Attachment D - Drawings.pdf

PDF 11 MB Posted

Attached to
Y1DZ--Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
Solicitation number
36C77626B0020
Issued by

About this file

This document is a set of electrical engineering design drawings for an electrical distribution upgrade project at the NY Harbor Healthcare Center, VA Brooklyn Campus.

The project, identified as 630A4-16-430, involves upgrading life safety and critical branch electrical distribution systems across multiple buildings (Buildings 1, 2, 4, 14, and 15) at the facility. The work encompasses de-energizing, disconnecting, removing, and replacing electrical panels, switchboards, transformers, and associated power distribution equipment. Specific tasks include: replacing surface-mounted and recessed electrical panels with new units meeting or exceeding specified short-circuit current ratings; replacing switchboard equipment; installing new circuit breakers and terminating feeder and branch circuit conductors; providing enclosed circuit breakers and disconnect switches in NEMA 12 enclosures; cleaning electrical equipment to remove debris; installing cable support systems; and replacing transformer equipment on concrete pads with new dry-type units. The work is scheduled to take place during evening/night and weekend shifts, with coordination required during shoulder months for heating/cooling seasons. Drawings are issued for construction as of August 24, 2022 (Revision 0), prepared by Ramboll Americas and Engineering Solutions, Inc. under design by D2X Associates. The project represents comprehensive electrical infrastructure modernization to ensure life safety system reliability and critical branch distribution performance across the healthcare facility's multiple interconnected buildings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ft>

�o

II =

�ID

N

,E

0 " ·= 0

,E•

§ 00

�v :E .o>• � 0 w :i:

<ri

C -

I

C

C

.'==I

I

B-33

PREPARATION RM.

521.08

I

REFRIG.

111.36

[I]

8-35

AUTOPSY ROOM

660.20

I

DRAWING NOTES:

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE DURING AN EVENING/NIGHT

WEEKEND SHIFT.

PIT

(5'-6" DEEP)

136.48

I l-=======1I1==::=J

I

[I]

IV 1,-----,1 .-I --,I .-I --,I:=====�I�===:::J

D

I I

8-401

TRANSFORMER ROOM

874.82

I I I I

TRANSFORMER VAULTS

I

P_ 114_':',_1

T _IA_

L_

_B _U _!

L _D

_I N_�-. _1 _BA_S_E_M_E_N_T_FL_O_O_R_P _LA_N

DRAWING KEYNOTES: @

1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE

CONSULTANTS: STAMP

RAMB LL

I

I

PLAN

NORTH

4 5

I

[I]

I

I I I I

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

II

[I]

B-400

MECHANICAL EQUIPMENT ROOM

6132.10

DATE:

08124/22

[I]

I

Drawing Tltle

TASK ORDERS

DP-B

SIEMENS A

(A-BOARD)

I ) 500A

A-16 BUILDING 1 MAIN SWITCHGEAR A-BOARD

EATON

1°') MDSLOB

r1i B00AF

; B00AS

B00AP

720AT

LSIG

) HMD6

I

800A

I ) 200A

HOUSE

PUMP#3

75HP

94FLA

I ) 150A

MRI

TRAILER

SIE

65KASCCR

BODA MLO

SIE

) HFD6

225A

SIE

) HFD6

225A

0 PP-B

AHU -1

125 HP

(EST.)

156FLA

@ �f:�� E

I AL BU ILDING 1 ONE-L INE DIAGRAM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS

DRAWING.

PANEL SCHEDULE

POWER PANEL PP-B LOCATION XFMR ROOM B-401

RATINGS 225A

MAIN LUGS .

MAIN CIRCUIT BREAKER

DESCRIPTION

UNIDENTIFIED (ON)

HOT WATER CIRC PUMP

EXHAUST FAN EF-1

EXHAUST FAN GX-1

SPACE

SPACE

SPACE

AMPS 480Y/277V VOLTS 3 PH

CB. INTERRUPTING RATING

225A AMPS CONNECTED LOAD

LOAD CB. CIF CIFW/KW/HP AMPS A B C

20 1 -� �- 2 20 3 -� �- 4 20 s -� �- 6 20 7 -� �- 8

20 9 -� �- 10 20 11 -� �- 12

-� �- 14

15 J.5_ -� �-T6

17 -� �-

-� �- 20 15 c21 -� �-,22

OS -

� �- 24

, 25 -� �- 26

-� �- 28 -� �- 30 c31 -� �- 32 fs -� �- 34 -� �- 36

37 -� �- 38 ·•u -� �- 40 A1 -� �- 42

INSTALLATION SURFACE

4 WIRE 60 HZ.- - ,_

GRD. BAR YES

65kAIC RMS. SYMM. AMPS

. KW, PANEL SIZE 42 SPACES

CB. LOAD DESCRIPTIONAMPS W/KW/HP

20 " ...

20 UNIDENTIFIED JN

20 == ,..

20 .JN

20 UNIDENTIFIED JN

20 " ...

15 UNIDENTIFIED (ON)

TB BATHROOM EXHAUST15 ADMITTING

BACK-UP HOT WATER CIRC20 PUMP(OFF)

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

WORK AREA

PLAN

B 1 - BASEMENT - KEY P LAN NORTH

NOT TO SCALE EE?

Project Title Project Number 630A4-16-430

PANEL PP-B AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Building Number

Office of Construction and Facilities Management Approved: Project Director Location 800 POLY PLACE BROOKLYN NY 11209' Drawing Number

-1.·. RAMBOLL AMERICAS

f

090890

25° St. Ives Dr.

� REV, 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e

.,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17

18-01-BK

EP-158

Dwg, 63 of 91

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;:;;;;;===;;:_:;;;==================================;:.:;;;========;;;:.:;===============================;;;;;_:===================;;;:,:;======;;:_:;;;===;;;:,:;===;;;;;:,;=======;;:,.==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

C

II o

.s

!m C u

C

�o

II =

�ID

,E

N

§ 00

II

�v :E .o>

� 0

1 2 3 4 5 6 7 8 9

1') W

, 1200A

0 SWBD DP-B

) 125A ) 150A ) 250A ) 250A ) 300A ) 400A ) 100A ) 300A

SPARE

PPBSW ) 125A PPBNW PP5NW PP16SE 480V 6 75kVA PP16SW DRY TYPE

FPE FPE GE FPE FPE

208Y 1120V -t GE 400A MLO MLO

) TED

LINCOLN ELECTRIC BOX

) NFJ ) %2=5.1 LINCOLN ELECTRIC BOX FPE FPE

250AMLO GE TED GIB'S

(2)SRPF 250A 1 DOA LARGEST

THEO GIB'S FPE NEF GIB'S

100A LARGEST 30A LARGEST

TCAL GIB'S

60A LARGEST

) NFJ OR NJF

150A

) 100A

1 RV STARTER

OBSOLETE

CC-16

40HP

50FLA

) NFJ OR NJF

150A

) 100A

1 RV STARTER

OBSOLETE

CC-17

40HP

50FLA

FPE NEF GIB'S

30A LARGEST

GE TED GIB'S

100A

I134A I

) BROKEN HANDLE

I 134B I

AC-7

30HP

37FLA

400AMLO

FPE NB GIB'S

30A LARGEST

175A

GE

) TEC

150A

B16M AC-12

75HP (EST.)

94FLA

NFJ

175A

IRM

) 100A COMPUTER ROOM

A/C

AC-13

400AMLO

FPE NB GIB'S

40A LARGEST

) NFJ

175A

SQD

) KA

150A

AC-11

75HP (EST.)

94FLA

) NFJ

175A

SQD

) FA

100A

B16M AC-10

50HP (EST.)

62FLA

@ ����!AL BUILDI NG 1 ONE-LI NE DIAG RAM

ii'.

w :i:

<ri u

C

C

REFRIG.

111.36

[I]

8-35

AUTOPSY ROOM

660.20

I

H H

I

D

G)(vswlTCHBOARD DP-B

I

8-401

TRANSFORMER ROOM

874.82

I I

[I]

I I

I

I

@)f-- -�_A_=,--�--T_I _A _L _B _U _I L_D_} N_G_

__ 1_B_A_S _E_M _E_N _T _F _L_O_O_ R_PL_A_N

DRAWING NOTES: DRAWING KEYNOTES: @

1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE

PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS DURING

AN EVENING/NIGHT WEEKEND SHIFT.

CONSULTANTS:

RAMB LL

1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SWITCHBOARD INDICATED.

DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO FACILITATE SWITCHBOARD

REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO TERMINATE FEEDER AND BRANCH

CIRCUIT CONDUCTORS TO REPLACEMENT SWITCHBOARD INCLUDING ANY REQUIRED CABLE

EXTENSIONS. REFER TO SWITCHBOARD SCHEDULE THIS DRAWING. SWITCHBOARD AND

CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING INDICATED IN

SWITCHBOARD SCHEDULE.

2. PROVIDE ALL MATERIAL AND LABOR TO SUPPORT ENCLOSED WIRE TROUGH TO FACILITATE

SWITCHBOARD REPLACEMENT. SUPPORTS SHALL BE INSTALLED PRIOR TO DEMOLITION.

STAMP

ONE-LINE DIAGRAM NOTES:

PLAN

NORTH

1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE SWITCHBOARD

SCHEDULE THIS DRAWING.

