Attachment_-_Drawings.pdf
PDF 20 MB Posted
- Attached to
- Restroom Renovation Federal contract opportunity
- Solicitation number
- 140P6423Q0042
About this file
This document provides details for a federal solicitation seeking construction services for restroom renovations. The National Park Service Midwest Region is soliciting quotes for upgrades to restrooms at the William Howard Taft National Historic Site in Cincinnati, Ohio. Work includes renovations to meet ADA requirements, upgrades to mechanical, electrical and plumbing systems, and replacement of finishes and fixtures. The project magnitude is estimated between $100,000 and $250,000. The solicitation number is 140P6423Q0042 and will be awarded as a firm-fixed price construction contract. Evaluation criteria are price, technical experience, and prior experience. The NAICS code is 236220 for commercial and institutional building construction with a size standard of $45 million. The project is set aside 100% for total small businesses. The point of contact is Craig D Bryant at craig_bryant@nps.gov or 330-468-2500 x6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6423Q0042_Amd_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Revised_Specifications_-_29_Jun_2023_0001.pdf | ||
| Sol_140P6423Q0042_Amd_0001.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Price_Schedule_-_Restroom_Renovation.xlsx | XLSX spreadsheet | |
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Price_Schedule_-_Restroom_Renovation.pdf | ||
| Attachment_-_Provisions_to_be_Completed.pdf | ||
| Sol_140P6423Q0042.pdf | ||
| Wage_Determination_-_Hamilton_Co.pdf | ||
| Technical_Questionnaire.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Specifications_-_Restroom_Renovation.pdf | ||
| Attachment_-_Pictures.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 2
M
M
AFS
F
S
FS
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, O=THE SCHEMMER ASSOCIATES, C=US
Date: 2023.04.22 11:17:41-05'00'
6 2
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:18:04-05'00'
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
MEN
WOMEN
7 2
DIFFUSER, REGISTER AND GRILLE SCHEDULE
FAN SCHEDULE
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:18:39-05'00'
8 2
M
M
AFS
F
S
FS
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:19:28-05'00'
9 2
DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:04-05'00'
0 2
DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:30-05'00'
1 2
DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:59-05'00'
2 2
DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:21:25-05'00'
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
MEN
WOMEN
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
MEN
WOMEN
3 2
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:21:48-05'00'
4 2
PLUMBING FIXTURE SCHEDULE
PUMP SCHEDULE
EXPANSION TANK SCHEDULE
ELECTRIC WATER HEATER SCHEDULE
Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:22:11-05'00'
5 2
Digitally signed by Joseph C Binge DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:07:19-05'00'
6 2
DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:07:43-05'00'
7 2
DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:02-05'00'
8 2
DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:19-05'00'
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
K
C
AXTON
LAVATO
R Y
VITR
EOU
S
C
HINA
MEN
WOMEN
Digitally signed by Joseph C Binge DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:39-05'00'
0 2
DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:06:41-05'00'
K-2210CAXTONLAVATORYVITREOUSCHINA
K-2210CAXTONLAVATORYVITREOUSCHINA
MEN
WOMEN
WWWWWWWWWWWWWWWWWOWO
INSTALL NEW SPRINKLER FROM
EXISTING OUTLET.
EXISTING SPRINKLER TO BE
DEMOLISHED.
210A
INSTALL NEW SPRINKLER FROM NEW
CONNECTION TO EXISTING
OVERHEAD SYSTEM.
1" 1"
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
247612/80029
80029
JLK
JLK
JLK
04/21/2023
DATE INITIAL
www.codeconsultants.com
ST. LOUIS, MISSOURI 63146-4235
2043 WOODLAND PKWY, SUITE 300
314-991-2633
TM
WILLIAM B. SMITH, PE
LICENSE NO. PE-73499
CODE CONSULTANTS, INC.
2043 WOODLAND PKWY, SUITE 300
ST. LOUIS, MO 63146-4235
PHONE: 314-991-2633
CORPORATE CERTIFICATE OF AUTHORITY
NO. 02037
ENGINEER OF RECORD:
07310.035
RESTROOM REMODEL
THE WILLIAM HOWARD TAFT NATIONAL HISTORIC SITE
2036 AUBURN AVE, CINCINNATI, OHIO 45209
FIRE PROTECTION PLAN
FP100
HANGER NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL HANGER
TYPES AND LOCATIONS. THE HANGERS SHALL COMPLY WITH NFPA 13.
