R

Requirements / Specifications: WR on-wafer probes from 110 GHz to 500 GHz 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: WR on-wafer probes from 110 GHz to 500 GHz Requesting Lab/Division/Group: 67/2/01

General Statement of Need The National Institute of Standards and Technology (NIST)/Communications Technology Laboratory (CTL) need to test nonlinear on-wafer devices to 1 THz. As such, CTL needs on-wafer probes, because only these probes meet the technical specifications. These specifications include E-field orientation, overtravel, bias-tees, probe pitch, and insertion loss. These WR (WR2.2, WR3.4, WR 4.3, WR5.1, WR6) probes will be used an custom on-wafer probe station for on-wafer THz electronics. The probe station uses VDI extender heads with a vertical E-field orientation. The station can only control the height of the probe to within about 10 um, so the probe must be able to tolerate 20 um of overtravel. The WR probes should have a bias tee, and where possible standard 50 um pitch, no more than 10 dB of insertion loss and a return loss no greater than -15 dB.

Items and/or Ancillary Services

Item 1: WR6, WR5.1, WR4.3, WR3.4, WR2.2 Waveguide Probe with bias Ts Quantity: 10 Specifications: Purchase new: WR probes (2 each) in each band for a total of 10 probes. Probes must have bias tees; must have service contract; must tolerate 10 um of overtravel; must have less than 15 dB of instertion loss;

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: 0 Specifications: [Enter quantity here.]

[List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery

[Enter shipping and delivery information by item here.] Shipping criteria:

Requirements / Specifications: WR on-wafer probes from 110 GHz to 500 GHz 2

☐ N/A ☒ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

☐ Delivery of goods, installation, and training shall be completed no later than:

[Insert date here] ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☒ N/A

[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Requirements / Specifications: WR on-wafer probes from 110 GHz to 500 GHz 3

Warranty ☒ N/A

[Choose warranty type here.] [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A

We will perform and on-wafer calibration and confirm that the worst-case error in two successive multiline TRL is comparable (within a factor of 2) of a back-to-back multiline TRL and series resistor calibration.

☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 30 days ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☐ N/A

Retipping and repair contract Period Length: 3 years What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment

[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian)

Requirements / Specifications: WR on-wafer probes from 110 GHz to 500 GHz 4

☒ N/A Serial Number: Click or tap here to enter text.

Description: on-wafer probes NIST property number: NA ☐ Other: [Enter other details here]

Travel ☒ N/A

[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: WR on-wafer probes from 110 GHz to 500 GHz
Requesting Lab/Division/Group: 67/2/01
General Statement of Need