This document is a Position/Task Risk Designation Levels Matrix that outlines the required position sensitivity levels for various labor categories under specific tasks for a federal contract opportunity.
The key details are:
The tasks covered include project management services, interior design, furniture, fixtures and equipment (FF&E), and space planning services. The labor categories are designated as requiring either a low (NACI), moderate (MBI), or high (BI) position sensitivity level. The labor categories include administrative, technical, management, and construction roles. The related federal contract opportunity is for the Q702--El Paso Health Care Center Design Support, solicitation number 36C77624Q0256, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. No other details about the contract opportunity are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77624Q0256 0001.docx | DOCX document | |
| S05 - Questions and Answers - El Paso.pdf | ||
| ATTACHMENT I - Wage Determination.pdf | ||
| ATTACHMENT C - Contract Staff Roster.pdf | ||
| ATTACHMENT D - Risk Management Plan and Register Template.xlsx | XLSX spreadsheet | |
| ATTACHMENT H - VSC Security Package 3.4.2024.pdf | ||
| ATTACHMENT K - El Paso RCL.xlsx | XLSX spreadsheet | |
| 36C77624Q0256_1.docx | DOCX document | |
| ATTACHMENT E - Room Contents Plan Template for Pre-planning and Design Supportfor 6.5.2024.xlsx | XLSX spreadsheet | |
| ATTACHMENT J - List of Services.pdf | ||
| ATTACHMENT F - QASP.docx | DOCX document | |
| ATTACHMENT A - PWS - El Paso Design Support 8.6.2024.pdf | ||
| ATTACHMENT B - Travel Authorization Request.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POSITION/TASK RISK DESIGNATION LEVELS MATIX
TASK TASK DESCRIPTION POSITION SENSITIVITY LEVEL
(LOW/NACI),
(MODERATE/MBI),
(HIGH/BI)
16.1 Project Management Services LOW
16.2 Interior Design, FF&E and Space Planning Services LOW
***Sample Labor Categories under the specific Tasks listed above
LABOR CATEGORY LOW
(NACI)
MODERATE
(MBI)
HIGH
(BI)
Administrative Assistant X
Database Developer X
Project Director X
Project Manager X
Quality Assurance Manager X
SharePoint Manager X
IT Specialist X
Scheduler X
StratCom Manager X
Transition Planner X
Designer X
Equipment Planner X
Acquisition Project Manager X
Acquisition Specialist X
Warehouse Laborer X
Warehouse Supervisor X
BMET X
Installer – FF&E X
Relocation Supervisor X
Trainer X
Truck Driver X
Construction Laborer X
Construction Manager X
Engineer X
File details come from the government source that posted it. Updated .