[I]

I

I

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

[I]

B-400

MECHANICAL EQUIPMENT ROOM

6132.10

DATE:

08124/22

[I]

I

Drawing Tltle

TASK ORDERS

SWITCHBOARD SCHEDULE

SWITCHBOA RD NAME SWBD DP-B LOCATION XFMR ROOM B-401 INSTALLATION FLOOR

_4_WIRE,�HZ. GRD.BAR RA TINGS BODA AMPS 480Y/277V VOLTS 3 PH

MA IN LUGS________ CB. INTERRUPTING RATING 100kAIC RMS. SYMM. AMPS

YES

MA IN CIRCUIT BREAKER -�B�□□�A __

DESCRIPTION

PANEL PP3R

PANEL PP-BNW

PANEL PP-BSW

PANEL PP-16SW

SPARE

Project Title

LOA D

W/KW/HP

AMPS CONNECTED LOA D _ _KW, SWBD SIZE 60" MOUNTING SPACE

CB.

AMPS

CB. LOA D Cl AMPS W/KW/HP

DESCRIPTION

PROVISIONED SPACE

IRMA/CUNIT

PANEL PP-SNW

PROVISIONED SPACE

PANEL PP-16SE

WORK AREA

PLAN

B1 - BASEMENT - KEY PLAN NORTH

NOT TO SCALE EE?

Project Number 630A4-16-430

PANEL DP-B AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Building Number

Office of Construction and Facilities Management Approved: Project Director Location 800 POLY PLACE, BROOKLYN NY 11209 Drawing Number

-!_·_ RAMBOLL AMERICAS

f

090890

25° St. Ives Dr.

� REV. O ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17

18-01-BK

EP-159

Dwg. 64 of 91

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:_:;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;_:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

II = � "'

N

,E • C 0 " � 0 •• .o>• � 0

,E

0 "

,!l

�o•

,E • C �v

.o>• � 0 a.

N w

C I- 0� a.

a.w' iii I;; w

C

I-" w �w ' w C a.

<ri

N ii:

V 3-217 J.C.

3-106 J.C.

3-105

JOA FILM LIBRARY

LET

3-104 3-104B

OFFICE CLOSET312.07 43.75

3-104A

BATH

� 0.

� fo I

3-103A

OFFICE

97.63 '

3-103B

TOILET

34.98

3-103 '

OFFICE

235.73

I I 1n1

I

3-102B

3-102 CLOSET

LOUNGE 43.75

297.54

3-102A

BATH

Q� 35.94

3-101A �·

BATH

34.98

I

3-101B

3-101 CLOSET

MUil Tl-PURPOSE 44.24 296.97

DRAWING NOTES:

VISITOR'S

LOBBY

CORRIDOR

EC

1149.73

I

D

D

PLUMB

SHAFT

DUCT

-1

ELEV.

-2

ELEV.

P-3

ELEV.

-4

ELEV.

ELEV.

3-108

TOILET

62.49

STAIR#6

'>n&:: O'l

I I

STAIR#3

141.41 c----:: � 1------

I

- I r------

,J

I ·

I

LEV.

-2

ELEV.

ID

DUCT

I '

:I� I

_J

D -

ELE1� _

D-

/ELEV.�

3-113

STORAGE

94.74

I I I I I I I I I I I I I I I I I I I I I I I I I I I

I :1 :1 :1 :1 :1 :1 :1 :

[g

\v�

3-108

TOILET

24.24

3-109

TOILET

24.58

SERVICE

LOBBY

CORRIDOR

WC

748.97

PLAN

NORTH

@,__ -�_A_=,·-�-- T_I_A _L _B_U _l

L_ D_}_N _�_ 1_ T_H_I_R _D _F_ L_O_O_ R_P_LA_N ,_______,' ,_______,

DRAWING KEYNOTES: ©

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS . 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE RECESSED PANEL INDICATED

WITH A SURFACE MOUNTED PANEL DISCONNECT FEEDER AND BRANCH CIRCUIT

CONDUCTORS TO FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND

LABOR TO TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

REPLACEMENT PANEL INCLUDING ANY REQUIRED CABLE EXTENSIONS, REFER TO

PANEL SCHEDULE THIS DRAWING. PANEL AND CIRCUIT BREAKERS SHALL

MEET/EXCEED SHORT CIRCUIT CURRENT RATING INDICATED IN PANEL SCHEDULE.

REV. 0 ISSUED FOR CONSTRUCTION 08124122

Revisions: Date

VA FORM 08 - 6231

CONSULTANTS:

RAMB LL

RAMBOLL AMERICAS

ENGINEERING SOLUTIONS, INC.

18 LINK DRIVE

BINGHAMTON, NY 13902

STAMP

09089�

O,t:"E'SS\0

2022-08-17

I

PP3R0

3-112A

STOR

I I □

I y

3-114A

EMERGENCY LAB

302.63

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

259 St. Ives Dr.

Talent, OR. 97540 v

3-326

LOUNGE

126.30 n

DATE:

08124/22

6 7

V

Drawing Tltle

TASK ORDERS

8 9

I SWBD DP-B 1�--�1------�i---- ) 125A ) 150A

PPBSW

GE

250AMLO

(2)SRPF 250A

THED GIB'S

1 OOA LARGEST

TCALC/B'S

60A LARGEST

) 125A

0�

0�2E

IA L BUILDING 1 ONE-LI NE DIA GRAM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS

DRAWING.

PANEL SCHEDULE

POWER PANEL PP3R LOCATION XFMR ROOM B-401 INSTALLATION SURFACE

RATINGS 125A

MAIN LUGS -

MAIN CIRCUIT BREAKER

DESCRIPTION

UPS

SPARE

1-CRAC2

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

Project Title

AMPS 480Y/277V VOLTS 3 PH 4 WIRE 60 HZ. - ,_ GR□. BAR YES

CB. INTERRUPTING RATING 42kAIC RMS. S YMM. AMPS

125A

LOAD

W/KW/HP

AMPS

CB.

AMPS

CONNECTED LOAD - KW, PANEL SIZE 30SPACES

CIF

J_ rt -�

11 -�

J.5_

17 -�

19 -�

21 -�

25 -� 27 -�

29 -�

CIF CB. LOAD DESCRIPTION

A B C AMPS W/KW/HP

cl_ �- 4 15 1-CU-1

�- 8 �-1o 15 1-CU-2

�- 14

�-T6 60 1-CRAC1

�- 20 SPACE

�- 22 SPACE

�- 24 SPACE

�- 26 SPACE

�- 28 SPACE

�- 30 SPACE

WORK AREA

PLAN

B1 - 3RD F L - KEY PLA N NORTH

____ ffi

NOT TO SCALE W

Project Number

630A4-16-430

PANEL PP3R AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Building Number

Office of Construction and Facilities Management Approved: Project Director

Location 800 POLY PLACE BROOKLYN NY 11209'

Issue Date

08/24122

Checked

BKD

F.7

Drawing Number

18-01-BK

EP-160

Dwg, 65 of 91

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

A

B

C

D

II =

N

,E • C 0 " 0 •• .o>•

,E

0 " ,!l

�o•

,E • C �v

.o>• � 0 a."' N w

C I- 0 � a.

i-"'-a.

w' iii I;;

w

C

I-" w� w' w C a.

<ri"' N ii:

l!J I \_

TEL CHASE

@ C-

I

G) G) G),, \

[I]

L/ 2-101

PATIENTS LIBRARY

351.95

I

[I] 7

2-100A

MEDICAL LIBRARY

266.83

- [I]

PUBLIC ELEVATOR CORRIDOR

767.71 m

Xu

2-103

� TOILET

------- 27.41

I : :

I

D T 2-104

TOILET

( STAIR#3 28.74

154.88 '

[I] [gJ [gJ

[I]

I\ ./

I

P-1

ELEV

[I]

P-2

ELEV

[OJ

P-3

ELEV

[I]

P-4

ELEV

[OJ

P-5

ELEV

[I] 7 2-106A

TOILET

39.61

2-106B

TOILET

35.40

T

STAIR#6

224.27

G)LP2FA

,-J

X

I

S-4

ELEV

ELEV

S-2

ELEV

� I I

LEV

2-106

TOILET

54.72

I/;

I

[I]

D

[I]

D

[I]

�l-

CORR

722.89

PARTIAL BUILDING 1 SECOND FLOOR PLAN

1/4"=1'-0" 2' 4'

DRAWING NOTES: DRAWING KEYNOTES: 0

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE RECESSED PANEL INDICATED.

REV. 0 ISSUED FOR CONSTRUCTION 08124122

Revisions: Date

VA FORM 08 - 6231

DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO FACILITATE PANEL

REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO TERMINATE FEEDER AND

BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL INCLUDING ANY

REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS DRAWING. PANEL

AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING

INDICATED IN PANEL SCHEDULE.

CONSULTANTS:

RAMB LL

RAMBOLL AMERICAS

ENGINEERING SOLUTIONS, INC.

18 LINK DRIVE

BINGHAMTON, NY 13902

2 3

PLAN

NORTH

STAMP

2-318

UTILITY RM.

