Attachment F - Supplemental Cost Breakdown Sheet.pdf
PDF 108 KB Posted
- Attached to
- Draft Specifications - Modular Billeting, Prince Sultan Air Base (PSAB) Federal contract opportunity
- Solicitation number
- W912ER21R0008
About this file
This cost breakdown sheet and solicitation package are for a design-build contract to construct modular billeting facilities at Prince Sultan Air Base in Saudi Arabia. The Army Corps of Engineers seeks proposals to build insulated and weatherproof modular buildings constructed of steel frames and metal panels. The non-permanent structures will house 5,500 personnel in the Life Support Area. In addition to the modular construction, proposers will also be responsible for necessary site work including grading, utilities installation, and provision of a new transformer. Due to space constraints, the modular buildings are anticipated to be stacked two stories high and include structural supports, stairs and other accessibility features. Proposers must provide pricing for the modular construction and support facilities, as well as an optional line item for furnishing, fixtures and equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Specifications - Info Purposes Only 16 Dec 2020.pdf | ||
| W912ER21R0008 Amendment 0001.pdf | ||
| Phase 1 Solicitation - W912ER21R0008.pdf | ||
| Attachment G - Responsibility Determination Questionnaire.pdf | ||
| Attachment E - Past Performance Questionnaire (PPQ-0).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER21R0008 P2# 490232
PROJECT: Modular Housing PROPOSER:
LOCATION: Prince Sultan Air Base (PSAB) DATE:
Mobilization and Demobilization in accordance with the contract documents
0002 Site Design & Survey in accordance with the contract documents
Construct Modular Housing in accordance with the contract documents
0003AA Construct Foundations
0003AB Construct Modular Housing
0003AC Construct Split AC Units
0003AD Construct Stairs
0003AE Construct Balconies
Construct Modular Housing Supporting Facilities in accordance with the contract documents
0004AA Construct Site Electrical Distribution
0004AB Provide & Install Transformers
0004AC Construct Site Grading
0004AD Site Improvements
Option #1 Contractor Provide (FFE) Furniture, Fixtures, and Equipment in accordance with the contract documents
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0005)
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
TOTAL OPTION PRICE (ITEM 0005)
OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
ATTACHMENT F
SUPPLEMENTAL COST BREAKDOWN SHEET
ITEM DESCRIPTION
Cost Breakdown Sheet
File details come from the government source that posted it. Updated .