Attachment II SOW.pdf

PDF 2 MB Posted

Attached to
LOCK REPLACEMENT AND RE-KEYING (TUCSON, AZ)
Solicitation number
12905B23Q0092
Issued by

About this file

This document includes a Statement of Work (SOW) for a federal contract opportunity to replace locks and re-key multiple buildings at the Carl Hayden Bee Research Center in Tucson, Arizona. The SOW requires providing all labor, equipment, and materials to replace over 160 locks across 14 buildings with MEDCO high-security master system locks or CLIQ system locks. It specifies the lock and door descriptions, quantities, and part numbers needed. The contractor must also supply one-year warranties on labor and lifetime warranties against lock breakage. The contract period of performance is 90 calendar days from notice to proceed. The solicitation was issued by the US Department of Agriculture Agricultural Research Service and responses were due by an unspecified date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

TUCSON FACILTY BUILDINGS LOCK

REPLACEMENT AND RE-KEYING

CARL HAYDEN BEE RESEARCH CENTER

TUCSON, AZ

Date: May 26, 2022

STATEMENT OF WORK

1.0 CONTRACT PROJECT:

a. Project Number: TBD

b. Project Title: FACILITY BUILDINGS RE-KEYING

c. Project Location: Southwest Watershed Research Center 2000 E. Allen Road, Tucson AZ

2.0 PROJECT CONTACT PERSONS:

a. CONTRACTING OFFICER (CO):

Michael Hassett

USDA-ARS-PWA

Email: Michael.hassett@usda.gov Tel. No.: 510-292-5186

b. CONTRACTING SPECIALIST (CS):

Spencer Hamilton

USDA-ARS-PWA

Email: spencer.hamilton@usda.gov Tel. No.: 510-559-6338

c. LOCATION MONITOR (LM):

Roger Clemo

USDA-ARS-PWA

2000 E. Allen Road, Tucson AZ 85719 Email: roger.clemo@usda.gov Tel. No.: 520-330-1896

d. ADMINISTRATIVE OFFICER (AO):

Laura Elmore

USDA-ARS-PWA

Email: laura.elmore@usda.gov Tel. No.: 520-647-9160

e. CONTRACTING OFFICERS REPRESENTATIVE (COR):

Roger Clemo

USDA-ARS-PWA

Email: roger.clemo@usda.gov Tel. No.: 520-330-1896

f. AREA SAFETY AND HEALTH MANAGER Ken Cushman

USDA-ARS-PWA

800 Buchanan Street Albany, CA 94710 Email: ken.cushman@usda.gov Tel. No.: 510-529-5921

g. ENGINEERING PROJECT MANAGER (EPM) Peter Lane

USDA-ARS-PWA

800 Buchanan St. Albany, CA 94710

Email: peter.lane@usda.gov Tel. No.: 510-559-6340

3.0 PROJECT

DESCRIPTION:

Provide all services necessary to replace ALL locks for door with MEDCO high security master system and MEDCO CLIQ system.

4.0 PROJECT REQUIREMENTS:

a. Provide Lifetime warranty against breakage on M4 cylinders and one year warranty on labor and other parts.

b. Contractor shall provide and maintain all necessary guards, lights, barricades, etc., to protect persons, property, and materials in and around the site.

c. Do not disturb hazardous materials and report condition immediately to the Contracting

Officer’s Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.

d. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.

e. All work shall meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS

242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.

4.1 Background & Site Description:

Carl Hayden Bee Research facility has 8 buildings on site that will require all Locks to be replaced out with either MEDCO M4 high security master system or CLIQ system with some hardware replacement.

4.2 Bid Schedule:

Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items. Local business is a must for service, repair, and warranty.

4.3 Description of Work:

a. Demolition

i. Remove all old locks in existing doors, Approx 120 doors.

ii. Remove old door knobs, approx. 28.

b. New MEDCO High Security Master System.

i. 43-M4 100400H 26 RIM CYL HOR, 6ea.

ii. 43-M4 100200H 26 MORT CYL, 60 ea.

iii. 43-M4 2020490H 626/26D KIK CYL, 92 ea.

iv. 43-M4 200900 26 KID CYL, 3 ea.

v. HIGH SECURITY SET-UP, 161 ea.

vi. QL81 SR 26D C 234 ENTRY LEVER GR1, 26 ea.

vii. S605-231 TAILPIECE "S" DRIVER, 2 ea.

viii. 100B 32D ENTRY KNOB LL LC G2, 1 ea.

ix. 43-M4 KYB4SX600 43 99 6 PIN KB, 50 ea.

c. New MEDCO CLIQ system

i. KEC496003 DYNAMIC USER KEY-X4 CLIQ, 7 ea.