77.63

I 2-318A

_) CLOSET

22.00 r

IWb---J m

[I] I

[I]

2-105

) SECRETARY & CLERICAL

326.04

2-108A OFFlr.F A/0

[I]

ARCHITECT /ENGINEERS:

5 6

C-1

I DB-C 1-I----T------------

1 SIE SIE

65KA SCCR ) HHL

400A 2D8V

GE

) THHQB

1DOA

BF

E

GIB'S

G

THQB

15A LAR

THHQB

30A LAR

GEST

GIB'S

GEST

(1 )2 QA

GE

) TOD

150A

F-A

E

SCCR

G

10KA

THQB & THH

80ALA

QB GIB'S

RGEST

GE

) THHQB

100A

1F

E

SCCR

G

22KA

THQB

30A/2P LA

THHQB

40A/1P LA

THQD

20A/1P LA

GIB'S

RGEST

GIB'S

RGEST

GIB'S

RGEST

GE

) THHQB

7DA

2FB

GE

SCCR 22KA

THHQB

30ALA

GIB'S

RGEST

GE

) THQB

___l___1_ciOAl2P

LPB �

G E

10KAS CCR

GIB'S

RGEST

/B'S

RGEST

THHQB

20A/1P LA

THQB C

20A/1P LA

GE

) TJD

�DA

�LPG

G

THH QB

E

GIB'S

GEST

CCR

4DALAR

22KAS

GE

) THQD

DA

LP1

G E

22KAS CCR

GIB'S

RGEST

GIB'S

RGEST

THQB

30A/2P LA

THHQB

30A/2P LA

) 15DA

01 LPlFA I

��JAL BUILDING 1 ONE-LINE DIAGRAM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS

DRAWING.

2. PANEL DB-C IS LOCATED IN THE BASEMENT FEEDER ROOM C.

APPROVED BY: DATE:

08124/22

Drawing Tltle

VJC TASK ORDERS

7 8 9

PANEL SCHEDULE

POWER PANEL LP2FA LOCATION 2ND FL CORRIDOR INSTALLATION RECESSED

RATINGS 150A AMPS 208Y/120V VOLTS 3 PH 4 WIRE, 60 HZ. GRD. BAR YES

MAIN LUGS .

MAIN CIRCUIT BREAKER 150A

DESCRIPTION LOAD

W/KW/HP

SPARE

SPARE

SPARE

SPARE

USED

USED

SPARE

SPARE

DATA CLOSET

SPARE

SPARE

SPARE

SPARE

Project Title

CB. INTERRUPTING RATING 18kAIC RMS. SYMM. AMPS

AMPS

CB.

AMPS

CONNECTED LOAD . KW, PANEL SIZE 42 SPACES

CIF

1 -�

3 -�

5 -�

7 -�

9 -�

11 -�

13 -�

15 -�

17 -�

'19 -� c-21 -�

?S -

27 -�

129 -� c31 -� fs -�

37 -�

CIF CB. LOAD DESCRIPTION A B C AMPS W/KW/HP

�- 2 20 SPARE

�- 4 20 SPARE

�- 6 20 SPARE

�- 8 20 SPARE

�- 10 20 SPARE

�- 12 20 SPARE

�- 14 30 SPARE

�- 16 50 SPARE

�- 18 50 SPARE

�- 20

�- 22 20 DATA CLOSET

� - 24 20 DATA CLOSET �- 26

�- 28

�-'30 50 SPARE

�- 32

�- 34 30 SPARE

�- 36 �- 38

�- 40 30 SPARE

�- 42

WORK AREA

PLAN

B1 - 2ND FL - KEY PLAN

NORTH

____ ffi

NOT TO SCALE W

Project Number

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

630A4-16-430

Building Number

D2X Associates

PANEL LP2FA AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Drawing Number

Office of Construction and Facilities Management

09089�

O,t:"E'SS\0

2022-08-17

259 St. Ives Dr.

Talent, OR. 97540

5 6 7

Issue Date

08/24122

Checked

BKD

F.7

18-01-BK

EP-161

Dwg. 66 of 91

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

A

B

C

D m C 0" .5 m

�o

II =� "'

N

,E m C 0 " ·= 0 m

,E m

�v :E .o>m � 0

1 2 3 4 5 6 7 8 9

6 BUILDING 15 MAIN SWITCHGEAR

ONSULT. �

#3

G-659

EXAM

#29

G-660

-PAT.WIG

G-666

.T.-PAT.W/C

G-667

H.A.C. #2 G-668 l/

I

I

I

SIGNAL

G-669 t--

. TEST E.K.G. TEST

'31A G-731B

/7 �

EXAM

#27

G-658

EXAM

#30

G-661

EXAM

#32

G-665

EXAM

#28

G-657

□�r

CORRIDOR

EXAM

#31 G-662

EXAM

#333

G-664

I

I

I r'

CORRIDOR

SOIL UTIL.

G-663

I j I

!�-GB

I 01 II

LPE-GB T RPE-GB RP-GB 0 ©

H \ y JH

IATS-7I ATS-10 ATS-11

ATS-12- /

EDP-B

ATS-13

SWITCH -

EDP-A

- ATS-1 ATS·3 I IATS-8I � / �===============I Y tt

HDPE-1B

HDP-LSG

ATS-5

HDP-1CA�

� i--.

Q

ATS-4�

I,_

HDP-1CB

t-

ATS-2

0- I/

ELECTRICAL

SWITCHBOARD

G-672

V

BUILDING 15

SWITCHGEAR

(REAR)

@DS-HDP1CA�

TEL.

G-670 LPE-GB 1 .- r------

1- PPE-X1 - HDPE-1A

PPE-GB

ELEC.

G-671

HDPE-1D

��I

CORRIDOR

L/

I

I

STAIR

/ #1 DN

@1-- P_ 114 ,f!:-_

1,_�-..

T _IA_

4, L_

_B_U _!� L_D

_I N_�-, _15_G_ RO_ U _N _D_F _L _O _O _R _P _L_A_N

I

PLAN

NORTH

0 HDP-1CA

7 2 5

GE GE GE

) TEY ) SFH ) TEY

BOA 175AP 100A

175AT

PP-HXA

LPE-BA

GE

14KA SCCR

TEY C/B'S

20A/1 P LARGEST

GE

SFP

175AP

175AT

GE

) TEY

70A

) 150A

I RPE-BA r-�I--, . I GE

225A ) TEY

70A

LPE-BB

GE

14KA SCCR

TEY C/B'S

20A LARGEST

GE

SEP)

90AP

90AT

I LPE-1A I

GE

14KA SCCR

TEY C/B'S

20ALARGEST

GE

) TEY

30A

15kVA

1�S�A

) 70A

I RPE-BD t- _I __ 1 RPE-BB f,-

�I -- 225A

125A

GE

) TED

150A

GE

I

) TED

150A

I) ��p

125AP

125AT

GE

) TEY

100A

) 90AP

90AT

® ASCO

SERIES 300

W/SOLID NEUTRAL

ATS-4

© (2-SETS)-,

4-#300KCMIL,

1-#1GND

IN 2-1/2"C

r,;\ DS-HDP1CA f-- -----,\::.I ' ' I I

I 600AI

I I I I I I 1(3) 600A I I I L __ _____ J

© (2-SETS)

4-#300KCMIL,

1-#1GND

IN 2-1/2"C

GE

if AKRU-10D-30

W/MVf+

BOOAF

BOOAS

600AP

660AT

L,S,I,G

GE

11:P:..-., ) SGH ®

600AP

600AT

6 1

GE GE

) TED

125A

) SFH

225AP

225AT

GE

SEP

100AF

90AP

I LPE-GC I I GE

GE ) TED

14KA SCCR 125A

TEY C/B'S

20A/1 P LARGEST

= 75kVA LPE-GB ===:= T-5

) 225AP

I

225AT

I LPE-1C

r-l �--,I )-125A

) GE

225A

RPE-1A1 c--�--"---

GE

225A

RPE-1A2 c---'----

GE

225A

) 60A

== 45kVA s125A

I RPE-GB ,__, -�1 -,

I) ��A

I ) 70A I RPE-GF r-l -�1 --

125A

T 75kVA

) GE

I

200A

I RPE-GC I

I 225A GE ) 100A

) GE

I

90A

I RPE-GE r-l ...... --- 125A

��--- 75kVA

1200A I RPE-1C r-l -�1 ---,----

1) GE225A 100A

I RPE-1E

125A

GE

I ) 200A

DRAWING NOTES: DRAWING KEYNOTES: 0

PANEL SCHEDULE @>--p_N0�_T0

R_8!-L!

A_L_ B_U _IL_D_I N_G_ 15_O_ N _E-_L_IN_E _D_I _A _G _RA_M

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, AND REMOVE POWER CIRCUIT FROM ATS-4 TO PANEL

HDP-1CA AS INDICATED COMPLETE.

2. DISCONNECT SWITCH, ASSOCIATED RACEWAY AND CABLE SHALL BE INSTALLED TO

THE FURTHEST EXTENT POSSIBLE PRIOR TO SHUTDOWN OF ATS-4 AND PANEL 2. PROVIDE ALL MATERIAL AND LABOR TO TIE INTO EXISTING ELECTRICAL EQUIPMENT

HDP-1CA. SHUTDOWN FOR ELECTRICAL DEMOLITION AND TERMINATIONS SHALL INDICATED.

TAKE PLACE ON AN EVENING/NIGHT WEEKEND SHIFT.

