Attachment D - Shelter Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- RFB-785-2400000113-1
About this file
This document appears to be Attachment D - Shelter Drawings related to a state and local contract opportunity involving the Kentucky Transportation Cabinet (KYTC) and the Fayette County Health Department. The drawings provide specifications for concrete pads to be used as the foundation for air monitoring shelters at three locations: the Buckner KYTC Maintenance Facility, the Fayette County Health Department in Lexington, and the Nature Center in Union, Kentucky. The drawings detail the dimensions, materials, and construction requirements for each 10x12 foot or 10x16 foot concrete pad, including the use of gravel sub-base, rebar reinforcement, 4000 psi concrete, and broom finishing. The document also notes that existing electrical poles and underground electrical lines will be utilized to power the shelters.
The document does not contain information on pricing, set-asides, incumbent contractors, funding sources, or other salient commercial terms. It appears to be strictly technical specifications related to the construction of the concrete foundation pads for the air monitoring shelters at the designated locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - Bid Documents.pdf | ||
| Final_RFB_785_2400000113_1_SO_FORM.PDF | ||
| Attachment C - MOVEit Instructions for Vendor.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buckner DOT (Oldham Co.)
KYTC Maintenance Facility 1601 South Hwy 393 Buckner, KY. 40031
Concrete Slab for Air Monitoring Shelter
12 Feet
12 feet
(Drawing not to scale)
F ee t
In ch es
4/21/2023
• Gravel (#57 or equivalent) will be hauled on site and compacted for sub-base.
• Pad will be formed and ½” rebar grid at 12” spacings will be set to strengthen concrete.
• Grade 60 rebar or equivalent will be used.
• Rebar will be located 1 to 2 inches from the slab edge.
• 4000 psi concrete will be poured to a minimum thickness of 4”.
• Pad will be broom finished.
• Cure and seal will be applied to concrete once finished.
• Use existing Electrical pole and Electrical lines are to be run underground to shelter.
Buckner Shelter
Buckner-KYTC Maintenance Facility
Concrete Pad 10’x12’x4”
Lat: 38.4001911 Long: -85.444291
Use existing Electrical Pole lines are underground to shelter
Lexington Primary (Fayette Co) Fayette County Health Department 650 Newtown Pike Lexington, KY. 40508
16 Feet
16 Feet
F
• Gravel (# 57 or equivalent) will be hauled on site and compacted for sub-base.
• Grade 60 rebar or equivalent will be used.
• Rebar will be located 1 to 2 inches from the slab edge.
• 4000 psi concrete will be poured to a minimum thickness of 4”.
• Pad will be broom finished.
• Cure and seal will be applied to concrete once finished.
Lat: 38.065056 Long:-84.497556
Use existing Electrical Pole lines are underground to shelter
Concrete Pad 10’x16’x4”
Lexington Primary
Nature Center 9101 Camp Ernst Road Union, KY. 41091
F
• Gravel (#57 or equivalent) will be hauled on site and compacted for sub-base.
• Grade 60 rebar or equivalent will be used.
• Rebar will be located 1 to 2 inches from the slab edge.
• 4000 psi concrete will be poured to a minimum thickness of 4”.
• Pad will be broom finished.
• Cure and seal will be applied to concrete once finished.
Use existing Electrical pole Electrical lines are underground to shelter.
Nature Center
Concrete Pad 10’x12’x4”
Lat: 38.9674434 Long: -84.7213627
| Buckner Shelter Placement-REV Stamp PE |
| Lexington Shelter Placement-REV Stamp PE |
| Nature Center Shelter Placement-REV Stamp PE |
File details come from the government source that posted it. Updated .