This document is a Geotechnical Engineering Report prepared by Terracon Consultants, Inc. for AVI Professional Corporation, focusing on the Dale Creek Structure project located in Larimer County, Colorado. The report details a geotechnical investigation for a proposed multi-cell precast concrete box culvert to be constructed along County Road 45E over Dale Creek. The investigation involved two boreholes drilled to depths of 14.5 to 24.1 feet, with the primary objectives of evaluating subsurface conditions, groundwater levels, and providing geotechnical recommendations for the structure's design and construction.
The report reveals that the site consists of approximately 4 feet of clayey sand overlying 9-10 feet of well-graded sand with silt and gravel, with granitic rock encountered at depths of 13-14 feet. Groundwater was observed at 4-8 feet below existing grades. Key geotechnical considerations include potentially loose sand soils, difficult excavation conditions due to dense gravelly materials, and the need for careful foundation preparation. The report recommends using shallow spread footings, maintaining a minimum 3-foot separation from groundwater levels, and implementing specific earthwork and compaction procedures. The investigation suggests the site is suitable for the proposed construction, provided the recommended geotechnical precautions and design considerations are followed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment B - Sample Contract, Insurance Requirements and P_P Bonds.pdf | ||
| B25-14 ITB Package .pdf | ||
| Attachment D - Constructions Plans.pdf | ||
| Attachment C - Special Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Cover Page
Prepared for:
AVI, Professional Corporation
2290 East Prospect Road, Suite 5
Fort Collins, Colorado 80525
Dale Creek Structure Geotechnical Engineering Report
Larimer County, Colorado
August 15, 2024 | Terracon Project No. 20245000
Dale Creek Structure | Larimer County, Colorado
Facilities | Environmental | Geotechnical | Materials i
Table of Contents
Report Summary .............................................................................................. i Introduction Project Description Site Conditions Geotechnical Characterization
Groundwater Conditions Seismic Site Class Corrosivity Geotechnical Overview
Shallow Groundwater Low Relative Density Soils Difficult Excavation Foundation Recommendations
Earthwork Demolition Site Preparation Excavation Subgrade Preparation Fill Material Types Fill Placement and Compaction Requirements Utility Trench Backfill Grading and Drainage Earthwork Construction Considerations Construction Observation and Testing
Shallow Foundations Spread Footings – Design Recommendations Shallow Foundation Construction Considerations
Lateral Earth Pressures Design Parameters
General Comments
Figures GeoModel
Facilities | Environmental | Geotechnical | Materials ii
Attachments
Exploration and Testing Procedures Site Location and Exploration Plans Exploration and Laboratory Test Results Supporting Information
Note: This report was originally delivered in a web-based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
Refer to each individual Attachment for a listing of contents.
Facilities | Environmental | Geotechnical | Materials i
Report Summary
Topic 1 Overview Statement 2
Project Description
A geotechnical exploration has been performed for the proposed multi-cell precast concrete box culvert and wing walls to be constructed along County Road 45E at Dale Creek in Larimer County, Colorado. Two borings were performed to depths of approximately 14½ to 24 feet below existing grades.
Geotechnical Characterization
Subsurface conditions encountered in the exploratory borings generally consisted of about 4 feet of clayey sand over about 9 to 10 feet of well graded sand with silt and gravel. Granitic rock was encountered in the borings below the well graded sand soils at depths of approximately 13 to 14 feet below existing site grades.
Auger refusal was encountered in the granitic rock at a depth of about 14½ feet below existing grade in Boring No. B-1.
Groundwater was encountered in the borings at depths of about 4 to 8 feet below existing site grades at the time of drilling.
Groundwater levels can fluctuate in response to site development and to varying season and weather conditions, and fluctuations in Dale Creek.
Geotechnical Overview
The following geotechnical concerns were identified for this project:
■ Groundwater was measured at depths ranging from about 4 to 8 feet below existing site grades at the time of drilling.
We anticipate the culvert and wing walls will be constructed near or below these groundwater levels. Terracon recommends maintaining a separation of at least 3 feet between the bottom of the culvert and below-grade wing wall foundations and measured groundwater levels during construction. Temporary construction dewatering will likely be needed where excavations extend deeper than the observed groundwater levels or water levels within Dale Creek.