3. PROVIDE A SURFACE MOUNTED, 600V, 3-POLE, 600A, FUSED DISCONNECT SWITCH

WITH NEUTRAL BAR AS INDICATED WITH 200kAIC RATED VERY FAST ACTING

CURRENT LIMITING FUSES AS INDICATED IN NEMA 12 LOCKABLE ENCLOSURE.

4. PROVIDE POWER CIRCUIT AS INDICATED.

5. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE.

POWER PANEL LPE-GB LOCATION ELEC CLOSET G-671

RATINGS 125A AMPS 480Y/277V VOLTS 3 PH - -

MAIN LUGS - CB. INTERRUPTING RATING

MAIN CIRCUIT BREAKER 90A AMPS CONNECTED LOAD

DESCRIPTION LOAD CB. CII CII W!',()fl/HP AMPS A B C 169A, 169, 169, 168, 167, G_f_S. 20 1 r-� �- 2

1, 134, 150. GND FL ST

H 20 3�� �- 4

G.F.S. INTER 20 � �� �-

c4 EM. BATT. PAK-RO OMS GB169A 20 1�� �- 8 SPARE . •N 20 g�� �-

Jr 20 11 �� �- 12 . ,.. 20 13 �� �- 14 iPARE . •N 20 15 � �- 16

PARE JN 20 11 �� �- 18

INSTALLATION SURFACE

_4_ WIRE,_§{)__ HZ. GRD. BAR YES

65kAIC RMS. SYMM. AMPS

- KW, PANEL SIZE 30 SPACES

CB. LOAD DESCRIPTION AMPS W/IW//HP

20 111, 11A, 11B, 1 27, G.F.S_ 20 ..-,PAREluN

60 RPE- GB VIA T5

20 "'" 20 �" i

PARE N

20 PARE "'N

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM_

GE

) TEY

80A

PNL A

SPACE 19

SPACE 21 r-� �-

SPACE � �-

20 SPACE

22 SPACE

24 SPACE B15 -GROUND FL - KEY PLA N

PLAN

NORTH

SPACE 25 r-� �- 26 SPACE NOT TO SCALE

SPACE 27 �� �- 28 SPACE

SPACE 2• �� �- 30 SPACE

CONSULTANTS: STAMP

RAMB LL

RAMBOLL AMERICAS o9089s

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

DATE:

08124/22

Drawing Tltle

TASK ORDERS

HDP-1 CA & LPE-GB AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Tit l e

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-162

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-Ess,o 259 St. Ives Dr. Issue Date Checked � � REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e

� l,,:

R e vt s io n s ;;;: ==============D a t e

B l

N

G

H

AM

=T;;;

O

N

N

;;;Y=

;;;;;==;;;;!.�====================================;;;:,,:;======================;;;;:.:;;;;======;;;;:.:;;;;===;;;;:..:;;;;===;;;;:.:;;;;;;;Dw=g.=67=;;;of=;;;9;;;1 =============:.i

� Vctu·J11s AffJ1ts

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

II =

�ID

,E•

N

§ 00

�v :E .o>• � 0 ii'.

;i;

w :i:

<ri

DRAWING NOTES:

SPECIAL

PURPOSE

EXAM

1-769

PATIENT

CONSULT.

1-770

I

I� j\� I\ / I I

I

I ST¥. I

I / \ I I / \ I I / \ I I/ \ I l(_ ___ j

EXAM#7

1-829

I

II

II

II

n:

CLEAN

PAT.

TOIL.

WIC�

l

DR.

EXAM #11

1-771

CORR.

D

SOIL

EXAM #10

1-772

I

I\

TEL. RM.

1-833

EXAM#9

1-773

M.E.R.

I1A174]

I\ f--f--

EXAM#8

1-774

:::::::====::;';::::::::'.-=:===========: :::: ELEC. CL.

EXAM#6

1-826

1-834

��LPE-1C0

I I I I

STAIR#2

I\ � EXAM #5

I

EXAM#1

1-823

-, /-1-----1-'-·.:i,__.y '

CORR.

EXAM#2

1-824

1-827

EXAM#3

1-825

EXAM#4

1-826

I

I

,--------7 I I I I L ________ J

P_ 114_1:1---,._�-..

T_I _A _L _B _U _I L_D_} N_G_

__ 1 _5_F _I R_S_T _F_L_O_O_R_P _LA_N

DRAWING KEYNOTES: 0

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

BRACING INDICATED IN PANEL SCHEDULE.

CONSULTANTS:

II

PLAN

NORTH

{I-DN

}1

C)

CJ

STAMP

4 5

HDP-1CA

GE

) TEY

BOA

BD H

I

I II

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL

-1.·.

RAMBOLL AMERICAS

f D2X Associates

090890

25° St. Ives Dr.

2 5

GE GE

) SFH ) TEY

175AP 100A

175AT

PANEL SCHEDULE

4 9

GE

) TED

150A

GE

) TEY

100A

GE

) TED

125A

I GE

SGH)

600AP

600AT

GE

) SFH

225AP

225AT

) 225AP

I

225AT

01 LPE-1C 1-

i

I ) 125A

75kVA

1200A I RPE-1C f-1 -'-1 �--

1) GE225A 100A

I RPE-1E

125A

GE

I ) 200A

@ �f:��!AL BUILDING 15 ONE-LINE DIAG RAM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.

GE

) TEY

BOA

POWER PANEL LPE-1C LOCATION ELEC CLOSET 1-834 INSTALLATION SURFACE

RATINGS 225A

MAIN LUGS -

MAIN CIRCUIT BREAKER

DESCRIPTION

1ST FL NORTH STH.

1C131, 132,125 � .I. ,1G1

SPARE .,N

ur, JO, RPE-1 C VIAXFMR

SPACE

SPACE

SPACE

SPACE

SPACE

DATE:

08124/22

AMPS 480Y/277V VOLTS 3 PH 4 WIRE 60 HZ. - - ,_ GRD.BAR YES

225A

LOAD

WIKWIHP

CB. INTERRUPTING RATING

AMPS

CB.

AMPS

CONNECTED LOAD

CIF

J..5_ ·,u

A B C _r--.. r--.._

-r--.. ,--._ -

CIF

30kAIC RMS. SYMM. AMPS

- KW, PANEL S IZE 30 SPACES

CB.

WI���� ;

CRIPTION AMPS

20 =�; 20

20 SPARE ..,N

20 _,� 20 ,.., 20 �PARE NJ

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

Drawing Tltle

TASK ORDERS

PANEL LPE-1C AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

WORK AREA

PLAN

B15 - 1 ST FL - KEY P LAN NORTH

NOT TO SCALE EE?

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 P OLY PLACE, BROOKLYN NY 11209

Project Number 630A4-16-430

Building Number

Drawing Number

Office of Construction and Facilities Management

� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e .,, Revisions: Date BINGHAMT ON, NY 13902 2022_08_17

18-01-BK

EP-163

Dwg. 68 of 91

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

C

II o

.s

!m C

C

�o

II =

,E •

N

II

�v :E .o>• � 0

1 2 3

�-----�rn□

,'J r;=--�

ID

l'c--� CB-3

CORRIDOR

535.94 n

I I

I I

I I

LJ

CB-6A

SERVICE ELEVATOR LOBBY

244.86

ELEV. EL .

S-1 P-3

PASSENGER ELEV. LOBBY

ELEV. ELEV.

SOIL

LINEN

COLL.

[BA 109]

PANEL EPP-ELG)

ELEV. MACH. ROOM

[BA 111]

P_

114.�

1._�-..

T_ I A_

4.

L_

_B_U

_1 L_D

_1 N_�-. _15_ B_ A _S_E_M_E_N_T _P _LA_N

DRAWING NOTES: DRAWING KEYNOTES: 0

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE.

PLAN

NORTH

4 5 z

PANEL SCHEDULE

POWER PANEL EPP-EL LOCATION BASEMENTELEVMACHRM BA 111 INSTALLATION SURFACE

RATINGS_40_0A _ __ AMPS 480Y/277V VOLTS _3_ PH _4 _ WIRE,_§{)__ HZ. GRD. BAR YES

MAIN LUGS CB. INTERRUPTING RATING 42kAIC RMS. SYMM. AMPS

MAIN CIRCUIT BREAKER

DESCRIPTION

ELEVATOR P-1

SPACE

ELEVATOR P-2

SPACE

400A AMPS CONNECTED LOAD. _ __ KW, PANEL SIZE 4_2�S _PA_C�E�S _ __

LOAD CB.

W!,()N/HP AMPS

C CB. LOAD I

AMPS W/IWI/HP

SPACE

SPACE

SPACE

DESCRIPTION

SPARE(ON)

SPARE(ON)

6 7

5 BUILDING 15 MAIN SWITCHGEAR

GE

'f AKRU-10D-30

) W/MVT+

800AF

400AS

400AP

440AT

L,S,I,G

�CH---►IFROM EDP-A

ASCO

SERIES 300

W/SOLID NEUTRAL

ATS-1

400A/3P

0 EPP-EL

) 400AP

400AP

) 125A

INVERTER

TYP.OF 4

DC ELEVATORS

60HP (EST.)