2. PIPES LARGER THAN 2 IN. RUNNING PARALLEL TO TRUSSES/ROOF JOIST SHALL BE
HUNG FROM TRAPEZE HANGERS SUPPORTED NEARLY EQUALLY BY TWO JOISTS.
3. ONLY ONE PIPE SHALL BE SUPPORTED FROM A SINGLE TRAPEZE HANGER UNLESS
OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER OF RECORD.
4. CONTRACTOR SHALL NOT CUT MEMBERS UNLESS ANALYSIS IS PROVIDED BY A
STRUCTURAL ENGINEER.
CONSTRUCTION NOTES
1. DURING CONSTRUCTION, FIRE SPRINKLER CONTRACTOR SHALL KEEP FIRE
SPRINKLER SYSTEMS OUT OF CONSTRUCTION AREA FULLY CHARGED AND
OPERATIONAL DURING BUSINESS HOURS.
2. COORDINATE REQUIRED SHUT-DOWNS OF THE EXISTING SYSTEMS WITH THE
CONTRACTING OFFICER AND FIRE DEPARTMENT.
3. PROVIDE TEMPORARY PIPING AND FITTINGS AS REQUIRED TO MAINTAIN SERVICE
TO FIRE SPRINKLER SYSTEMS (NEW AND EXISTING) DURING CONSTRUCTION.
4. COORDINATE CONSTRUCTION PHASES WITH CONTRACTING OFFICER AND
GENERAL CONTRACTOR.
GENERAL NOTES
1. PROVIDE ALL NECESSARY OFFSETS, RAISES OR DROPS IN PIPING AND AUXILIARY
DRAINS REQUIRED BY BUILDING CONDITIONS IN ORDER TO PROVIDE A FULLY
FUNCTIONING COMPLIANT FIRE SPRINKLER SYSTEM PER NFPA, FIRE PROTECTION
ENGINEER OF RECORD AND AUTHORITY HAVING JURISDICTION. (WHETHER OR NOT
SHOWN ON THE DRAWINGS).
2. THE CONTRACTOR MUST REVIEW THE CONSTRUCTION DOCUMENTS AND EXAMINE
THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS,
CLEARANCES, PIPE SIZES, ETC., PRIOR TO BID. SHOULD MODIFICATIONS TO THESE
PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH
OTHER TRADES, IT WILL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATE
APPROVAL OF THESE CHANGES WITH THE CONTRACTING OFFICER.
3. ARCHITECTURAL, CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY.
REFER TO THE PROPER DRAWINGS FOR EXACT LOCATIONS, SIZES, AND
QUANTITIES OF OTHER TRADES' WORK. OBSTRUCTION TO SPRINKLER DISCHARGE
MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION.
EXTRA SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER.
4. THE ENGINEERING DRAWINGS HAVE BEEN PREPARED USING AUTOCAD. THE
DRAWINGS ARE 100% CAD. THESE DOCUMENTS WILL BE MADE AVAILABLE TO THE
SUCCESSFUL FIRE SPRINKLER CONTRACTOR IN EITHER ELECTRONIC FORM.
5. THE CONTRACTOR SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS
AS REQUIRED BY THE SPECIFICATIONS. CONTRACTOR SHALL BASE SHOP
DRAWINGS DESIGN ON THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS.
SPRINKLER SHOP DRAWINGS SHALL INCLUDE ALL NECESSARY ELEVATIONS,
HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION METHODS/NOTES,
MATERIAL DATA, AND AND ANY OTHER INFORMATION NECESSARY TO CLARIFY THE
INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZES, SPRINKLER
SPACING, AND ALL SYSTEM CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN
DESIGN OF THE SYSTEM OR IN MATERIALS OR EQUIPMENT USED MUST BE
APPROVED IN WRITING FROM THE CONTRACTING OFFICER PRIOR TO BIDDING,
FABRICATION, OR INSTALLATION.
6. THE CONTRACTOR SHALL DOCUMENT ALL FIELD COORDINATION CHANGES ON THE
INSTALLATION DRAWINGS. ONCE INSTALLATION IS COMPLETE THE CONTRACTOR
SHALL SUPPLY AS-BUILT DRAWINGS TO THE OWNER.