■ Comparatively loose, low relative density sand soils were encountered at depths of approximately 4 to 7 feet below existing grade in Boring No. B-2. These materials present a risk for potential settlement of shallow foundations and other surficial improvements. These materials can also be susceptible to disturbance and loss of strength under repeated construction traffic loads and unstable conditions
Facilities | Environmental | Geotechnical | Materials ii
Topic 1 Overview Statement 2 could develop. Rework or stabilization of loose soils may be required at some locations to provide adequate support for construction equipment and the proposed structure.
Terracon should be contacted if these conditions are encountered to observe the conditions exposed and to provide guidance regarding stabilization (if needed).
■ Dense to very dense sand soils with gravel were encountered in the borings. These conditions can complicate and increase the difficulty of excavation and additional effort may be necessary to extract larger-sized materials, particularly in deeper narrow excavations, such as utility trenches. Also, excavation penetrating rock (if any) may require the use of specialized heavy-duty equipment, together with ripping or jack-hammering to advance the excavation and facilitate rock break-up and removal. Consideration should be given to obtaining a unit price for difficult excavation in the contract documents for the project.
Earthwork
On-site soils typically appear suitable for use as engineered fill on the site provided they are placed and compacted as described in this report. Import materials (if needed) should be evaluated and approved by Terracon prior to delivery to the site.
Shallow Foundations
We believe the wing walls for the proposed precast concrete box culvert can be supported on a shallow, spread footing foundation system provided the foundations bear on the medium dense to very dense well-graded sand soils with gravel encountered in the borings and any loose soils encountered below foundations are removed and replaced with moisture conditioned, properly compacted engineered fill.
Service limit bearing resistance = 3,500 psf
Expected settlements: 1-inch total, ½ to ¾-inch differential
General Comments
This section contains important information about the limitations of this geotechnical engineering report.
1. If the reader is reviewing this report as a pdf, the topics above can be used to access the appropriate section of the report by simply clicking on the topic itself.
2. This summary is for convenience only. It should be used in conjunction with the entire report for design purposes.
Facilities | Environmental | Geotechnical | Materials 1
Introduction
This report presents the results of our subsurface exploration and Geotechnical Engineering services performed for the proposed box culvert to be located along County Road 45E over Dale Creek in Larimer County, Colorado. The purpose of these services was to provide information and geotechnical engineering recommendations relative to:
■ Subsurface soil and rock conditions
■ Groundwater conditions
■ Seismic site classification
■ Site preparation and earthwork
■ Demolition considerations
■ Dewatering considerations
■ Foundation design and construction
■ Lateral earth pressures for culvert wing walls
The geotechnical engineering Scope of Services for this project included the advancement of test borings, laboratory testing, engineering analysis, and preparation of this report.
Drawings showing the site and boring locations are shown in the Site Location and Exploration Plan section of this report. The results of the laboratory testing performed on soil and bedrock samples obtained from the site during our field exploration are included on the boring logs and as separate graphs in the Exploration Results section.
Project Description
Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows:
Item Description
Information Provided
The project information described below is based on the following:
■ Email and phone communication with AVI, PC
■ Google Earth KMZ file from AVI, PC
Facilities | Environmental | Geotechnical | Materials 2
Item Description
Project Description
The planned project includes construction of a multi-cell precast concrete box culvert along County Road 45E at Dale Creek. The dimensions of the culvert were not provided at this time. Wing walls will be installed at the ends of the culvert. We anticipate wing walls will be supported on shallow, spread footing foundations.
As an alternative to a box culvert, consideration has been given by the project team to construct a single-span bridge over Dale Creek supported on shallow, spread footing foundations.
Planned Bearing Elevation
We anticipate the proposed culvert and wing wall foundations will bear at depths of about 4 feet or deeper below existing grades.
Grading/Slopes
Grading plans were not provided to Terracon at the time of this report. We anticipate cuts and fills on the order of about 5 feet or less will be required to achieve proposed grades. Deeper excavations could be required for some structural elements.
Free-Standing Retaining Walls
Wing walls are planned to be constructed at the ends of the culvert to achieve final grades. Wing walls are anticipated to be designed and constructed as reinforced concrete cantilevered walls.
Pavements
No new pavements requiring design are anticipated. We anticipate existing roadway pavements/surfacing will be demolished as part of the installation of the culvert will be replaced per Larimer County specifications to a minimum thickness at least equal to the existing pavement/surfacing thickness.
Design Code AASHTO LRFD Bridge Design Specifications
Terracon should be notified if any of the above information is inconsistent with the planned construction, especially the grading limits, as modifications to our recommendations may be necessary.
