Attachment D is a pool dimensions diagram for the City of St. Cloud, Florida's Chris Lyle Aquatics Center Pool resurfacing project (ITB #2025-227). The document provides dimensional specifications for the pool facility located at 2991 17th Street, St. Cloud, Florida 34769, indicating the pool encompasses 5,382 square feet with various measurement annotations including length markings of 75.7 feet, 78.4 feet, 72.5 feet, and 143.5 feet, along with width dimensions of 21.5 feet, 16 feet, 25 feet, 29 feet, and 10 feet. The resurfacing and restoration project requires comprehensive services including surface preparation, application of exposed quartz finish, replacement of perimeter waterline tiles, inspection and repair of coping stones, resealing expansion and control joints, and reinstallation or replacement of pool fixtures. A mandatory pre-bid conference is scheduled for December 16, 2025, at 9:00 a.m. at the St. Cloud Civic Center, with written questions due by December 26, 2025, at 5:00 p.m. Bids must be submitted electronically through the City's procurement portal by January 8, 2026, at 10:00 a.m., with work to commence no earlier than February 23, 2026, and conclude by April 6, 2026.

The estimated project cost is $302,750.00, funded through the City's General Fund, with no specific set-aside designations restricting bidder eligibility. Contractors must submit a bid bond equal to five percent of the bid price, and the selected contractor must provide payment and performance bonds equal to one hundred percent of the contract amount. Qualified bidders must demonstrate a minimum of three years of experience resurfacing commercial swimming pools, maintain current Florida Department of State registration, and possess surety bonding capability. Insurance requirements include general liability coverage of $1,000,000 per occurrence and $2,000,000 aggregate, along with workers' compensation insurance. Liquidated damages are assessed at $1,685 per calendar day for failure to meet the April 6, 2026 completion deadline. The contractor must comply with 2 CFR Part 200 (Uniform Guidance), the Davis-Bacon Act for prevailing wage compliance, provide E-Verify verification for all employees and subcontractors, and deliver a one-year warranty on all completed work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5,382 SQUARE FEET

75.7'

78.4'

21.5'

16'

45.5' 72.5'

25'

16'

29'

10'

CHRIS LYLE AQUATIC CENTER

0 7 143.5 Feet

Service Layer Credits: Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community

Attachment D - Pool Dimensions