Attachment E – Task Order # 2- North Zone
Schedule of Items:
Ottawa National Forest North Zone Openings Maintenance
Ottawa NF IDIQ FY20 Task Order #2:
SITE DISTRICT COMP./STAND/
FOREST ROAD
ACRES/MILES COST PER
ACRE OR MILE
TOTAL
D – Opening
Kenton D4/C124/S003
FR3768-C
5.0 acres $
E – Opening
Kenton D4/C124/S047
FR3768
10.6 acres $
F – Opening
Kenton D4/C124/S010
FR3768-B
9.5 acres $
G – Opening
Kenton D4/C124/S048
FR3760
3.7 acres $
H – Opening
Kenton D4/C124/S014
FR3760
1.9 acres $
I – Opening
Kenton D4/C123/S011
FR2113
8.6 acres $
TOTAL AMOUNT FOR ALL ITEMS
39.3 acres
SEE OPENING-SPECIFIC CUTTING SPECIFICATIONS, SITE CONDITIONS, EQUIPMENT LIMITATIONS, AND
SEASONAL OPERATION RESTRICTIONS FOR ADDITIONAL INFORMATION TO CALCULATE ACCURATE
PRICING
This Request for Quotations (RFQ) will result in the issuance of a contract against the Ottawa’s IDIQ. This task order is for wildlife habitat improvement work on the Ottawa National Forest. Project area is located on the Ottawa National Forest.
BASIS OF AWARD: One task order will be awarded according to the terms described in solicitation 12569R20Q0023. Ability to meet the completion date will also be considered as a primary factor to determine if a quoter can be responsible for this contract. Bid information should include both price and sufficient information for us to determine whether or not the work can be completed on time (e.g. operating plan and/or list of employees and/or list of current contracts held by quoter)
For Technical information, contact Scott Pearson at (906) 358-4027
Include the following information with your responses to the technical criteria:
Company Name: ______________________________________________________________
Name: _____________________________________________ Date: ________________
Signature: __________________________________________
EMAIL: ________________________________________ DUNS: __________________________
CONTRACT TIME: The start date will be on 1 July 2020 – 14 September 2020.
Technical Contracting Officers Representative:
Scott Pearson, Biological Technician Iron River-Watersmeet Ranger District Ottawa National Forest E23979 US Hwy 2 East
Attachment E – Task Order # 2- North Zone
Watersmeet, MI 49969 P: 906-358-4027 C: 906-367-2138
DEFINITIONS OF TECHNICAL SPECIFICATION TERMS
This Task Order RFQ incorporates the Ottawa Wildlife Habitat Improvement IDIQ Specifications, please read Attachment A for details.
Attachment E – Task Order #2, North Zone
Ottawa National Forest Wildlife Habitat Improvement Services Description/Specifications/Scope of Work
Task Order #2 North Zone Openings Maintenance
Introduction This task order pricing request will result in the issuance of a task order against the Ottawa’s IDIQ.
Location Project area is located on the Ottawa National Forest
Scope of Work Statement of Work and Site Conditions: This task order identifies approximately 15 acres of upland openings that were formerly more open than today, due to encroachment of trees and shrubs. We want most of the woody vegetation removed, to preserve the open, sunny character of these sites.
Included are upland openings that can be maintained entirely via mechanical means such as tractors with rotary mower decks, skidsteers with mower decks, skidsteers with grinding heads (e.g. Fecon or similar forestry mulching heads). Portions of some of these sites may only be accessible on foot with hand-held chainsaws and/or rotary head brush saws, these areas will be flagged and/or identified on a final georeferenced field map. We expect operators to have all the necessary equipment to efficiently and effectively cut and fell or mow/mulch undesired woody vegetation encroaching on the sites. The perimeter of each opening has been flagged or painted and a georeferenced pdf map is available for upload into programs such as Avenza. Some openings are a short distance (all <1/5 mile) off of main access roads, which means that a trail through the woods (mostly shrubs and sapling sized trees) will need to be created in order to accommodate mechanical equipment. These access trail routes will also be flagged. Within some openings there may be reserve trees and shrubs that have been blue-flagged to aid operators to avoid cutting them. We also expect operators to be proficient at identifying tree and shrub species common in this area. Our specifications require identifying and not cutting certain species of trees and shrubs as part of project implementation. Sensitive resources exist within some of the openings and need protection during project implementation and are either outside the pink boundary or flagged with pink/black striped flag as a do not enter zone within the opening boundary. If during implementation, additional archeological resources, listed plants or dens or nests of listed wildlife are found and occupied, work will cease immediately and the Forest Service will be contacted to determine restrictions and next steps.