Site Conditions
The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps.
Facilities | Environmental | Geotechnical | Materials 3
Parcel Information
The project site location is along County Road 45E about 0.2 miles west of the intersection of County Road 45E and Highway 287 in Larimer County, Colorado. The culvert will be oriented in a north-south alignment in Dale Creek.
Latitude/Longitude (approximate): 40.95998° N, 105.36664° W See Site Location
Existing Improvements
County Road 45E is a two-lane, aggregate-surfaced roadway, with a bridge that crosses over Dale Creek.
Current Ground Cover
The existing roadway is aggregate surfaced. The surrounding ground cover consists of native grasses and weeds.
Existing Topography
The alignment gently slopes towards Dale Creek. The interpolated ground surface elevations at the boring locations range from about El. 6,889 to El. 6,890 feet AMSL.
Geotechnical Characterization
We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting, and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of the site. Conditions observed at each exploration point are indicated on the individual logs. The individual logs can be found in the Exploration Results and the GeoModel can be found in the Figures attachment of this report.
As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel.
Model Layer
Layer Name General Description
1 Clayey Sand Clayey sand
2 Sand Well graded sand with silt and gravel
3 Rock Granitic rock
Groundwater Conditions
The boreholes were observed while drilling and shortly after completion for the presence and level of groundwater. The water levels observed in the boreholes are noted on the attached boring logs and are summarized in the following table.
Facilities | Environmental | Geotechnical | Materials 4
Boring Number
Depth to Groundwater While
Drilling, ft.
Depth to Groundwater After
Drilling, ft.
Approximate Elevation of
Groundwater After
Drilling, ft.1
B-1 8 4 ±6,886
B-2 5 5 ±6,884
1. Elevations of groundwater are based on interpolated ground surface elevations at the boring locations obtained by Terracon from a publicly available USGS topographic map.
Groundwater conditions may change because of seasonal variations in rainfall, runoff, and other conditions not apparent at the time of drilling. Long-term groundwater monitoring was outside the scope of services for this project.
Seismic Site Class
The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the AASHTO LRFD Bridge Design Specifications. Based on the soil and bedrock properties observed at the site as described on the exploration logs and laboratory test results, our professional opinion is a Seismic Site Classification of D be considered for the project. Subsurface explorations at this site were extended to a maximum depth of approximately 24 feet. The site properties below the boring depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. Additional deeper borings or geophysical testing may be performed to confirm the conditions below the current boring depth.
Corrosivity
The table below lists the results of laboratory soluble sulfate, soluble chloride, sulfides, electrical resistivity, redox, and pH testing. The values may be used to estimate potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction.
Facilities | Environmental | Geotechnical | Materials 5
Corrosivity Test Results Summary
Boring (Sample Depth)
Soluble Sulfate
Soluble Chloride
Sulfides (mg/kg)
Total Salts
(mg/kg)
Electrical Resistivity
(Ω-cm) 1
Redox (mV) pH
B-2 at 0.2-5.0 feet
0.0015 0.0028 Nil 515 3100 +132 8.3
1. Laboratory electrical resistivity testing was performed on a saturated sample.
Results of water-soluble sulfate testing indicate Exposure Class S0 according to ACI (American Concrete Institute) 318 – Building Code Requirements for Structural Concrete. ASTM Type I, IL, or II portland cement can be specified for all project concrete on and below grade. Foundation concrete can be designed for low sulfate exposure in accordance with the provisions of the ACI 318.
Numerous sources are available to characterize corrosion potential to buried metals using the parameters above. ANSI/AWWA is commonly used for ductile iron, while threshold values for evaluating the effect on steel can be specific to the buried feature (e.g., piling, culverts, welded wire reinforcement, etc.) or agency for which the work is performed. Imported fill materials may have significantly different properties than the site materials noted above and should be evaluated if expected to be in contact with metals used for construction. Consultation with a NACE certified corrosion professional is recommended for buried metals on the site.
Geotechnical Overview
Based on subsurface conditions encountered in the borings, the site appears suitable for the proposed construction from a geotechnical point of view provided certain precautions and design and construction recommendations described in this report are followed. We have identified several geotechnical conditions that could impact design, construction and performance of the proposed structure and other site improvements. These included shallow groundwater, potentially loose, low relative density sand soils, and difficult excavation. These conditions will require particular attention in project planning, design and during construction and are discussed in greater detail in the following sections.
