Attachment_-_Drawings.pdf

PDF 20 MB Posted

Attached to
Restroom Renovation Federal contract opportunity
Solicitation number
140P6423Q0042
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document provides details for a federal solicitation seeking construction services for restroom renovations. The National Park Service Midwest Region is soliciting quotes for upgrades to restrooms at the William Howard Taft National Historic Site in Cincinnati, Ohio. Work includes renovations to meet ADA requirements, upgrades to mechanical, electrical and plumbing systems, and replacement of finishes and fixtures. The project magnitude is estimated between $100,000 and $250,000. The solicitation number is 140P6423Q0042 and will be awarded as a firm-fixed price construction contract. Evaluation criteria are price, technical experience, and prior experience. The NAICS code is 236220 for commercial and institutional building construction with a size standard of $45 million. The project is set aside 100% for total small businesses. The point of contact is Craig D Bryant at craig_bryant@nps.gov or 330-468-2500 x6.

View the file

Other files for this federal contract opportunity

Other files attached to Restroom Renovation, newest first.
File Type Posted
Sol_140P6423Q0042_Amd_0002.pdf PDF
Questions_and_Answers_0001.pdf PDF
Revised_Specifications_-_29_Jun_2023_0001.pdf PDF
Sol_140P6423Q0042_Amd_0001.pdf PDF
Attachment_-_Notice_to_Contractors.pdf PDF
Technical_Questionnaire.docx DOCX document
Price_Schedule_-_Restroom_Renovation.xlsx XLSX spreadsheet
Attachment_-_Construction_Contract_Administration.pdf PDF
Price_Schedule_-_Restroom_Renovation.pdf PDF
Attachment_-_Provisions_to_be_Completed.pdf PDF
Sol_140P6423Q0042.pdf PDF
Wage_Determination_-_Hamilton_Co.pdf PDF
Technical_Questionnaire.pdf PDF
Attachment_-_Submittal_List.pdf PDF
Specifications_-_Restroom_Renovation.pdf PDF
Attachment_-_Pictures.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 2

M

M

AFS

F

S

FS

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, O=THE SCHEMMER ASSOCIATES, C=US

Date: 2023.04.22 11:17:41-05'00'

6 2

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:18:04-05'00'

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

MEN

WOMEN

7 2

DIFFUSER, REGISTER AND GRILLE SCHEDULE

FAN SCHEDULE

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:18:39-05'00'

8 2

M

M

AFS

F

S

FS

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:19:28-05'00'

9 2

DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:04-05'00'

0 2

DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:30-05'00'

1 2

DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:20:59-05'00'

2 2

DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:21:25-05'00'

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

MEN

WOMEN

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

MEN

WOMEN

3 2

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:21:48-05'00'

4 2

PLUMBING FIXTURE SCHEDULE

PUMP SCHEDULE

EXPANSION TANK SCHEDULE

ELECTRIC WATER HEATER SCHEDULE

Digitally signed by Jeffrey Kulhanek DN: CN=Jeffrey Kulhanek, dnQualifier=A01410C00000180942C1088000A7736, Date: 2023.04.22 11:22:11-05'00'

5 2

Digitally signed by Joseph C Binge DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:07:19-05'00'

6 2

DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:07:43-05'00'

7 2

DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:02-05'00'

8 2

DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:19-05'00'

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

K

C

AXTON

LAVATO

R Y

VITR

EOU

S

C

HINA

MEN

WOMEN

Digitally signed by Joseph C Binge DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:08:39-05'00'

0 2

DN: CN=Joseph C Binge, dnQualifier=A01410C0000018738F6716100009112, Date: 2023.04.21 15:06:41-05'00'

K-2210CAXTONLAVATORYVITREOUSCHINA

K-2210CAXTONLAVATORYVITREOUSCHINA

MEN

WOMEN

WWWWWWWWWWWWWWWWWOWO

INSTALL NEW SPRINKLER FROM

EXISTING OUTLET.

EXISTING SPRINKLER TO BE

DEMOLISHED.

210A

INSTALL NEW SPRINKLER FROM NEW

CONNECTION TO EXISTING

OVERHEAD SYSTEM.

1" 1"

1044 North 115th Street | Suite 300 Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

247612/80029

80029

JLK

JLK

JLK

04/21/2023

DATE INITIAL

www.codeconsultants.com

ST. LOUIS, MISSOURI 63146-4235

2043 WOODLAND PKWY, SUITE 300

314-991-2633

TM

WILLIAM B. SMITH, PE

LICENSE NO. PE-73499

CODE CONSULTANTS, INC.

2043 WOODLAND PKWY, SUITE 300

ST. LOUIS, MO 63146-4235

PHONE: 314-991-2633

CORPORATE CERTIFICATE OF AUTHORITY

NO. 02037

ENGINEER OF RECORD:

07310.035

RESTROOM REMODEL

THE WILLIAM HOWARD TAFT NATIONAL HISTORIC SITE

2036 AUBURN AVE, CINCINNATI, OHIO 45209

FIRE PROTECTION PLAN

FP100

HANGER NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL HANGER

TYPES AND LOCATIONS. THE HANGERS SHALL COMPLY WITH NFPA 13.

2. PIPES LARGER THAN 2 IN. RUNNING PARALLEL TO TRUSSES/ROOF JOIST SHALL BE

HUNG FROM TRAPEZE HANGERS SUPPORTED NEARLY EQUALLY BY TWO JOISTS.

3. ONLY ONE PIPE SHALL BE SUPPORTED FROM A SINGLE TRAPEZE HANGER UNLESS

OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER OF RECORD.

4. CONTRACTOR SHALL NOT CUT MEMBERS UNLESS ANALYSIS IS PROVIDED BY A

STRUCTURAL ENGINEER.

CONSTRUCTION NOTES

1. DURING CONSTRUCTION, FIRE SPRINKLER CONTRACTOR SHALL KEEP FIRE

SPRINKLER SYSTEMS OUT OF CONSTRUCTION AREA FULLY CHARGED AND

OPERATIONAL DURING BUSINESS HOURS.

2. COORDINATE REQUIRED SHUT-DOWNS OF THE EXISTING SYSTEMS WITH THE

CONTRACTING OFFICER AND FIRE DEPARTMENT.

3. PROVIDE TEMPORARY PIPING AND FITTINGS AS REQUIRED TO MAINTAIN SERVICE

TO FIRE SPRINKLER SYSTEMS (NEW AND EXISTING) DURING CONSTRUCTION.

4. COORDINATE CONSTRUCTION PHASES WITH CONTRACTING OFFICER AND

GENERAL CONTRACTOR.

GENERAL NOTES

1. PROVIDE ALL NECESSARY OFFSETS, RAISES OR DROPS IN PIPING AND AUXILIARY

DRAINS REQUIRED BY BUILDING CONDITIONS IN ORDER TO PROVIDE A FULLY

FUNCTIONING COMPLIANT FIRE SPRINKLER SYSTEM PER NFPA, FIRE PROTECTION

ENGINEER OF RECORD AND AUTHORITY HAVING JURISDICTION. (WHETHER OR NOT

SHOWN ON THE DRAWINGS).

2. THE CONTRACTOR MUST REVIEW THE CONSTRUCTION DOCUMENTS AND EXAMINE

THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS,

CLEARANCES, PIPE SIZES, ETC., PRIOR TO BID. SHOULD MODIFICATIONS TO THESE

PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH

OTHER TRADES, IT WILL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATE

APPROVAL OF THESE CHANGES WITH THE CONTRACTING OFFICER.

3. ARCHITECTURAL, CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL

BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY.

REFER TO THE PROPER DRAWINGS FOR EXACT LOCATIONS, SIZES, AND

QUANTITIES OF OTHER TRADES' WORK. OBSTRUCTION TO SPRINKLER DISCHARGE

MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION.

EXTRA SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER.

4. THE ENGINEERING DRAWINGS HAVE BEEN PREPARED USING AUTOCAD. THE

DRAWINGS ARE 100% CAD. THESE DOCUMENTS WILL BE MADE AVAILABLE TO THE

SUCCESSFUL FIRE SPRINKLER CONTRACTOR IN EITHER ELECTRONIC FORM.

5. THE CONTRACTOR SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS

AS REQUIRED BY THE SPECIFICATIONS. CONTRACTOR SHALL BASE SHOP

DRAWINGS DESIGN ON THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS.

SPRINKLER SHOP DRAWINGS SHALL INCLUDE ALL NECESSARY ELEVATIONS,

HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION METHODS/NOTES,

MATERIAL DATA, AND AND ANY OTHER INFORMATION NECESSARY TO CLARIFY THE

INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZES, SPRINKLER

SPACING, AND ALL SYSTEM CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN

DESIGN OF THE SYSTEM OR IN MATERIALS OR EQUIPMENT USED MUST BE

APPROVED IN WRITING FROM THE CONTRACTING OFFICER PRIOR TO BIDDING,

FABRICATION, OR INSTALLATION.

6. THE CONTRACTOR SHALL DOCUMENT ALL FIELD COORDINATION CHANGES ON THE

INSTALLATION DRAWINGS. ONCE INSTALLATION IS COMPLETE THE CONTRACTOR

SHALL SUPPLY AS-BUILT DRAWINGS TO THE OWNER.

7. SUPPLY ONLY ONE (1) SPRINKLER FROM A SINGLE BRANCH LINE OUTLET. PROVIDE

NEW BRANCH LINES AS REQUIRED.

8. SPRINKLERS NEAR A HEAT SOURCE (UNIT HEATERS, DIFFUSERS, STEAM MAINS,

SKYLIGHTS, ETC.) SHALL HAVE TEMPERATURE RATINGS IN ACCORDANCE WITH

NFPA 13.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER PROTECTION OF

PENETRATIONS OF RATED ASSEMBLIES WITH A LISTED FIRE STOPPING METHOD.

10. SPRINKLER PROTECTION IS REQUIRED IN ELECTRICAL ROOMS. NO MAIN PIPING

SHALL PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. BRANCHLINE

PIPING SHALL NOT PASS ABOVE THE ELECTRICAL PANELS.

11. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND INSPECTORS TEST CONNECTION

DISCHARGE AWAY FROM FINISHED SURFACES. SPLASH BLOCKS SHALL BE

PROVIDED AS NECESSARY TO PROTECT LANDSCAPED SURFACES FROM DAMAGE.

21 22

FIRE SPRINKLER LEVEL 1 PLAN

SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"

DESIGN CRITERIA

RESTROOM AND OFFICE (LIGHT HAZARD WET PIPE FIRE SPRINKLER SYSTEM):

DENSITY - 0.10 GPM/SQ FT

OPERATING AREA - 1,500 SQ FT

TEMPERATURE CLASSIFICATION / NOMINAL K-FACTOR / RESPONSE TYPE -

ORD / 5.6 / QR

HOSE STREAM ALLOWANCE - 100 GPM

DURATION: 0.5 HR

SPRINKLER SPACING SHALL BE AS SHOWN ON THE ENGINEERING DRAWINGS.

UNFINISHED AREAS - LOCATE SPRINKLERS AS SHOWN ON THE ENGINEERING

DRAWINGS.

FIRE SPRINKLER LEVEL 1 - DEMOLITION PLAN

SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"

HYDRAULIC REFERENCE POINT

CAPPED PIPE

xxx

CENTER LINE OF SPRINKLER: ALIGN WITH LIGHTS AND/OR OTHER

SPRINKLERS: COORDINATE WITH OTHER TRADES.

RECOMMENDED CENTER LINE ELEVATION OF PIPE A.F.F. AND/OR CENTER

LINE ELEVATION OF PIPE FROM TOP OF JOIST

RISE FROM LEFT TO RIGHT AND DROP FROM RIGHT TO LEFT

STRUCTURAL SHOWN FOR REFERENCE ONLY, VERIFY ACTUAL STRUCTURAL LOCATIONS.

XX

NOTE

PIPE HANGER

TRAPEZE HANGER

NEW PIPING

SYMBOL KEY

EXISTING UNDERGROUND WATER MAIN

FIRE DEPARTMENT CONNECTION

GLOBE VALVE

RISER

ZONE BOUNDARY LINE

PLUGGED OUTLET

SPRINKLER TYPESYMBOL

SPRINKLER LEGEND

QRWHT

FINISH RESP. QTY.

5.6

K

ORD

TEMP.

CONCEALED STANDARD COVERAGE PENDENT 3

EXISTING PENDENT TO BE DEMOLISHED

QRWHT5.6ORD

EXISTING CONCEALED STANDARD COVERAGE

PENDENT ETR

FIRE SPRINKLER LEVEL 2 PLAN

SCALE: 1/4" = 1'-0" FIN. FLOOR ELEV. = 100'-0"

1044 North 115th Street | Suite 300 Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

247612/80029

80029

JLK

JLK

JLK

04/21/2023

DATE INITIAL

www.codeconsultants.com

ST. LOUIS, MISSOURI 63146-4235

2043 WOODLAND PKWY, SUITE 300

314-991-2633

TM

WILLIAM B. SMITH, PE

LICENSE NO. PE-73499

CODE CONSULTANTS, INC.

2043 WOODLAND PKWY, SUITE 300

ST. LOUIS, MO 63146-4235

PHONE: 314-991-2633

CORPORATE CERTIFICATE OF AUTHORITY

NO. 02037

ENGINEER OF RECORD:

07310.035

RESTROOM REMODEL

THE WILLIAM HOWARD TAFT NATIONAL HISTORIC SITE

2036 AUBURN AVE, CINCINNATI, OHIO 45209

SPECIFICATIONS -

FIRE PROTECTION FP101

SPECIFICATIONS 21 13 13 FIRE SPRINKLER SYSTEMS

SECTION 211313 - FIRE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL

AND SUPPLEMENTARY CONDITIONS AND DIVISION 01 SPECIFICATION SECTIONS,

APPLY TO THIS SECTION.

B. FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS

REQUIRED FOR THE RENOVATION OF AN EXISTING AUTOMATIC SPRINKLER

SYSTEM.

1.2 SUMMARY

A. SECTION INCLUDES:

1. PIPES, FITTINGS, AND SPECIALTIES.

2. HANGERS AND SLEEVES.

3. SPRINKLERS.

1.3 DESCRIPTION OF WORK

A. PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, TESTING AND

SERVICES NECESSARY FOR A RENOVATION OF AN EXISTING OPERATIONAL WET

PIPE FIRE PROTECTION SYSTEM FOR THE BUILDING AS HEREINAFTER DESCRIBED

AND AS SHOWN ON THE ENGINEERING DRAWINGS.

B. WORK SHALL BEGIN AT THE AREAS SHOWN ON THE ENGINEERING DRAWINGS

AND SHALL INCLUDE THE FOLLOWING:

1. FIRE SPRINKLER SYSTEM MODIFICATION.

2. COORDINATION OF WORK AND SCHEDULES WITH OTHER TRADES.

C. IT IS INTENDED THAT THE ENGINEERING DRAWINGS AND SPECIFICATION SHALL

DESCRIBE AND PROVIDE FOR A WORKING INSTALLATION COMPLETE IN EVERY

DETAIL AND ALL ITEMS NECESSARY FOR SUCH COMPLETE INSTALLATION SHALL

BE PROVIDED WHETHER OR NOT SPECIFICALLY MENTIONED HEREIN OR SHOWN

ON THE ENGINEERING DRAWINGS.

1.4 DEFINITIONS

A. STANDARD PRESSURE SPRINKLER PIPING: LISTED FOR 175 PSI MINIMUM

WORKING PRESSURE.

1.5 SYSTEM DESCRIPTION

A. FIRE SPRINKLER SYSTEM DESIGN CRITERIA SHALL BE STRICTLY PER THIS

SPECIFICATION.

B. MAINTAIN FIRE SPRINKLER SYSTEM TO PROVIDE COMPLETE FIRE PROTECTION

FOR THE ENTIRE BUILDING.

C. EXISTING INTERFACE FIRE SPRINKLER SYSTEM WITH BUILDING FIRE ALARM

SYSTEMS SHALL REMAIN.

D. RESTROOM AND OFFICE (NFPA 13 - LIGHT HAZARD FIRE SPRINKLER SYSTEM):

DENSITY - 0.10 GPM/SQ FT

OPERATING AREA - 1,500 SQ FT.

TEMPERATURE CLASSIFICATION / NOMINAL K-FACTOR / RESPONSE TYPE -

ORD / 5.6 / QR

DURATION: 0.5 HOURS

E. SPRINKLER SPACING SHALL BE AS SHOWN ON THE ENGINEERING DRAWINGS.

1. HARD CEILINGS - LOCATE SPRINKLERS IN ACCORDANCE WITH THE

ENGINEERING DRAWINGS. SPRINKLERS SHALL BE IN LINE WITH LIGHT

FIXTURES AND OTHER SPRINKLERS WHERE INDICATED ON THE DRAWINGS.

COORDINATE CLOSELY WITH THE ELECTRICAL CONTRACTOR.

2. UNFINISHED AREAS - LOCATE SPRINKLERS AS SHOWN ON THE ENGINEERING

DRAWINGS.

F. PROVIDE ALL NECESSARY OFFSETS, RAISES OR DROPS IN MAIN OR BRANCH LINE

PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS WHETHER

OR NOT SHOWN ON THE ENGINEERING DRAWINGS.

G. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES,

ELEVATIONS, CLEARANCES, PIPE SIZES, ETC.

H. IT IS UNDERSTOOD, UNLESS SPECIFICALLY INDICATED OTHERWISE, THAT THE

PIPE SIZES AS SHOWN ON THE ENGINEERING DRAWINGS WILL BE USED.

1.6 PERFORMANCE REQUIREMENTS

A. STANDARD PRESSURE PIPING SYSTEM COMPONENT: LISTED FOR 175 PSI

MINIMUM WORKING PRESSURE.

1.7 SUBMITTALS

A. THE ENGINEERING DRAWINGS HAVE BEEN PREPARED USING AUTOCAD. THESE

DOCUMENTS WILL BE MADE AVAILABLE TO THE SUCCESSFUL FIRE SPRINKLER

CONTRACTOR IN EITHER ELECTRONIC FORM OR HARD COPY. UTILIZATION OF

THESE DOCUMENTS FOR THE DEVELOPMENT OF SHOP DRAWINGS AND

SUBMITTALS DOES NOT RELIEVE THE FIRE SPRINKLER CONTRACTOR FROM ANY

OF HIS RESPONSIBILITIES REQUIRED HEREIN.

B. SUBMITTALS SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE GENERAL

CONDITIONS OF THE CONTRACT.

C. PRODUCT LITERATURE: FOR ALL WET PIPE SPRINKLER SYSTEM EQUIPMENT.

1. LITERATURE SHALL CLEARLY IDENTIFY EXACTLY WHAT COMPONENTS ARE

BEING PROVIDED AND SHALL INCLUDE: FINISH, SIZE, TYPE, ETC. LITERATURE

WHICH IS NOT CLEARLY IDENTIFIED WILL BE REJECTED.

D. SHOP DRAWINGS:

1. DRAWINGS MUST BE COMPREHENSIVE OF ENTIRE PROJECT,

DEMONSTRATING COORDINATION WITH OTHER DISCIPLINES, COMPLETE IN

ALL DETAIL AND THE SAME SCALE AS THE ENGINEERING DRAWINGS.

2. HYDRAULIC CALCULATIONS (CALCULATIONS SHALL INCLUDE PEAKING

INFORMATION).

3. NPS REGIONAL FIRE MARSHAL (AHJ) WILL REVIEW THIS SUBMITTAL FOR

CONSISTENCY WITH CONTRACT DOCUMENTS AND FOR APPROVAL.

E. THE FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR RESPONDING,

IN WRITING, TO ANY COMMENTS FROM THE AHJ WITHIN TEN (10) WORKING DAYS

AFTER THE RECEIPT OF THEIR COMMENTS. COPIES OF THE RESPONSE SHALL BE

SENT TO THE GENERAL CONTRACTOR.

F. PROVIDE AS-BUILT DOCUMENTS IN ACCORDANCE WITH REQUIREMENTS OF THE

GENERAL CONDITIONS OF THE CONTRACT.

G. FIELD TEST REPORTS AND CERTIFICATES: INDICATE TEST RESULTS FOR

COMPLIANCE WITH PERFORMANCE REQUIREMENTS AND AS DESCRIBED IN NFPA

13. INCLUDE "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR

ABOVEGROUND PIPING."

H. PROVIDE OPERATING AND MAINTENANCE INSTRUCTIONS TO THE OWNER IN

ACCORDANCE WITH REQUIREMENTS OF THE GENERAL CONDITIONS OF THE

CONTRACT AND NFPA 13.

1.8 QUALITY ASSURANCE

A. INSTALLER QUALIFICATIONS:

1. INSTALLER'S RESPONSIBILITIES INCLUDE PREPARING SHOP DRAWING

SUBMITTAL, FABRICATING, AND INSTALLING SPRINKLER SYSTEMS. BASE

CALCULATIONS ON WATER SUPPLY COORDINATES PROVIDED HEREIN.

a. INSTALLER SHALL BE STATE AND LOCALLY LICENSED.

b. INSTALLER SHALL BE MINIMALLY NICET LEVEL III OR A PROFESSIONAL

ENGINEER.

c. ON-SITE INSTALLATION SHALL BE SUPERVISED BY A MINIMUM NICET

LEVEL II TECHNICIAN.

B. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED

AS DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR

INTENDED LOCATION AND APPLICATION.

C. REFERENCES: FIRE SPRINKLER SYSTEM EQUIPMENT, SPECIALTIES,

ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY WITH ALL

APPLICABLE CODES AND REFERENCED DESIGN STANDARDS:

1. 2021 INTERNATIONAL BUILDING CODE

2. 2021 INTERNATIONAL FIRE CODE

3. NFPA 13, SPRINKLER SYSTEMS - 2022 EDITION.

D. EQUIPMENT AND COMPONENTS SHALL BE UL LISTED FOR FIRE PROTECTION

SYSTEMS INSTALLATION.

E. ALL FIRE SPRINKLER SYSTEM COMPONENTS SHALL BE INSTALLED FREE OF ANY

RUST, CORROSION OR VISIBLE DAMAGE. ALL ITEMS NOT COMPLYING WITH THIS

REQUIREMENT SHALL BE REPLACED WITHOUT COST TO THE OWNER.

1.9 COORDINATION

A. COORDINATE LAYOUT AND INSTALLATION OF SPRINKLERS WITH OTHER

CONSTRUCTION THAT PENETRATES CEILINGS, INCLUDING LIGHT FIXTURES, HVAC

EQUIPMENT, AND PARTITION ASSEMBLIES.

B. COORDINATE INSTALLATION OF SYSTEM WITH ALL OTHER DISCIPLINES.

1.10 EXTRA MATERIALS

A. FURNISH EXTRA MATERIALS THAT MATCH PRODUCTS INSTALLED AND THAT ARE

PACKAGED WITH PROTECTIVE COVERING FOR STORAGE AND IDENTIFIED WITH

LABELS DESCRIBING CONTENTS.

B. PROVIDE AT THE RISER ONE (1) TWELVE (12) HEAD SPARE SPRINKLER CABINETS

STOCKED WITH SPRINKLERS AND ESCUTCHEON ASSEMBLIES PROPORTIONATE

TO THOSE PROVIDED IN THE BUILDING AND ALL NECESSARY SPRINKLER

WRENCHES AS REQUIRED BY NFPA 13.

1.11 REGULATORY REQUIREMENTS

A. THE FIRE SPRINKLER CONTRACTOR SHALL NOT PURSUE ANY APPROVALS OR

INTERPRETATIONS OF THE CONTRACT DOCUMENTS EXCEPT THROUGH NPS

REGIONAL FIRE MARSHAL.

B. SPRINKLER PIPING SHALL NOT BE CONCEALED WHERE IT IS INACCESSIBLE

UNLESS IT IS FIRST INSPECTED AND ACCEPTED BY A REPRESENTATIVE OF THE

AUTHORITY HAVING JURISDICTION.

C. ANY WORK PERFORMED PRIOR TO THE SATISFACTORY REVIEW BY AND

APPROVAL BY THE AUTHORITY HAVING JURISDICTION, WILL BE SOLELY AT THE

FIRE SPRINKLER CONTRACTOR'S RISK.

D. THE SYSTEM WILL NOT BE ACCEPTABLE UNTIL FINAL TESTING AND RECEIPT OF

THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE HAS BEEN OBTAINED.

1.12 WARRANTY

A. REPAIR ALL DEFECTIVE WORKMANSHIP OR REPLACE ALL DEFECTIVE MATERIALS

FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.

WORKMANSHIP OR EQUIPMENT FOUND TO BE DEFECTIVE DURING THAT PERIOD

SHALL BE REPLACED WITHOUT COST TO THE OWNER.

PART 2 - PRODUCTS

2.1 PIPE AND FITTINGS

A. PER LOCAL REQUIREMENTS AND NFPA 13. ALL PIPE SHALL HAVE A CORROSION

RESISTANCE RATIO (CRR) EQUAL TO OR GREATER THAN 1.00. REFER TO THE

CURRENT UL FIRE PROTECTION EQUIPMENT DIRECTORY - STEEL SPRINKLER PIPE

FOR ACCEPTABLE MANUFACTURERS, SIZES, AND JOINING METHODS.

B. THE ENGINEER'S HYDRAULIC CALCULATIONS ANTICIPATES THAT ALL GROOVED

WET PIPE SYSTEM RISERS, FEED AND CROSS MAINS, AND BRANCH LINES SHALL

HAVE HYDRAULIC CHARACTERISTICS EQUAL TO OR GREATER THAN SCHEDULE 10

PIPE.

C. ALL THREADED PIPING SHALL BE SCHEDULE 40 PIPE.

D. ALL 1 IN. SHALL BE SCHEDULE 40 PIPE.

E. FITTINGS SHALL BE SCREWED OR FLANGED BLACK CAST IRON OR APPROVED

EQUAL SUCH AS MECHANICAL, GROOVED OR WELDED CONNECTIONS. WELDED

CONNECTIONS ARE ONLY PERMITTED ON SHOP FABRICATED PIPING. ONSITE

WELDING OF PIPING IS NOT PERMITTED.

F. PRESSURE RATING: 175 PSI MINIMUM.

2.2 JOINING OF PIPE AND FITTINGS

A. ALL PIPE SHALL BE JOINED IN ACCORDANCE WITH NFPA 13 AND MANUFACTURERS

RECOMMENDATIONS.

B. WHERE GROOVED FITTINGS AND COUPLINGS ARE USED TOGETHER THEY SHALL

BE OF THE SAME MANUFACTURER.

C. BUSHINGS SHALL NOT BE USED.

D. FLEXIBLE COUPLINGS SHALL BE IDENTIFIED ON THE SHOP DRAWINGS.

2.3 HANGERS

A. ALL HANGERS SHALL BE OF APPROVED MATERIALS AND SPACED IN ACCORDANCE

WITH NFPA 13 AND THE PIPING MANUFACTURER'S SPECIFICATIONS.

B. THE SECTION MODULUS REQUIRED BY NFPA 13 SHALL BE PROVIDED FOR ALL

TRAPEZE MEMBERS SUPPORTING PIPING.

2.4 SPRINKLERS

A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, AVAILABLE

MANUFACTURERS OFFERING PRODUCTS THAT MAY BE INCORPORATED INTO THE

WORK INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:

1. GLOBE.

2. RELIABLE.

3. TYCO.

4. VICTAULIC.

5. VIKING.

B. GENERAL REQUIREMENTS:

1. PRESSURE RATING: 175 PSI MINIMUM.

2. ONLY SPRINKLERS MANUFACTURED AFTER JANUARY 1, 2022 WILL BE

ACCEPTED FOR USE.

3. ONLY SPRINKLERS MANUFACTURED UTILIZING BELLEVILLE SPRING SEALS

WILL BE ACCEPTABLE FOR USE.

4. ONLY NEW SPRINKLERS SHALL BE INSTALLED. REMOVAL OF EXISTING

SPRINKLERS FROM THE FITTING SHALL BE REPLACED WITH NEW

SPRINKLERS.

C. SPRINKLER TYPES:

1. WHITE CONCEALED PENDENT - GLASS BULB QUICK RESPONSE RECESSED

SPRINKLER WITH WHITE MATCHING COVER PLATE.

D. SPRINKLER ESCUTCHEONS: MATERIALS, TYPES, AND FINISHES SHALL MATCH

SPRINKLERS.

1. ESCUTCHEONS SHALL BE LISTED FOR USE WITH THE SPRINKLER IT IS

INSTALLED WITH.

PART 3 - EXECUTION

3.1 COORDINATION WITH OTHER TRADES

A. COORDINATE CLOSELY WITH ALL OTHER TRADES TO EXPEDITE CONSTRUCTION

AND AVOID INTERFERENCE.

3.2 SYSTEM INSTALLATION

A. DEVIATIONS FROM ENGINEERING DOCUMENTS REQUIRE PRIOR WRITTEN

APPROVAL FROM THE NPS REGIONAL FIRE MARSHAL (AHJ).

B. PIPING STANDARD: COMPLY WITH REQUIREMENTS IN NFPA 13 FOR INSTALLATION

OF SPRINKLER PIPING.

C. INSTALL HANGERS AND SUPPORTS FOR SPRINKLER SYSTEM PIPING ACCORDING

TO NFPA 13.

D. SLEEVES SHALL BE PROVIDED FOR PIPING PASSING THROUGH CONCRETE SLABS,

CONCRETE OR MASONRY WALLS AND PARTITIONS, THROUGH FLOORS, CEILINGS,

WALLS, OR PARTITIONS OF OTHER BUILDING MATERIALS. WATERTIGHT SLEEVES

CAULKED WITH MASTIC OR LEAD SHALL BE PROVIDED FOR FLOOR SLABS AND

WALLS ON OR BELOW GRADE. STANDARD PIPE OR GALVANIZED SHEET METAL

SLEEVES SHALL BE INSTALLED IN ABOVE GRADE CONSTRUCTION AS MAY BE

REQUIRED. THE SLEEVES SHALL BE OF SUFFICIENT DIAMETER TO PASS PIPE

LINES WITH COUPLINGS OR WITH INSULATION OR ANNULAR AREA FOR CAULKING

WHERE REQUIRED.

E. ESCUTCHEONS SHALL BE APPROVED FLOOR AND CEILING PLATES MADE OF

STEEL OR BRASS, PLAIN OR CHROMIUM PLATE FINISH AND SHALL BE INSTALLED

AROUND ALL EXPOSED PIPING PASSING THROUGH A FINISHED FLOOR, WALL OR

CEILING. THE PLATES SHALL BE OF SUFFICIENT OUTSIDE DIAMETER TO COVER

THE SLEEVE OPENING AND SHALL BE PROVIDED WITH SPRINGS OR SET SCREWS

TO INSURE THEM FITTING SNUGLY AROUND THE PIPE.

3.3 IDENTIFICATION

A. INSTALL LABELING AND PIPE MARKERS ON EQUIPMENT AND PIPING ACCORDING

TO REQUIREMENTS IN NFPA 13 AND THE LOCAL AHJS.

3.4 FIELD QUALITY CONTROL

A. PERFORM TESTS AND INSPECTIONS.

B. TESTS AND INSPECTIONS:

1. LEAK TEST: AFTER INSTALLATION, HYDROSTATICALLY TEST ENTIRE SYSTEM

AND TEST FOR LEAKS BY CHARGING SYSTEM TO 10 PSI ABOVE MAXIMUM

WORKING PRESSURE OR 150 PSI, WHICHEVER IS LESS IN ACCORDANCE WITH

NFPA 13. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.

2. TEST AND ADJUST CONTROLS AND SAFETIES. REPLACE DAMAGED AND

MALFUNCTIONING CONTROLS AND EQUIPMENT.

3. FLUSH, TEST, AND INSPECT SPRINKLER SYSTEMS ACCORDING TO NFPA 13,

"SYSTEMS ACCEPTANCE" CHAPTER.

4. COORDINATE WITH FIRE ALARM TESTS. OPERATE AS REQUIRED.

C. TESTS SHALL BE WITNESSED BY THE AUTHORITY HAVING JURISDICTION, AND

OWNER'S AUTHORIZED AGENT.

D. PRELIMINARY TESTING PROCEDURES SHALL BE CONDUCTED AS MENTIONED

ABOVE TO ASSURE PROPER OPERATION WHEN THE FINAL TESTING IS

PERFORMED.

E. THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES AS SHOWN IN NFPA 13

MUST BE COMPLETED AND SUBMITTED TO THE PROJECT MANAGER AND AHJ

BEFORE FINAL ACCEPTANCE MAY BE GIVEN.

3.5 CLEANING

A. REMOVE AND REPLACE SPRINKLERS WITH PAINT, OTHER THAN FACTORY FINISH,

INCLUDING OVERSPRAY.

3.6 DEMONSTRATION

A. TRAIN OWNER'S MAINTENANCE PERSONNEL TO ADJUST, OPERATE, AND MAINTAIN

FIRE SPRINKLER SYSTEM COMPONENTS.

B. AFTER COMPLETION OF ALL INSTALLATION, TESTS, ETC. AND PRIOR TO THE

OPENING DATE, THE SPRINKLER CONTRACTOR SHALL INSTRUCT THE OWNER IN

THE OPERATION OF THE SPRINKLER SYSTEM. PROVIDE WRITTEN OPERATING

INSTRUCTIONS AND MOUNT ON WALL IN A FRAME WITH GLASS FRONT. INCLUDE

THE FOLLOWING SO THAT THE OWNER:

1. WILL IMMEDIATELY RECOGNIZE THE MAIN VALVES ARE IN OPEN OR CLOSED

POSITION.

2. WILL KNOW HOW TO DRAIN THE SYSTEM.

3. WILL KNOW HOW TO RESET THE ALARM SYSTEM.

4. WILL KNOW NOW TO MAKE COMPLETE WEEKLY INSPECTION.

5. WILL KNOW HOW TO MAINTAIN THE SYSTEM IN ACCORDANCE WITH NFPA 13

AND 25.

END OF SECTION 211313