Attachment II -SOW-PortableRestrooms_20210708 (1).docx
DOCX document 25 KB Posted
- Attached to
- Rental of two portable toilets
- Solicitation number
- NB193000-21-02706
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment IV - Guidelines for Contractors and A-E firms - revised June 4 2018 (2).docx | DOCX document | |
| Attachment V - Wage Rates.txt | TXT text file | |
| NB193000-21-02706- Attachment I - Combined Synopsis Solicitation 061621 Final_ CO Revisions.docx | DOCX document | |
| Attachment III - Clauses and Provisions- Gary.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PORTABLE RESTROOM RENTAL GATE C AND F
SERVICE CONTRACT
AT THE
NATIONAL INSTITUTES OF STANDARDS AND TECHNOLOGY
GAITHERSBURG, MD
PART 1 – MAINTENANCE SERVICES
1.1 Project Identification
A. PROJECT TITLE: Portable Restroom Rental Gate C and F
B. BUILDING: Gate C and F
C. LOCATION: NIST, Gaithersburg, MD
1.2 Background
Security gates C and F do not have permanent restrooms installed. To provide facilities for the security personnel, portable restrooms are rented.
1.3 Objectives.
The objective is to obtain a service contractor to provide rental to NIST, two (2) portable restrooms for the period of 10/1/2021 to 9/30/2026.
PART 2: - CONTRACTOR REQUIREMENTS
2.1 Contractor Scope of Work
A. Contractor shall provide rental to NIST, two (2) portable restrooms. Units will be standard size single occupant portable restrooms with non-splash corner urinal.
B. Contractor shall provide all labor, equipment and material needed to service each portable restroom on a weekly basis. This will include, but not limited to, collection and disposal of all of liquid waste materials/sewage, provide toilet paper, ensure the unit is clean, and hand sanitizing station.
C. Contractor will be responsible for changing units out if they become damaged or obsolete.
D. For scheduling and security purposes, each unit is to be serviced between 7:00 am and 4:00 pm.
PART 3: GOVERNMENT RESPONSIBILITIES
3.1 Site Access
The government will arrange for site access. Regular delivery/service drivers will need to be assigned to NIST so that they can be provided with NIST site access badges. This process requires a NIST-performed security background investigation. Allow for 60-90 min for the driver to complete the paperwork and two (2) other 60-90 minutes on-site meetings; one (1) with the Office of Security and one (1) with the Badging Office.
For any substitute drivers, at least 48 hours’ notice is required to the COR before access may be granted.
PART 4: Period of Performance
The contractor will provide pricing for a 1 year award with 4 option years starting 10/1/2021.