ATTACHMENT G - EXPERIENCE INFORMATION SHEET.pdf
PDF 832 KB Posted
- Solicitation number
- 36C24822R0147
About this file
This solicitation requests design-build services to replace a Toshiba OR-8 hybrid operating room at the Miami VA Healthcare System. Offerors must provide all labor, materials, equipment, supervision, and resources necessary to design and construct the project. The period of performance is 310 calendar days from notice to proceed. The project budget is between $500,000 and $1,000,000. This is a 100% service-disabled veteran-owned small business set-aside. The associated NAICS code is 236220 for commercial and institutional building construction. Phase I proposals are due to determine which offerors will submit Phase II proposals. Phase II instructions will be provided to selected Phase I offerors only. Proposals must come from firms registered in the System for Award Management and certified as a service-disabled veteran-owned small business in VetBiz.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT E - CONTRACT PROGRESS SCHEDULE.docx | DOCX document | |
| SOLICITATION 36C24822R0147.pdf | ||
| 36C24822R0147_1.docx | DOCX document | |
| ATTACHMENT C - DBA WD FL20220215 07.01.2022.pdf | ||
| ATTACHMENT H - PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ATTACHMENT B - OR8 FLOOR PLAN - DRAWINGS.pdf | ||
| ATTACHMENT F - EMR FORM.pdf | ||
| ATTACHMENT D - LIMITATION ON SUBCONTRACTING CERTIFICATION.docx | DOCX document | |
| ATTACHMENT A - 01 00 00 General Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 1
a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)
e. Percent (%) of project work performed by your company
f. If you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
ATTACHMENT G {3 PAGES}
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:
Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary
ATTACHMENT F {3 PAGES}
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution
j. Describe unforeseen conditions and how each were resolved
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
If not completed, Why?
m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.
n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
ATTACHMENT F {3 PAGES}
File details come from the government source that posted it. Updated .