This is a Statement of Work (SOW) and Specification document for dockside repairs to the USCGC NORTHLAND (WMEC-904/270A), a 270-foot medium endurance cutter, during FY2027. The specification covers 32 work items to be performed during a dockside availability scheduled from 19 April 2027 through 13 June 2027, with a performance location at NAVSTA Everett (a Coast Guard facility).

The work items encompass comprehensive tank cleaning and inspection (aviation fuel, diesel fuel, potable water, ballast, and waste tanks), structural cleaning of chain lockers and accessible voids, preservation and partial preservation of various tanks, mechanical overhauls and replacements (anchor windlass, warping capstan, propulsion shafting alignment checks, commissary hoist), electrical work (400 Hz circuit breaker inspection and testing, engine room fan controller renewal), ventilation duct cleaning (engine room, galley, laundry), and structural repairs including potable water piping renewal, bulkhead plating renewal, watertight door renewal, and auxiliary saltwater pump replacement. Government-furnished property includes two Anchor Windlass Assemblies (Port and Starboard, A-Class, valued at $222,000 each), Intech Marine Services Custom Engine Room Fan Controllers (2 units at $6,755 each), and Auxiliary Saltwater Pumps (2 Durco MK3 units at $42,000 each), among other specified components. The contractor must comply with all Surface Forces Logistics Center (SFLC) Standard Specifications for general requirements, welding and allied processes, preservation of ship structures, and environmental protection requirements specific to Coast Guard facilities. Critical inspection items must be completed within the first 25 percent of the availability contract period, with all other condition reports due within 40 percent of the period.

View the file

Other files

File Type Posted
A0001.pdf PDF
STATEMENT OF WORK.pdf PDF
70Z08026QMECP0027.pdf PDF
Attachment I - Schedule of Services - Blank Price Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC NORTHLAND (WMEC 904)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2027

Developed By: Gregory A Stanczuk

(Rev-0, 05 May 2026)

USCGC NORTHLAND (WMEC-270A) DOCKSIDE AVAILABILITY FY2027

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Tanks (Aviation Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 2: Chain Lockers, Clean and Inspect WORK ITEM 3: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect WORK ITEM 4: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 5: Tanks, Potable Water, Clean and Inspect WORK ITEM 6: Tanks, Ballast, Clean and Inspect WORK ITEM 7: Voids, Accessible, Clean and Inspect WORK ITEM 8: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 9: Propulsion Shafting, Strain Gauge Alignment, Dockside, Check WORK ITEM 10: Circuit Breakers (400 HZ), Inspect and Test WORK ITEM 11: Vent Ducts, Engine Room, Commercial Cleaning WORK ITEM 12: Vent Ducts, Galley, Commercial Cleaning WORK ITEM 13: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 14: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 15: Commissary Hoist, Inspect and Service WORK ITEM 16: Anchor Chains and Ground Tackle, Inspect and Repair WORK ITEM 17: Anchor Windlass, Overhaul (OPTIONAL) WORK ITEM 18: Towing Bitts, Chocks, and Fairleads; Inspect and Test WORK ITEM 19: Warping Capstan, Overhaul WORK ITEM 20: Tanks, Aviation Fuel Storage, Preserve, Partial (OPTIONAL) WORK ITEM 21: Tanks, Ballast, Preserve, Partial (OPTIONAL) WORK ITEM 22: Chain Lockers, Preserve, Partial (OPTIONAL) WORK ITEM 23: Tanks, Dirty Oil and Waste, Preserve, Partial (OPTIONAL) WORK ITEM 24: Tanks, Potable Water, Preserve, Partial (OPTIONAL) WORK ITEM 25: Anchor Windlass, Replace WORK ITEM 26: Engine Room Fan Controllers, Renew WORK ITEM 27: Head & Shower, Renew WORK ITEM 28: Potable Water System Piping, Renew WORK ITEM 29: Structural Bulkhead Plating, 3/16 in Steel Plate, Renew WORK ITEM 30: Watertight Doors and Scuttles, Internal, DC Deck and Below, Renew WORK ITEM 31: Shaft Seal Seawater Cooling System Configuration, Restore WORK ITEM 32: Auxiliary Saltwater Pumps, Replace iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 113-001, Rev E, Tank Top PL & FR Fwd FR 101