7. SUPPLY ONLY ONE (1) SPRINKLER FROM A SINGLE BRANCH LINE OUTLET. PROVIDE
NEW BRANCH LINES AS REQUIRED.
8. SPRINKLERS NEAR A HEAT SOURCE (UNIT HEATERS, DIFFUSERS, STEAM MAINS,
SKYLIGHTS, ETC.) SHALL HAVE TEMPERATURE RATINGS IN ACCORDANCE WITH
NFPA 13.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER PROTECTION OF
PENETRATIONS OF RATED ASSEMBLIES WITH A LISTED FIRE STOPPING METHOD.
10. SPRINKLER PROTECTION IS REQUIRED IN ELECTRICAL ROOMS. NO MAIN PIPING
SHALL PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. BRANCHLINE
PIPING SHALL NOT PASS ABOVE THE ELECTRICAL PANELS.
11. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND INSPECTORS TEST CONNECTION
DISCHARGE AWAY FROM FINISHED SURFACES. SPLASH BLOCKS SHALL BE
PROVIDED AS NECESSARY TO PROTECT LANDSCAPED SURFACES FROM DAMAGE.
21 22
FIRE SPRINKLER LEVEL 1 PLAN
SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"
DESIGN CRITERIA
RESTROOM AND OFFICE (LIGHT HAZARD WET PIPE FIRE SPRINKLER SYSTEM):
DENSITY - 0.10 GPM/SQ FT
OPERATING AREA - 1,500 SQ FT
TEMPERATURE CLASSIFICATION / NOMINAL K-FACTOR / RESPONSE TYPE -
ORD / 5.6 / QR
HOSE STREAM ALLOWANCE - 100 GPM
DURATION: 0.5 HR
SPRINKLER SPACING SHALL BE AS SHOWN ON THE ENGINEERING DRAWINGS.
UNFINISHED AREAS - LOCATE SPRINKLERS AS SHOWN ON THE ENGINEERING
DRAWINGS.
FIRE SPRINKLER LEVEL 1 - DEMOLITION PLAN
SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"
HYDRAULIC REFERENCE POINT
CAPPED PIPE
xxx
CENTER LINE OF SPRINKLER: ALIGN WITH LIGHTS AND/OR OTHER
SPRINKLERS: COORDINATE WITH OTHER TRADES.
RECOMMENDED CENTER LINE ELEVATION OF PIPE A.F.F. AND/OR CENTER
LINE ELEVATION OF PIPE FROM TOP OF JOIST
RISE FROM LEFT TO RIGHT AND DROP FROM RIGHT TO LEFT
STRUCTURAL SHOWN FOR REFERENCE ONLY, VERIFY ACTUAL STRUCTURAL LOCATIONS.
XX
NOTE
PIPE HANGER
TRAPEZE HANGER
NEW PIPING
SYMBOL KEY
EXISTING UNDERGROUND WATER MAIN
FIRE DEPARTMENT CONNECTION
GLOBE VALVE
RISER
ZONE BOUNDARY LINE
PLUGGED OUTLET
SPRINKLER TYPESYMBOL
SPRINKLER LEGEND
QRWHT
FINISH RESP. QTY.
5.6
K
ORD
TEMP.
CONCEALED STANDARD COVERAGE PENDENT 3
EXISTING PENDENT TO BE DEMOLISHED
QRWHT5.6ORD
EXISTING CONCEALED STANDARD COVERAGE
PENDENT ETR
FIRE SPRINKLER LEVEL 2 PLAN
SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
247612/80029
80029
JLK
JLK
JLK
04/21/2023
DATE INITIAL
www.codeconsultants.com
ST. LOUIS, MISSOURI 63146-4235
2043 WOODLAND PKWY, SUITE 300
314-991-2633
TM
WILLIAM B. SMITH, PE
LICENSE NO. PE-73499
CODE CONSULTANTS, INC.
