Attachment D - Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- 36C77626B0020
About this file
This document is a set of electrical engineering design drawings for an electrical distribution upgrade project at the NY Harbor Healthcare Center, VA Brooklyn Campus.
The project, identified as 630A4-16-430, involves upgrading life safety and critical branch electrical distribution systems across multiple buildings (Buildings 1, 2, 4, 14, and 15) at the facility. The work encompasses de-energizing, disconnecting, removing, and replacing electrical panels, switchboards, transformers, and associated power distribution equipment. Specific tasks include: replacing surface-mounted and recessed electrical panels with new units meeting or exceeding specified short-circuit current ratings; replacing switchboard equipment; installing new circuit breakers and terminating feeder and branch circuit conductors; providing enclosed circuit breakers and disconnect switches in NEMA 12 enclosures; cleaning electrical equipment to remove debris; installing cable support systems; and replacing transformer equipment on concrete pads with new dry-type units. The work is scheduled to take place during evening/night and weekend shifts, with coordination required during shoulder months for heating/cooling seasons. Drawings are issued for construction as of August 24, 2022 (Revision 0), prepared by Ramboll Americas and Engineering Solutions, Inc. under design by D2X Associates. The project represents comprehensive electrical infrastructure modernization to ensure life safety system reliability and critical branch distribution performance across the healthcare facility's multiple interconnected buildings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ft>
�o
II =
�ID
N
,E
0 " ·= 0
,E•
§ 00
�v :E .o>• � 0 w :i:
<ri
C -
I
C
C
.'==I
I
B-33
PREPARATION RM.
521.08
I
REFRIG.
111.36
[I]
8-35
AUTOPSY ROOM
660.20
I
DRAWING NOTES:
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE DURING AN EVENING/NIGHT
WEEKEND SHIFT.
PIT
(5'-6" DEEP)
136.48
I l-=======1I1==::=J
I
[I]
IV 1,-----,1 .-I --,I .-I --,I:=====�I�===:::J
D
I I
8-401
TRANSFORMER ROOM
874.82
I I I I
TRANSFORMER VAULTS
I
P_ 114_':',_1
T _IA_
L_
_B _U _!
L _D
_I N_�-. _1 _BA_S_E_M_E_N_T_FL_O_O_R_P _LA_N
DRAWING KEYNOTES: @
1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE
CONSULTANTS: STAMP
RAMB LL
I
I
PLAN
NORTH
4 5
I
[I]
I
I I I I
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
II
[I]
B-400
MECHANICAL EQUIPMENT ROOM
6132.10
DATE:
08124/22
[I]
I
Drawing Tltle
TASK ORDERS
DP-B
SIEMENS A
(A-BOARD)
I ) 500A
A-16 BUILDING 1 MAIN SWITCHGEAR A-BOARD
EATON
1°') MDSLOB
r1i B00AF
; B00AS
B00AP
720AT
LSIG
) HMD6
I
800A
I ) 200A
HOUSE
PUMP#3
75HP
94FLA
I ) 150A
MRI
TRAILER
SIE
65KASCCR
BODA MLO
SIE
) HFD6
225A
SIE
) HFD6
225A
0 PP-B
AHU -1
125 HP
(EST.)
156FLA
@ �f:�� E
I AL BU ILDING 1 ONE-L INE DIAGRAM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS
DRAWING.
PANEL SCHEDULE
POWER PANEL PP-B LOCATION XFMR ROOM B-401
RATINGS 225A
MAIN LUGS .
MAIN CIRCUIT BREAKER
DESCRIPTION
UNIDENTIFIED (ON)
HOT WATER CIRC PUMP
EXHAUST FAN EF-1
EXHAUST FAN GX-1
SPACE
SPACE
SPACE
AMPS 480Y/277V VOLTS 3 PH
CB. INTERRUPTING RATING
225A AMPS CONNECTED LOAD
LOAD CB. CIF CIFW/KW/HP AMPS A B C
20 1 -� �- 2 20 3 -� �- 4 20 s -� �- 6 20 7 -� �- 8
20 9 -� �- 10 20 11 -� �- 12
-� �- 14
15 J.5_ -� �-T6
17 -� �-
-� �- 20 15 c21 -� �-,22
OS -
� �- 24
, 25 -� �- 26
-� �- 28 -� �- 30 c31 -� �- 32 fs -� �- 34 -� �- 36
37 -� �- 38 ·•u -� �- 40 A1 -� �- 42
INSTALLATION SURFACE
4 WIRE 60 HZ.- - ,_
GRD. BAR YES
65kAIC RMS. SYMM. AMPS
. KW, PANEL SIZE 42 SPACES
CB. LOAD DESCRIPTIONAMPS W/KW/HP
20 " ...
20 UNIDENTIFIED JN
20 == ,..
20 .JN
20 UNIDENTIFIED JN
20 " ...
15 UNIDENTIFIED (ON)
TB BATHROOM EXHAUST15 ADMITTING
BACK-UP HOT WATER CIRC20 PUMP(OFF)
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
WORK AREA
PLAN
B 1 - BASEMENT - KEY P LAN NORTH
NOT TO SCALE EE?
Project Title Project Number 630A4-16-430
PANEL PP-B AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Building Number
Office of Construction and Facilities Management Approved: Project Director Location 800 POLY PLACE BROOKLYN NY 11209' Drawing Number
-1.·. RAMBOLL AMERICAS
f
090890
25° St. Ives Dr.
� REV, 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e
.,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17
18-01-BK
EP-158
Dwg, 63 of 91
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;:;;;;;===;;:_:;;;==================================;:.:;;;========;;;:.:;===============================;;;;;_:===================;;;:,:;======;;:_:;;;===;;;:,:;===;;;;;:,;=======;;:,.==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
C
II o
.s
!m C u
C
�o
II =
�ID
,E
N
§ 00
II
�v :E .o>
� 0
1 2 3 4 5 6 7 8 9
1') W
, 1200A
0 SWBD DP-B
) 125A ) 150A ) 250A ) 250A ) 300A ) 400A ) 100A ) 300A
SPARE
PPBSW ) 125A PPBNW PP5NW PP16SE 480V 6 75kVA PP16SW DRY TYPE
FPE FPE GE FPE FPE
208Y 1120V -t GE 400A MLO MLO
) TED
LINCOLN ELECTRIC BOX
) NFJ ) %2=5.1 LINCOLN ELECTRIC BOX FPE FPE
250AMLO GE TED GIB'S
(2)SRPF 250A 1 DOA LARGEST
THEO GIB'S FPE NEF GIB'S
100A LARGEST 30A LARGEST
TCAL GIB'S
60A LARGEST
) NFJ OR NJF
150A
) 100A
1 RV STARTER
OBSOLETE
CC-16
40HP
50FLA
) NFJ OR NJF
150A
) 100A
1 RV STARTER
OBSOLETE
CC-17
40HP
50FLA
FPE NEF GIB'S
30A LARGEST
GE TED GIB'S
100A
I134A I
) BROKEN HANDLE
I 134B I
AC-7
30HP
37FLA
400AMLO
FPE NB GIB'S
30A LARGEST
175A
GE
) TEC
150A
B16M AC-12
75HP (EST.)
94FLA
NFJ
175A
IRM
) 100A COMPUTER ROOM
A/C
AC-13
400AMLO
FPE NB GIB'S
40A LARGEST
) NFJ
175A
SQD
) KA
150A
AC-11
75HP (EST.)
94FLA
) NFJ
175A
SQD
) FA
100A
B16M AC-10
50HP (EST.)
62FLA
@ ����!AL BUILDI NG 1 ONE-LI NE DIAG RAM
ii'.
w :i:
<ri u
C
C
REFRIG.
111.36
[I]
8-35
AUTOPSY ROOM
660.20
I
H H
I
D
G)(vswlTCHBOARD DP-B
I
8-401
TRANSFORMER ROOM
874.82
I I
[I]
I I
I
I
@)f-- -�_A_=,--�--T_I _A _L _B _U _I L_D_} N_G_
__ 1_B_A_S _E_M _E_N _T _F _L_O_O_ R_PL_A_N
DRAWING NOTES: DRAWING KEYNOTES: @
1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE
PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS DURING
AN EVENING/NIGHT WEEKEND SHIFT.
CONSULTANTS:
RAMB LL
1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SWITCHBOARD INDICATED.
DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO FACILITATE SWITCHBOARD
REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO TERMINATE FEEDER AND BRANCH
CIRCUIT CONDUCTORS TO REPLACEMENT SWITCHBOARD INCLUDING ANY REQUIRED CABLE
EXTENSIONS. REFER TO SWITCHBOARD SCHEDULE THIS DRAWING. SWITCHBOARD AND
CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING INDICATED IN
SWITCHBOARD SCHEDULE.
2. PROVIDE ALL MATERIAL AND LABOR TO SUPPORT ENCLOSED WIRE TROUGH TO FACILITATE
SWITCHBOARD REPLACEMENT. SUPPORTS SHALL BE INSTALLED PRIOR TO DEMOLITION.
STAMP
ONE-LINE DIAGRAM NOTES:
PLAN
NORTH
1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE SWITCHBOARD
SCHEDULE THIS DRAWING.
[I]
I
I
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
[I]
B-400
MECHANICAL EQUIPMENT ROOM
6132.10
DATE:
08124/22
[I]
I
Drawing Tltle
TASK ORDERS
SWITCHBOARD SCHEDULE
SWITCHBOA RD NAME SWBD DP-B LOCATION XFMR ROOM B-401 INSTALLATION FLOOR
_4_WIRE,�HZ. GRD.BAR RA TINGS BODA AMPS 480Y/277V VOLTS 3 PH
MA IN LUGS________ CB. INTERRUPTING RATING 100kAIC RMS. SYMM. AMPS
YES
MA IN CIRCUIT BREAKER -�B�□□�A __
DESCRIPTION
PANEL PP3R
PANEL PP-BNW
PANEL PP-BSW
PANEL PP-16SW
SPARE
Project Title
LOA D
W/KW/HP
AMPS CONNECTED LOA D _ _KW, SWBD SIZE 60" MOUNTING SPACE
CB.
