Attachment I Price Breakdown blank.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C26325B0021
About this file
The file is a Price Breakdown Template for a Department of Veterans Affairs (VA) project to upgrade the Physical Access Control System (PACS) at a VA campus. The Excel spreadsheet provides a detailed divisional cost breakdown template with sections for General Building Construction, Mechanical and Electrical Systems, Site Improvements, and Miscellaneous Costs, allowing contractors to itemize pricing across 34 specific construction and technical divisions.
The related federal contract opportunity (Solicitation 36C26325B0021) involves a comprehensive PACS upgrade requiring installation of new card access hardware, software, card readers, and door hardware. The project scope includes replacing existing PACS devices, modifying utilities and architectural elements, and integrating high-priority biometric card readers with a new PC-based server. The contractor must complete all work within 495 days, ensuring full system integration, testing, and compliance with VA directives, local, state, federal, and national codes. The project is managed by the Veterans Health Administration's Veterans Integrated Service Network 23.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Price Schedule Breakdown Sheet |
| Project Title: |
| Project Number: |
| Contractor: |
| Division # | Division Title | Base Project |
| 1 | General Requirements | |
| 2 | Existing Conditions | |
| 3 | Concrete | |
| 4 | Masonry | |
| 5 | Metals | |
| 6 | Wood, Plastics and Composites | |
| 7 | Thermal and Moisture Protection | |
| 8 | Openings | |
| 9 | Finishes | |
| 10 | Specialties | |
| 11 | Equipment | |
| 12 | Furnishings | |
| 14 | Conveying Equipment | |
| Subtotal General Building Construction |
| 21 | Fire Suppression |
| 22 | Plumbing |
| 23 | Heating, Ventilating and Air Conditioning |
| 25 | Integrated Automation |
| 26 | Electrical |
| 27 | Communications |
| 28 | Electronic Safety and Security |
| Subtotal Mechanical and Electrical |
| 31 | Earthwork |
| 32 | Exterior Improvements |
| 33 | Utilities |
| 34 | Transportation |
| Subtotal Site Improvements |
Miscellaneous (Contractor shall identify any costs included)
| Subtotal All Divisions & Miscellaneous (if any) | |
| Profit | |
| Overhead | |
| Proposal Grand Total |
File details come from the government source that posted it. Updated .