75FLA

) 50A

= 30kVA

GE

) 100A

I ELP-EL 1-I _,__

I

125A

,__P_

N0�_ T0

R_s!- L

!A_L_ B_U _IL_D _IN_ G_ 15_O_ N_ E_-_L_IN _E _ D_ I _A _G_R A_ M

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.

WORK AREA

ELEVATOR P-3 125

SPACE

SPACE

SPACE

SPACE B15 - BA SEMENT - KEY PLA N

PLAN

NORTH

w :i:

ELEVATOR S-1

SPACE

SPACE

SPACE

ELP-EL VIA XFMR

20 EL DISPATCH NOT TO SCALE

SPACE

125 SPARE(ON)

SPACE

SPACE

SPACE

<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL

-1.·.

RAMBOLL AMERICAS

f D2X Associates

090890

25° St. Ives Dr.

DATE:

08124/22 Drawing Tltle

TASK ORDERS

PANEL EPP-EL AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

� REV. O ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-164

Dwg. 69 of 91

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l,,,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;,;====================;;;;,,:;======;;;;;,;:;;;;;===;;,,:;;;===;;;;,,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

II =

�ID

,E

N

§ 00

�v :E .o>

� 0

-PAT.W/C

G-666

.T.-PAT.W/C

G-667

H.A.C.#2 G-668

------ I ------

L/

EXAM

#32

G-665

CORRIDOR

EXAM

#333 G-664 n"' -

SOIL UTIL.

G -663 l l I l �I �I =- ::=====:::::;-;:===:.::::::::::;-;:;:::::=::::;::;:=::;:::::::::'.::::::;:::::'..:::::::;:;;::::::::::::'.,.'.:::=::::::: ll��o 1��11��

SIGNAL

G-669

TEL.

G-670

I

ELEC.

G-671

I I L/ - I

L/ CORRIOOR

l::Lt:.t; I Klt..:AL

SWITCHBOARD

G-672

- DD�---� H \._________,/ H

"bj::::::::::::::::::::::;--_-GA-TE--------i!�U�P �R�,¥'if]=)=;--�� /

HDPE-1B

GE

200KASCCR

1200A MLO

(3)THLC BOA

GE

) THLC

250A

GE

�A

GE

22KASCCR

TEY C/B'S

50A LARGEST

GE

) THLC

225A

) 225AP

225AT

GE

) THLC

250A

PPE-B A

GE

25KASCCR

225A MLO

THE□ C/B'S

50A LARGEST

GE

) THLC

225A

GE

SFL

) 225AP

225AT

GE

) THLC

225A

GE

) SFP

225AP

225AT

PP-1B

GE

100KASCCR

TE D C/B'S

70A LARGEST

GE

) THLC

225A

) 225AP

225AT

STAIR

#1 DN 0 PPE -GB t--->---- PPE-GA t--->--- PPE-GC >--->----ii'.

lll

DRAWING NOTES:

. TEST

'31A

E.K.G. TEST

G -7318

E.K.G.

WAITING

G-731

� ""-PANEL PPE-GB 0

MECHANICAL

EQUIPMENT RM.

G-705

I

@,__P_ 114.f!:-_1._�-..

T_ IA_

L_

_B_U

_IL _D

_ IN_�-- _15_G_ R_ O_ U _N _D_F_LO_ O_R _P _ L_A_N

DRAWING KEYNOTES: 0

1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE

PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS

BEGINNING ON A WEEKEND SHIFT.

1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL RE PLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE.

PLAN

NORTH

H i

AREA

WAY

I

POWER PANEL

RATINGS 225A

MAIN LUGS

) 110A

AC-3

40HP

50FLA

GE

THE□ C/B'S

40A LARGEST

GE

) THE□

110A

SOD

) FA

100A

15-AC-2

40HP

50FLA

SOD

COMB.

@ ��o�:C�A L BUILDING 15 ONE-LINE DIAG R AM

ONE-LINE DIAGRAM NOTES:

PPE-GB

AMPS

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE -LINE DIAGRAM .

PANEL SCHEDULE

LOCATION MECH RM G-705

480Y/277V VOLTS 3 PH

CB. INTERRUPTING RATING

INSTALLATION SURFACE

4 WIRE 60 HZ. - - ,_ GRD. BAR

65kAIC RMS. SYMM. AMPS

YES

MAIN CIRCUIT BREAKER 225A AMPS CONNECTED LOAD - KW, PANEL SIZE 42 SPACES

DESCRIPTION LOAD CB. �IF �IF CB. LOAD DESCRIPTION W/KWIHP AMPS A B C AMPS WIKW/HP

�� �- 2

A/C3 110 f-� �-4 40 AC-3 (40HP ) 5 f-� �-f-� �-Jl EF-26 20 _9_ f-� �-jj)_ 20 AC3-2

11 f-� �- 12 _13 f-� �-J.i

15-PAC-3 45 _15_ f-� �- 16 20 15-P-AC3-2 17 f-� �-f-� �-

AC3 GLYCOL 20 .21 f-� �- 22 20 SPARE(ON) 23 f-� �-24

� f-� �- � SPARE(ON) 20 .II f-� �-

1§_ 20 SPARE(ON)

29 f-� �- 30 ..31 f-

� �- 32 SPACE

SPARE(ON) 20 � f-� �- 34 SPACE

35 f-� �- 36 SPACE SPACE 37 f-� �- 38 SPACE SPACE 39 f-� �- 40 SPACE SPACE 41 f-� �- 42 SPACE

) 110A

AC-4

40HP

50FLA

B15 - GROUND FL - KEY PLAN

PLAN

NORTH

w:i:

NOT TO SCALE

<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL

-1.·. RAMBOLL AMERICAS

f D2X Associates

090890

25° St. Ives Dr.

DATE:

08124/22

Drawing Tltle

TASK ORDERS

PANEL PPE-GB AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e _,, Revisions: Date BING HAMTON, NY 13902 2022_08_17

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-165

Dwg. 70 of 91

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:_:;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;_:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D ft>-m C .5• e

C " 0

.5

!m C u

C

�o

II =

�ID

N

C .5 � 0 a •

C"ID •

e

,E•

§ 00

�v :E .o>• � 0

I n 11 n-

.T.-PAT.W/C

G-667 - I

D

I

SIGNAL TEL.

G-669 G-670

H.A.C.#2 G-668

ELEC .

G-671

------ I ------ � - - I I

L/ � �

-LA_

. TEST EKG. TEST

'31A G-731B c-c-lln I I l J I _J 1-

11 I

I I L/ c!.J

CORRIDOR

w-

�DD

I r--GATE

STAIR

#1 DN

I I

4 5 6 7 8 9

HDPE -1B

GE GE GE GE GE GE

GE

) THLC ) THLC ) THLC ) THLC ) THLC ) THLC

200KASCCR 250A 225A 250A 225A 225A 225A

1200A MLO

I

(3)THLC BOA

fH \ H GE

A

PPE-BA

l ../ GE

GE

SFP

' A 25KASCCR 225AP

UP / - 225A MLO 225AT

GE THEO C/B'S

22KASCCR 50A LARGEST

TEY C/B'S

' 50A LARGEST PP-1B

7, 7

' GE

100KASCCR

TE D C/B'S

I HF H

70A LARGEST

L/ r

GE

SFL

) 225AP )

225AP

225AP

225AT 225AT 225AT

PPE -GB >--->--�- PPE -GA >--->--� 0 PPE -GC >--->--�-

EKG.

WAITING

G-731

EKG. TEST

G-731C

C.G. STOR.

G-731B

ULTRASOUND

G-732

MED. TREATMENT

G-733

I I

I I

II:

I r7 L....J

MECHANICAL

EQUIPMENT RM.

G-705

MECHANICAL

EQUIPMENT RM.

G-705

I

III

Ill I! I

PLAN

NORTH

H

AREA

WAY

AREA

WAY

) 110A

AC-3

40HP

50FLA

GE

THEO GIB'S

40A LARGEST

GE

) THEO

110A

15-AC-2

40HP

50FLA

SOD

FA

100A

SOD

COMB.

@ ��o�:C�A L BUILDING 15 ONE-LINE DIAG R AM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM .

PANEL SCHEDULE

POWER PANEL P P E-GC LOCATION MECH RM G-705 INSTALLATION SURFACE

RATINGS 225A AMPS 480Y/277V VOLTS 3 PH

MAIN LUGS - CB. INTERRUPTING RATING

MAIN CIRCUIT BREAKER 225A AMPS CONNECTED LOAD

DESCRIP TION LOAD CB. �IF �IF WIKW/HP AMP S A B C

-� �- 2

SPARE(ON) 40 -� �-4

5 f--� �--� �-Jl

AC3-P.H. 20 _9_ f-- � �-jj)_

11 -� �- 12 .13 -� �-J.i

15-PAC4 02 .15_ f--� �- 16 17 -� �--� �-

� SPARE(ON) 50 21 -� �- 22

23 -� �-24

SPACE .,. f--� �- 26

SPACE 27 -� �- 28

SPACE 29 -� �- 30

SPACE 31 -� �- 32

SPACE 33 -� �- 34

SPACE 35 f--� �- 36

SPACE 37 -� �- 38

SPACE 39 -� �- 40

SPACE 41 -� �- 42

4 WIRE 60 HZ. - - ,_ GRD. BAR

65kAIC RMS. SYMM. AMPS

YES

- 'i<W, P ANEL SIZE 42 SP ACES

CB . LOAD DESCRIP TION AMP S WIKW/HP

110 AC4(40HP)

20 EF-27

20 SPARE(ON)

40 PCH-1

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

) 110A

AC-4

40HP

50FLA

WORK AREA

@>--P_ 114.f!:-_1._�-..

T_ IA_

L_

_B_U

_IL _D

_ IN_�-- _15_G_ R_ O_ U _N _D_F_LO_ O_R _P _ L_A_N

B15 - GROUND FL - KEY PLAN

PLAN

NORTH

w :i:

DRAWING NOTES:

1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE

PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS

BEGINNING ON A WEEKEND SHIFT.

DRAWING KEYNOTES: 0

1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE.

NOT TO SCALE

<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL

-!_·_ RAMBOLL AMERICAS

f D2X Associates

090890

25° St. Ives Dr.

DATE:

08124/22

Drawing Tltle

TASK ORDERS

PANEL PPE-GC AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 P OLY PLACE, BROOKLYN NY 11209

� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-166

Dwg. 71 of 91

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;,,:;;;===;;;:,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D ft>-m C 0 "• .5•

C " 0

.5

!m C

C •• C

�o

II =

ID

N

,E m C 0 "� ·= 0

C

,E • § 00

�v :E .o>• � 0 ii'.

1 2 3

ONSULT. � L/ EXAM EXAM �

#3 #27 #28

G-659 G-658 G-657 CORRIDOR

\ I I y JH □�r \ H

I I I I

EXAM EXAM EXAM

#29 #30 #31

G-660 G-661 G-662 SWITCH -- -

f I\ / - I I I IV, -PAT.W/C

G-666

.T.-PAT.W/C

G-667

H.A.C.#2 G-668

'\ET

L/

I

SIGNAL

G-669

L/ t--

. TEST E.K.G. TEST

'31A G-7318

/7 �

EXAM

#32

G-665

'-di

CORRIDOR ELECTRICAL

SWITCHBOARD

EXAM

#333 G-664

TEL.

G-670 l

DI

ELEC.

G-671

I

SOIL UTIL.

G-663

I I

I I

CORRIDOR

1-

-�PANEL HD

"1CBG)

L/

I

STAIR

#1 DN

P_

114.f!:-_ 1._�-..

T_ IA_

4.

L_ _B _U

_IL _D

_ IN_�-. _15_ G_ R_ O_ U _N _D _F_LO_ O _R _P _ L_A_N

G-672

I

PLAN

NORTH

DRAWING NOTES: DRAWING KEYNOTES: 0

0 HDP-1CB

LPE-1B

GE

14KA SCCR

TEYC/B'S

20A/1 P LARGEST

I RPE-1B

0 PANEL SCHEDULE

) 100AP

100AT

GE

SEP) 100AP

100AT

GE

) TEY

70A

�� 45kVA

I I

) 150A

I LPE-GD I

GE

14KA SCCR

TEYC/B'S

20A LARGEST

ASCO

SERIES 300

W/SOLID NEUTRAL

ATS-2

400A/3P

) 100AP

100AT

GE

TEY I) 100A

I) ��y 70A

�� 45kVA

GE

I ) 150A

I RPE-GD f--1 �---- 225A I

GE

I RPE-1D

125A

60A

GE

I ) 100A

7 8

4 BUILDING 15 MAIN SWITCHGEAR

GE

ifi AKRU-10D-30

) W/MVT+

BOOAF

400AS

400AP

440AT

L,S,I,G o+---------- FROM EDP-B

) 350AP

350AT

) 100AP

100AT

GE

�D

GE

14KA SCCR

TEY C/B'S

20A/1 P LARGEST

) BOAP

BOAT

X-RAY

I LPE-GA I

GE

14KA SCCR

TEYC/B'S

20A LARGEST

) BOAP

BOAT

) 40AP

40AT

30kVA

GE

) 100A

I RPE-TEL le----�I __

GE

GE

I

) TEY

BOA

I) ��y 50A

= 30kVA

150A

I RPE-GA F"""I �I ---

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE MAIN AND BRANCH CIRCUIT

BREAKERS IN SURFACE MOUNTED PANEL INDICATED. DISCONNECT FEEDER AND

BRANCH CIRCUIT CONDUCTORS TO FACILITATE BREAKER REPLACEMENT. FEEDER

AND BRANCH CIRCUIT CONDUCTORS SHALL BE TERMINATED TO REPLACEMENT

CIRCUIT BREAKER. REFER TO PANEL SCHEDULE THIS DRAWING. MAIN AND BRANCH

CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING

INDICATED IN PANEL SCHEDULE. CIRCUIT BREAKERS SHALL MATCH EXISTING

MANUFACTURER GE. PANEL IS A GE SPECTRA SERIES PANEL.

POWER PANEL HDP-1CB LOCATION ELEC SWITCHGEAR RM G-<172 INSTALLATION SURFACE

AL BUILDING 15 ONE-LINE DIAGR AM

RATINGS 400A

MAIN LUGS -

MAIN CIRCUIT BREAKER

DESCRIPTION

PANEL LPE-1B

PANEL LPE-BD

SPARE(ON)

AMPS 480Y/277V VOLTS 3 PH

CB. INTERRUPTING RATING

350A AMPS CONNECTED LOAD

LOAD CB. :IF CIF W!',()///HP AMPS A B C

� f-� �- 2

100 d �� �-4 s �� �-

�� �- 8

100 J!. �� �-To 11 �� �-

�� �---11 25 j_5 � �-jft

17 �� �- 18

_4_ WIRE,_§{)__ HZ. GRD. BAR YES

1 00kAIC RMS. SYMM. AMPS

- KW, PANEL SIZE 45" MOUNTING SPACE

CB. LOAD DESCRIPTION AMPS W/twl/HP

100 PANEL LPE-{;D

80 PANEL X-RAY

80 PANEL LPE-<3A

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.

) 125AP

125AT

CT

ROOM

j-9 PANEL RPE-TEL 40

1Q

22 25 24 SPARE(ON) B 15 - GR OUND FL - KEY P LAN

PLAN

NORTH

w :i:

SPARE(ON)

SPARE(ON)

CT ROOM

T7 '20

�� �- 26 NOT TO SCALE

�� �-28 30 SPARE(ON)

f-� �- 32

� �-34 SPACE

�� �- 38 �� �-40 �� �-42

<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL

-!_·_ RAMBOLL AMERICAS

f D2X Associates

090890

25° St. Ives Dr.

DATE:

08124/22

Drawing Tltle

TASK ORDERS

PANEL HDP-1 B AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DR IVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-167

Dwg. 72 of 91

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts

ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D m C .5•

�o

0 II =

N

,E m C ·= 0

,E•

�v :E .o>• � 0

ONSULT. �

#3

G-659

EXAM

#27 G-658

EXAM

#28 G-657

2 3

CORRIDOR

\I I y JH \

□�r H I I

- I I

EXAM EXAM EXAM

#29 #30 #31

G-660 G-661 G-662 SWITCH -

:::::::-=====::::::::::==I =I=:'.:::::::::::: 11V"

-PAT.W/C

G-666

.T.-PAT.W/C

G-667 -

H.A.C.#2 G-668

EXAM

#32

G-665

CORRIDOR

EXAM

#333 G-664

SOIL UTIL.

G-663

I I I J r.=1 ===;I :=-

SIGNAL

G-669

TEL.

G-670

� 1_ □ 1_11_

PANEL LS-GB 0

ELEC.

G-671

� r-

I L/

� t--

. TEST E.K.G. TEST

'31A G-7318

/7 �

,'J

CORRIDOR

I ir;;;-

LJ[JI

I

) r--GATE

STAIR

/ #1 DN

I

ELECTRICAL

SWITCHBOARD

G-672

I

I

PLAN

NORTH

@1-- P_ 114 .f!:-_1._�-..

T_ IA_

L_

_B _U _!

l""""""" L_D

_I N_�-. _15_ G_ RO_ U _N _D _F_L_O_O_R_P_ L_A_N \

DRAWING NOTES: DRAWING KEYNOTES: 0

5 6

GE

SFP)

225AP

225AT

7 8

HDP-LSG 1-------�-------�-----�--,----------------------,----------------,---

GE

100KA SCCR

(2)SEP 20AP/AT SPARE

(2)SEP 30AP/AT SPARE

(1)SEP 50AP/AT SPARE

(1)SEP ?OAP/AT SPARE

PANEL SCHEDULE

GE

) SEP

60AP

GOAT

GE

I) !�I

GE

14KA SCCR

TEYC/B'S

50ALARGEST

GE

) SEP

60AP

GOAT

GE

14KA SCCR

TEYC/B'S

20ALARGEST

GE

) SEP

SOAP

80AT

GE

) TEY

I 60A I LS-GA e-l ---'-· �-

14KA ��CR I ) ;:y

60A TEYC/B'S

20ALARGEST

GE

14KA SCCR

TEYC/B'S

20A LARGEST

0 LS-GB

) 30A

GE

SEP) 30AP

30AT

LS-1B

GE

14KA SCCR

TEYC/B'S

30A LARGEST

GE

) SEP

100AP

100AT

) 60AP

60AT

) 50A

GE

SEP

I

) 60AP

I LS-GC rl -�-6, 0A-T

GE I ) ;:y

14KA SCCR 40A

TEYC/B'S

20A/1 P LARGEST

GE

14KA SCCR

TEYC/B'S

20A LARGEST

@ ���2!AL BUILDING 15 ONE-LINE DIAGRAM

ONE-LINE DIAGRAM NOTES:

1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.