ii. KEB49600C C-KEY X4-CLIQ, 1 ea.

iii. EA-100179 LOCAL PROGRAMMING DEVICE-X4 CLIQ, 1 ea.

iv. SW-500170 STAND ALONE SOFTWARE (ONE TIME 2, CHARGE), 1 ea.

v. SW-500170-R LOCAL-STAND ALONE SOFTWARE-ANNUAL MAINTENANCE

(RECURRING), 1 ea.

vi. 20200S1M 26-43 CLIQ KIK CYLINDERS, 14 ea

d. KEY MANAGER PROGRAM

i. KEY MANAGER SOFTWARE-BASIC VER.8 * BASIC VER./SINGLE USER * ( ONE

TIME PURCHASE)

ii. KEY MANAGER MONTHLY SUBSCRIPTION, * INCLUDES LIVE KEY UPDATES, WORK, * BASIC VER./SINGLE USER * ( ONE TIME PURCHASE)

iii. ORDERS, 1ST YR. FACTORY INCLUDED MAINTENANCE/UPDATES, SET-UP, AND TRAINING.

iv. ALL NEED TO INCLUDE REMOTE LOCAL SUPPORT

4.4 Government Furnished Equipment\Services

a. Government will furnish a reasonable amount of electricity and water.

5.0 GENERAL REQUIREMENTS:

5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations.

Contractor shall legally dispose all any materials removed that will not be retained.

5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.

5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.

5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.

5.6 Protection of Work and Property/Safety Requirements:

a. Contractor shall furnish a Site-Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) ten days after contract award. SSSP / APP shall be approved by the Government before construction work commences.

b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.

c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

d. Contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.

5.7 Temporary Facilities:

a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during construction, the

Contractor shall obtain approval for such shutdown from the Location Monitor twenty-one (21) working days prior to the need.

5.8 Materials and Equipment:

a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft, or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.

c. Government will not furnish any labor or equipment to unload or move materials or supplies.

5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.

5.10 Warranty:

a. Submit data concerning the Provided Lifetime warranty against breakage on M4 cylinders and one year warranty on labor and other parts, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

b. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.

5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO

FINAL PAYMENT (other documents may also be required):

a. General contractor’s minimum one (1) year warranty on work.

b. Manufacturer ten (10) year warranty on equipment

c. Operation and Maintenance Data

d. Release of liens.

e. Final Invoice

6.0 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from Notice to Proceed. Contractor shall install new system prior to demolishing existing AC and coordinate switchover with Location Monitor.

7.0 Figures

Figure 1. Main Building Plans for Location A. Bldg 107 1st floor & basement B. SWRC Building Plan C. Bldg 320 Building Plan

Figure 2. Door by buildings and types – MEDCO & CLIQ doors

FLAT T.V

F L A

T

T .V

FLAT T.V

TV

T V

UP

B

B

1 1

C

C

D

D

F

F

G

G

H

H

I

I

J

J

2 2

4 4

5 5

8 8

10 10

LOBBY

PSA

RL OFFICE

COPY/

PRINT

BREAK

MEETING

ROOM

OFFICE

OFFICE

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

CORRIDOR

OFFICE

OFFICE

CORRIDOR

SHARED

OFFICE

SHARED

OFFICE

SHARED

OFFICE

ELECTRICAL

MEETING

ROOM

MEETING

ROOM

STOR

IT/COMPUTER

MEETING

ROOM

MEN'S

RESTROOM

WOMEN'S

RESTROOM

WELLNESS

STORAGE

ELEC

WORK

ROOM

CORRIDOR

SPECTROSCOPY

WORK

ROOM

SOILS

WORK

ROOM

FIELD

WORK

ROOM

FIELD

EQUIPMENT

STORAGE

CORRIDOR

OFFICE

OPEN

OFFICE

OFFICE

OFFICE

OPEN

OFFICE

117 OFFICE

STOR

148B

JAN

CHARGING AREA

OPEN

OFFICE

RISER

ROOM

E

E

SHOWER

SHOWER

A

A

3 3

7 7

6 6

IT STOR

9 9

1 T V

T V

AR CH I T E CT S

W

SMARCH OMC. W

2O O4 8 1 44O. .

