1 | P a g e

Statement of Work

Well Deck Wing Wall

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1-2.2 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1-2.1.2 complying with the following specifications:

SOW Par# QTY Name of Part W/I # W/I Para # PC #

2.1.1 31 each SYNTHETIC BATTERBOARD 134-11-001 5.1.1 15

2.12 27 each SYNTHETIC DECKING PANEL 134-11-002 5.1.1 1

2.2 All material to be in accordance with Reference of 584-7318229 REV C, Synthetic Deck & Batterboard.

2.3 Required Date of Delivery: 02/06/23

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.