We expect the work to be conducted between July 1 to November 14 within one or two operating seasons. If weather and/or soil conditions postpone work, a longer timeline can be negotiated. Forest Service will determine favorable site conditions and notify Contractor within 24 hours that work can begin. Mobilization of equipment to the site can be done earlier if it does not cause road rutting or other resource concerns. Our experience indicates clay soils can usually support equipment operations July 1- Sept 14, but not always. There may be periods of 1-3 days when equipment operations would have to cease following heavy rains.
Description This RFQ incorporates the Ottawa Wildlife Habitat Improvement IDIQ, please see the IDIQ details.
Road Access to the Sites
All of these openings are located on the Kenton Ranger District of the Ottawa National Forest. All openings are located less than 10 miles (straight-line distance) from Kenton and Sidnaw, Michigan.
These six openings (Units D through I) are centrally located between Kenton and Sidnaw and can be accessed by taking M-28 east from Kenton to South Sidnaw Road, and then south to FR3760 and FR2113. More detailed directions are as follows:
Unit D: T47N-35W-Sec.18. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR3760 to FR3768 to FR3768-C to flagged trail.
Unit E: T47N-R35W-Sec.19. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR3760 to FR3768 and FR3768-B.
Unit F: T47N-R35W-Sec.19. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR3760 to FR3768 and FR3768-B to flagged trail.
Unit G: T47N-R35W-Sec.19. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR3760.
Unit H: T47N-R35W-Sec.19. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR3760.
Unit I: T47N-R35W-Sec.20. From Kenton, MI take M-28 to Sidnaw, MI to South Sidnaw Road to FR2113.
Shall maintain Forest Service roads and trails in approximately the same conditions they are in before the work began. Performance of road and trail maintenance may be required prior to, during, or after each period of use. Maintenance may include brushing, removal of fallen trees or logs, back blading, re-crowning and re-shaping to drain the road surface.
So far as practicable, project workers shall protect access routes and other improvements (such as dikes, trails, berms, ditches, etc.):
a) Existing in the operating area
b) Determined to have a continuing need or use, and
c) Designated on the Project Area Map
Contractors shall keep roads and trails needed for fire protection or other purposes and designated on the Project Area Map free of equipment, slash, and debris resulting from Contractor’s operations.
Contractor shall restore any roads or trails damaged by Contractor’s operations.
Opening-Specific Site Conditions, Equipment Limitations, and Seasonal Operating Restrictions:
1) Unit D (Stand ID: C124/S003). This opening is 5.0 acres and is located off of FR3768-C south of Sidnaw, MI. Caution: The north side of the unit abuts private land so care must be taken not to cross over the property boundary. Mechanized equipment and/or hand tools may be used throughout July 1 – November 14. Work will involve moderate to heavy brushing, tree felling/girdling and brushpiling. Create 1 to 2 brushpile(s)/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody vegetation with larger logs forming the base to create access burrows and the smaller materials piled at the top for thermal cover. A trail of about 1,000-feet will need to be created through the woods to access the opening with mechanical equipment. The trail will be flagged by wildlife staff and will likely require mechanical equipment to create the trail. Trail creation will predominately involve taking down small sapling trees and shrubs and only needs to be wide enough for your equipment to gain access to the opening. Trail length will likely be around 1000’.
2) Unit E (Stand ID: C124/S047). This opening is 10.6 acres and is located off of and along FR3768 and FR3768-B south of Sidnaw, MI. Mechanized equipment and/or hand tools may be used throughout July 1 – November 14. Work will involve moderate brushing, tree felling/girdling and brushpiling. Create 1 brushpile/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody vegetation with larger logs forming the base to create access burrows and the smaller materials piled at the top for thermal cover.
3) Unit F (Stand ID: C124/S010). This opening is 9.5 acres and located just west of Unit E. To access this stand go to the end of FR3768-B and there will a short ~150-foot trail flagged by wildlife staff. Creating this trail should be relatively easy as it will only require removal of small shrubs and saplings to gain access to the opening. Mechanized equipment and/or hand tools may be used throughout July 1 – November 14. Work will involve moderate brushing, tree felling/girdling and brushpiling. Create 1 brushpile/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody vegetation with larger logs forming the base to create access burrows and the smaller materials piled at the top for thermal cover.