52O O4 8 1 7O. . 1 F

T E L

AX

BE

S

3 O N3

T

N

A

C A

26 8

857 81

EVELLBPMAHTRO

AORO , I Z NNSCU

U OI T E

COPYRIGHT BY WSM ARCHITECTS INC - 2018

PROJECT:

PLOT DATE:

SHEET TITLE:

SHEET NO.:

PROJECT NO.:

DRAWN:

CHECKED:

DATE:

REVISIONS:

8/5/2022 2:12:25 PM

F1.0

FURNITURE FLOOR

PLAN

18-001

WSM TEAM

JDM

MARCH 18, 2022

U S D

A A

R S

S O

U

TH

W E S T

W A

TE

R

S H

E D

R E S E A

R C

H C

E N

TE

R

E

A L L E N

R D

T U

C S O

N A

Z

1/8" = 1'-0"1

FURNITURE FLOOR PLAN

THIS PLAN IS PROVIDED FOR REFERENCE ONLY - FURNITURE IS TO BE PROVIDED BY OWNERN

0 ' ' '16 248

1 ASI #01 - 4/18/2022

2 ASI #02 - 8/5/2022

JOEL D.

MESIK

23507RE

GISTERED ARCHITECT

C

ERT I F I CA T E NO

Da t e S i g n e d

A R

I Z O N A U . S . A

8/5/2022

Natural Resources Conservation Service

& Southwest Watershed Research Center

Building 320, 2000 E. Allen Road, Tucson AZ 85719

South Side \ \ r=-T--.------.---,---,.,._ _ __,__ _ __,-----,---,---------=- '----- '---,--ReSt

Rest ttorag

Rest ·@ M1 I f. room room 106

102 103 •000• 123 112 room 133 ltest 131

Ill room

___ __, '-11t------J__----, rarag e 104 � N RCS

/1 ·-· / 1--\ -\ / 101 111 I

Kitchen \

IT

Rest Storage room 145

\-L_

Conference Room l s,,,:-"i

,os

� m ma

� ���.1=-=-==�\ Jlil IL /_I I

EMERGENCY NUMBERS.

. -� � [IEII Fire alarm pull-handle

BUILDING MAINTENANCE ................. Roger Clemo II Fire extinguisher ADMIN OFFICER ................................ Laura Elmore Ci] Shower CENTER DIRECTOR ......................... Gloria Hoffman El Eye wash

IN CASE OF BUILDING EVACUATION,

MEET AT EAST END OF BUILDING #316 FOR ROLL CALL

Kitchen

SAFETY OFFICER..............GEOFFREY HILDALGO

M4-32026B23: USDA - ARS-MEDECO M4 SYSTEM

Doors

QtyDoor Description Area Lock/CylinderStamping

1 MAIN LOBBY-EXTERIOR DOOR01 BUILDING 107 1005491-43-M4 RIM

CYL

PEND

2 MAIN LOBBY-INTERIOR DOOR01 BUILDING 107 1005491-43-M4 RIM

CYL

PEND

109A ROOM 109- DOOR #101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

109B ROOM 109- DOOR #201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

109C ROOM 109-CONNECTING DOOR01 BUILDING 107 1005494-43-M4

2020490H 26 KIK

PEND

110 ROOM 11001 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

111 ROOM 11101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

112 ROOM 11201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

DOOR MISSING-BEING BID OUT

113 ROOM 11301 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

LIBRARY-A LIBRARY-DOOR #101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

LIBRARY-B LIBRARY-DOOR #201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

EXT-1 SE CORRIDOR-INTERIOR01 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

ARC LOCK

EXT-2 SE CORRIDOR-EXTERIOR01 BUILDING 107 1005491-43-M4 RIM

CYL

PEND

RIM PANIC

STAIRWELL-1 SE BASEMENT01 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

125 ROOM 12501 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

126 ROOM 12601 BUILDING 107 1005494-43-M4

2020490H 26 KIK

PEND

127 ROOM 12701 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

128 ROOM 12801 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

129 ROOM 12901 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

130 ROOM 13001 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

131 ROOM 13101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

132 ROOM 13201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

134 ROOM 13401 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

STAIRWELL-2 SW BASEMENT01 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

EXT-3 SW CORRIDOR-INTERIOR01 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