Shallow Groundwater
As previously stated, groundwater was measured at depths ranging from about 4 to 8 feet below existing site grades. We understand the box culvert will likely be constructed near or below these groundwater levels. Terracon recommends maintaining a separation
Facilities | Environmental | Geotechnical | Materials 6 of at least 3 feet between the bottom of proposed below-grade foundations for wing walls and the bottom of the culvert floor and measured groundwater levels during construction. Temporary construction dewatering will likely be needed where excavations extend deeper than the observed groundwater levels or water levels within Dale Creek.
It is also possible and likely that groundwater levels below this site may rise as water levels in the Dale Creek rise.
Low Relative Density Soils
Comparatively loose, low relative density sand soils were encountered at depths of approximately 4 to 7 feet below existing grade in Boring No. B-2. Loose soils could also exist at other locations on the site and extend to greater depths particularly within the creek itself. These materials present a risk for potential settlement of shallow foundations and other surficial improvements. These materials can also be susceptible to disturbance and loss of strength under repeated construction traffic loads and unstable conditions could develop. Stabilization of loose soils may be required at some locations to provide adequate support for construction equipment and proposed structures.
Terracon should be contacted if these conditions are encountered to observe the conditions exposed and to provide guidance regarding stabilization (if needed).
Difficult Excavation
Dense to very dense sand soils with gravel were encountered in the borings. These conditions can complicate and increase the difficulty of excavation and additional effort may be necessary to extract larger-sized materials, particularly in deeper narrow excavations, such as utility trenches. Also, excavation penetrating rock (if any) may require the use of specialized heavy-duty equipment, together with ripping or jack-hammering to advance the excavation and facilitate rock break-up and removal.
Consideration should be given to obtaining a unit price for difficult excavation in the contract documents for the project.
Foundation Recommendations
Based on the results of the borings and our understanding of the project, we believe the wing walls for the proposed concrete box culvert can be supported by a shallow, spread footing foundation system provided the foundations bear on the medium dense to very dense well-graded sand soils with gravel encountered in the borings and any loose soils encountered below foundations are removed and replaced with moisture conditioned, properly compacted engineered fill. On-site soils free of any deleterious materials are suitable for use as engineered fill below foundations. Design recommendations for foundations for the proposed structure and related structural elements are presented in the following sections of this report.
Facilities | Environmental | Geotechnical | Materials 7
To reduce the potential for differential movements between the culvert and wing walls due to the presence of potentially loose soils at/near the anticipated culvert floor elevation, we recommend the top 12 inches of subgrade below the base/floor of the culvert be scarified, moisture conditioned, and compacted to at least 95 percent of the maximum dry unit weight of the material as determined by AASHTO T99 prior to the construction of the culvert.
The recommendations contained in this report are based upon the results of field and laboratory testing (presented in the Exploration Results), engineering analyses, and our current understanding of the proposed project. The General Comments section provides an understanding of the report limitations.
Earthwork
Earthwork is anticipated to include demolition, site preparation, excavations, subgrade preparation, soil stabilization (if needed), and engineered fill placement. The following sections provide recommendations for use in the preparation of specifications for the project. Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations.
Demolition
Demolition of the existing roadway and drainage structure should include complete removal of all foundation systems, any other below-grade structural elements, and existing roadway pavements/surfacing within the proposed construction area. This should include removal of any utilities to be abandoned along with any loose utility trench backfill or loose backfill found adjacent to existing foundations or structures. All materials derived from the demolition of existing structures and roadways should be removed from the site.
Site Preparation
Prior to placing fill, existing vegetation, topsoil, root mats, and any other deleterious materials should be removed from the proposed construction area. Complete stripping of the topsoil should be performed in areas of new construction. While not encountered in our borings, any existing, undocumented fill if encountered should also be completed removed from within the proposed construction area.
Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas or exposed slopes after completion of grading operations. Prior to the placement of fills, the site should be graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed structures.
Facilities | Environmental | Geotechnical | Materials 8
Where fill is placed on existing slopes steeper than 5H:1V (Horizontal:Vertical), benches should be cut into the existing slopes prior to fill placement. The benches should have a minimum vertical face height of 1 foot and a maximum vertical face height of 3 feet and should be cut wide enough to accommodate the compaction equipment. This benching will help provide a positive bond between the fill and natural soils and reduce the possibility of failure along the fill/natural soil interface.