Coast Guard Drawing 901 WMEC 113-002, Rev A, Tank Top PL & FR Aft 182

Coast Guard Drawing 901 WMEC 113-003, Rev G, Tank Top Pl & Fr, Fr 101-182

Coast Guard Drawing 901 WMEC 116-001, Rev D, CVK Fwd 101 & G Long 2

Coast Guard Drawing 901 WMEC 116-002, Rev E, CVK Aft 182

Coast Guard Drawing 901 WMEC 116-003, Rev E, CVKFr 101-182 & G Long. 2&4

Coast Guard Drawing 901 WMEC 121-001, Rev D, Long Tank Bhds, Aft 182

Coast Guard Drawing 901 WMEC 122-001, Rev H, Transv Bhds 12 & 26

Coast Guard Drawing 901 WMEC 122-002, Rev G, Transv Bhds 47, 78 & 82

Coast Guard Drawing 901 WMEC 122-003, Rev G, Transv Bhds 103, 117

Coast Guard Drawing 901 WMEC 122-004, Rev F, Transv. Bhds. 165, 169, 151.6

Coast Guard Drawing 901 WMEC 122-005, Rev F, Transv Bhds 186 & 190

Coast Guard Drawing 901 WMEC 122-006, Rev F, Transv Bhds 196, 207, 228 & 242

Coast Guard Drawing 901 WMEC 123-001, Rev C, Dumbwaiter TRK & FDN FR 165

Coast Guard Drawing 901 WMEC 123-002, Rev D, Chain Lkr Bhds & Details

Coast Guard Drawing 901 WMEC 123-007, Rev C, Tank (4-169-1-W) Modification Incidental to OWS

Installation

Coast Guard Drawing 901 WMEC 136-001, Rev N, 01 Level Pl & Fr Fwd 101

Coast Guard Drawing 901-WMEC 167-001,Rev AA, List of Structural Closures

Coast Guard Drawing 901 WMEC 185-003, Rev C, Capstan Foundation

Coast Guard Drawing 901 WMEC 185-004, Rev E, Anchor Windlass Fdn

Coast Guard Drawing 901 WMEC 185-015, Rev J, Aux Mchry Space No2 Fnds

Coast Guard Drawing 901 WMEC 185-025, Rev -, Anchor Windlass Foundation & Structural Mods

Coast Guard Drawing 901 WMEC 233-005, Rev Z, Piping Schematic (Fuel Oil System)

Coast Guard Drawing 901 WMEC 243-001, Rev L, Shafting Arrangement

Coast Guard Drawing 901 WMEC 243-005, Rev D, Sftg Align Anal and Procs

Coast Guard Drawing 901 WMEC 256-002, Rev U, Mn and Aux SW Cooling Sys A&D

Coast Guard Drawing 901 WMEC 256-004, Rev A, Aux. Salt Water Mods.

Coast Guard Drawing 901 WMEC 256-005, Rev B, Cooling Water Piping Mods Incidental to Stern Tube v (Rev-0)

Coast Guard Drawing 901 WMEC 256-012, Rev -, Shaft Seal Vent Line Modification

Coast Guard Drawing 901 WMEC 256-013, Rev C, Mn and Aux SW Cooling Sys Diag

Coast Guard Drawing 901 WMEC 262-001, Rev K, Lube Oil Sys Diag

Coast Guard Drawing 901 WMEC 302-008, Rev A, 270 WMEC S&A Anchor Windlass Controls, Wiring

Diagram

Coast Guard Drawing 901 WMEC 314-002, Rev G, 400 Hz MG Wiring Diagram

Coast Guard Drawing 901 WMEC 314-003, Rev L, 400 Hz MG Schematic Diagram

Coast Guard Drawing 901 WMEC 320-002, Rev T, Power System Feeders IWD

Coast Guard Drawing 901 WMEC 320-003, Rev U, Power System Hold

Coast Guard Drawing 901 WMEC 320-011, Rev N, 400 Hz Distr IWD

Coast Guard Drawing 901 WMEC 320-013, Rev C, Anchor Windlass Elec Arr & Wiring Det “A” Class

MEP.