ARC LOCK

EXT-4 SW CORRIDOR-EXTERIOR01 BUILDING 107 1005491-43-M4 RIM

CYL

PEND

RIM PANIC

140 ROOM 140-JANITOR CLOSET01 BUILDING 107 1005495-43-M4

200900 26 KID CY

PEND

141 ROOM 14101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

142 ROOM 14201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

143 ROOM 14301 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

144 ROOM 14401 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

145 ROOM 14501 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

QtyDoor Description Area Lock/CylinderStamping

146 ROOM 14601 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

147 ROOM 14701 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

148 ROOM 14801 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

149 ROOM 14901 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

150 ROOM 15001 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

151 ROOM 15101 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

152 ROOM 15201 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

153 ROOM 15301 BUILDING 107 1005493-43-M4

100200H 26 MORT

PEND

160A ROOM 160-DOOR #101 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

160B ROOM 160-DOOR #201 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

161A ROOM 160-DOOR #101 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

161B ROOM 160-DOOR #201 BUILDING 107-LABS 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS SCHLAGE "S" DRIVER

163A ROOM 163A01 BUILDING 107-LABS 1005494-43-M4

2020490H 26 KIK

PEND

164 ROOM 16401 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

166 ROOM 16601 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

167 ROOM 16701 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

168 ROOM 16801 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

169A ROOM 169A01 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

169B ROOM 169B01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

LOCK TO BE DETERMINED

170 ROOM 17001 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

171 ROOM 17101 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

172 ROOM 17201 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

173 ROOM 17301 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

174 PREP ROOM-AUTOCLAVE01 BUILDING 107-LABS 1005493-43-M4

100200H 26 MORT

PEND

B011A ROOM 011-DOOR #101 BUILDING

107-BASEMENT

1005493-43-M4

100200H 26 MORT

PEND

B011B ROOM 011-DOOR #201 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS 100B KNOB 2 3/8

B012A ROOM 012-DOOR #1 TO HALL01 BUILDING

107-BASEMENT

1005493-43-M4

100200H 26 MORT

PEND

B012B ROOM 012-DOOR #201 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER 2 3/8

B012C ROOM 012-DOOR #301 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

HAS ENTRY LEVER

B014 ROOM 01401 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER 2 3/8

B015 ROOM 01501 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS CLIQ KIK

QtyDoor Description Area Lock/CylinderStamping

B016A ROOM 016-DOOR #101 BUILDING

107-BASEMENT

1005493-43-M4

100200H 26 MORT

PEND

B016B ROOM 016-DOOR #201 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

HAS ENTRY LEVER

B020 ADMIN STORAGE01 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

B021 "DOOR NAME"?01 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

B017 ROOM 01701 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

B019 ROOM 01901 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

B022A FITNESS DOOR-#101 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

B022B FITNESS DOOR-#201 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

HAS ENTRY LEVER

B002 MECHANICAL ROOM -DOOR #1-INNER DOOR01 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

B004 MECHANICAL ROOM -DOOR #201 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

HAS ENTRY LEVER

B005 MECHANICAL ROOM-DOOR #301 BUILDING

107-BASEMENT

1005494-43-M4

2020490H 26 KIK

PEND

NEEDS STOREROOM LEVER

108-NORTH ROOM 108-NORTH DOOR01 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

108-IT ROOM 108-IT01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS CLIQ KIK

108-SE ROOM 108-SOUTH EAST DOOR01 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

ROOM 108-SOUTH-CENTER DOOR108-SOUTH-CENTER 01 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

108A ROOM 108-DOOR #101 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

108B ROOM 108-DOOR #201 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

108C ROOM 108-DOOR #301 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

108-SOUTHWEST ROOM 108-SOUTHWEST DOOR01 BUILDING 108 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

109-109A ROOM 109-DOOR #101 BUILDING 109 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

109-109B ROOM 109-DOOR #201 BUILDING 109 1005494-43-M4

2020490H 26 KIK

PEND

109-109C ROOM 109-DOOR #301 BUILDING 109 1005494-43-M4

2020490H 26 KIK

PEND

110-NORTH ROOM 110-NORTH DOOR01 BUILDING 110 1005493-43-M4

100200H 26 MORT

PEND

110-SW ROOM 110-SOUTHWEST DOOR01 BUILDING 110 1005493-43-M4

100200H 26 MORT

PEND

110-SE ROOM 110-SOUTHEAST DOOR01 BUILDING 110 1005493-43-M4

100200H 26 MORT

PEND

110-WEST ROOM 110-WEST DOOR01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS CLIQ KIK

QtyDoor Description Area Lock/CylinderStamping

111A ROOM 111-DOOR #101 BUILDING 111 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

111B ROOM 111-DOOR #201 BUILDING 111 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

111C ROOM 111-DOOR #301 BUILDING 111 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

320-101A ROOM 101A-COPY ROOM-DOOR #101 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-101B ROOM 101-COPY ROOM-DOOR #201 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-HALL HALL OUTER DOOR-WEST01 BUILDING 320 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

320-103A ROOM 103A01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEED HOLE FILLER & "S" DRIVER

320-103B ROOM 103B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-102 ROOM 10201 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-104 ROOM 10401 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-105 ROOM 10501 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-106 ROOM 10601 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEED ENTRY LEVER

320-GD GARAGE DOOR-NORTH EAST01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