Although no evidence of fill or underground facilities (such as septic tanks, cesspools or utilities) was observed during the exploration and site reconnaissance, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction.
Excavation
We anticipate excavations for the proposed construction can be accomplished, but could be difficult, with conventional earthmoving equipment. Excavations into the on-site soils will encounter loose and saturated soil conditions with possible caving conditions. The bottom of excavations should be thoroughly cleaned of loose/disturbed materials prior to backfill placement and/or construction.
Dense to very dense sand soils with gravel were encountered in the borings. These conditions can complicate and increase the difficulty of excavation and additional effort may be necessary to extract larger-sized materials, particularly in deeper narrow excavations, such as utility trenches.
Excavation penetrating rock (if any) may require the use of specialized heavy-duty equipment, together with ripping or jack-hammering to advance the excavation and facilitate rock break-up and removal. Consideration should be given to obtaining a unit price for difficult excavation in the contract documents for the project.
Any excavation extending below the bottom of foundation elevation should extend laterally beyond all edges of the foundations at least 8 inches per foot of excavation depth below the foundation base elevation. The excavation should be backfilled to the foundation base elevation with engineered fill placed in accordance with the recommendations presented in this report.
Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or groundwater may be encountered in excavations on the site. We anticipate pumping from sumps may be utilized to control water within excavations. Well points may be required for significant groundwater flow, or where excavations penetrate groundwater to a significant depth.
Facilities | Environmental | Geotechnical | Materials 9
The subgrade soil conditions should be evaluated during the excavation process and the stability of the soils determined at that time by the contractors’ Competent Person as defined by OSHA. Slope inclinations flatter than the OSHA maximum values may have to be used. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards.
As a safety measure, we recommend all vehicles and soil piles be kept a minimum lateral distance from the crest of the slope equal to the slope height. The exposed slope face should be protected against the elements.
Subgrade Preparation
After site preparation, removal of existing, undocumented fill (if necessary), any required undercuts, and completion of recommended over-excavations, the top 10 inches of the exposed ground surface should be scarified, moisture conditioned, and compacted to at least 95 percent of the maximum dry unit weight as determined by AASHTO T99 before any new fill, roadway embankment, or foundation is placed or constructed.
Large areas of prepared subgrade should be proof rolled prior to new construction. Proof rolling is not required in areas which are inaccessible to proof rolling equipment.
Subgrades should be proof rolled with an adequately loaded vehicle such as a fully-loaded tandem-axle dump truck. Proof rolling should be performed under the observation of the Geotechnical Engineer or representative. Areas excessively deflecting under the proof roll should be delineated and subsequently addressed by the Geotechnical Engineer. Excessively wet or dry material should either be removed and replaced with new engineered, or moisture conditioned and compacted.
If pockets of soft, loose, or otherwise unsuitable materials are encountered at the bottom of the foundation excavations and it is inconvenient to lower the foundations, the proposed foundation elevations may be reestablished by over-excavating the unsuitable soils and backfilling with moisture conditioned, properly compacted engineered fill or lean concrete as shown in the following figure.
Facilities | Environmental | Geotechnical | Materials 10
In addition, large cobbles or boulder-sized materials could be encountered beneath foundation areas. Such conditions could create point loads on the bottom of foundations, increasing the potential for differential foundation movement. If such conditions are encountered in the foundation excavations, the cobbles and/or boulders should be removed from the upper 6 inches of the subgrade and be replaced with engineered fill prepared as recommended in this report.
After the bottom of the excavations have been prepared as recommended above, engineered fill can be placed to bring the subgrade to the desired grade. Engineered fill should be placed in accordance with the recommendations presented in subsequent sections of this report.
The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unstable conditions develop, workability may be improved by scarifying and drying. Alternatively, over-excavation of wet zones and replacement with granular materials may be used, or crushed gravel and/or rock can be tracked or “crowded” into the unstable surface soil until a stable working surface is attained. Use of geosynthetics could also be considered as a stabilization technique. Lightweight excavation equipment may also be used to reduce subgrade pumping.
Fill Material Types
Fill for this project should consist of engineered fill. Engineered fill is fill that meets the criteria presented in this report and has been properly documented. On-site soils free of deleterious materials or approved granular and low plasticity cohesive imported materials may be used as fill material. Rock excavated during site development and construction can be reused as fill provided the material is broken down and thoroughly processed to a “soil-like” consistency, with no particles greater than 2 inches in size. The earthwork contractor should expect significant mechanical processing and moisture conditioning of the site soils and/or rock will be needed to achieve proper compaction.
