This is a pricing breakdown template for RFP No. 36C26126R0025 for construction services related to road crack repair and slurry seal work at the VA Las Vegas Medical Center in North Las Vegas, Nevada. The template is organized according to the MasterFormat classification system and includes 25 divisions spanning general requirements through electrical power generation. Each division contains line items for labor (broken down by number of personnel, hourly rates, and hours) and materials (broken down by quantity and unit cost), with subtotals calculated for each division. The template includes space for overhead, profit, bonds and insurance calculations, leading to a total project cost.

The pricing breakdown is structured to capture all project costs including general requirements such as project management, superintendent, mobilization, infection control, and design fees, as well as specialized construction trades. The template allows bidders to itemize labor and material costs comprehensively across all relevant construction divisions, with a final summary section for calculating subtotals, overhead, profit, and bonding/insurance costs to arrive at the total offer price. This document serves as the standardized format for contractors to submit their cost proposals for the road repair and slurry seal project at the VA facility.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26126R0025 PRICE BREAKDOWN

RFP No. 36C26126R0025 PRICE BREAKDOWN

PRICE BREAKDOWN

Repair Road Cracks and Slurry Seal, Las Vegas, NV

DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

01. General Requirements (Division 01)

A. Project Manager

$
$

B. Superintendent

$
$

C. General Requirements

$
$

D. Mobilization

$
$

E. Premium After Hours Work

$
$

F. Infection Control (ICRA)

$
$

G. Storage Container/Office (rent)

$
$

H. Dumpster (rent)

$
$

I. Design Fee (Engineer stamped shop drawings)

$
$
$
$
$
$
$
$
$
$
$
$

01. General Requirements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$

02. Existing Conditions Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

03. Concrete (Division 03)

$
$
$
$
$
$
$
$

03. Concrete Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

04. Masonry (Division 04)

$
$
$
$
$
$
$
$

04. Masonry Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

05. Metals (Division 05)

$
$
$
$
$
$
$
$

05. Metals Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

06. Wood and Plastic (Division 06)

$
$
$
$
$
$
$
$

06. Wood and Plastic Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

07. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$

07. Thermal and Moisture Protection Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Doors and Windows (Division 08)

$
$
$
$
$
$
$
$

08. Doors and Windows Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

09. Finishes (Division 09)

$
$
$
$
$
$
$
$

09. Finishes Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Specialties (Division 10)

$
$
$
$
$
$
$
$

10. Specialties Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

11. Equipment (Division 11)

$
$
$
$
$
$
$
$

11. Equipment Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

12. Furnishings (Division 12)

$
$
$
$
$
$
$
$

12. Furnishing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

13. Special Construction (Division 13)

$
$
$
$
$
$
$
$

13. Special Construction Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Conveying Equipment (Division 14)

$
$
$
$
$
$
$
$

13. Conveying Equipment Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Fire Suppression (Division 21)

$
$
$
$
$
$
$
$

14. Fire Suppression Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

15. Plumbing (Division 22)

$
$
$
$
$
$

15. Plumbing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

16. Heating, Ventilating, and Air Conditioning (Division 23)

$
$
$
$
$
$

16. Heating, Ventilating, and Air Conditioning Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

17. Integrated Automation (Division 25)

$
$
$
$
$
$

17. Integrated Automation Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

18. Electrical (Division 26)

$
$
$
$
$
$

18. Electrical Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

19. Communications (Division 27)

$
$
$
$
$
$

19. Communications Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

20. Electronic Safety and Security (Division 28)

$
$
$
$
$
$

20. Electronic Safety and Security Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

21. Earthwork (Division 31)

$
$
$
$
$
$

21. Earthwork Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

22. Exterior Improvements (Division 32)

$
$
$
$
$
$

22. Exterior Improvements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

23. Utilities (Division 33)

$
$
$
$
$
$

23. Utilities Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

24. Transportation (Division 34)

$
$
$
$
$
$

24. Transportation Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

25. Electrical Power Generation (Division 48)

$
$
$
$
$
$

25. Electrical Power Generation Subtotal

$
$

SUB TOTAL (Items 1 – 25)

Overhead

$
$

Profit

$
$

Bonds and Insurance

$
$

Total

$
$

TOTAL OFFER

Note: All other costs may be included as a separate item and shall be specified in this breakdown.

File details come from the government source that posted it. Updated .