VERIFY LOCK HARDWARE

320-111A ROOM 111A01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-111B ROOM 111B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-HALL-2 HALL OUTER DOOR-EAST01 BUILDING 320 1005491-43-M4 RIM

CYL

PEND

HAS RIM PANIC

320-HALL-3 HALL INNER DOOR-WEST01 BUILDING 320 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

320-112 ROOM 11201 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-121 ROOM 12101 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-122A ROOM 122A01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-122B ROOM 122B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-123A ROOM 123A01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-123B ROOM 123B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-HALL-4 HALLWAY INNER DOOR-EAST01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

320-131B ROOM 131B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

320-132A ROOM 132A-INNER DOOR01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ KIK

320-132B ROOM 132B-OUTER DOOR01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ KIK-NEEDS ENTRY LEVER

320-133A ROOM 133A01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

QtyDoor Description Area Lock/CylinderStamping

320-133B ROOM 133B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

320-140A ROOM 140A01 BUILDING 320 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

320-140B ROOM 140B01 BUILDING 320 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

320-145 ROOM 145-STORAGE01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

320-141A ROOM 141A01 BUILDING 320 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

320-141B ROOM 141B01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

320-WEST ATTIC WEST ATTIC DOOR01 BUILDING 320 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

413-NORTH DOOR NORTH DOOR-EXTERIOR01 BUILDING 413 1005493-43-M4

100200H 26 MORT

PEND

HAS ARC LOCK

413-409A ROOM 409A01 BUILDING 413 1005495-43-M4

200900 26 KID CY

PEND

413-409B ROOM 409B01 BUILDING 413 1005494-43-M4

2020490H 26 KIK

PEND

413-411 ROOM 41101 BUILDING 413 1005495-43-M4

200900 26 KID CY

PEND

413-412 ROOM 41201 BUILDING 413 1005494-43-M4

2020490H 26 KIK

PEND

413-414 ROOM 41401 BUILDING 413 1005494-43-M4

2020490H 26 KIK

PEND

413-416 ROOM 41601 BUILDING 413 1005494-43-M4

2020490H 26 KIK

PEND

413-STORAGE-A STORAGE A01 BUILDING 413 1005491-43-M4 RIM

CYL

PEND

HAS RIM PANIC

413-STORAGE-B STORAGE B01 BUILDING 413 1005494-43-M4

2020490H 26 KIK

PEND

NEEDS ENTRY LEVER

413-AIR HANDLER AIR HANDLER01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ KIK-- NEEDS ENTRY LEVER

413-SOUTH DOOR SOUTH DOOR01 BUILDING 413PEND

HAS RIM PANIC

SWRC-101A LOBBY DOOR01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-101B ROOM 101B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-102 ROOM 10201 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-103 ROOM 10301 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-105 ROOM 10501 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-106 ROOM 10601 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-107 ROOM 10701 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-108 ROOM 10801 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-111 ROOM 11101 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-113 ROOM 11301 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-115 ROOM 11501 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

QtyDoor Description Area Lock/CylinderStamping

SWRC-118 ROOM 11801 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-123 ROOM 12301 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-124 ROOM 12401 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-125 ROOM 12501 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-126 ROOM 12601 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-127 ROOM 12701 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-128 ROOM 12801 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-129 ROOM 12901 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-130 ROOM 13001 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-131 ROOM 13101 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-132 ROOM 13201 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-133A ROOM 133A01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-133B ROOM 133B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-134A ROOM 134A01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-134B ROOM 134B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-135 ROOM 13501 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-136 ROOM 13601 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-141 ROOM 14101 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-142A ROOM 142A01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-142B ROOM 142B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-143A ROOM 143A01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-143B ROOM 143B01 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ-KIK

SWRC-144 ROOM 14401 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ-KIK

SWRC-146 ROOM 14601 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-147 ROOM 14701 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-148A ROOM 148A01 BUILDING SWRC 1005493-43-M4

100200H 26 MORT

PEND

SWRC-148B ROOM 148B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-149A ROOM 149A01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-149B ROOM 149B01 BUILDING SWRC 1005494-43-M4

2020490H 26 KIK

PEND

SWRC-150 ROOM 15001 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ-KIK

SWRC-152 ROOM 15201 CLIQ-ACCESS DOOR 1005494-43-M4

2020490H 26 KIK

PEND

CLIQ-KIK

Attachment II SOW
Fig 1-A Bldg 107 1st Floor and Basement
Fig 1-B SWRC Building Plan
Fig 1-C Bldg 320 Evacuation Plan
Fig 2 MEDECO and CLIQ Doors

File details come from the government source that posted it. Updated .