This is a WebAIM Short Form Task Group Instruction (TGI) document for naval ship maintenance work on USS JOHN FINN (DDG-113). The document, dated 30-MAY-2026, contains instructions for installing 12 foundations for the MK59 Decoy Launcher system on the vessel's 02 Level Weather deck area, spanning frames 200-218 (both port and starboard sides) and frames 278-292 (port side), with additional work locations in the Fan Room Pressure Zone, Deck Gear Locker, Replenishment Gear Locker, and Director Equipment Room.

The work scope requires installation of each new foundation in accordance with referenced technical drawings and standards, submission of alignment data reports to the supervisor, and accomplishment of surface treatment requirements per naval specifications. Work involves structural fabrication (handled separately by TGI No. 38BC147405F03), with SRF-JRMC providing government-furnished materials and service work including crane and rigging services, electrical utilities, low-pressure air/water/steam supply, safety inspections, gas-free inspections, and quality assurance inspections. The task involves multiple skilled trades including structural fabrication, welding, electrical work, installation, painting, and repair work. Material requirements include adhesive (12 per page, stock number 8040 014175562) ordered for the contractor. Work start and completion dates are referenced in the 6J1 POP List_Bundle #3. The document notes a potential asbestos hazard during initial conditions and contains references to 11 technical drawings, manuals, and specifications for alignment verification and installation control procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

30-MAY-2026 1034

20.15.6.0.9333 (July 2025) ICN: 38BC147405 KeyOp: A09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SA 30088K MK59 FDN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - (RE) S/A 30088K, INSTALL FOUNDATION FOR MK59 DECOY LAUNCHER

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EXSAZCF3

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

WATANABE, KAZUMI 231A 3152434518 27-MAY-2026

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 28-MAY-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZCF3

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

474G1105 0

1. SCOPE/PURPOSE:

1.1 Title: S/A 30088K, Foundation for MK59 Decoy Launcher; install

1.2 Location of Work:

1.2.1 02 Level Weather, Frames between 200 and 218, Starboard (Stbd)

1.2.2 02 Level Weather, Frames between 200 and 218, Port

1.2.3 02 Level Weather, Frames between 278 and 292, Port

1.2.4 Fan Room Pressure Zone No. 2 (01-200-2-Q)

1.2.5 Deck Gear Locker (01-276-2-A)

1.2.6 Replenishment Gear Locker (01-201-1-A)

JRMC ONLY - Combat Systems Alignment Required, TGI Short Form

30-MAY-2026 1034

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC147405 KeyOp: A09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SA 30088K MK59 FDN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - (RE) S/A 30088K, INSTALL FOUNDATION FOR MK59 DECOY LAUNCHER

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.2.7 06 Level Weather, Frame 150, Center

1.2.8 Director Equipment Room No. One (05-131-0-Q)

1.3 Identification:

1.3.1 Quantity (12 EA), Foundation for MK59 Decoy Launcher on Platform, 02 Level Weather, Port and Stbd

Remarks: See Plan 16-5A, Plan 23-5A, and Plan 30-5A of Ref. No. 3 for material and detail

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: **See 6J1 POP List_Bundle #3

1.7 Contractor work completion date: **See 6J1 POP List_Bundle #3

2. PROCEDURE:

2.1 Install each new foundation listed in 1.3.1 in accordance with Ref. No. 3 through Ref. No. 6, using Ref. No. 7 through Ref.

No. 11 for guidance.

2.1.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of alignment data of each foundation to the SUPERVISOR.

2.1.2 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) A and D, Lines One through 7.

2.2 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 231A K. Watanabe, 243-4518

Planner: Code 233 S. Sato, 080-9350-1452

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 Fabrication of new foundation listed in 1.3.1 will be accomplished by TGI No. 38BC147405F03 (SRF-JRMC TGI).

2.3.4 JCN EXSA-ZCF3 is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38BC147405S03).

30-MAY-2026 1034

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC147405 KeyOp: A09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SA 30088K MK59 FDN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - (RE) S/A 30088K, INSTALL FOUNDATION FOR MK59 DECOY LAUNCHER

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA Inspection for (G) symbol(s).

30-MAY-2026 1034

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC147405 KeyOp: A09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SA 30088K MK59 FDN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - (RE) S/A 30088K, INSTALL FOUNDATION FOR MK59 DECOY LAUNCHER

FOUO Pg 4 of 5

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 DWG 100-8991124 LAUNCHING SYS DECOY

MK59 MOD1 STRUC & MODS

& ML

A Y ALL

4 LAR

30088/DDG113/1236

DDG 113 LAUNCHER

FOUNDATION

- Y ALL

5 LAR

30088/DDG113/1234

DDG 113 LAR DRAWING

8991124

- Y ALL

6 LAR

30088/DDG113/1237

SPECIAL NOTES AND

LAUNCHER MAINT

ENVELOPES RECTIFY RLAR

1234508 & 1234988

- Y ALL

7 DWG 150-7060433 UNIT STRL ARR DWG ASSY

UNIT 4410

D Y 3-

8 DWG 150-7060437 UNIT STRUCTURAL ARR

ASSY UNIT 4610

H Y 3-

9 DWG 8730437 INSTALLATION CONTROL

DRAWING FOR MK 59 MOD 1

DECOY LAUNCHING SYSTEM

- Y ALL

10 TM SW225-CH-CSA-

CSAM FOR DDG51 CLASS;

ALIGNMENT VERIFICATION &

CORRECTIVE ALIGNMENT

PROCEDURES

08 N

11 TM SW225-A0-MMA-

COMBAT SYSTEM

ALIGNMENT THEORY

5 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 SFTR HRs, WELD HRs, ELEX HRs, INSL HRs, PNTR HRs, RGRS

HRs, QA HRs

22/KE PC 0 0 N

2.2 PNTR HRs, QA HRs 22/KE PC 0 0 N

Structure Work CFM: for all paints, thinner, insulation, tape, cap, adhesive, pin, firewatch cost, asbestos sampler and analysis cost, and misc such as electrode, gases, covering material, and other consumable.

22/MQ CS 0 0 N

Electronics Work CFM: for MISK. 22/MQ CS 0 0 N

Process Funding Document 10/CT OM 0 0 N

MATERIAL LIST

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38BC147405 KEY OP: A09

30-MAY-2026 1034

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC147405 KeyOp: A09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SA 30088K MK59 FDN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - (RE) S/A 30088K, INSTALL FOUNDATION FOR MK59 DECOY LAUNCHER

FOUO Pg 5 of 5

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

300 M ADHESIVE, ORIG: C233,

S.SATO, 080-9350-1452

ORDERED FOR KTR

9B 8040 014175562 NA 4 N 61405090 12/PG