ATTACHMENT I Statement of Work.pdf

PDF 370 KB Posted

Attached to
WATERTIGHT DOORS
Solicitation number
N5005423Q0067
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Statement of Work

Title: STRUCTURAL DOOR; REPLACE

Work Spec Items: 167-11-003 and 168-11-004

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC

PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 through 2.1.6 complying with the following specifications:

SOW

PARA

NO.

QTY NOUN NAME TECH MANUAL # PART NO. / NSN W/I # W/I

PARA

2.1.1 1 AY Door Assembly, Structural/

Left Hand/10 Dog

167-7060865 Rev L 22219-294/

9999-LLCYA-9125

167-11-003 3.1

2.1.2 1 AY Door Assembly, Structural/

Left Hand/8 Dog

167-7060865 Rev L 22219-251/

9999-LLCYA-9123

167-11-003 3.1

2.1.3 1 AY Door Assembly, Structural/

Right Hand/8 Dog

167-7060865 Rev L 22219-260/

9999-LLCYA-9124

167-11-003 3.1

2.1.4 1 AY Door Assembly, Structural/

Left Hand/10 Dog

167-7060865 Rev L 22219-251/

9999-LLCYA-8712

167-11-003 3.1

2.1.5 1 AY

Door Assembly, Structural/

Left Hand/10 Dog

167-7060865 Rev L 22219-294/

9999-LLCYA-7812

167-11-003 3.1

2.1.6 1 EA Door, WTQA, LH 10 DOG S9169-AQ-MMA-

010/95310 Rev 1, Cargo Doors with

Actuators P/N's

56W44-SK-8504-

198, -199, -200

LLCYB7561 168-11-004 3.4

2.2. All material to be in accordance with Reference 2.2 of spec item 167-11-003 and Reference

2.3 of spec item 168-11-004.

2.3. Required Date of Delivery: 10/13/2023 or best possible.

3.0. DELIVERY / ACCEPTANCE

DLA Distribution Norfolk RMC PROJ

Bunker Hill Tow away Bldg. X136

Mr. Tony Cunningham 757 278 8148 RIC 17H

Norfolk, VA 23511

2 | P a g e

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at

FOB Destination. Shipping cost shall be included in the quote.

4.0 MATERIAL SHIPMENT NOTIFICATION

4.1. Notification of date and tracking information to be provided to the following upon shipment of material:

4.1.1 Allison Harding, allison.k.harding.civ@us.navy.mil, phone (757) 967-6077

4.1.2 Shephard Whitfield, shephard.l.whitfield.civ@us.navy.mil, phone (757) 967-6076 mailto:shephard.l.whitfield.civ@us.navy.mil

File details come from the government source that posted it. Updated .