Coast Guard Drawing 901 WMEC 320-031, Rev B, 400 Hz Distr IWD

Coast Guard Drawing 901 WMEC 320-035, Rev AV, As-Built Electrical One-Line Diagram

Coast Guard Drawing 901 WMEC 320-075, Rev B, Electrical One-Line Diagram (WMEC 901 Only)

Coast Guard Drawing 901 WMEC 324-008, Rev J, 400Hz Switchboard Arrangement and Details

Coast Guard Drawing 901 WMEC 324-009, Rev G, 400Hz Swbd EWD

Coast Guard Drawing 901 WMEC 512-001, Rev H, Vent, Hld & 1st Platf Fwd 47 A&D

Coast Guard Drawing 901 WMEC 512-002, Rev J, Vent, Hld Aft 169 A&D

Coast Guard Drawing 901 WMEC 512-003, Rev J, Vent 1st Platf Aft 207, A&D

Coast Guard Drawing 901 WMEC 512-005, Rev M, Vent, Mn Dk Fwd 47 A&D

Coast Guard Drawing 901 WMEC 512-008, Rev L, Vent Mn Dk Aft 186 A&D

Coast Guard Drawing 901 WMEC 512-009, Rev E, Vent 01 Lvl & Above Fr 103-140 A&D

Coast Guard Drawing 901 WMEC 512-015, Rev D, Magazine Vent’l ReCirc System

Coast Guard Drawing 901 WMEC 512-016, Rev B, Magazine Vent’l Purge System

Coast Guard Drawing 901 WMEC 512-018, Rev -, Anchor Windlass & Bosun Workshop Vent Mods

Coast Guard Drawing 901 WMEC 512-019, Rev -, Ventilation Mods to Refridgerated & Dry Stores

Coast Guard Drawing 901 WMEC 512-021, Rev -, HVAC Mods to Systems Serving the 76MM Gun, Mag, & Control Booth

Coast Guard Drawing 901 WMEC 512-022, Rev -, Ventilation Modifications Incdt Talon Helo Grid Instl

Coast Guard Drawing 901 WMEC 512-023, Rev H, Vent Mods to Steering Gear Room 3-228-0-E

Coast Guard Drawing 901 WMEC 513-005, Rev F, Vent, ER & ECC – Plan, Sect & Elev A & D

Coast Guard Drawing 901 WMEC 514-001, Rev L, HVAC Sys Diag

Coast Guard Drawing 901 WMEC 514-004, Rev J, HVAC 1st Platf Fr 47-82 A&D

Coast Guard Drawing 901 WMEC 514-005, Rev J, HVAC Fan Room Mn Dk A&D

Coast Guard Drawing 901 WMEC 514-006, Rev H, HVAC Fan Rm 02 Lvl – A&D

Coast Guard Drawing 901 WMEC 514-007, Rev G, HVAC Hold Dk, Fr 47-48 A&D

Coast Guard Drawing 901 WMEC 514-008, Rev K, HVAC 1st Platf, Fr 165-186 A&D

Coast Guard Drawing 901 WMEC 514-009, Rev G, HVAC 1st Platf, Fr 186-207 A&D

Coast Guard Drawing 901 WMEC 514-010, Rev H, HVAC Mn Dk Fr 47-82 A&D

Coast Guard Drawing 901 WMEC 514-011, Rev H, HVAC Main Deck Fr 82-117 A&D

Coast Guard Drawing 901 WMEC 514-012, Rev J, HVAC Mn Dk Fr 117-165 A&D vi (Rev-0)

Coast Guard Drawing 901 WMEC 514-013, Rev H, HVAC 01 Lvl, FWD 82 A&D

Coast Guard Drawing 901 WMEC 514-014, Rev F, HVAC 01 Lvl, Fr 82-103 A&D

Coast Guard Drawing 901 WMEC 514-015, Rev J, HVAC 02-106-0-Q A&D

Coast Guard Drawing 901 WMEC 514-016, Rev E, HVAC PH & Wea Dk, 02 Lvl A&D

Coast Guard Drawing 901 WMEC 514-017, Rev J, HVAC Snsr Rm/CSC, 02 LVL - A&D

Coast Guard Drawing 901 WMEC 514-026, Rev H, HVAC Main Deck Fr 165-186 A&D

Coast Guard Drawing 901 WMEC 514-027, Rev E, Fan Room Arrgt 02-45-0-Q

Coast Guard Drawing 901 WMEC 514-046, Rev – HVAC Modifications to Commissary Stores (4-169-0-

A) to Provide Air Cond.

