Attachment F - Supplemental Cost Breakdown Sheet.pdf

PDF 108 KB Posted

Attached to
Draft Specifications - Modular Billeting, Prince Sultan Air Base (PSAB)
Solicitation number
W912ER21R0008
Issued by

About this file

This cost breakdown sheet and solicitation package are for a design-build contract to construct modular billeting facilities at Prince Sultan Air Base in Saudi Arabia. The Army Corps of Engineers seeks proposals to build insulated and weatherproof modular buildings constructed of steel frames and metal panels. The non-permanent structures will house 5,500 personnel in the Life Support Area. In addition to the modular construction, proposers will also be responsible for necessary site work including grading, utilities installation, and provision of a new transformer. Due to space constraints, the modular buildings are anticipated to be stacked two stories high and include structural supports, stairs and other accessibility features. Proposers must provide pricing for the modular construction and support facilities, as well as an optional line item for furnishing, fixtures and equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER21R0008 P2# 490232

PROJECT: Modular Housing PROPOSER:

LOCATION: Prince Sultan Air Base (PSAB) DATE:

Mobilization and Demobilization in accordance with the contract documents

0002 Site Design & Survey in accordance with the contract documents

Construct Modular Housing in accordance with the contract documents

0003AA Construct Foundations

0003AB Construct Modular Housing

0003AC Construct Split AC Units

0003AD Construct Stairs

0003AE Construct Balconies

Construct Modular Housing Supporting Facilities in accordance with the contract documents

0004AA Construct Site Electrical Distribution

0004AB Provide & Install Transformers

0004AC Construct Site Grading

0004AD Site Improvements

Option #1 Contractor Provide (FFE) Furniture, Fixtures, and Equipment in accordance with the contract documents

TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0005)

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

LABOR MAN-HOURS DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL BASE BID PRICE (ITEMS 0001 - 0004)

TOTAL OPTION PRICE (ITEM 0005)

OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

ATTACHMENT F

SUPPLEMENTAL COST BREAKDOWN SHEET

ITEM DESCRIPTION

Cost Breakdown Sheet

File details come from the government source that posted it. Updated .