Facilities | Environmental | Geotechnical | Materials 11
Imported fill materials (if required) should meet the following material property requirements. Regardless of its source, compacted fill should consist of approved materials that are free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade.
Gradation Percent Finer by Weight (ASTM C136)
3” 100
1” 70-100
No. 4 Sieve 30-100
No. 200 Sieve 50 (max.)
Soil Properties Values
Liquid Limit 35 (max.)
Plasticity Index 15 (max.)
Other import fill material types may be suitable for use on the site depending upon proposed application and location on the site and could be tested and approved for use on a case-by-case basis.
Fill Placement and Compaction Requirements
Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift.
Item Description
Maximum Lift Thickness
9 inches or less in loose thickness when heavy, self-propelled compaction equipment is used
4 to 6 inches in loose thickness when hand-guided equipment (i.e., jumping jack or plate compactor) is used
Minimum Compaction
Requirements 1
Engineered Fill: At least 95% of the maximum dry unit weight as determined by AASHTO T99.
Engineered Fill 8 Feet or Greater: At least 98% of the maximum dry unit weight as determined by AASHTO T99 for the entire depth of fill in areas receiving 8 feet of fill or greater.
Aggregate Base Course (for roadway aggregate-surfacing): At least 95% of maximum dry unit weight as determined by
AASHTO T180.
Facilities | Environmental | Geotechnical | Materials 12
Water Content
Range 2,3
Cohesive (clay): -1% to +3% of optimum moisture content
Granular (sand): -3% to +3% of optimum moisture content
1. We recommend engineered fill be tested for moisture content and compaction during placement. If the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved.
2. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these materials could result in an increase in the material’s expansive potential.
Subsequent wetting of these materials could result in undesirable movement.
3. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to be achieved without the fill material pumping when proof rolled.
Utility Trench Backfill
Any loose, soft, or unsuitable materials encountered at the bottom of utility trench excavations should be removed and replaced with engineered fill or bedding material in accordance with public works specifications for the utility to be supported. This recommendation is particularly applicable to utility work where settlement control of the utility is critical.
On-site materials are considered suitable for backfill of utility and pipe trenches provided the material is free of organic matter and deleterious substances.
Utility trench backfill should be placed and compacted as discussed earlier in this report.
Compaction of initial lifts should be accomplished with hand-operated tampers or other lightweight compactors. Flooding or jetting for placement and compaction of backfill is not recommended.
We recommend a representative of the Geotechnical Engineer provide full-time observation and compaction testing of trench backfill within construction areas.
Grading and Drainage
Grades should be adjusted to provide effective drainage away from the proposed structure and roadway during construction. Infiltration of water into foundation excavations must be prevented during construction.
Backfill against foundations and walls should be properly compacted and free of all construction debris to reduce the possibility of moisture infiltration. After construction of the proposed structure and prior to project completion, we recommend verification of
Facilities | Environmental | Geotechnical | Materials 13 final grading be performed to document positive drainage, as described above, has been achieved.
Maximum grades practical should be used for roadways to prevent areas where water can pond. Care should be taken to prevent the infiltration of surface water into the roadway subgrade and behind the culvert wing walls.
Earthwork Construction Considerations
Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction. Construction traffic over the completed subgrades should be avoided. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. Water collecting over or adjacent to construction areas should be removed. If the subgrade freezes, desiccates, saturates, or is disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted.
Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred.
Excavations or other activities resulting in ground disturbance have the potential to affect adjoining properties. Our scope of services does not include review of available final grading information or consider potential temporary grading performed by the contractor for potential effects such as ground movement beyond the project limits. A preconstruction/precondition survey should be conducted to document nearby property/infrastructure prior to any site development activity. Excavation or ground disturbance activities adjacent or near property lines should be monitored or instrumented for potential ground movements that could negatively affect adjoining property and/or structures.
Construction Observation and Testing
The earthwork efforts should be observed by the Geotechnical Engineer (or others under their direction). Observation should include documentation of adequate removal of surficial materials (vegetation and topsoil), subgrade stabilization, as well as proof rolling and mitigation of unsuitable areas delineated by the proof roll. Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, as recommended by the Geotechnical Engineer prior to placement of additional lifts.