Coast Guard Drawing 901 WMEC 514-048, Rev – Ventialtion Mods to Snsr Rm & CSC 02 Lvl & Abv

Coast Guard Drawing 901 WMEC 529-001, Rev N, Ballasting & Emer Bilge Drainage Sys Diagram

Coast Guard Drawing 901 WMEC 533-005, Rev J, H&C Potable Water System Mn Dk - A & D

Coast Guard Drawing 901 WMEC 533-006, Rev H, H & C Potable Water System, 01 Lvl & Abv A&D

Coast Guard Drawing 901 WMEC 533-007, Rev J, H & C Potable Water Blw Mn Dk

Coast Guard Drawing 901 WMEC 542-1, Rev J, JP-5 System Diagram

Coast Guard Drawing 901 WMEC 542-2, Rev H, JP-5 System – A&D

Coast Guard Drawing 901 WMEC 572-001, Rev G, Svce Hoist Instl A&D

Coast Guard Drawing 901 WMEC 581-001, Rev H, Anchor Handling A & D

Coast Guard Drawing 901 WMEC 581-002, Rev C, Hawse & Chain Pipes

Coast Guard Drawing 901 WMEC 581-004, Rev L, Anchor Windlass Arrangement and Details

Coast Guard Drawing 901 WMEC 581-005, Rev-, Port Anchor Windlass, WMEC 270 A-Class, 1-1/2-inch Chain, Vertical, Model VAW-1.50-30E-36-A-P, General Arrangement

Coast Guard Drawing 901 WMEC 581-006, Rev-, Stbd Anchor windlass, WMEC 270 A-Class, 1-1/2-inch Chain, Vertical, Model VAW-1.50-30E-36-A-S, General Arrangement

Coast Guard Drawing 901 WMEC 581-008, Rev -, Anchor Windlass Upgrade Installation

Coast Guard Drawing 901 WMEC 582-001, Rev F, Mooring & Towing Ftgs – A&D

Coast Guard Drawing 901 WMEC 582-002, Rev F, Capstan Arrangement and Details

Coast Guard Drawing 901 WMEC 634-001, Rev G, Deck Covering Schedule

Coast Guard Drawing 901-WMEC 644-001, Rev E; Plumbing Fixtures List

Coast Guard Drawing 901-WMEC 644-002, Rev A; Chemical, Biological & Radiological

Decontamination Station

Coast Guard Drawing 901 WMEC 665-005, Rev H, Ordnance Workshop – A&D

Coast Guard Drawing 901 WMEC 801-004, Rev L, General Arrangement 01 Level

Coast Guard Drawing 901 WMEC 801-010, Rev D, Inboard Profile

Coast Guard Drawing 901 WMEC 801-020, Rev G, Booklet of General Plans

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual

Coast Guard Technical Publication (TP) 2721, May 2016, Manufacturer's Instruction Book - SWBS 581, Section A, Windlass, Anchor

Coast Guard Technical Publication (TP) 2721, May 2016, SWBS 572, Dumbwaiter vii (Rev-0)

Coast Guard Technical Publication (TP) 2721, May 2016, SWBS 582, Section A, Technical Manual for

Warping Capstan Model No. 3404-EC

Coast Guard Technical Publication (TP) 2819, SWBS 302, Feb 2009, Motor Controllers (270 WMEC)

Coast Guard Technical Publication (TP) 2823B, Manufacturer's Instruction Book-SWBS Group(s) 324-

426, Section A; Aug 2015; Switchboard, 400 Hz

Coast Guard Technical Publication (TP) 2837, Manufacturer's Instruction Book, SWBS Group 581, Section A, Jul 2016, Capstan-Windlass Model X-1836

Coast Guard Technical Publication (TP) 3231A, Oct 2019, Manufacturer’s Instruction Book-SWBS

Group(s) 242-245, Chapter 243, Section A, Stern Tube Seal, MX9, US-71996

Coast Guard Technical Publication (TP) 4432, 10 Oct 2024, Seawater Cooling Pump, Model- DURCO

