Attachment-E_HALE_Panels_Cost_Estimate_Form.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- HAFC_HALE_216048_WAYSIDES PANEL FAB Federal contract opportunity
- Solicitation number
- 140P2123Q0201
About this file
This document is a cost estimate form for the fabrication of panels for a federal contract opportunity with the Department of the Interior National Park Service. The form provides pricing details for project management, layouts and fabrication drawings, graphic panels, project closeout, and shipping for the fabrication of 29 exhibits. Labor rates and hours are left blank to be filled in. Materials costs are also left blank, with categories identified for various sized double-sided aluminum panels. The related federal contract opportunity is solicitation number 140P2123Q0201 for wayside panel fabrication at HAFC, with an unspecified response deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2123Q0201_Amd_0001.pdf | ||
| Attachment-D_Past_Performance_Questionnaire.pdf | ||
| Attachment-B_ProductionNotes.pdf | ||
| Attachment-A_Panel_Production.pdf | ||
| Attachment-C_Graphic_Panels_Specifications.docx | DOCX document | |
| Sol_140P2123Q0201.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Panels
| Attachment D - COST ESTIMATE FORM -- HALE: PANEL FABRICATE | ||||||
| PROJECT MANAGEMENT | $0.00 | |||||
| LAYOUTS & FABRICATION DRAWINGS | $0.00 | |||||
| GRAPHIC PANELS | $0.00 | |||||
| PROJECT CLOSEOUT | $0.00 | |||||
| SHIPPING | $0.00 | Total Materials Cost | ||||
| TOTAL | $0.00 | |||||
| Rounded to | $0 | |||||
| (Estimating 29 Exhibits) | ||||||
| PROJECT MANAGEMENT (excluding travel) | ||||||
| LABOR | hours | x | rate | amount | ||
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Layouts | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous (Graphic Set-up Fee) | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | |
| TOTAL Layouts | $0.00 |
| Graphic Panels | |||||
| MATERIALS: | qty. | unit | dig output | amount | |
| 29.875" width x 19.875" height low-profile (double-sided aluminum) | ea | $0.00 | |||
| 35.875" width x 47.875" height upright (double-sided aluminum) | ea | $0.00 | |||
| 33.25" width x 45.25" height bulletin case (double-sided aluminum) | ea | $0.00 | |||
| 23.875" width x 23.875" height low-profile (double-sided aluminum) | ea | $0.00 | |||
| 35.875" width x 23.875" height low-profile (double-sided aluminum) | ea | $0.00 | |||
| 41.875" width x 23.975" height low-profile (double-sided aluminum) | ea | $0.00 | |||
| ea | $0.00 | ||||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist | hours | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Misc. | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | 0 | hours @ | $0.00 | ||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
File details come from the government source that posted it. Updated .