Facilities | Environmental | Geotechnical | Materials 14
In areas of foundation excavations, the bearing subgrade should be evaluated by the Geotechnical Engineer. If unanticipated conditions are observed, the Geotechnical Engineer should prescribe mitigation options.
In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes.
Shallow Foundations
If the site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations.
Spread Footings – Design Recommendations
Item Description
Required Bearing Stratum 1
Properly prepared on-site soils consisting of medium dense to very dense well graded sand soils, or new, properly placed engineered fill.
Estimated Bearing Depth At or below a depth of about 4 feet below existing grades
Maximum Net Service Limit Bearing
Resistance 2 3,500 psf
Minimum Foundation Dimensions Continuous: 18 inches
Lateral Earth Pressure Coefficients 3
On-site granular soil:
Active, Ka = 0.31 Passive, Kp = 3.25 At-rest, Ko = 0.47
Sliding Resistance
On-site granular soil:
μ = 0.42
(nominal/ultimate)
Moist Soil Unit Weight On-site granular soil:
γ = 125 pcf
Minimum Embedment Below
Finished Grade 4 36 inches
Estimated Total Movement 5 About 1 inch or less
Estimated Differential Movement 5 About ½ to ¾ of total movement
Facilities | Environmental | Geotechnical | Materials 15
1. Unsuitable or soft/loose soils should be over-excavated and replaced with engineered fill per the recommendations presented in Earthwork.
2. The maximum net service limit bearing resistance is the resistance in excess of the minimum surrounding overburden pressure at the footing base elevation. The design bearing resistance applies to a dead load plus design live load condition.
3. Use of lateral earth pressures require the sides of the excavation for the spread footing foundation to be nearly vertical and the concrete placed neat against these vertical faces or the footing forms be removed and compacted engineered fill be placed against the vertical footing face. Assumes no hydrostatic pressure. The lateral earth pressure coefficients are nominal/ultimate values and do not include a resistance factor. The foundation designer should include the appropriate resistance factor.
4. Embedment necessary to minimize the effects of frost and/or seasonal water content variations. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure.
5. The estimated movements presented above assume the maximum footing width is 4 feet for continuous footings. Larger foundation footprints will likely require reduced net service limit soil bearing resistances to reduce risk for potential settlement.
Footings should be proportioned to reduce differential foundation movement. As discussed, total movement resulting from the assumed structural loads is estimated to be on the order of about 1 inch. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, proper drainage should be provided in the final design and during construction and throughout the life of the structure. Failure to maintain the proper drainage as recommended in the Grading and Drainage section of the Earthwork section of this report will nullify the movement estimates provided above.
Any excavation extending below the bottom of foundation elevation should extend laterally beyond all edges of the foundations at least 8 inches per foot of excavation depth below the foundation base elevation. The excavation should be backfilled with engineered fill to the foundation base elevation in accordance with the recommendations presented in this report.
Shallow Foundation Construction Considerations
As noted in Earthwork, foundation excavations should be evaluated under the observation of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Excessively wet or dry material or any loose/disturbed material in the bottom of foundation excavations should be removed/reconditioned before foundation concrete is placed.
Facilities | Environmental | Geotechnical | Materials 16
To reduce the potential of “pumping” and softening of the foundation soils at the foundation bearing level and the requirement for corrective work, we suggest the foundation excavation for the structure be completed remotely with a track-hoe operating outside of the excavation limits.
Foundation elements should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement.
Unstable subgrade conditions encountered in foundation excavations should be observed by Terracon to assess the subgrade and provide suitable alternatives for stabilization.
Typical methods of stabilization/improvement are presented in the Earthwork section of this report.
Lateral Earth Pressures
Design Parameters
Structures with unbalanced backfill levels on opposite sides should be designed for earth pressures at least equal to values indicated in the following table. Earth pressures will be influenced by structural design of the walls, conditions of wall restraint, methods of construction, and/or compaction and the strength of the materials being restrained. Two wall restraint conditions are shown in the diagram below. Active earth pressure is commonly used for design of free-standing cantilever retaining walls and assumes wall movement. The “at-rest” condition assumes no wall movement and is commonly used for basement walls, loading dock walls, or other walls restrained at the top. The recommended design lateral earth pressures do not include a factor of safety and do not provide for possible hydrostatic pressure on the walls (unless stated).