MK 3 – Installation, Operation Maint & User Instructions

Coast Guard Technical Publication (TP) TBD, SWBS 581, Jun xxxx, Anchor Windlass (270 WMEC A-

Class)

Coast Guard Technical Specification D-123-2048, Feb 2020, 270’ WMEC A Class Fluid Handling Plan for Tank Inspections

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General

Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC

Electrical Motors In-Shop

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard

Electric Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2022, Clean

Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior

Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary

Hull Accesses

OTHER REFERENCES

American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016

American National Standards Institute (ANSI) C37.50, 2018, Low Voltage AC Power Circuit Breakers

Used in Enclosures, Test Procedures

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities viii (Rev-0)

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System

Components - Health Effects

American Society for Testing and Materials (ASTM) A193 , June 2025, Standard Specification for Alloy-

Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special

Purpose Applications

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting

Electrical Plant Installation Standard Methods for Surface Ships and Submarines, MIL-STD-2003B-2020.

Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and

Alloy Steel

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018, Pipe

Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-DTL-23549, Sep 2016, Grease, General Purpose

Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-PRF-17672E, Oct 2012, Hydraulic Fluid, Petroleum, Inhibited

MIL-STD-769, Insulation Requirements for U.S. Naval Vessels

National Electrical Manufacturers Association (NEMA) Std, pub. No. AB4, 2017, Guidelines for

Inspection and Preventative Maintenance of Molded Case Circuit Breakers used in Commercial and

Industrial Application

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-

PRO-160, Jan 2011, Chapter 16, Cofferdams

NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight

& Airtight Quick Acting or Individually Dogged Personnel Doors

Rules for Building and Classing Marine Vessels (ABS/MVR) – Part 4, Vessel Systems and Machinery

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning

Title 46, Code of Federal Regulations (46CFR), Subchapter J, Electrical Engineering

Underwriters Laboratories Inc. (UL) 1066, Apr 2012, Low-Voltage AC and DC Power Circuit Breakers

Used in Enclosures

Underwriters Laboratories Inc. (UL) 489, Oct 2016, Molded Case Circuit Breaker ix (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

19 N **Electric brake PN: J199133 1 ea.

19 N Oil seal PN: J17E0078 1 ea.

19 N **Thrust bearing assy PN: J05A0269 1 ea.

19 N **Spherical roller bearing

PN: J05A0270 1 ea.

19 N Gasket cork PN: J05C0080 1 ea.

19 N **Shim PN: JR1406903 1 ea.

19 N **Roller bearing PN: J056A0021 1 ea.

19 N **Tapered roller bearing

PN: J05A0268 1 ea.

19 N **Grease fitting PN: JA2001402 1 ea.

19 N **Gearbox vent PN: J11C0033 1 ea

19 N **Locknut PN: J41NTE-164 1 ea

19 N **Lock washer PN: J199132 1 ea

19 N **Spacer PN: J199135 1 ea

19 N **Motor A/C NSN: 6105-01-685-6254 PN:

15A00117-000

1 ea. $28,771.00

25 Y Anchor Windlass

Assembly Port (A-

Class)

NSN: 3950-01-F25-7136 PN:

VAW-1.50-30E-36-A-P

1 ea. 222,000.00

25 Y Anchor Windlass

Assembly Stbd (A-

Class)

NSN: 3950-01-F25-7137 PN:

VAW-1.50-30E-36-A-S

1 ea. 222,000.00

25 N Motor Controllers NSN: 6110-01-F25-7212 PN:

ACS880-01-052A-5

2 ea. 5,000.00

25 N Junction box enclosure with pushbutton control pendant.

NSN: 0000-XF-C39-6480 PN:

SCE-10086ELJSS6

2 ea. 2,000.00

25 N Cable, Electrical NSN: 6145-01-F25-7423 PN:

37-103-312VFD

238 ft. 4,798.08

26 Y Intech Marine Services

Custom Engine Room

Fan Controller

NSN: 6110-01-721-8667 PN:

IMS-23-1344

2 ea. 6,755.00

31 N Flow Switch NSN: 5930-01-043-0942 2 ea. 456.62

31 N Meter, Impeller Type, Liquid

NSN: 6680-01-727-4949

PN: G2P10NQ9GMA

2 ea. 800.00

31 N ***Drive Clamp Ring

Assembly

PN: H-44789 2 ea.

32 Y Auxiliary Saltwater Pump PN: Durco MK3 Pump 2K6X4V-

13RV-CD4

NSN: 4320-99-602-2262

2 ea $42,000.00 x (Rev-0)

*Government-loaned property, which must be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4

(Inspection report particulars)):

Work

Item Title

2 Chain Lockers, Clean and Inspect

3 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect

4 Tanks, MP Fuel Service, Clean and Inspect

6 Tanks, Ballast, Clean and Inspect

8 Tanks, Dirty Oil and Waste, Clean and Inspect

15 Commissary Hoist, Inspect and Service

16 Anchor Chains and Ground Tackle, Inspect and Repair

17 Anchor Windlass, Overhaul

19 Warping Capstan, Overhaul

25 Anchor Windlass, Replace

32 Auxiliary Saltwater Pumps, Replace

All other inspection reports on individual work items requiring condition found reports should be provided within the first 40% of the availability contract period.

xii (Rev-0)

PRINCIPAL CHARACTERISTICS

270' WMEC (A-CLASS)

PHYSICAL

Length overall 270' 0"

Length between perpendiculars 255' 0"

Beam molded 38' 0"

Depth molded, main deck amidships

01 level amidships

23' 6"

31' 4"

Full load displacement 1,902.2 long tons

Draft, full load to baseline amidships 14' 3"

Highest projection above baseline

*height approximated

≈ 110' 0"

Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase

Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each

Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-

1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-

1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Number of propellers 2

Propeller diameter 9' 0"

Number of blades, Each 4

Pitch Controllable

Shaft RPM 260

Shaft diameter 10.55" at exit of hull

Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 79,210 gal.

JP-5 total (95%) 25,890 gal.

Potable water total (100%) 8,553 gal.

Hydraulic & lube oil total (95%) 2,237 gal.

1 (Rev-0)

00000_0226_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

NOTE

NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast

Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.

Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast

Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must

3 (Rev-0) be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity

Generator.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’

Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous

4 (Rev-0)

Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental

Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast

Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.6.1 The Contractor must obtain RapidGate Credentials for access to Base Portsmouth.

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.8 Freeze protection. After the Arrival Conference, the Contractor must conduct a walkthrough with the COR and Ships Force (EO and/or MPA), to perform a joint inspection to identify compartments and systems that will require freeze protection. Within 7 days of completing this joint inspection, the Contractor must submit a CFR documenting their plan for freeze protection when temperatures are expected to drop below freezing. Freeze protection must include securing systems/components and auxiliary equipment and its piping exposed to freezing temperatures or if not protected must be completely drained. If necessary, drain connections may be broken to prevent damage due to freezing.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading

(mils)

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

4.2 Tank and Void Assessment form.

12 (Rev-0)

13 (Rev-0)

12300_1225_FLT

REC_12311_FLT_270’ WMEC ‘A’ Class (ALL) (0423)

WORK ITEM 1: Tanks (Aviation Fuel Stowage And Overflow), Clean And Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean, inspect and repair base metal in the following tank(s):

TABLE 1 - TANKS

TYPE OF TANK LOCATION

CAPACITY - 95%

(GALLONS)

LOW SUCTION

(GALLONS)

JP-5 Drain 4-186-1-J 219 20

*JP-5 Overflow 4-186-2-J 610 40

* Tank needing base metal repair

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 113-001, Rev E, Tank Top PL & FR Fwd FR 101

