Attachment H - STI External Inspection Template - Copy.docx
DOCX document 187 KB Posted
- Attached to
- API Tank Inspection Camp Clark, Missouri Federal contract opportunity
- Solicitation number
- W9128F25Q0004
About this file
This document is an STI In-Service Inspection Report for a storage tank installation located at Camp Clark in Missouri. The report provides a detailed inspection of the tank's construction, foundation, appurtenances, coatings, piping, and secondary containment in compliance with industry standards STI SP001, NFPA 30, NFPA 326, UFGS 33 56 10, and federal regulations 40 CFR 112, UFC 3-460-01, and UFC 3-460-03.
The report identifies mandatory repairs that must be completed to prevent risks to the system and equipment, as well as short-term and long-term repairs recommended to preserve the asset and bring it up to current standards. Appendices include engineering drawings, inspection checklists, and photographs documenting the tank's condition. This inspection report is associated with a federal contract opportunity W9128F25Q0004 issued by the U.S. Army Corps of Engineers Omaha District to perform the STI external inspection on the storage tank located at Camp Clark, Missouri.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP-POL-CMP-INSPECT-FY25-CCM-CLIN Bid Schedule.docx | DOCX document | |
| Attachment A - General Installation Security Requirements - Copy.docx | DOCX document | |
| Attachment D - Monthly Contractors Progress.xlsx | XLSX spreadsheet | |
| Attachment E - Inspection Telecon Briefing Template.docx | DOCX document | |
| Attachment J.1 - Camp Clark-Fac 10212 (Tank 3 AO5A).pdf | ||
| SP-POL-CMP-INSPECT-FY25-CCM-52.212-1 addendum.pdf | ||
| Attachment B (Blank) - Copy.xlsx | XLSX spreadsheet | |
| Attachment J - Camp Clark-Fac 10201 (Tank 2 AO5B).pdf | ||
| Attachment J.2 - Camp Clark-Fac 10213 (Tank 4 AO5C).pdf | ||
| Combined Synopsis-Solicitation Camp Clark.pdf | ||
| SP-POL-CMP-INSPECT-FY25-CCM-PWS.pdf | ||
| Attachment C - Tank Data Sheet.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STI In-Service Inspection Report Installation, State
US Army Corps of Engineers Omaha District STI In-Service Inspection Report
[Location] [Facility Number] [Tank Number]
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
(USACE POL-MCX)
[DATE]
Table of Contents
| ACRONYMS AND ABBREVIATIONS | 3 | |
| GENERAL SUMMARY | 4 | |
| INSPECTION DATE | 5 | |
| STATE REGULATIONS | 5 | |
| PREVIOUS INSPECTION DATES | 5 | |
| RECOMMENDED FUTURE INSPECTION DATES | 5 | |
| GENERAL TANK INFORMATION | 6 | |
| A. | GENERAL PROJECT INFORMATION | 7 |
| 1. | STI SP001 Inspection | 7 |
| 2. | Site Information | 7 |
| B. | TANK INSPECTION COMMENTS | 7 |
| 1. | Tank Construction | 7 |
| 2. | Tank Foundation | 7 |
| 3. | Tank Appurtenances | 7 |
| 4. | Tank Coating | 7 |
| 5. | Tank Piping System | 7 |
| 6. | Fire Protection System | 7 |
| 7. | Secondary Containment | 8 |
| C. | FINDINGS AND RECOMMENDATIONS | 8 |
| 1. | MANDATORY REPAIRS per STI SP001, UFC 3-460-01, NFPA 30, or NFPA 30A | 8 |
| 2. | SHORT TERM REPAIRS | 9 |
| 3. | LONG TERM REPAIRS | 10 |
| APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS | 12 | |
| TANK CONFIGURATION DIAGRAM | 12 | |
| TANK UT MEASUREMENTS | 13 | |
| APPENDIX B: STI SP001 FORMAL EXTERNAL INSPECTION CHECKLIST | 14 | |
| APPENDIX C: STI SP001 MONTHLY INSPECTION CHECKLIST | 15 | |
| APPENDIX D: STI SP001 ANNUAL INSPECTION CHECKLIST | 16 | |
| APPENDIX E: PHOTOGRAPHS | 17 |
ACRONYMS AND ABBREVIATIONS
| API | American Petroleum Institute |
| ASME | American Society of Mechanical Engineers |
| ASNT | American Society of Non-Destructive Testing |
| ATG | Automatic Tank Gauge |
| BBL | Barrel |
| CFR | Code of Federal Regulations |
| CP | Cathodic Protection |
| DFT | Dry Film Thickness |
| HLA | High Level Alarm |
| HLCS | High Level Control Shutoff |
| HHLA | High-High Level Alarm |
| LLA | Low Level Alarm |
| LLLA | Low-Low Level Alarm |
| MFL | Magnetic Flux Leakage |
| MT | Magnetic Particle Testing |
| NACE | National Association of Corrosion Engineers |
| NDT | Non-Destructive Testing |
| NFPA | National Fire Protection Association |
| PSI | Pounds per Square Inch |
| PT | Penetrant Testing |
| P/V | Pressure/Vacuum |
| RP | Recommended Practice |
| PST | Product Saver Tank |
| RT | Radiography Testing |
| STI | Steel Tank Institute |
| TML | Thickness Measurement Location |
| TRV | Thermal Relief Valve |
| UFC | Unified Facilities Criteria |
| UFGS | Unified Facilities Guide Specifications |
| ULS | Ultra Low Sulfur |
| UT | Ultrasonic Testing |
| VT | Visual Testing |
GENERAL SUMMARY
Summary of Inspection
INSPECTION DATE
Inspection Date: 1 January 20XX Equipment Used:
| Manufacturer: |
| Model Number: |
| Calibration Method: |
Inspector(s):
STATE REGULATIONS
| State Regulation for STI In-Service Tank Inspections | XX Years | |
| State Regulation for STI Out-of-Service Tank Inspections | XX Years |
NOTE: If there are no state regulations for tank inspections then N/A shall reside in-place of the number of years between inspections. If state regulations reside, the recommended future inspections dates shall be based on whichever is more stringent between the STI inspector’s calculations and the State regulations.