Facilities | Environmental | Geotechnical | Materials 17
Lateral Earth Pressure Design Parameters
Earth Pressure
Condition 1
Coefficient for
Backfill Type 2
Surcharge
Pressure 3 p1 (psf)
Equivalent Fluid Pressures
(psf) 2,4
Unsaturated 5 Submerged 5
Active (Ka) Granular - 0.31 (0.31)S (40)H (85)H
At-Rest (Ko) Granular – 0.47 (0.47)S (60)H (95)H
Passive (Kp) Granular – 3.25 --- --- ---
1. For active earth pressure, wall must rotate about base, with top lateral movements 0.002 H to 0.004 H, where H is wall height. For passive earth pressure, wall must move horizontally to mobilize resistance. Fat clay or other expansive soils should not be used as backfill behind the wall.
2. Uniform, horizontal backfill, with a maximum unit weight of 125 pcf.
3. Uniform surcharge, where S is surcharge pressure.
4. Loading from heavy compaction equipment is not included.
5. To achieve “Unsaturated” conditions, drainage behind walls is incorporated into the design. “Submerged” conditions are recommended when drainage behind walls is not incorporated into the design.
Backfill placed against structures should consist of granular soils or low plasticity cohesive soils. For the granular values to be valid, the granular backfill must extend out and up from the base of the wall at an angle of at least 45 and 60 degrees from vertical for the active and passive cases, respectively. To calculate the resistance to sliding, a value of 0.42 should be used as the nominal/ultimate coefficient of friction between the footing and the underlying sand soil.
To control hydrostatic pressure behind the walls, we recommend a drain be installed at the foundation and wing walls with a collection pipe leading to a reliable discharge. If this is not possible, then combined hydrostatic and lateral earth pressures should be calculated for granular backfill using the submerged equivalent fluid pressures presented in the above table for active and at-rest conditions. These pressures do not include the influence of surcharge, equipment, or traffic loading, which should be added. Heavy equipment should not operate within a distance closer than the exposed height of retaining walls to prevent lateral pressures more than those provided.
The lateral earth pressure recommendations given in this section are applicable to the design of rigid retaining walls subject to slight rotation, such as cantilever, or gravity type concrete walls. These recommendations are not applicable to the design of modular block – geogrid reinforced backfill walls (also termed MSE walls). Recommendations covering these types of wall systems are beyond the scope of services for this assignment. However, we would be pleased to develop a proposal for evaluation and design of such wall systems upon request.
Facilities | Environmental | Geotechnical | Materials 18
General Comments
Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration.
Variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations.
Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly effect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others.
Construction and site development have the potential to affect adjacent properties. Such impacts can include damages due to vibration, modification of groundwater/surface water flow during construction, foundation movement due to undermining or subsidence from excavation, as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report. The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and
Facilities | Environmental | Geotechnical | Materials 19 recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing.
Facilities | Environmental | Geotechnical | Materials
Figures
Contents:
GeoModel
6,864
6,866
6,868
6,870
6,872
6,874
6,876
6,878
6,880
6,882
6,884
6,886
6,888
6,890
6,892
Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project.
Numbers adjacent to soil column indicate depth below ground surface.
NOTES:
A P
P R
O X
IM
A
TE
E
LE
V
A
TI
O N
M
S L) fe et
Legend
This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions.
GeoModel
County Road 45E over Dale Creek | Larimer County, Colorado Terracon Project No. 20245000
Dale Creek Structure
1901 Sharp Point Dr Ste C Fort Collins, CO
Second Water Observation First Water Observation
Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time.
Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details.
Clayey Sand
Well-graded Sand with Silt and Gravel
Model Layer Layer Name General Description
1 Clayey sand, brown, medium dense
3 Granitic rock, red, gray and tan, very hard
2 Well graded sand with silt and gravel, brown to dark brown, very loose to very dense
B-1 B-2
Rock
Vegetative LayerClayey Sand
Rock
Sand
13.9 14.5
24.1
Attachments
Exploration and Testing Procedures
Field Exploration
Number of Borings Approximate Boring
Depth (feet) Location
(Boring Nos. B-1 and B-2)
14.5 to 24.1 Planned culvert location
Boring Layout and Elevations: Terracon personnel provided the boring layout.
Coordinates of the boring locations were obtained using handheld GPS equipment (estimated horizontal accuracy of about ±20 feet). Approximate ground surface elevations were obtained by Terracon by interpolation from a publicly available USGS topographic map.
Subsurface Exploration Procedures: We advanced the borings with a truck-mounted, drill rig using solid-stem, continuous-flight augers.