GE

) SEP

30AP

30AT

== 15kVA

T

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL

INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO

FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO

TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL

INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS

DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT

CURRENT RATING INDICATED IN PANEL SCHEDULE.

POWER PANEL LS-GB LOCATION ELEC SWITCHGEAR RM G-ll72 INSTALLATION SURFACE

RATINGS 125A

MAIN LUGS -

MAIN CIRCUIT BREAKER

OESCRIPTION

c<UNJ

�PAREruNI

EXIT L TS, GND FL. INTE R

PANELLS-GC

SPACE

SPACE

SPACE

AMPS 480Y/277V VOLTS 3 PH

CB. INTERRUPTING RATING

90A AMPS CONNECTED LOAD

LOAD CB. CII CII W!,()N/HP AMPS A B C

20 1 r-� �- 2

20 3�� �- 4

20 � r-� �-

.i � � �- 8

50 JI_

r-� �-1o

11 r-� �-

13 r-� �- 14 15 � �- 16 11 �� �- 18 r-� �-

_4_ WIRE,_§{)__ HZ. GRD. BAR YES

42kAIC RMS. SYMM. AMPS

- KW, PANEL SIZE 30 SPACES

CB. LOAD DESCRIPTION AMPS W/twl/HP

20 EXIT LTS, GND FL. SOUTH

20 CORR. GND. FL. SOUTH

20 �fL,,-

30 PANEL LS-1B

SPACE

SPACE

SPACE

SPACE 19

SPACE 21 r-� �-

SPACE � �-

20 SPACE

22 SPACE

24 SPACE B15 - GROUND FL - KEY PLA N

PLAN

NORTH

, r-

SPACE 25 r-� �- 26 SPACE NOT TO SCALE

SPACE 27 �� �- 28 SPACE

SPACE 2• r-� �- 30 SPACE

CONSULTANTS: STAMP

RAMB LL

RAMBOLL AMERICAS

o9089s

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

DATE:

08124/22

Drawing Tltle

TASK ORDERS

PANEL LS-GB AREA PLAN ONE-LINE

DIAGRAM AND SCHEDULE

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Project Number 630A4-16-430

Building Number

Drawing Number

18-01-BK

EP-168

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-Ess,o 259 St. Ives Dr. Issue Date Checked � � REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e

�l::R;;;evt;;;;';;;si;;;;on;;;s;;;:===========;;;::;D;;;at;;;e===-====;;;B;;;l;;;N ;;;G;;;H;;;AM=TO;;; N;;;,;;;N;;;Y;;;1;;;3;;;9;;;02========================;;!!;==;;;;;;;2;;;0;;;2;;;2_;;;08;;;_;;;17;;;;;==;;!!;;=================================;:_;;;====================:,:;;;======;:,,:;;===;;;;:.:====:,:;;;;;;Dw=g.;;;7;;;3=of=;;;9;;;1=;;;;.:==========.J � Vctu·J11s AffJ1ts

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

C

II

.s

!m C

C • C

�o

II =

N

,E

II

·= 0

C

,E •

II

�v :E .o>• � 0

B-524

STORAGE RM.

369.51

I\ 1---------�-

.....---J B-501

SUPPLY RM.

87.63

I

I I

B-106

MECICAL MEDIA

103.39

I I u

I

B-107

ETO RM

-□ -I_I ________ I __ I r

B-105

CORRIDOR

u

B-108A

SPD GAS STERILIZER

L

3 4 5 u I 11 � 1111

I B-108 CLEAN PREP ROOM I r:=:=::=::::::::::=:::::::::::=::::::::::=::::::===;-;:===1 I

I

G)PANELLPBH

I '-------.I �----�

B-102

AIR CONDITIONING RM.

387.87

I 11

B-104C

DARKROOM

106.89

I B-127

ELEC. FEEDER 'D"

142.61

I I

::======::J( l,::c� ==�������§

� B-104D � B-104B

DRYING ROOM

79.17

DARKROOM

88.13

IX

,:=========iI f' t========:::::::::.===::::t1

I

B-126

CLOSET

42.15

B-128

ANATOMY ROOM

340.18

I

I t.

D-9

I GE

) TJD

400A

SWITCHBOARD DB-D

GE

) THQD

225A

BH

E

SCCR

G

22KA

THHQ

100A LA

BC/B'S

RGEST

GE

) THQD

125A

-BHA

E

SCCR

G

22KA

THHQ

60A/2P

BC/B'S

LARGEST

D-6

I GE

) TKM

I 1200A

I GE

) TJD

400A

GE

) THQD

I LP-1HA :

I 225A

6GE

22KASCCR

THHQB C/B'S

35ALARGEST

THQB C/B'S

30A/2P LARGEST

I LP-1HB I

GE

22KASCCR

225A MLO

THHQB C/B'S B-503

RADIOACTIVE WASTE

95.17

II

'''\ _____ c-L/ � J l-=;::i$ C I�;::::::::::J

20A/2P LARGEST

B-105B- -

MEDICAL MEDIA

L,J

\_ REFIG

32.01

B-504

AUTOPSY AREA

435.40 I I I I -

B-105A

MED. MEDIA

B-104

STUDIO

I

B-104A

PHOTO STUDIO

B-39

WASH ROOM

100.70 t0( � I

I��

TOILET

B-37

HOUSE STAFF OFFICE

141.92

I

GE

) THQD

SA

GE

22KASCCR

THHQB C/B'S

30ALARGEST

1-- -��-T0

R_s!-L�

A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M

DRAWING NOTES:

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .

@1-- -�-�-=1•_�--

T_ IA_

4 _ L _

B_U _!�

L _D

_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N

DRAWING KEYNOTES: @

1. DE-ENERGIZE PANEL LPBH AT SWITCHBOARD DB-D. PERFORM THOROUGH

CLEANING TO REMOVE ALL DEBRIS FROM PANEL ENCLOSURE AND INTERIOR

BREAKERS/BUS. PROVIDE ALL MATERIAL AND LABOR TO INSTALL #3 BARE GROUND

CONDUCTOR FROM METALLIC RACEWAY TO GROUND BAR

PLAN

NORTH

D

PLAN

B1 - BA SEMENT - KEY PLA N NORTH

NOT TO SCALE �

CONSULTANTS: STAMP ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

RAMB LL D2X Associates

DATE:

08124/22

Drawing Tltle

TASKORDER6

BUILDING 1 PARTIAL BASEMENT PLAN

PANEL LPBH AREA

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Project Number

630A4-16-430

Building Number

Drawing Number

RAMBOLL AMERICAS 18-01-BK

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked � EP-169 � REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B Dwg. 74 of 91 �l.S

R e vt;;;· s io n s

Da t e

===-=====B;;;

IN

;;;G;;;HAM=T;;;O;;;

N

N

;;;Y=13;;;90;;;2======================!!;;;;==;!

==;;;!!;==============================:_:;;;;==================�=====;;;:_:;;===;;;:_:;;===;;;:,,:;=======-:=========.J � Vctu·J11s AffJ1ts

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

C

II 0

.s

!m C

C

C

�o

II =

N

,E

II

·= 0

C

,E

II

�v :E .o> • � 0

1 2 u

I

B-107

ETO RM

i===============IT71

B-524

STORAGE RM.

369.51

I\ 1---------�-

L,J

.....---J B-501

SUPPLY RM.

87.63

I

B-503

RADIOACTIVE WASTE

95.17

B-106

MECICAL MEDIA

103.39

I I

-□ -I_I ________ I __ I r

B-105B

MEDICAL MEDIA

B-105

CORRIDOR

B-105A

MED. MEDIA

REFIG

32.01

B-504

AUTOPSY AREA

435.40 I I I I

u

B-108A

SPD GAS STERILIZER

L

4 5 u I 11 � 1111

I B-108 CLEAN PREP ROOM I r:=:=::=::::::::::=:::::::::::=::::::::::=::::::===;-;:===1 I

I

B-102

AIR CONDITIONING RM.

387.87

I 11

B-104C

DARKROOM

106.89

I � f' t========:::::::::.===::::t1

'-------.I �----�

G)G)PANEL LPB-1 � -

I B-127

ELEC. FEEDER 'D"

142.61

I

B-126

CLOSET

42.15

SWITCHBOARD DB-D

:::::::=====::J l,::c� �����

� B-104D � B-104B

DRYING ROOM

79.17

B-104

STUDIO

I

DARKROOM

88.13

IX

,:=========iI

II

B-104A

PHOTO STUDIO

B-39

WASH ROOM

100.70 t0( � I

I��

TOILET

B-128

ANATOMY ROOM

340.18

B-37

HOUSE STAFF OFFICE

141.92

I

I t.

DB-D

GE

(3)THQD SPARE C/B'S

6QQA LARGEST

2Q8V

D-12

I GE

) THQD

15QA

GE

) THQB

QA

SQD

22KASCCR

D-13 D-14

I GE

) THQD

I GE

) THED

2QQA

GE

D-14

MLO

?QA

) THQB

QA

GE

1QKASCCR

THQB C/B'S

7QALARGEST

0 LPB-1

LI NCOL N ELEC BOX

SPLIT PANEL

15QAMLO

(28)2QA

(1)3QA

(1)4QA

(1)5QA

CA 7QAC/B'S

D-10

I GE

) THEO

9QA

1-- -��-T0

R_s!-L�

A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M

DRAWING NOTES:

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .

@1-- -�-�-=1•_�--

T_ IA_

4 _ _L _

B_U _!�

L _D

_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N

DRAWING KEYNOTES: @

1. PROVIDE SINGLE POLE BLANK COVERS ON POLE POSITIONS 1, 4, AND 11. BLANK

COVERS SHALL BE COMPATIBLE WITH EXISTING PANEL PANEL INDICATED IS A

LINCOLN ELECTRIC TYPE NQB PANEL

2. DE-ENERGIZE, DISCONNECT, AND REMOVE (4) SINGLE PHASE 20A CIRCUIT

BREAKERS IN POLE POSITIONS 3, 5, 19, AND 21. PROVIDE (2) 2-POLE 20A CIRCUIT

BREAKER. CIRCUIT BREAKER SHALL BE COMPATIBLE EXISTING PANEL

MANUFACTURER AND MATCH INTERRUPTING RATING.

PLAN

NORTH

D

PLAN

B1 - BA SEMENT - KEY PLA N NORTH

NOT TO SCALE �

CONSULTANTS: STAMP ARCHITECT /ENGINEERS: APPROVED BY:

VJC

RAMB LL D2X Associates

DATE:

08124/22

Drawing Tltle

TASK ORDER 7

BUILDING 1 PARTIAL BASEMENT PLAN

PANEL LPB-1 AREA

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Project Number

630A4-16-430

Building Number

Drawing Number

RAMBOLL AMERICAS 18-01-BK

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked � EP-170 � REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B

Dwg. 75 of 91

�l.SR;;;evt;;;·s�io�n;;;s :===========;;;;Da;;;;t;;;e===-=====B;;;I N

;;;G;;;HAM=T;;;O;;;

N

N

;;;Y=13;;;90;;;2======================!!;;;;==;!2;;;;

Q2

2:;;; _0�8 _;!1;;;;

7 ==;;;!!;==============================:_:;;;;==================�=====;;;:_:;;===;;;:_:;;===;;;:_:;;=======-:=========.J � Vctu·J11s AffJ1ts

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

II =

,E

N

�v :E .o>

� 0

1 2 3 4 5 t===�rnr;:============;-irnr;:==========�rnr;:===========1I rn

B-201

LINEN CHUTE ROOM

186.37

B-200A

ELEC. FEEDER "A"

B-200

EXCHANGE CART STORAGE

2617.33

PANEL LP-BB{D(D

D rn

DB-A

rn

====-lrnl.'.:::::::1:t::::==========:::'..lrn===========�rnt:::::::============1

I

CLOSET

18.07

B-115

CLEAN AREA

283.14

B-111

I

STERILIZER

32.12

I

B-112

STORAGE

77.52

I

STERILE STORAGE AREA

325.61

I

B-115D

DIRTY AREA

308.23

B-113

TOILET

61.55

CORRIDOR SC

1611.11

B-114

TOILET

56.33

B-110

SUPPLY RM. NON-STERILE AREA

1078.96

I

I

I

I

I

I

B-116C

CHIEF OFFICE

108.31

B-116D

ENG. ROOM

B-116A

DUMBWAITER

ELEV. PIT

L ___ _

DB-A

SIE

65KASCCR

208V

SQD

) Q2

�5A

0�

SQD

10KASCCR

QOB C/B'S

60A LARGEST

GE

) TQD

DA

FPE NBC/B'S

60A LARGEST

A-7

I SIE ) HHL

400A

GE

) THQD

OA

GE

22KASCCR

THHQB & THQB C/B'S

50A LARGEST

GE

) THQD

OA

GE

22KASCCR

THQB & TH HQB C/B'S

30A LARGEST

A-1

I SIE ) HHL

400A

I

ELEV. PIT @

f-- -��-T0

R_s!-L�

A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M

DRAWING NOTES:

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .

@f-- -�-�-=1•_�--

T_ IA_

__L _

B_U _!�

L _D

_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N

DRAWING KEYNOTES: @

1. DE-ENERGIZE PANEL INDICATED. DISCONNECT, REMOVE AND REPLACE METAL

PANEL COVER. PANEL COVER SHALL BE A SQUARE D PANEL COVER FOR A NQOB

TYPE PANELBOARD. EXISTING PANEL CATALOG NUMBER IS NQOB-42450-ZM.

COORDINATE EXACT PANEL COVER REQUIREMENTS IN FIELD PRIOR TO PURCHASE.

PANEL COVER REPLACEMENT SHALL INCLUDE A LOCK. COORDINATE EXACT LOCK

WITH VA REPRESENTATIVE PRIOR TO PURCHASE. PAINT EXTERIOR SIDE OF PANEL

COVER TO MATCH EXISTING.

2. DE -ENERGIZE, DISCONNECT, AND REMOVE (3) SINGLE PHASE 20A CIRCUIT

BREAKERS IN POLE POSITIONS 10, 12, AND 14. PROVIDE (1) 3-PHASE 20A CIRCUIT

BREAKER. CIRCUIT BREAKER SHALL MATCH EXISTING PANEL MANUFACTURER AND

INTERRUPTING RATING.

PLAN

NORTH

D

PLAN

B1 - BA SEMENT - KEY PLA N NORTH

NOT TO SCALE �

CONSULTANTS: STAMP

RAMB LL

Qr-NEt,y

CJ. M

ARCHITECT /ENGINEERS:

APPROVED BY:

VJC

D2X Associates

DATE:

08124/22

Drawing Tltle

TASKORDER8

BUILDING 1 PARTIAL BASEMENT PLAN

PANEL LP-BB AREA

Approved: Project Director

Project Title

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

Location 800 POLY PLACE, BROOKLYN NY 11209

Project Number 630A4-16-430

Building Number

Drawing Number

RAMBOLL AMERICAS 18-01-BK

Office of Construction and Facilities Management

� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked

EP-171

� REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B

Dwg. 76 of 91

� l.=R;;;evt;;;;'s;;;io�n;;;s;;;;: ===========:;D;;;a;;;;te;;;;;;==.;:;;;;;===;;;B;;;IN;;;G;;;H;;;AM=T;;;O;;;N ;;;, N;;;Y;;;1;;;3;;;90;;;2=======================;!!;;;==;;; 2!:;0;!2!;2 -;;;;08;;;; -!;17;;;;;;==:.!;;;;===============================�===================�=====;;;;:,:;;;;;===�===;;_:;;======;;;;:.==========.J � Vctu·J11s AffJ1ts

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

A

B

C

D

II =

,E

N

�v :E .o>

� 0

STAIR#4

190.95

2-513

THYROID PROBE RM

214.8

2-514

CONFERENCE RM.

314.85

2-515A

COMPUTER ROOM

143.82

2-515

CRASH CART

B

)OM

l

CORRIDOR N/E

421.09

2-507A

DEVELOPMENT RM.

110.37

2-514A

TOILET

20.33

2-507

SCANNING ROOM "B'

745.01

2-515B

TOILET

20.50

PANEL PP-2Q00

168.67

PARTIAL BUILDING 1 SECOND FLOOR PLAN - PANEL PP-2Q WORK AREA

1/4"=1'-0"

DRAWING NOTES:

2' 4'

1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .

2. PANEL DP-D IS IN THE BASEMENT IN FEEDER D ROOM 8-127.

DRAWING KEYNOTES: ©

1. DE-ENERGIZE DISCONNECT AND REPLACE PANEL PP-2Q 150A 3-PHASE MAIN

CIRCUIT BREAKER. CIRCUIT BREAKER SHALL MATCH EXISTING PANEL

MANUFACTURER (SQUARE D TYPE NQOB) AND INTERRUPTING RATING.

3. PANEL PP-2Q HAS AN EXISTING ARC FLASH LABEL IDENTIFIED FOR PANEL PP-2R. 2. DISCONNECT AND REMOVE GROUNDED CONDUCTOR BONDED TO THE NEUTRAL

TERMINAL STRIP. INTERCEPT AND EXTEND AS REQUIRED TO GROUNDING TERMINAL

STRIP.

2-516

PATIENTS WAITING AREA

229.20

2-506

SCANNING ROOM 'A"

675.64

PLAN

NORTH

2-505

COPY ROOM

108.84

2-517

WORK RM.

152.60

OFF

5 6

D-2

GE

) THQD

225A

DB-D

SOD

I

�OA

SOD

22KASCCR

SOD

22KASCCR

SOD

SOD

22KASCCR

D-4

GE

) THQD

200A

D-5

GE

) THQD

150A

SOD

) 02 9�0A

SOD

22KASCCR

SOD

) 02

�SA

SOD

22KASCCR

2 PANEL SECTIONS

SOD

) 02

SA

SOD

22KASCCR

PARTIAL BUILDING 1 ONE-LINE DIAGRAM

NOT TO SCALE

WORK AREA

PLAN

B1 - 2ND FL - KEY PLAN �NOT TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .