This Statement of Work (SOW) details the procurement of specific mechanical parts for the USS Iwo Jima (LHD-7), specifically #2 Main Attached Lube Oil Pump Drive Assembly overhaul components. The required parts include 2 bearings (Part # 1138G26-1), 2 bearings (Part # 1138G26-10), 2 gear sets (Part # 4054G47G-1), 1 spacer (Part # 7625B25-1), 2 shims (Part # 3054066-1), 1 bearing (Part # 1138G26-5), and 1 retaining ring (Part # 643A412-54), all referenced in drawing S9241-CK-MMA-010 REV 3.

Delivery requirements specify that all materials must be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511, with a required delivery date of February 15, 2026 or the best possible date. Shipping terms are FOB Destination, with shipping costs to be included in the quote. The primary contact is Mr. Cunningham, reachable at (757) 278-8148, and the solicitation is associated with RFQ number N5005425Q0387 under the Department of the Navy Naval Sea Systems Command.

View the file

Other files

File Type Posted
Combined Synopsis Solicitation.docx DOCX document
Attachment III Instructions for the DD2345 (1).pdf PDF
Attachment IV 52.212-5.pdf PDF
Attachment II DD 2345.pdf PDF
Attachment V FAR 52.212-3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Statement of Work

USS IWO JIMA (LHD-7)

Title: #2 MAIN ATTACHED LUBE OIL PUMP DRIVE ASSY; OVERHAUL Work Spec Items: 262-32-001

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 thru 2.1.7 complying with the following specifications:

SOW

Para no.

QTY NAME OF

PART/DESCRIPTION

Part # / NSN Drawing # Tech Manual Piece No.

2.1.1 2 EA BEARING 1138G26-1 S9241-CK-MMA-010 REV 3 43

2.1.2 2 EA BEARING 1138G26-10 S9241-CK-MMA-010 REV 3 48

2.1.3 2 SE GEAR SET 4054G47G-1 S9241-CK-MMA-010 REV 3 52

2.1.4 1 EA SPACER 7625B25-1 S9241-CK-MMA-010 REV 3 23

2.1.5 2 EA SHIM 3054066-1 S9241-CK-MMA-010 REV 3 47

2.1.6 1 EA BEARING 1138G26-5 S9241-CK-MMA-010 REV 3 58

2.1.7 1 EA RING, RETAIING 643A412-54 S9241-CK-MMA-010 REV 3 61

2.2 All material to be in accordance with Reference 2.2 of work spec item 262-32-001

2.3 Required Date of Delivery: 02/15/2026 OR BEST POSSIBLE.

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511

Primary: Mr. Cunningham Phone: (757) 278-8148 RIC 17H

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.