2043 WOODLAND PKWY, SUITE 300
ST. LOUIS, MO 63146-4235
PHONE: 314-991-2633
CORPORATE CERTIFICATE OF AUTHORITY
NO. 02037
ENGINEER OF RECORD:
07310.035
RESTROOM REMODEL
THE WILLIAM HOWARD TAFT NATIONAL HISTORIC SITE
2036 AUBURN AVE, CINCINNATI, OHIO 45209
SPECIFICATIONS -
FIRE PROTECTION FP101
SPECIFICATIONS 21 13 13 FIRE SPRINKLER SYSTEMS
SECTION 211313 - FIRE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL
AND SUPPLEMENTARY CONDITIONS AND DIVISION 01 SPECIFICATION SECTIONS,
APPLY TO THIS SECTION.
B. FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED FOR THE RENOVATION OF AN EXISTING AUTOMATIC SPRINKLER
SYSTEM.
1.2 SUMMARY
A. SECTION INCLUDES:
1. PIPES, FITTINGS, AND SPECIALTIES.
2. HANGERS AND SLEEVES.
3. SPRINKLERS.
1.3 DESCRIPTION OF WORK
A. PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, TESTING AND
SERVICES NECESSARY FOR A RENOVATION OF AN EXISTING OPERATIONAL WET
PIPE FIRE PROTECTION SYSTEM FOR THE BUILDING AS HEREINAFTER DESCRIBED
AND AS SHOWN ON THE ENGINEERING DRAWINGS.
B. WORK SHALL BEGIN AT THE AREAS SHOWN ON THE ENGINEERING DRAWINGS
AND SHALL INCLUDE THE FOLLOWING:
1. FIRE SPRINKLER SYSTEM MODIFICATION.
2. COORDINATION OF WORK AND SCHEDULES WITH OTHER TRADES.
C. IT IS INTENDED THAT THE ENGINEERING DRAWINGS AND SPECIFICATION SHALL
DESCRIBE AND PROVIDE FOR A WORKING INSTALLATION COMPLETE IN EVERY
DETAIL AND ALL ITEMS NECESSARY FOR SUCH COMPLETE INSTALLATION SHALL
BE PROVIDED WHETHER OR NOT SPECIFICALLY MENTIONED HEREIN OR SHOWN
ON THE ENGINEERING DRAWINGS.
1.4 DEFINITIONS
A. STANDARD PRESSURE SPRINKLER PIPING: LISTED FOR 175 PSI MINIMUM
WORKING PRESSURE.
1.5 SYSTEM DESCRIPTION
A. FIRE SPRINKLER SYSTEM DESIGN CRITERIA SHALL BE STRICTLY PER THIS
SPECIFICATION.
B. MAINTAIN FIRE SPRINKLER SYSTEM TO PROVIDE COMPLETE FIRE PROTECTION
FOR THE ENTIRE BUILDING.
C. EXISTING INTERFACE FIRE SPRINKLER SYSTEM WITH BUILDING FIRE ALARM
SYSTEMS SHALL REMAIN.
D. RESTROOM AND OFFICE (NFPA 13 - LIGHT HAZARD FIRE SPRINKLER SYSTEM):
DENSITY - 0.10 GPM/SQ FT
OPERATING AREA - 1,500 SQ FT.
TEMPERATURE CLASSIFICATION / NOMINAL K-FACTOR / RESPONSE TYPE -
ORD / 5.6 / QR
DURATION: 0.5 HOURS
E. SPRINKLER SPACING SHALL BE AS SHOWN ON THE ENGINEERING DRAWINGS.
1. HARD CEILINGS - LOCATE SPRINKLERS IN ACCORDANCE WITH THE
ENGINEERING DRAWINGS. SPRINKLERS SHALL BE IN LINE WITH LIGHT
FIXTURES AND OTHER SPRINKLERS WHERE INDICATED ON THE DRAWINGS.
COORDINATE CLOSELY WITH THE ELECTRICAL CONTRACTOR.
2. UNFINISHED AREAS - LOCATE SPRINKLERS AS SHOWN ON THE ENGINEERING
DRAWINGS.
F. PROVIDE ALL NECESSARY OFFSETS, RAISES OR DROPS IN MAIN OR BRANCH LINE
PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS WHETHER
OR NOT SHOWN ON THE ENGINEERING DRAWINGS.
G. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES,
ELEVATIONS, CLEARANCES, PIPE SIZES, ETC.
H. IT IS UNDERSTOOD, UNLESS SPECIFICALLY INDICATED OTHERWISE, THAT THE
PIPE SIZES AS SHOWN ON THE ENGINEERING DRAWINGS WILL BE USED.
1.6 PERFORMANCE REQUIREMENTS
A. STANDARD PRESSURE PIPING SYSTEM COMPONENT: LISTED FOR 175 PSI
MINIMUM WORKING PRESSURE.
1.7 SUBMITTALS
A. THE ENGINEERING DRAWINGS HAVE BEEN PREPARED USING AUTOCAD. THESE
DOCUMENTS WILL BE MADE AVAILABLE TO THE SUCCESSFUL FIRE SPRINKLER
CONTRACTOR IN EITHER ELECTRONIC FORM OR HARD COPY. UTILIZATION OF
THESE DOCUMENTS FOR THE DEVELOPMENT OF SHOP DRAWINGS AND
SUBMITTALS DOES NOT RELIEVE THE FIRE SPRINKLER CONTRACTOR FROM ANY
OF HIS RESPONSIBILITIES REQUIRED HEREIN.
B. SUBMITTALS SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE GENERAL
CONDITIONS OF THE CONTRACT.
C. PRODUCT LITERATURE: FOR ALL WET PIPE SPRINKLER SYSTEM EQUIPMENT.
1. LITERATURE SHALL CLEARLY IDENTIFY EXACTLY WHAT COMPONENTS ARE
BEING PROVIDED AND SHALL INCLUDE: FINISH, SIZE, TYPE, ETC. LITERATURE
WHICH IS NOT CLEARLY IDENTIFIED WILL BE REJECTED.
D. SHOP DRAWINGS:
1. DRAWINGS MUST BE COMPREHENSIVE OF ENTIRE PROJECT,
DEMONSTRATING COORDINATION WITH OTHER DISCIPLINES, COMPLETE IN
ALL DETAIL AND THE SAME SCALE AS THE ENGINEERING DRAWINGS.
2. HYDRAULIC CALCULATIONS (CALCULATIONS SHALL INCLUDE PEAKING
INFORMATION).
3. NPS REGIONAL FIRE MARSHAL (AHJ) WILL REVIEW THIS SUBMITTAL FOR
CONSISTENCY WITH CONTRACT DOCUMENTS AND FOR APPROVAL.
E. THE FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR RESPONDING,
IN WRITING, TO ANY COMMENTS FROM THE AHJ WITHIN TEN (10) WORKING DAYS
AFTER THE RECEIPT OF THEIR COMMENTS. COPIES OF THE RESPONSE SHALL BE
SENT TO THE GENERAL CONTRACTOR.
F. PROVIDE AS-BUILT DOCUMENTS IN ACCORDANCE WITH REQUIREMENTS OF THE
GENERAL CONDITIONS OF THE CONTRACT.
G. FIELD TEST REPORTS AND CERTIFICATES: INDICATE TEST RESULTS FOR
COMPLIANCE WITH PERFORMANCE REQUIREMENTS AND AS DESCRIBED IN NFPA
13. INCLUDE "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR
ABOVEGROUND PIPING."
H. PROVIDE OPERATING AND MAINTENANCE INSTRUCTIONS TO THE OWNER IN
ACCORDANCE WITH REQUIREMENTS OF THE GENERAL CONDITIONS OF THE
CONTRACT AND NFPA 13.
1.8 QUALITY ASSURANCE
A. INSTALLER QUALIFICATIONS:
1. INSTALLER'S RESPONSIBILITIES INCLUDE PREPARING SHOP DRAWING
SUBMITTAL, FABRICATING, AND INSTALLING SPRINKLER SYSTEMS. BASE
CALCULATIONS ON WATER SUPPLY COORDINATES PROVIDED HEREIN.
a. INSTALLER SHALL BE STATE AND LOCALLY LICENSED.
b. INSTALLER SHALL BE MINIMALLY NICET LEVEL III OR A PROFESSIONAL
ENGINEER.
c. ON-SITE INSTALLATION SHALL BE SUPERVISED BY A MINIMUM NICET
LEVEL II TECHNICIAN.
B. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED
AS DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR
INTENDED LOCATION AND APPLICATION.
