Attachment I Statement of Work.pdf
PDF 174 KB Posted
- Attached to
- USS NEW YORK (LPD-21) Furniture
- Solicitation number
- N5005427Q0002
About this file
This is a Statement of Work for furniture supply and delivery to support USS NEW YORK operations. The contractor is required to supply and deliver five furniture items to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511 by October 23, 2026 or as soon as possible. The required items include four chair assemblies with pedestals (Part #525-108), one chair assembly without a pedestal (Part #525-149), one two-drawer legal filing cabinet (Part #FCN-23-01), one type one filing cabinet (Part #FCN-23-16), and one type one desk (Part #FDN-05-24). All items must comply with specified drawings and technical manuals referenced in the SOW.
Delivery terms are FOB Destination, with product acceptance and inspection occurring at the destination point. All shipping costs must be included in the contractor's quote. The contractor bears full responsibility for transportation to the specified Norfolk, Virginia address. No response dates, pricing templates, set-asides, or contract vehicle information are specified in this SOW document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment II DD 2345.pdf | ||
| Attachment III Instructions for the DD2345 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Statement of Work
USS NEW YORK
Title: FURNITURE
1.0. INTRODUCTION.
1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.
2.0. GENERAL REQUIREMENTS
2.1. The Contractor shall supply and deliver the material listed in 2.1.1 thru 2.1.5 complying with the following specifications:
SOW
Para no.
QTY NAME OF PART/DESCRIPTION PART
#/NSN
DRAWING #
TECH
MANUAL
PIECE NO.
2.1.1 4 EA CHAIR ASSEMBLY, 12 INCH BY 15
INCH BASE, 65 POUND, ALUMINUM,
BLACK UPHOLSTERY, WITH
PEDESTAL, SHEET ONE OF 2.2, 36-1/2
INCH BY 12 INCH FOUNDATION
525-108 525-108 REV F N/A
2.1.2 1EA CHAIR ASSEMBLY, 12 INCH BY 15
INCH BASE, 65 POUND, ALUMINUM,
BLACK UPHOLSTERY, WITHOUT
PEDESTAL, SHEET ONE OF 2.3, 40-1/2
INCH BY 12 INCH FOUNDATION
525-149 525-149 REV B N/A
2.1.3 1EA FILING CABINET, 2 DRAWER, LEGAL,
ALUMINUM, ITEM NUMBER 9, SHEET
ONE OF 2.4
FCN-23-01 J100-25 REV P N/A
2.1.4 1EA FILING CABINET, TYPE ONE, ITEM
NUMBER 11, SHEET ONE OF 2.4
FCN-23-16 J100-25 REV P N/A
2.1.5 1EA DESK, TYPE ONE, FDN-05-24, ITEM
NUMBER 20, SHEET ONE OF 2.4
FDN-05-24 J100-25 REV P N/A
2.3 Required Date of Delivery: 10/23/2026 or best possible.
3.0. DELIVERY / ACCEPTANCE
3.1. Delivery shall be made to the following address:
DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511
3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.
File details come from the government source that posted it. Updated .