Coast Guard Drawing 901 WMEC 113-002, Rev A, Tank Top PL & FR Aft 182

Coast Guard Drawing 901 WMEC 113-003, Rev G, Tank Top PL & FR, FR 101-182

Coast Guard Drawing 901 WMEC 116-001, Rev D, CVK Fwd 101 & G Long 2

Coast Guard Drawing 901 WMEC 116-002, Rev E, CVK Aft 182

Coast Guard Drawing 901 WMEC 116-003, Rev E, CVKFr 101-182 & G Long. 2&4

Coast Guard Drawing 901 WMEC 121-001, Rev D, Long Tank Bhds, Aft 182

Coast Guard Drawing 901 WMEC 122-001, Rev H, Transv Bhds 12 & 26

Coast Guard Drawing 901 WMEC 122-002, Rev G, Transv Bhds 47, 78 & 82

Coast Guard Drawing 901 WMEC 122-003, Rev G, Transv Bhds 103, 117

Coast Guard Drawing 901 WMEC 122-004, Rev F, Transv. Bhds. 165, 169, 151.6

Coast Guard Drawing 901 WMEC 122-005, Rev F, Transv Bhds 186 & 190

Coast Guard Drawing 901 WMEC 122-006, Rev F, Transv Bhds 196, 207, 228 & 242

14 (Rev-0)

COAST GUARD PUBLICATIONS

Coast Guard Technical Specification D-123-2048, Feb 2020, 270’ WMEC A Class Fluid

Handling Plan for Tank Inspections

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

OTHER REFERENCES

American Society for Testing and Materials (ASTM) A193 , June 2025, Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH)

S0600-AA-PRO-160, Jan 2011, Chapter 16, Cofferdams

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

3. REQUIREMENTS

3.1 General. The Contractor must refer to the Coast Guard Drawings listed under Section 2 (References) for guidance in accomplishing this work.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

NOTE

Vessel may come in with less tank fluid contents than specified above. The

Contractor is responsible for providing all materials, equipment and services necessary to comply with local environmental regulations.

3.1.4 Interferences. The contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: up to a total of 400 gallons of fuel.

15 (Rev-0)

Coast Guard personnel will operate all shipboard machinery and equipment.

3.1.4.1 The Contractor must follow the fluid handling plan in accordance with Coast Guard Technical

Spec D-123-2048 when moving fluid between tanks to ensure adequate stability of the vessel.

3.1.5 Operational test, initial. Prior to commencement of work, the contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.2 Plug log. The Contractor must keep a written record of all plugs put in any tanks vents. A separate list must be kept for each tank being entered.

3.2.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.2.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

3.3 Cleaning requirements. The contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual water, sediment, sludge, rust, and bacterial growth, taking care not to damage the coating system (if applicable).

3.3.1 Remove cleaning media and residues continuously during the washing process. Wash the tank with high-pressure cold fresh water before it has a chance to dry after emptying. Do not use steam as it can damage the tank’s coating.

3.3.2 Drain and dry the tank using a portable air-driven pump. When dry, and after final visual inspection, close the tank. Submit a CFR.

WARNING

Do not use the Fuel Service or Transfer systems to drain the water from the tank. Excessive fuel contamination will result.

3.4 Tank content and waste disposal. The contractor must dispose of tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.5 Inspection. The contractor must visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding/vent tube and striker plate condition.

16 (Rev-0)

• Suction and discharge piping condition.

• Fastener material and condition.

3.6 Cofferdam repairs. The Contractor must fabricate and install a cofferdam in accordance with UWSH

S0600-AA-PRO-160, and as follows:

3.6.1 Prior to cofferdam installation, provide the KO with individual diver certification documentation that each diver is trained and experienced in accordance with UWSH S0600-AA-PRO-160, Appendix E.

3.6.2 Maintain double-valve protection (two boundaries) using two of the following:

• Sea chest valve

• Internal blank-off

• External cofferdam, patch or plug

3.6.3 After all work is complete, turn over fabricated cofferdam(s) to the Coast Guard Property

Administrator for disposition.

NOTE

A cofferdam is any device preventing water intrusion during maintenance and/ or repairs; including a plug, patch or containment structure.

3.7 Removal/Preparation. Prior to doing repairs, the Contractor must remove all Belzona/doubler plate material to properly prep the area for base metal repair.

3.8 Repair. Clad weld approx. 25 sq ft of base metal located in JP-5 Overflow Tank (4-186-2). Exact location to be designated by Coast Guard Inspector. Submit a CFR.

3.9 Pit measurement. The contractor must measure up to 10 “pits” within each tank as designated by the

Coast Guard Inspector using a Contractor supplied ‘Pit Gauge’. The results of these measurements should also be included in the inspection report showing where pit measurements were taken and the depth of the pit.

3.10 Ultrasonic thickness (UT) measurement. The contractor must take a total of 20 UT measurements…