C. REFERENCES: FIRE SPRINKLER SYSTEM EQUIPMENT, SPECIALTIES,
ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY WITH ALL
APPLICABLE CODES AND REFERENCED DESIGN STANDARDS:
1. 2021 INTERNATIONAL BUILDING CODE
2. 2021 INTERNATIONAL FIRE CODE
3. NFPA 13, SPRINKLER SYSTEMS - 2022 EDITION.
D. EQUIPMENT AND COMPONENTS SHALL BE UL LISTED FOR FIRE PROTECTION
SYSTEMS INSTALLATION.
E. ALL FIRE SPRINKLER SYSTEM COMPONENTS SHALL BE INSTALLED FREE OF ANY
RUST, CORROSION OR VISIBLE DAMAGE. ALL ITEMS NOT COMPLYING WITH THIS
REQUIREMENT SHALL BE REPLACED WITHOUT COST TO THE OWNER.
1.9 COORDINATION
A. COORDINATE LAYOUT AND INSTALLATION OF SPRINKLERS WITH OTHER
CONSTRUCTION THAT PENETRATES CEILINGS, INCLUDING LIGHT FIXTURES, HVAC
EQUIPMENT, AND PARTITION ASSEMBLIES.
B. COORDINATE INSTALLATION OF SYSTEM WITH ALL OTHER DISCIPLINES.
1.10 EXTRA MATERIALS
A. FURNISH EXTRA MATERIALS THAT MATCH PRODUCTS INSTALLED AND THAT ARE
PACKAGED WITH PROTECTIVE COVERING FOR STORAGE AND IDENTIFIED WITH
LABELS DESCRIBING CONTENTS.
B. PROVIDE AT THE RISER ONE (1) TWELVE (12) HEAD SPARE SPRINKLER CABINETS
STOCKED WITH SPRINKLERS AND ESCUTCHEON ASSEMBLIES PROPORTIONATE
TO THOSE PROVIDED IN THE BUILDING AND ALL NECESSARY SPRINKLER
WRENCHES AS REQUIRED BY NFPA 13.
1.11 REGULATORY REQUIREMENTS
A. THE FIRE SPRINKLER CONTRACTOR SHALL NOT PURSUE ANY APPROVALS OR
INTERPRETATIONS OF THE CONTRACT DOCUMENTS EXCEPT THROUGH NPS
REGIONAL FIRE MARSHAL.
B. SPRINKLER PIPING SHALL NOT BE CONCEALED WHERE IT IS INACCESSIBLE
UNLESS IT IS FIRST INSPECTED AND ACCEPTED BY A REPRESENTATIVE OF THE
AUTHORITY HAVING JURISDICTION.
C. ANY WORK PERFORMED PRIOR TO THE SATISFACTORY REVIEW BY AND
APPROVAL BY THE AUTHORITY HAVING JURISDICTION, WILL BE SOLELY AT THE
FIRE SPRINKLER CONTRACTOR'S RISK.
D. THE SYSTEM WILL NOT BE ACCEPTABLE UNTIL FINAL TESTING AND RECEIPT OF
THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE HAS BEEN OBTAINED.
1.12 WARRANTY
A. REPAIR ALL DEFECTIVE WORKMANSHIP OR REPLACE ALL DEFECTIVE MATERIALS
FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.
WORKMANSHIP OR EQUIPMENT FOUND TO BE DEFECTIVE DURING THAT PERIOD
SHALL BE REPLACED WITHOUT COST TO THE OWNER.
PART 2 - PRODUCTS
2.1 PIPE AND FITTINGS
A. PER LOCAL REQUIREMENTS AND NFPA 13. ALL PIPE SHALL HAVE A CORROSION
RESISTANCE RATIO (CRR) EQUAL TO OR GREATER THAN 1.00. REFER TO THE
CURRENT UL FIRE PROTECTION EQUIPMENT DIRECTORY - STEEL SPRINKLER PIPE
FOR ACCEPTABLE MANUFACTURERS, SIZES, AND JOINING METHODS.
B. THE ENGINEER'S HYDRAULIC CALCULATIONS ANTICIPATES THAT ALL GROOVED
WET PIPE SYSTEM RISERS, FEED AND CROSS MAINS, AND BRANCH LINES SHALL
HAVE HYDRAULIC CHARACTERISTICS EQUAL TO OR GREATER THAN SCHEDULE 10
PIPE.
C. ALL THREADED PIPING SHALL BE SCHEDULE 40 PIPE.
D. ALL 1 IN. SHALL BE SCHEDULE 40 PIPE.
E. FITTINGS SHALL BE SCREWED OR FLANGED BLACK CAST IRON OR APPROVED
EQUAL SUCH AS MECHANICAL, GROOVED OR WELDED CONNECTIONS. WELDED
CONNECTIONS ARE ONLY PERMITTED ON SHOP FABRICATED PIPING. ONSITE
WELDING OF PIPING IS NOT PERMITTED.
F. PRESSURE RATING: 175 PSI MINIMUM.
2.2 JOINING OF PIPE AND FITTINGS
A. ALL PIPE SHALL BE JOINED IN ACCORDANCE WITH NFPA 13 AND MANUFACTURERS
RECOMMENDATIONS.
B. WHERE GROOVED FITTINGS AND COUPLINGS ARE USED TOGETHER THEY SHALL
BE OF THE SAME MANUFACTURER.
C. BUSHINGS SHALL NOT BE USED.
D. FLEXIBLE COUPLINGS SHALL BE IDENTIFIED ON THE SHOP DRAWINGS.
2.3 HANGERS
A. ALL HANGERS SHALL BE OF APPROVED MATERIALS AND SPACED IN ACCORDANCE
WITH NFPA 13 AND THE PIPING MANUFACTURER'S SPECIFICATIONS.
B. THE SECTION MODULUS REQUIRED BY NFPA 13 SHALL BE PROVIDED FOR ALL
TRAPEZE MEMBERS SUPPORTING PIPING.
2.4 SPRINKLERS
A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, AVAILABLE
MANUFACTURERS OFFERING PRODUCTS THAT MAY BE INCORPORATED INTO THE
WORK INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
1. GLOBE.
2. RELIABLE.
3. TYCO.
4. VICTAULIC.
5. VIKING.
B. GENERAL REQUIREMENTS:
1. PRESSURE RATING: 175 PSI MINIMUM.
2. ONLY SPRINKLERS MANUFACTURED AFTER JANUARY 1, 2022 WILL BE
ACCEPTED FOR USE.
3. ONLY SPRINKLERS MANUFACTURED UTILIZING BELLEVILLE SPRING SEALS
WILL BE ACCEPTABLE FOR USE.
4. ONLY NEW SPRINKLERS SHALL BE INSTALLED. REMOVAL OF EXISTING
SPRINKLERS FROM THE FITTING SHALL BE REPLACED WITH NEW
SPRINKLERS.
C. SPRINKLER TYPES:
1. WHITE CONCEALED PENDENT - GLASS BULB QUICK RESPONSE RECESSED
SPRINKLER WITH WHITE MATCHING COVER PLATE.
D. SPRINKLER ESCUTCHEONS: MATERIALS, TYPES, AND FINISHES SHALL MATCH
SPRINKLERS.
1. ESCUTCHEONS SHALL BE LISTED FOR USE WITH THE SPRINKLER IT IS
INSTALLED WITH.
PART 3 - EXECUTION
3.1 COORDINATION WITH OTHER TRADES
A. COORDINATE CLOSELY WITH ALL OTHER TRADES TO EXPEDITE CONSTRUCTION
AND AVOID INTERFERENCE.
3.2 SYSTEM INSTALLATION
A. DEVIATIONS FROM ENGINEERING DOCUMENTS REQUIRE PRIOR WRITTEN
APPROVAL FROM THE NPS REGIONAL FIRE MARSHAL (AHJ).
B. PIPING STANDARD: COMPLY WITH REQUIREMENTS IN NFPA 13 FOR INSTALLATION
OF SPRINKLER PIPING.
C. INSTALL HANGERS AND SUPPORTS FOR SPRINKLER SYSTEM PIPING ACCORDING
TO NFPA 13.
D. SLEEVES SHALL BE PROVIDED FOR PIPING PASSING THROUGH CONCRETE SLABS,
CONCRETE OR MASONRY WALLS AND PARTITIONS, THROUGH FLOORS, CEILINGS,
WALLS, OR PARTITIONS OF OTHER BUILDING MATERIALS. WATERTIGHT SLEEVES
CAULKED WITH MASTIC OR LEAD SHALL BE PROVIDED FOR FLOOR SLABS AND
WALLS ON OR BELOW GRADE. STANDARD PIPE OR GALVANIZED SHEET METAL
SLEEVES SHALL BE INSTALLED IN ABOVE GRADE CONSTRUCTION AS MAY BE
REQUIRED. THE SLEEVES SHALL BE OF SUFFICIENT DIAMETER TO PASS PIPE
LINES WITH COUPLINGS OR WITH INSULATION OR ANNULAR AREA FOR CAULKING
WHERE REQUIRED.
