9 1/2"
/2
2' - 6"
E Q
E Q
3' - 8"
3 1
17' - 3" +/-
17' - 7 1/2" +/-
/2
2' - 2 1/2"
/2
2' - 4" 10' - 0"
7' - 0"
143 SF
TISSUE CULTURE
B412B
415 SF
LAB PROCEDURE
ROOM
B411
126 SF
OFFICE
B415
242 SF
COLD ROOM
B415A
146 SF
AUTO-CLAVE /
DISHWASHER
B408
28 SF
HAC
B409
TYP
B412BB
5 55
A
A
KEY PLAN - 4TH FLOOR
N
GENERAL NOTES
A. CENTER DOWNLIGHT FIXTURE WITHIN CEILING
TILE (TYPICAL THROUGHOUT)
B. ALL LAY-IN CEILING GRID SHALL BE EQUAL
FROM OPPOSING EDGES OF ROOM UNLESS
OTHERWISE NOTED. AVOID CUT SIZES
SMALLER THAN 3".
C. CENTER SPRINKLER HEADS WITHIN CEILING
TILES. COORDINATE WITH OTHER CEILING
MOUNTED ACCESSORIES.
OUT OF SCOPE
LEGEND
NEW WALL
A AUTO DOOR OPENER
EXISTING 30 MINUTE SMOKE PARTITION
EXISTING 1 HOUR FIRE WALL
EXISTING 2 HOUR FIRE WALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS CINCINNATI
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Relocate Infusion Clinic &
HEMO Offices to 4E
3200 VINE STREET, CINCINNATI, OH
539-21-207
FULLY SPRINKLED
A u to d e s k D o c s /C in c in n a ti V
A
R e lo c a te I n fu s io n C lin ic
/F F
E
C in c in n a ti
R e lo c a te I n fu s io n C lin ic
B rv t
/2
/2
:0
:3
AE101
FOURTH FLOOR NEW WORK PLAN
11/24/2025 PQ SPS
1/4" = 1'-0"
FOURTH FLOOR - NEW WORK
DRAWING NOTES:
1 FIELD LOCATE EXISTING PIPING AND DUCTWORK. EXTENT OF PROPOSED WALL WRAPS AROUND EXISTING PLUMBING
AND MECHANICAL.
2 COORDINATE ABATEMENT OF AREA WITHIN WALL CAVITY PRIOR TO ENCLOSE OF NEW WALL
3 SEMI-RECESSED FIRE EXTINGUISHER CABINET.
4 ALIGN
5 APPLY INSULATION AND SHEATHING IN ACCORDANCE WITH WALL TYPE 2.
A
A
A
A
ANTE ROOM
B414C
WOMEN'S
RESTROOM
B406
MEN'S RESTROOM
B407
ELEC
B410
STAIR 4
S*4*4
STAIR 3
S*4*3
SIG CLOSET
B416
ELEC
B417
CORRIDOR
C*4*1
REGULAR E.E.G.
B403B
E.E.G. CONTROL
AND OBSERVATION
B403
OFFICE
B413B
EXAM
B413A
OFFICE
B412C
RESTROOM
B412B
INFUSION ROOM
B412
WORK STATION
AREA
B414
HAZARDOUS
STORAGE
B414A
HAZARDOUS
COMPOUNDING
B414B
NON-HAZARDOUS
COMPOUNDING
B414D
HAC
B412A
T-5
T-4
T-3
T-2
T-1
1 3
8 8
21 20
T-5
T-6
T-6 T-4
T-4
T-5
T-4
T-5
T-7
OFFICE
B415
COLD ROOM
B415A
AUTO-CLAVE /
DISHWASHER
B408
LAB PROCEDURE
ROOM
B411
HAC
B409
TISSUE CULTURE
B412B
4 4 4 4
T-5
T-7 T-4
KEY PLAN - 4TH FLOOR
N
VV - VA FURNISHED, VA INSTALLED
VC - VA FURNISHED, CONTRACTOR INSTALLED.
CC - CONTRACTOR FURNISHED AND INSTALLED (TYP. UNLESS NOTED OTHERWISE)
GENERAL NOTES
A. CENTER DOWNLIGHT FIXTURE WITHIN CEILING
TILE (TYPICAL THROUGHOUT)
B. ALL LAY-IN CEILING GRID SHALL BE EQUAL
FROM OPPOSING EDGES OF ROOM UNLESS
OTHERWISE NOTED. AVOID CUT SIZES
SMALLER THAN 3".
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .