This document is a Quality Assurance Surveillance Plan (QASP) for a residential housing contract opportunity with the Department of Veterans Affairs. The QASP defines performance standards for records and reports, mandatory training, housing facilities and management, and housing placement outcomes. Records must be maintained for daily sign-ins, individual care plans, progress notes, group participation documentation, and discharge summaries. Training requirements are outlined in the Performance Work Statement. Facilities must meet fire, safety, ADA, and licensing requirements and provide a clean environment with nutritious meals. Performance thresholds require 100% compliance for records and training, while housing placement goals target 50% of veterans admitted to permanent housing and no more than 20% of veterans admitted exiting to negative circumstances. Oversight will be conducted through quarterly record reviews and HOMES data analysis.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment I: Quality Assurance Surveillance Plan (QASP)

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) - HCHV Ft. Wayne NIHCS

FACILITY AND QTR: _________________________________________________________________________

Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets, or does not meet these standards. The Performance Requirements Summary Matrix is incorporated within this QASP to include performance standards and disincentives. The Government shall use these standards to determine Contractor performance and shall compare Contractor performance to the Acceptable Quality Level (AQL) defined below for each performance requirement.

Task Standard

Performance Threshold/ Acceptable

Quality Level

Method of Surveillance

Performance Acceptable/

Unacceptable

Records and Reports 1. Daily sign in sheets- signed by veterans.

2. Individual Care Plan created within 14 days of admission.

3. Progress notes for each veteran.

4. Documentation of veteran participation in daily groups and activities.

5. Discharge Summaries within 3 days of discharge.

6. Entry of veteran information into HMIS system.

100% during annual rating period

Annual VA team inspection.

The Government may, at its discretion, choose any time, announced or unannounced, to have VA personnel inspect the contractor’s facility.

YES ☐

NO ☐

Mandatory Training Contractor shall complete all required training on time per VAMC policy and as outlined in the

PWS.

100% of referred cases as outlined in

PSW

Quarterly record review.

The Government may, at its discretion, choose any time, announced or unannounced, to have VA personnel inspect the contractor’s records.

YES ☐

NO ☐

Attachment I: Quality Assurance Surveillance Plan (QASP)

Housing Facilities and Management

1.Facility meets requirements for fire, safety, Americans with Disabilities Act, licensure, safety and veteran privacy.

2. Provides clean and sober environment

3. Provides nutritionally adequate meals.

100% during quarterly rating period

Quarterly Veteran record review.

The Government may, at its discretion, choose any time, announced or unannounced, to have VA personnel inspect the contractor’s records.

Housing Placement: 1. Discharges into permanent housing

2. Negative exits

50% or greater of Veterans admitted to the facility.

Not more than 20% of Veterans admitted to the facility.

Quarterly record review and review of HOMES data from the date of contract award.

The Government may, at its discretion, choose any time, announced or unannounced, to have VA personnel inspect the contractor’s files

Signature of Contracting Officer Representative