PREVIOUS INSPECTION DATES
Inspection Date: 1 January 20XX
RECOMMENDED FUTURE INSPECTION DATES
| STI Out-of-Service (Internal) Inspection Date: | 1 January 20XX |
| STI In-Service (External) Inspection Date: | 1 January 20XX |
[Name] [Title] [Company] STI Certified Inspector No. [XXXX]
GENERAL TANK INFORMATION
| ITEM |
| DESCRIPTION |
Owner
Location
Facility Number
Tank Number
State / Country
City
Inspection Date
Tank Manufacturer
Design Standard
Date of Construction
Tank Contents
Tank Serial Number
Tank Diameter
Tank Length
Product Height
Tank Capacity
Tank Foundation
Tank Construction
Interior Coating System
Exterior Coating System
Level Gauging
Venting
Strapping Charts
Overfill Protection
| Piping (Size and Material) |
| Receipt |
Issue
Water Draw-Off
Level Alarms
Secondary Containment
A. GENERAL PROJECT INFORMATION
1. STI SP001 Inspection
XXXX
2. Site Information
XXXX
B. TANK INSPECTION COMMENTS
1. Tank Construction
XXXX
2. Tank Foundation
XXXX
3. Tank Appurtenances
a. Venting
XXXX
b. Emergency Venting
XXXX
c. Manways
XXXX
d. Water Draw-Off
XXXX
e. High Level Shutoff Valve
XXXX
f. Level Alarms
XXXX
g. Gauging
XXXX
h. Pumps
XXXX
i. Stairs and Platforms
XXXX
j. Grounding and Bonding
XXXX
4. Tank Coating
XXXX
5. Tank Piping System
XXXX
6. Fire Protection System
XXXX
7. Secondary Containment
XXXX
C. FINDINGS AND RECOMMENDATIONS
XXXX.
1. MANDATORY REPAIRS per STI SP001, UFC 3-460-01, NFPA 30, or NFPA 30A Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.
1. Title Observation: Description Reference: Description Recommendation: Description
Title Observation: Description Reference: Description Recommendation: Description
2. SHORT TERM REPAIRS
Short-term Repairs that directly relate to the long-term preservation of the asset. Short-term repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military Criteria.
1. Title Observation: Description Reference: Description Recommendation: Description
Title Observation: Description
3. LONG TERM REPAIRS
Long-term Repairs that directly relate to repair/upgrade of an asset to bring it up to the current standard from the standard at time of construction. Long-term Repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
1. Title Observation: Description Reference: Description Recommendation: Description
Title Observation: Description
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
TANK CONFIGURATION DIAGRAM
TANK UT MEASUREMENTS
APPENDIX B: STI SP001 FORMAL EXTERNAL INSPECTION CHECKLIST
APPENDIX C: STI SP001 MONTHLY INSPECTION CHECKLIST
APPENDIX D: STI SP001 ANNUAL INSPECTION CHECKLIST
APPENDIX E: PHOTOGRAPHS
E.1: Tank XX North View E.2: Tank XX South View
E.3: Tank XX East View E.4: Tank XX West View
E.5: Picture Description E.6: Picture Description
E.7: Picture Description E.8: Picture Description
E.9: Picture Description E.10: Picture Description
E.11: Picture Description E.12: Picture Description
E.13: Picture Description E.14: Picture Description
E.15: Picture Description E.16: Picture Description image3.jpeg image4.jpeg image5.jpeg image1.png image2.jpeg image6.gif