4) Unit G (Stand ID: C124/S048). This opening is 3.7 acres and is located directly along FR3760.
Mechanized equipment and/or hand tools may be used throughout July 1 – November 14.
Work will involve moderate brushing, tree felling/girdling and brushpiling. Create 1 brushpile/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody vegetation with larger logs forming the base to create access burrows and the smaller materials piled at the top for thermal cover.
5) Unit H (Stand ID: C124/S014). This opening is 1.9 acres and is located directly along FR3760.
Work will involve moderate brushing, tree felling/girdling and brushpiling. Create 1 brushpile/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody
6) Unit I (Stand ID: C123/S011). This opening is 8.6 acres and is located directly along FR2113.
Work will involve moderate brushing, tree felling/girdling and brushpiling. Create 1 brushpile/acre (roughly 10-15’ wide x 5-10’ tall) along the opening edges by piling the cut woody
Openings Maintenance Specifications:
1. Dead standing snag trees should be left standing, unless deemed a safety hazard.
2. Live cavity-containing (woodpecker holes) trees >6” diameter breast height (dbh) will be retained whenever practical.
3. Wildlife trees: oak, cedar, hemlock, apple, plum, and hawthorn should not be mowed, cut or girdled within the perimeter of the openings. White pines, in general, should not be cut, however, when young white pines are growing in dense clumps you may cut roughly 50-75% of the trees with preference for releasing (saving) the healthiest-looking white pines. Aspens >6” dbh should be retained. Save larger cherry trees (~>3” dbh), but where cherry regeneration is forming dense patches, you may cut up to 50-75% of the young cherry to help preserve the opening.
4. Wildlife shrubs: preserve serviceberry, hazel, hawthorn, willows, and cherry >3” dbh. Up to 50- 75% of young sapling cherries may be cut, especially where regenerating cherry is forming dense patches that appear to be taking over the opening.
5. Some trees and shrubs may have blue flagging on them. This blue flagging indicates a tree NOT to cut or damage. The flagging is intended to draw attention to the tree or shrub so that it can be reserved without accidental take. These will typically be oak, serviceberry, hazel and hawthorn.
6. Maximum stump height of cut or mowed/mulched trees shall be 6” or lower, or below any live branches that occur below 6”. For example, if green balsam boughs sprout 4” above the ground, the stump shall be cut below 4” level. Completely sever all trees and shrubs. Hinges are not acceptable. Stumps are not expected to be grubbed or pulled out.
7. One to two brushpile(s)/acre should be created on the edges of the openings using cut woody vegetation; this number is dependent upon available material. Larger logs (>8” dbh) should form the base of the brushpile. For example, a good brushpile will have 4-8 large logs placed 2- 4’ apart parallel with each other. Then another layer of logs are piled on top of the base logs running perpendicular to the bottom logs creating a crosshatch pattern. Then smaller woody materials, ideally evergreens, are piled on top up to 5-10’ high. The base with the larger logs will allow small to medium-sized animals to get completely inside the brushpile with the top layers providing thermal and escape cover.
8. When possible fall trees towards the opening edge to protect the interior of the opening. Care should be taken to preserve pollinator plants especially milkweed. Whenever possible, avoid these plants with mechanical equipment. It would be preferred to take out woody plants in these areas on foot using a chainsaw.
9. If using mower deck or mulching head, minimize scalping to the greatest extent practical. Ideal mowing and mulching height is about 4”-6” above the ground. Exposing mineral soil is discouraged to prevent soil erosion and creating sites for invasive plants.
10. Prior to taking any equipment off a gravel-surfaced road into the woods trails and openings, the Forest Service MUST inspect all equipment to be visually free of dirt, seeds, or plant parts that may contain invasive species. Expectation is for equipment to have been cleaned with stiff broom or thoroughly washed prior to arrival at work site. If moving between the above work sites the operator will not be expected to clean the equipment. But if equipment leaves the Ottawa and works elsewhere, we expect the equipment to be cleaned again, and we will inspect it again before allowing work to resume at these project sites.
11. If fire danger is Very High or Extreme, Forest Service may temporarily suspend operations until fire danger declines.
12. If rutting is occurring, Forest Service may temporarily suspend mechanical operations until ground conditions improve.
13. Roads and trails are to be reshaped and bladed, if needed, to restore road/trail surfaces to pre-contract conditions, unless mutually-agreed to by both parties prior to onset of use.
14. If heritage resources are discovered, work will cease immediately and the Forest Service archaeologist will be contacted to determine next steps.
15. If an active hawk nest is discovered in close proximity to the work area or golden-winged warblers are seen or heard, the work area timing or location may need to be adjusted. Signs of a nearby active nest includes hawks flying overhead or landing in a nearby tree calling continuously or white wash (bird droppings) on vegetation directly below a nest.
16. Also, consult wildlife biologist if there is evidence of recent wolf activity/occupation such as signs of a wolf den or rendezvous site. Notify wildlife biologist if you detect the presence of other federal, state listed, or sensitive plants or animals.
17. Recommended Evaluation Criteria if Subcontracting:
A. Experience shall be documented on OMB’s Experience and Capability Form (see attached document).
B. All workers on site removing vegetation must have ability to identify common tree and shrub species.
C. Diversity of equipment that can be deployed to quickly and efficiently implement the project within seasonal restrictions.
D. Ability to bring adequate personnel to the task for the handwork sites to get them completed quickly and efficiently.
Definitions of Technical Specifications Terms The RFQ incorporates the Ottawa Wildlife Habitat Improvement IDIQ, please see the IDIQ for details.
Kenton District of the Ottawa National Forest. Created on 27 Septemeber 2019
SIDNAW
MI-28
HOU-D161
HO
U-
D1
OLD M28
KITCHIE ROAD
IRN-PONOZZO ROAD
3668-A
HO
U-
D1
-C
HOU-D161F
2127-A
HOU-D161E
I
J
EF
D
K
G H
MI-28
FD
R3
FDR3660
FDR2127
FDR3630
FDR2020
FD
R3
OLD M28
FD
R2
FDR2009
FDR2400
HOU-KITCHIE ROAD
FDR2108
FDR1224
FD
R2
FDR3667
FDR3662
IRN-PONOZZO ROAD
HOUGHTON COUNTY LK THIRTEEN RD
FDR3773
FD
R363
FDR2012
FDR2130
FDR2113
FDR3740
FD
R3
FDR2125
FD
R3
FDR3722
FD
R3
FD
R2
2-C
FDR2009-F
FD
R3
FD
R2
FDR3633
FDR3661
FDR2204
FDR3775
FD
R2
7-K
FDR3762
FDR1224-K
FDR3568
FD
R2
7-K
FDR2129
FSR2495
FD
R3
FDR1224-L
FDR3546-A
FDR3633-C
FD
R3
FDR3545
FD
R2
8-H
FDR2127-K5B
FDR2117-K
FD
R2
9-D
FDR2117
FDR2475
FD
R1
4-F
FDR1224-P
FD
R3
FDR3785
FDR1224-K1
0415105
FDR3622
FDR1217
FDR2115
FDR3667-D
FDR3667-H
FDR2127-U
FDR3732-D
FDR3680
FD
R2
9-T
FD
R3
0-F
FDR3630-J
FDR376
FD
R3
0409238
FDR3642
FD
R3
FDR2493
FDR2011-E
FD
R2
5-B
FDR3549
FD
R3
0-M
FD
R3
2-C
FDR3746
FDR3767-C
FDR3783
FDR2149-R
FD
R2
3-C
FDR3557
FDR2213-H
FDR3574
FDR3779
FSR2125-D
FDR3667-B
FDR3663-D
0411527
FD
R2
FDR2017
FDR2108-J
FDR3555
FDR2214
FD
R2
7-C
FDR3538
FDR3632-M
FDR3558
FDR2149-Y2
FD
R3
0-K
FDR2108-N1
0412414
FD
R3
8-A
FD
R3
2-B
FDR3632-T
FDR2012-C5
FD
R363
FDR3568-C
FDR2009-A
FDR2204-G
0411620
FDR3660-R
FDR3542
FDR3764
FDR2100-F
FDR2021
FD
R375
FDR2007
FD
R3
-F
0411630
FDR3667-J
0415701
FDR2127-K9
0415817
FDR2117-K6
FDR2126
FDR3576
HO
UG
HT
ON
C
OU
NT
Y S
SI
DN
AW
R
OA
D
FD
R3
0408605
FDR3768
FDR2208
FDR2208
FDR1215
FDR3767-A
FD
R2
-F
FDR1213
FDR2142
0411617
FDR2127-S
0411521
FDR3787
FDR2009-F3
FDR3667-F
FDR3632-B
FDR2124
0411525
FDR2130-A
FD
R3
4-A
FDR3761
FDR3663-E
FDR2130-B
FD
R2
9-C
0411547
FD
R3
0-E
FD
R3
-L
FDR3786
FDR3630-G
0409412
FDR3642-S1
FDR2012-C4
FDR3778-A
FDR3762-A1
FDR2149-S
FD
R2
9-D
FDR3546
0412533
FDR3726
FDR2009-E
FDR3550
FD
R3
7-A
FDR3642-S
FD
R2
1-F
FDR2012-A
FDR3781
0411520
FD
R3
2-P
FD
R3
5-A
0411605
FDR2113
-D
FDR3773
-D
FD
R2
8-L
FD
R3
0-I
0411519
FDR2108-F
FDR2117-FFDR3665-C
FDR3580
FDR2108-H2
FDR3763
FD
R1
5-J
FDR3630-E2
FD
R3
0409242
FDR3660-N
0411602
FDR3637
FDR2127-K3
FD
R3
0-G
FDR2130-C
0409307
FDR220
0411528
FDR2020-A
FD
R3
2-A
FDR3632-E
FDR2127-L
FD
R2
7-C
FDR2493-D
FD
R3
5-A
FD
R2
0411619
FD
R2
3-E
FDR1235-E1
FDR2011-J
FDR3662-H
0409413
FDR2471
FDR2121
FDR2418-F
FD
R1
5-G
FDR3633-C1
FD
R366
0-T
FD
R3
4-B
0409244
FDR3637-A
FDR1224-K1A
FD
R1
4-M
FDR2149-Y
FD
R3
8-A
FDR3778
FDR3543-A
FDR3761-A
FDR3663-H
FDR2113-B
0411536
FDR3783-A
FDR2149-P
FDR3630-F2
FDR2213-K
FDR3661-A
FDR1224-J
0409232
FD
R3
9-A
FDR2204-A
FDR2012-C7
FD
R2
8-C
FSR2009-D4
FSR210
8-H
FDR3662-K
FDR2009-C
FDR3663-C
FD
R2
1-H
FDR2206
0409234
FSR2121-A
FDR3668
FDR2108-K
FDR2127-D
0409243
FD
R3
3-B
FDR2127-A
FDR3637-B
FS
R2
8-B
FDR3722-D
FDR3768-C
0412415FD
R3
FDR2015-B
FSR2009-G
0415108
FD
R2
5-D
0411517
FDR2111
FD
R1
4-H
FDR3660-E
FDR3546-A2
FDR3662-E
FDR3662-J
FDR3662-H1
FDR3773-C
FD
R200
FDR2130-A1
FDR3638-A
0411516
FDR3667-D1
0409408
0411537
FDR3549-B
0411524
FDR3630-J1
FDR2026
FDR2011-K
FDR3662-G
041163104
FDR3773-A
FDR3568-D
FD
R2
9-W
FD
R366
2-N
FDR1224-R
FDR2127-C2
FDR3642-P
FDR3772
16070411532
FDR2012-B
0415810
FDR3660-B
FS
R2
FD
R2
4-K
FDR3663-F
FSR2009-G1
FDR3661-E
0409230
FD
R210
0-G
FDR2108-H4
HOUGHTON COUNTY MILLTOWN ROAD
FD
R200
9-D
FD
R3
-B
FDR3722-D1
0415807
FDR2108-H5
FDR3545-A
0411621
FDR3632-C
FD
R3
2-A
FD
R3
-K
0411604
FD
R1
4-N
FDR3634
FDR1224-F2
HO
UG
HT
ON
C
OU
NT
Y S
CH
WI
TZ
ER
R
OA
D
FD
R3
FDR366
0-J
FD
R354
9-C
FSR2009-D6
0411622
FDR3779-A1
FDR3760-B
FDR2127-K7
FDR3784
FDR3722-C2
FDR2127-C1
0411526
HOUGHTON COUNTY FIRE TOWER RD
FD
R2
5-E
FDR2480
FDR2480
0411550
FD
R376
0-F
FD
R3
FDR3760-C
FDR2149-W1
0409211
0415816
FDR3642-R
FDR2017-B
FD
R2
0-G
FDR2108-H3
FD
R3
FDR3661-B
0415814
FDR2020-D
0415102
FDR3756-A
0409305
FDR3666
0411610
FSR2009-D5
FDR3667-D4
FDR1235-E
FDR3767-D
FDR2127-A2
FDR3633-E
FDR2213-H1
FDR2106
FDR3763-A
FDR3722-B
FDR2127
-H
FDR2015-A
0411551
FDR2127-K5M
0411540
FSR2125-
E
FSR2009-D4A
0415704
FDR3687 0412527
FDR2009-B
FDR3667-D3
FDR3660-D
FD
R1
3-C
FDR2127-C3
HOUGHTON COUNTY BORSCH ROAD
0408518
0415806
FDR3760-A
FD
R2
-R
FDR3632-W
FDR2481
FDR3775-B
FD
R2
-K4
FDR3635
FDR3546-D
FD
R2
3-D
FDR2488
FSR2108-H7
FD
R3
-B
FDR2482
FDR2129-A
FDR2130-A2
FDR3662-M
0408601
FDR2009-H
FDR3768-B
FD
R3
2-H
0411611
0415706
FDR3632-K
FDR2127-F
FDR3549-A
FSR2108-H8
FDR3756-B
FD
R212
7-K 5F
0411542
FDR3632-R
FDR3568-G
FD
R3
0-D
0411529
FDR3577
FD
R1
FDR2129-B
FDR3773
-E
FDR2011
-G
0408602
0411522
FDR3661-D
FD
R377
8-B
FD
R2
6-A
FDR2108-D
FD
R2
-B
FD
R3
0-F
FDR3660-L
FDR1224-C
0408509
FDR3630-RFD
R3
0-P
FDR2127-K5J
FDR3662-H3
FDR2127-G
FDR3632-V
FDR2127-A1
0411601
FDR3642-M
FDR3642-M
FDR1235-M
Legend GNA Opening Units
Road System Highways County Nat'l Forest Roads Nat'l Forest Roads & Trails ¯0 2 41
Miles
North Zone GNA Wildlife Opening Maintenance for FY2020: Map 2 sspearson Text Box FY20 Ottawa NF North Zone Openings Maintenance IDIQ Contract - Task Order #2 sspearson Callout Task Order #2 sspearson Oval
FDR3768-C
USDA - APFO; USDA - USFS – GTAC
Legend GNA Ope ning Units Nat'l Fo re st Ro ads & Trails Private Pro pe rty ¯0 350 700175
Fe e t
No rth Zo ne GNA Wildlife Ope ning Mainte nance fo r FY2020: Unit D
FD
R3
FDR3768-C
FD
R3
8-A
FDR3760
FDR3768-B
USDA - APFO; USDA - USFS – GTAC
Legend GNA Opening Units Na t'l Forest Roa ds & Tra ils Priva te Property ¯0 640 1,280320
Feet
North Zone GNA Wildlife Opening Ma intena nce for FY2020: Unit E
R3
FDR3760
FD
R376
FDR3768-C
FD
R3
7-A
FDR3768-B
USDA - APFO; USDA - USFS – GTAC
Legend GNA Ope ning Units Nat'l Fo re st Ro ads & Trails Private Pro pe rty ¯0 480 960240
Fe e t
Mainte nance fo r FY2020: Unit F
R3
FD
R376
USDA - APFO; USDA - USFS – GTAC
Legend GNA Ope ning Units Nat'l Fo re st Ro ads & Trails Private Pro pe rty ¯0 320 640160
Fe e t
Mainte nance fo r FY2020: Unit G
R3
FD
R3
USDA - APFO; USDA - USFS – GTAC
Legend GNA Open in g Un its Nat'l Forest Roads & Trails Private Property ¯0 320 640160
Feet
North Zon e GNA Wild life Open in g Main ten an ce for FY2020: Un it H
FDR2113
FDR2113-B
FDR2113-D
FD
R211
3-C
USDA - APFO; USDA - USFS – GTAC
Legend GNA Op ening Units Nat'l Forest Roads & Trails Private Prop erty ¯0 400 800200
Feet
North Zone GNA Wildlife Op ening Maintenance for FY2020: Unit I
| Attachment E - TaskOrder02_Schedule of Items |
| Attachment E - Specifications TaskOrder02 |
| Ottawa National Forest Wildlife Habitat Improvement Services |
| Description/Specifications/Scope of Work |
| Attachment E - Task Order 2 Maps |
| FY20_GNAOpening_UnitD |
| FY20_GNAOpening_UnitE |
| FY20_GNAOpening_UnitF |
| FY20_GNAOpening_UnitG |
| FY20_GNAOpening_UnitH |
| FY20_GNAOpening_UnitI |
File details come from the government source that posted it. Updated .