E. ESCUTCHEONS SHALL BE APPROVED FLOOR AND CEILING PLATES MADE OF
STEEL OR BRASS, PLAIN OR CHROMIUM PLATE FINISH AND SHALL BE INSTALLED
AROUND ALL EXPOSED PIPING PASSING THROUGH A FINISHED FLOOR, WALL OR
CEILING. THE PLATES SHALL BE OF SUFFICIENT OUTSIDE DIAMETER TO COVER
THE SLEEVE OPENING AND SHALL BE PROVIDED WITH SPRINGS OR SET SCREWS
TO INSURE THEM FITTING SNUGLY AROUND THE PIPE.
3.3 IDENTIFICATION
A. INSTALL LABELING AND PIPE MARKERS ON EQUIPMENT AND PIPING ACCORDING
TO REQUIREMENTS IN NFPA 13 AND THE LOCAL AHJS.
3.4 FIELD QUALITY CONTROL
A. PERFORM TESTS AND INSPECTIONS.
B. TESTS AND INSPECTIONS:
1. LEAK TEST: AFTER INSTALLATION, HYDROSTATICALLY TEST ENTIRE SYSTEM
AND TEST FOR LEAKS BY CHARGING SYSTEM TO 10 PSI ABOVE MAXIMUM
WORKING PRESSURE OR 150 PSI, WHICHEVER IS LESS IN ACCORDANCE WITH
NFPA 13. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.
2. TEST AND ADJUST CONTROLS AND SAFETIES. REPLACE DAMAGED AND
MALFUNCTIONING CONTROLS AND EQUIPMENT.
3. FLUSH, TEST, AND INSPECT SPRINKLER SYSTEMS ACCORDING TO NFPA 13,
"SYSTEMS ACCEPTANCE" CHAPTER.
4. COORDINATE WITH FIRE ALARM TESTS. OPERATE AS REQUIRED.
C. TESTS SHALL BE WITNESSED BY THE AUTHORITY HAVING JURISDICTION, AND
OWNER'S AUTHORIZED AGENT.
D. PRELIMINARY TESTING PROCEDURES SHALL BE CONDUCTED AS MENTIONED
ABOVE TO ASSURE PROPER OPERATION WHEN THE FINAL TESTING IS
PERFORMED.
E. THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES AS SHOWN IN NFPA 13
MUST BE COMPLETED AND SUBMITTED TO THE PROJECT MANAGER AND AHJ
BEFORE FINAL ACCEPTANCE MAY BE GIVEN.
3.5 CLEANING
A. REMOVE AND REPLACE SPRINKLERS WITH PAINT, OTHER THAN FACTORY FINISH,
INCLUDING OVERSPRAY.
3.6 DEMONSTRATION
A. TRAIN OWNER'S MAINTENANCE PERSONNEL TO ADJUST, OPERATE, AND MAINTAIN
FIRE SPRINKLER SYSTEM COMPONENTS.
B. AFTER COMPLETION OF ALL INSTALLATION, TESTS, ETC. AND PRIOR TO THE
OPENING DATE, THE SPRINKLER CONTRACTOR SHALL INSTRUCT THE OWNER IN
THE OPERATION OF THE SPRINKLER SYSTEM. PROVIDE WRITTEN OPERATING
INSTRUCTIONS AND MOUNT ON WALL IN A FRAME WITH GLASS FRONT. INCLUDE
THE FOLLOWING SO THAT THE OWNER:
1. WILL IMMEDIATELY RECOGNIZE THE MAIN VALVES ARE IN OPEN OR CLOSED
POSITION.
2. WILL KNOW HOW TO DRAIN THE SYSTEM.
3. WILL KNOW HOW TO RESET THE ALARM SYSTEM.
4. WILL KNOW NOW TO MAKE COMPLETE WEEKLY INSPECTION.
5. WILL KNOW HOW TO MAINTAIN THE SYSTEM IN ACCORDANCE WITH NFPA 13
AND 25.
END OF SECTION 211313