AMPS
CB. LOA D Cl AMPS W/KW/HP
DESCRIPTION
PROVISIONED SPACE
IRMA/CUNIT
PANEL PP-SNW
PROVISIONED SPACE
PANEL PP-16SE
WORK AREA
PLAN
B1 - BASEMENT - KEY PLAN NORTH
NOT TO SCALE EE?
Project Number 630A4-16-430
PANEL DP-B AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Building Number
Office of Construction and Facilities Management Approved: Project Director Location 800 POLY PLACE, BROOKLYN NY 11209 Drawing Number
-!_·_ RAMBOLL AMERICAS
f
090890
25° St. Ives Dr.
� REV. O ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17
18-01-BK
EP-159
Dwg. 64 of 91
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:_:;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;_:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
II = � "'
N
,E • C 0 " � 0 •• .o>• � 0
,E
0 "
,!l
�o•
,E • C �v
.o>• � 0 a.
N w
C I- 0� a.
a.w' iii I;; w
C
I-" w �w ' w C a.
<ri
N ii:
V 3-217 J.C.
3-106 J.C.
3-105
JOA FILM LIBRARY
LET
3-104 3-104B
OFFICE CLOSET312.07 43.75
3-104A
BATH
� 0.
� fo I
3-103A
OFFICE
97.63 '
3-103B
TOILET
34.98
3-103 '
OFFICE
235.73
I I 1n1
I
3-102B
3-102 CLOSET
LOUNGE 43.75
297.54
3-102A
BATH
Q� 35.94
3-101A �·
BATH
34.98
I
3-101B
3-101 CLOSET
MUil Tl-PURPOSE 44.24 296.97
DRAWING NOTES:
VISITOR'S
LOBBY
CORRIDOR
EC
1149.73
I
D
D
PLUMB
SHAFT
DUCT
-1
ELEV.
-2
ELEV.
P-3
ELEV.
-4
ELEV.
ELEV.
3-108
TOILET
62.49
STAIR#6
'>n&:: O'l
I I
STAIR#3
141.41 c----:: � 1------
I
- I r------
,J
I ·
I
LEV.
-2
ELEV.
ID
DUCT
I '
:I� I
_J
D -
ELE1� _
D-
/ELEV.�
3-113
STORAGE
94.74
I I I I I I I I I I I I I I I I I I I I I I I I I I I
I :1 :1 :1 :1 :1 :1 :1 :
[g
\v�
3-108
TOILET
24.24
3-109
TOILET
24.58
SERVICE
LOBBY
CORRIDOR
WC
748.97
PLAN
NORTH
@,__ -�_A_=,·-�-- T_I_A _L _B_U _l
L_ D_}_N _�_ 1_ T_H_I_R _D _F_ L_O_O_ R_P_LA_N ,_______,' ,_______,
DRAWING KEYNOTES: ©
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS . 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE RECESSED PANEL INDICATED
WITH A SURFACE MOUNTED PANEL DISCONNECT FEEDER AND BRANCH CIRCUIT
CONDUCTORS TO FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND
LABOR TO TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
REPLACEMENT PANEL INCLUDING ANY REQUIRED CABLE EXTENSIONS, REFER TO
PANEL SCHEDULE THIS DRAWING. PANEL AND CIRCUIT BREAKERS SHALL
MEET/EXCEED SHORT CIRCUIT CURRENT RATING INDICATED IN PANEL SCHEDULE.
REV. 0 ISSUED FOR CONSTRUCTION 08124122
Revisions: Date
VA FORM 08 - 6231
CONSULTANTS:
RAMB LL
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS, INC.
18 LINK DRIVE
BINGHAMTON, NY 13902
STAMP
09089�
O,t:"E'SS\0
2022-08-17
I
PP3R0
3-112A
STOR
I I □
I y
3-114A
EMERGENCY LAB
302.63
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
259 St. Ives Dr.
Talent, OR. 97540 v
3-326
LOUNGE
126.30 n
DATE:
08124/22
6 7
V
Drawing Tltle
TASK ORDERS
8 9
I SWBD DP-B 1�--�1------�i---- ) 125A ) 150A
PPBSW
GE
250AMLO
(2)SRPF 250A
THED GIB'S
1 OOA LARGEST
TCALC/B'S
60A LARGEST
) 125A
0�
0�2E
IA L BUILDING 1 ONE-LI NE DIA GRAM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS
DRAWING.
PANEL SCHEDULE
POWER PANEL PP3R LOCATION XFMR ROOM B-401 INSTALLATION SURFACE
RATINGS 125A
MAIN LUGS -
MAIN CIRCUIT BREAKER
DESCRIPTION
UPS
SPARE
1-CRAC2
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
Project Title
AMPS 480Y/277V VOLTS 3 PH 4 WIRE 60 HZ. - ,_ GR□. BAR YES
CB. INTERRUPTING RATING 42kAIC RMS. S YMM. AMPS
125A
LOAD
W/KW/HP
AMPS
CB.
AMPS
CONNECTED LOAD - KW, PANEL SIZE 30SPACES
CIF
J_ rt -�
11 -�
J.5_
17 -�
19 -�
21 -�
25 -� 27 -�
29 -�
CIF CB. LOAD DESCRIPTION
A B C AMPS W/KW/HP
cl_ �- 4 15 1-CU-1
�- 8 �-1o 15 1-CU-2
�- 14
�-T6 60 1-CRAC1
�- 20 SPACE
�- 22 SPACE
�- 24 SPACE
�- 26 SPACE
�- 28 SPACE
�- 30 SPACE
WORK AREA
PLAN
B1 - 3RD F L - KEY PLA N NORTH
____ ffi
NOT TO SCALE W
Project Number
630A4-16-430
PANEL PP3R AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Building Number
Office of Construction and Facilities Management Approved: Project Director
Location 800 POLY PLACE BROOKLYN NY 11209'
Issue Date
08/24122
Checked
BKD
F.7
Drawing Number
18-01-BK
EP-160
Dwg, 65 of 91
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
A
B
C
D
II =
N
,E • C 0 " 0 •• .o>•
,E
0 " ,!l
�o•
,E • C �v
.o>• � 0 a."' N w
C I- 0 � a.
i-"'-a.
w' iii I;;
w
C
I-" w� w' w C a.
<ri"' N ii:
l!J I \_
TEL CHASE
@ C-
I
G) G) G),, \
[I]
L/ 2-101
PATIENTS LIBRARY
351.95
I
[I] 7
2-100A
MEDICAL LIBRARY
266.83
- [I]
PUBLIC ELEVATOR CORRIDOR
767.71 m
Xu
2-103
� TOILET
------- 27.41
I : :
I
D T 2-104
TOILET
( STAIR#3 28.74
154.88 '
[I] [gJ [gJ
[I]
I\ ./
I
P-1
ELEV
[I]
P-2
ELEV
[OJ
P-3
ELEV
[I]
P-4
ELEV
[OJ
P-5
ELEV
[I] 7 2-106A
TOILET
39.61
2-106B
TOILET
35.40
T
STAIR#6
224.27
G)LP2FA
,-J
X
I
S-4
ELEV
ELEV
S-2
ELEV
� I I
LEV
2-106
TOILET
54.72
I/;
I
[I]
D
[I]
D
[I]
�l-
CORR
722.89
PARTIAL BUILDING 1 SECOND FLOOR PLAN
1/4"=1'-0" 2' 4'
DRAWING NOTES: DRAWING KEYNOTES: 0
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE RECESSED PANEL INDICATED.
REV. 0 ISSUED FOR CONSTRUCTION 08124122
Revisions: Date
VA FORM 08 - 6231
DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO FACILITATE PANEL
REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO TERMINATE FEEDER AND
BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL INCLUDING ANY
REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS DRAWING. PANEL
AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING
INDICATED IN PANEL SCHEDULE.
CONSULTANTS:
RAMB LL
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS, INC.
18 LINK DRIVE
BINGHAMTON, NY 13902
2 3
PLAN
NORTH
STAMP
2-318
UTILITY RM.
77.63
I 2-318A
_) CLOSET
22.00 r
IWb---J m
[I] I
[I]
2-105
) SECRETARY & CLERICAL
326.04
2-108A OFFlr.F A/0
[I]
ARCHITECT /ENGINEERS:
5 6
C-1
I DB-C 1-I----T------------
1 SIE SIE
65KA SCCR ) HHL
400A 2D8V
GE
) THHQB
1DOA
BF
E
GIB'S
G
THQB
15A LAR
THHQB
30A LAR
GEST
GIB'S
GEST
(1 )2 QA
GE
) TOD
150A
F-A
E
SCCR
G
10KA
THQB & THH
80ALA
QB GIB'S
RGEST
GE
) THHQB
100A
1F
E
SCCR
G
22KA
THQB
30A/2P LA
THHQB
40A/1P LA
THQD
20A/1P LA
GIB'S
RGEST
GIB'S
RGEST
GIB'S
RGEST
GE
) THHQB
7DA
2FB
GE
SCCR 22KA
THHQB
30ALA
GIB'S
RGEST
GE
) THQB
___l___1_ciOAl2P
LPB �
G E
10KAS CCR
GIB'S
RGEST
/B'S
RGEST
THHQB
20A/1P LA
THQB C
20A/1P LA
GE
) TJD
�DA
�LPG
G
THH QB
E
GIB'S
GEST
CCR
4DALAR
22KAS
GE
) THQD
DA
LP1
G E
22KAS CCR
GIB'S
RGEST
GIB'S
RGEST
THQB
30A/2P LA
THHQB
30A/2P LA
) 15DA
01 LPlFA I
��JAL BUILDING 1 ONE-LINE DIAGRAM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL CIRCUITS ARE SHOWN ON ONE-LINE DIAGRAM. SEE PANEL SCHEDULE THIS
DRAWING.
2. PANEL DB-C IS LOCATED IN THE BASEMENT FEEDER ROOM C.
APPROVED BY: DATE:
08124/22
Drawing Tltle
VJC TASK ORDERS
7 8 9
PANEL SCHEDULE
POWER PANEL LP2FA LOCATION 2ND FL CORRIDOR INSTALLATION RECESSED
RATINGS 150A AMPS 208Y/120V VOLTS 3 PH 4 WIRE, 60 HZ. GRD. BAR YES
MAIN LUGS .
MAIN CIRCUIT BREAKER 150A
DESCRIPTION LOAD
W/KW/HP
SPARE
SPARE
SPARE
SPARE
USED
USED
SPARE
SPARE
DATA CLOSET
SPARE
SPARE
SPARE
SPARE
Project Title
CB. INTERRUPTING RATING 18kAIC RMS. SYMM. AMPS
AMPS
CB.
AMPS
CONNECTED LOAD . KW, PANEL SIZE 42 SPACES
CIF
1 -�
3 -�
5 -�
7 -�
9 -�
11 -�
13 -�
15 -�
17 -�
'19 -� c-21 -�
?S -
27 -�
129 -� c31 -� fs -�
37 -�
CIF CB. LOAD DESCRIPTION A B C AMPS W/KW/HP
�- 2 20 SPARE
�- 4 20 SPARE
�- 6 20 SPARE
�- 8 20 SPARE
�- 10 20 SPARE
�- 12 20 SPARE
�- 14 30 SPARE
�- 16 50 SPARE
�- 18 50 SPARE
�- 20
�- 22 20 DATA CLOSET
� - 24 20 DATA CLOSET �- 26
�- 28
�-'30 50 SPARE
�- 32
�- 34 30 SPARE
�- 36 �- 38
�- 40 30 SPARE
�- 42
WORK AREA
PLAN
B1 - 2ND FL - KEY PLAN
NORTH
____ ffi
NOT TO SCALE W
Project Number
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
630A4-16-430
Building Number
D2X Associates
PANEL LP2FA AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Drawing Number
Office of Construction and Facilities Management
09089�
O,t:"E'SS\0
2022-08-17
259 St. Ives Dr.
Talent, OR. 97540
5 6 7
Issue Date
08/24122
Checked
BKD
F.7
18-01-BK
EP-161
Dwg. 66 of 91
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
A
B
C
D m C 0" .5 m
�o
II =� "'
N
,E m C 0 " ·= 0 m
,E m
�v :E .o>m � 0
1 2 3 4 5 6 7 8 9
6 BUILDING 15 MAIN SWITCHGEAR
ONSULT. �
#3
G-659
EXAM
#29
G-660
-PAT.WIG
G-666
.T.-PAT.W/C
G-667
H.A.C. #2 G-668 l/
I
I
I
SIGNAL
G-669 t--
. TEST E.K.G. TEST
'31A G-731B
/7 �
EXAM
#27
G-658
EXAM
#30
G-661
EXAM
#32
G-665
EXAM
#28
G-657
□�r
CORRIDOR
EXAM
#31 G-662
EXAM
#333
G-664
I
I
I r'
CORRIDOR
SOIL UTIL.
G-663
I j I
!�-GB
I 01 II
LPE-GB T RPE-GB RP-GB 0 ©
H \ y JH
IATS-7I ATS-10 ATS-11
ATS-12- /
EDP-B
ATS-13
SWITCH -
EDP-A
- ATS-1 ATS·3 I IATS-8I � / �===============I Y tt
HDPE-1B
HDP-LSG
ATS-5
HDP-1CA�
� i--.
Q
ATS-4�
I,_
HDP-1CB
t-
ATS-2
0- I/
ELECTRICAL
SWITCHBOARD
G-672
V
BUILDING 15
SWITCHGEAR
(REAR)
@DS-HDP1CA�
TEL.
G-670 LPE-GB 1 .- r------
1- PPE-X1 - HDPE-1A
PPE-GB
ELEC.
G-671
HDPE-1D
��I
CORRIDOR
L/
I
I
STAIR
/ #1 DN
@1-- P_ 114 ,f!:-_
1,_�-..
T _IA_
4, L_
_B_U _!� L_D
_I N_�-, _15_G_ RO_ U _N _D_F _L _O _O _R _P _L_A_N
I
PLAN
NORTH
0 HDP-1CA
7 2 5
GE GE GE
) TEY ) SFH ) TEY
BOA 175AP 100A
175AT
PP-HXA
LPE-BA
GE
14KA SCCR
TEY C/B'S
20A/1 P LARGEST
GE
SFP
175AP
175AT
GE
) TEY
70A
) 150A
I RPE-BA r-�I--, . I GE
225A ) TEY
70A
LPE-BB
GE
14KA SCCR
TEY C/B'S
20A LARGEST
GE
SEP)
90AP
90AT
I LPE-1A I
GE
14KA SCCR
TEY C/B'S
20ALARGEST
GE
) TEY
30A
15kVA
1�S�A
) 70A
I RPE-BD t- _I __ 1 RPE-BB f,-
�I -- 225A
125A
GE
) TED
150A
GE
I
) TED
150A
I) ��p
125AP
125AT
GE
) TEY
100A
) 90AP
90AT
® ASCO
SERIES 300
W/SOLID NEUTRAL
ATS-4
© (2-SETS)-,
4-#300KCMIL,
1-#1GND
IN 2-1/2"C
r,;\ DS-HDP1CA f-- -----,\::.I ' ' I I
I 600AI
I I I I I I 1(3) 600A I I I L __ _____ J
© (2-SETS)
4-#300KCMIL,
1-#1GND
IN 2-1/2"C
GE
if AKRU-10D-30
W/MVf+
BOOAF
BOOAS
600AP
660AT
L,S,I,G
GE
11:P:..-., ) SGH ®
600AP
600AT
6 1
GE GE
) TED
125A
) SFH
225AP
225AT
GE
SEP
100AF
90AP
I LPE-GC I I GE
GE ) TED
14KA SCCR 125A
TEY C/B'S
20A/1 P LARGEST
= 75kVA LPE-GB ===:= T-5
) 225AP
I
225AT
I LPE-1C
r-l �--,I )-125A
) GE
225A
RPE-1A1 c--�--"---
GE
225A
RPE-1A2 c---'----
GE
225A
) 60A
== 45kVA s125A
I RPE-GB ,__, -�1 -,
I) ��A
I ) 70A I RPE-GF r-l -�1 --
125A
T 75kVA
) GE
I
200A
I RPE-GC I
I 225A GE ) 100A
) GE
I
90A
I RPE-GE r-l ...... --- 125A
��--- 75kVA
1200A I RPE-1C r-l -�1 ---,----
1) GE225A 100A
I RPE-1E
125A
GE
I ) 200A
DRAWING NOTES: DRAWING KEYNOTES: 0
PANEL SCHEDULE @>--p_N0�_T0
R_8!-L!
A_L_ B_U _IL_D_I N_G_ 15_O_ N _E-_L_IN_E _D_I _A _G _RA_M
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, AND REMOVE POWER CIRCUIT FROM ATS-4 TO PANEL
HDP-1CA AS INDICATED COMPLETE.
2. DISCONNECT SWITCH, ASSOCIATED RACEWAY AND CABLE SHALL BE INSTALLED TO
THE FURTHEST EXTENT POSSIBLE PRIOR TO SHUTDOWN OF ATS-4 AND PANEL 2. PROVIDE ALL MATERIAL AND LABOR TO TIE INTO EXISTING ELECTRICAL EQUIPMENT
HDP-1CA. SHUTDOWN FOR ELECTRICAL DEMOLITION AND TERMINATIONS SHALL INDICATED.
TAKE PLACE ON AN EVENING/NIGHT WEEKEND SHIFT.
3. PROVIDE A SURFACE MOUNTED, 600V, 3-POLE, 600A, FUSED DISCONNECT SWITCH
WITH NEUTRAL BAR AS INDICATED WITH 200kAIC RATED VERY FAST ACTING
CURRENT LIMITING FUSES AS INDICATED IN NEMA 12 LOCKABLE ENCLOSURE.
4. PROVIDE POWER CIRCUIT AS INDICATED.
5. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE.
POWER PANEL LPE-GB LOCATION ELEC CLOSET G-671
RATINGS 125A AMPS 480Y/277V VOLTS 3 PH - -
MAIN LUGS - CB. INTERRUPTING RATING
MAIN CIRCUIT BREAKER 90A AMPS CONNECTED LOAD
DESCRIPTION LOAD CB. CII CII W!',()fl/HP AMPS A B C 169A, 169, 169, 168, 167, G_f_S. 20 1 r-� �- 2
1, 134, 150. GND FL ST
H 20 3�� �- 4
G.F.S. INTER 20 � �� �-
c4 EM. BATT. PAK-RO OMS GB169A 20 1�� �- 8 SPARE . •N 20 g�� �-
Jr 20 11 �� �- 12 . ,.. 20 13 �� �- 14 iPARE . •N 20 15 � �- 16
PARE JN 20 11 �� �- 18
INSTALLATION SURFACE
_4_ WIRE,_§{)__ HZ. GRD. BAR YES
65kAIC RMS. SYMM. AMPS
- KW, PANEL SIZE 30 SPACES
CB. LOAD DESCRIPTION AMPS W/IW//HP
20 111, 11A, 11B, 1 27, G.F.S_ 20 ..-,PAREluN
60 RPE- GB VIA T5
20 "'" 20 �" i
PARE N
20 PARE "'N
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM_
GE
) TEY
80A
PNL A
SPACE 19
SPACE 21 r-� �-
SPACE � �-
20 SPACE
22 SPACE
24 SPACE B15 -GROUND FL - KEY PLA N
PLAN
NORTH
SPACE 25 r-� �- 26 SPACE NOT TO SCALE
SPACE 27 �� �- 28 SPACE
SPACE 2• �� �- 30 SPACE
CONSULTANTS: STAMP
RAMB LL
RAMBOLL AMERICAS o9089s
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
DATE:
08124/22
Drawing Tltle
TASK ORDERS
HDP-1 CA & LPE-GB AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Tit l e
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-162
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-Ess,o 259 St. Ives Dr. Issue Date Checked � � REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e
� l,,:
R e vt s io n s ;;;: ==============D a t e
B l
N
G
H
AM
=T;;;
O
N
N
;;;Y=
;;;;;==;;;;!.�====================================;;;:,,:;======================;;;;:.:;;;;======;;;;:.:;;;;===;;;;:..:;;;;===;;;;:.:;;;;;;;Dw=g.=67=;;;of=;;;9;;;1 =============:.i
� Vctu·J11s AffJ1ts
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
II =
�ID
,E•
N
§ 00
�v :E .o>• � 0 ii'.
;i;
w :i:
<ri
DRAWING NOTES:
SPECIAL
PURPOSE
EXAM
1-769
PATIENT
CONSULT.
1-770
I
I� j\� I\ / I I
I
I ST¥. I
I / \ I I / \ I I / \ I I/ \ I l(_ ___ j
EXAM#7
1-829
I
II
II
II
n:
CLEAN
PAT.
TOIL.
WIC�
l
DR.
EXAM #11
1-771
CORR.
D
SOIL
EXAM #10
1-772
I
I\
TEL. RM.
1-833
EXAM#9
1-773
M.E.R.
I1A174]
I\ f--f--
EXAM#8
1-774
:::::::====::;';::::::::'.-=:===========: :::: ELEC. CL.
EXAM#6
1-826
1-834
��LPE-1C0
I I I I
STAIR#2
I\ � EXAM #5
I
EXAM#1
1-823
-, /-1-----1-'-·.:i,__.y '
CORR.
EXAM#2
1-824
1-827
EXAM#3
1-825
EXAM#4
1-826
I
I
,--------7 I I I I L ________ J
P_ 114_1:1---,._�-..
T_I _A _L _B _U _I L_D_} N_G_
__ 1 _5_F _I R_S_T _F_L_O_O_R_P _LA_N
DRAWING KEYNOTES: 0
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
BRACING INDICATED IN PANEL SCHEDULE.
CONSULTANTS:
II
PLAN
NORTH
{I-DN
}1
C)
CJ
STAMP
4 5
HDP-1CA
GE
) TEY
BOA
BD H
I
I II
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL
-1.·.
RAMBOLL AMERICAS
f D2X Associates
090890
25° St. Ives Dr.
2 5
GE GE
) SFH ) TEY
175AP 100A
175AT
PANEL SCHEDULE
4 9
GE
) TED
150A
GE
) TEY
100A
GE
) TED
125A
I GE
SGH)
600AP
600AT
GE
) SFH
225AP
225AT
) 225AP
I
225AT
01 LPE-1C 1-
i
I ) 125A
75kVA
1200A I RPE-1C f-1 -'-1 �--
1) GE225A 100A
I RPE-1E
125A
GE
I ) 200A
@ �f:��!AL BUILDING 15 ONE-LINE DIAG RAM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.
GE
) TEY
BOA
POWER PANEL LPE-1C LOCATION ELEC CLOSET 1-834 INSTALLATION SURFACE
RATINGS 225A
MAIN LUGS -
MAIN CIRCUIT BREAKER
DESCRIPTION
1ST FL NORTH STH.
1C131, 132,125 � .I. ,1G1
SPARE .,N
ur, JO, RPE-1 C VIAXFMR
SPACE
SPACE
SPACE
SPACE
SPACE
DATE:
08124/22
AMPS 480Y/277V VOLTS 3 PH 4 WIRE 60 HZ. - - ,_ GRD.BAR YES
225A
LOAD
WIKWIHP
CB. INTERRUPTING RATING
AMPS
CB.
AMPS
CONNECTED LOAD
CIF
J..5_ ·,u
A B C _r--.. r--.._
-r--.. ,--._ -
CIF
30kAIC RMS. SYMM. AMPS
- KW, PANEL S IZE 30 SPACES
CB.
WI���� ;
CRIPTION AMPS
20 =�; 20
20 SPARE ..,N
20 _,� 20 ,.., 20 �PARE NJ
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
Drawing Tltle
TASK ORDERS
PANEL LPE-1C AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
WORK AREA
PLAN
B15 - 1 ST FL - KEY P LAN NORTH
NOT TO SCALE EE?
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 P OLY PLACE, BROOKLYN NY 11209
Project Number 630A4-16-430
Building Number
Drawing Number
Office of Construction and Facilities Management
� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e .,, Revisions: Date BINGHAMT ON, NY 13902 2022_08_17
18-01-BK
EP-163
Dwg. 68 of 91
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
C
II o
.s
!m C
C
�o
II =
,E •
N
II
�v :E .o>• � 0
1 2 3
�-----�rn□
,'J r;=--�
ID
l'c--� CB-3
CORRIDOR
535.94 n
I I
I I
I I
LJ
CB-6A
SERVICE ELEVATOR LOBBY
244.86
ELEV. EL .
S-1 P-3
PASSENGER ELEV. LOBBY
ELEV. ELEV.
SOIL
LINEN
COLL.
[BA 109]
PANEL EPP-ELG)
ELEV. MACH. ROOM
[BA 111]
P_
114.�
1._�-..
T_ I A_
4.
L_
_B_U
_1 L_D
_1 N_�-. _15_ B_ A _S_E_M_E_N_T _P _LA_N
DRAWING NOTES: DRAWING KEYNOTES: 0
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE.
PLAN
NORTH
4 5 z
PANEL SCHEDULE
POWER PANEL EPP-EL LOCATION BASEMENTELEVMACHRM BA 111 INSTALLATION SURFACE
RATINGS_40_0A _ __ AMPS 480Y/277V VOLTS _3_ PH _4 _ WIRE,_§{)__ HZ. GRD. BAR YES
MAIN LUGS CB. INTERRUPTING RATING 42kAIC RMS. SYMM. AMPS
MAIN CIRCUIT BREAKER
DESCRIPTION
ELEVATOR P-1
SPACE
ELEVATOR P-2
SPACE
400A AMPS CONNECTED LOAD. _ __ KW, PANEL SIZE 4_2�S _PA_C�E�S _ __
LOAD CB.
W!,()N/HP AMPS
C CB. LOAD I
AMPS W/IWI/HP
SPACE
SPACE
SPACE
DESCRIPTION
SPARE(ON)
SPARE(ON)
6 7
5 BUILDING 15 MAIN SWITCHGEAR
GE
'f AKRU-10D-30
) W/MVT+
800AF
400AS
400AP
440AT
L,S,I,G
�CH---►IFROM EDP-A
ASCO
SERIES 300
W/SOLID NEUTRAL
ATS-1
400A/3P
0 EPP-EL
) 400AP
400AP
) 125A
INVERTER
TYP.OF 4
DC ELEVATORS
60HP (EST.)
75FLA
) 50A
= 30kVA
GE
) 100A
I ELP-EL 1-I _,__
I
125A
,__P_
N0�_ T0
R_s!- L
!A_L_ B_U _IL_D _IN_ G_ 15_O_ N_ E_-_L_IN _E _ D_ I _A _G_R A_ M
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.
WORK AREA
ELEVATOR P-3 125
SPACE
SPACE
SPACE
SPACE B15 - BA SEMENT - KEY PLA N
PLAN
NORTH
w :i:
ELEVATOR S-1
SPACE
SPACE
SPACE
ELP-EL VIA XFMR
20 EL DISPATCH NOT TO SCALE
SPACE
125 SPARE(ON)
SPACE
SPACE
SPACE
<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL
-1.·.
RAMBOLL AMERICAS
f D2X Associates
090890
25° St. Ives Dr.
DATE:
08124/22 Drawing Tltle
TASK ORDERS
PANEL EPP-EL AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
� REV. O ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-164
Dwg. 69 of 91
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l,,,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;,;====================;;;;,,:;======;;;;;,;:;;;;;===;;,,:;;;===;;;;,,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
II =
�ID
,E
N
§ 00
�v :E .o>
� 0
-PAT.W/C
G-666
.T.-PAT.W/C
G-667
H.A.C.#2 G-668
------ I ------
L/
EXAM
#32
G-665
CORRIDOR
EXAM
#333 G-664 n"' -
SOIL UTIL.
G -663 l l I l �I �I =- ::=====:::::;-;:===:.::::::::::;-;:;:::::=::::;::;:=::;:::::::::'.::::::;:::::'..:::::::;:;;::::::::::::'.,.'.:::=::::::: ll��o 1��11��
SIGNAL
G-669
TEL.
G-670
I
ELEC.
G-671
I I L/ - I
L/ CORRIOOR
l::Lt:.t; I Klt..:AL
SWITCHBOARD
G-672
- DD�---� H \._________,/ H
"bj::::::::::::::::::::::;--_-GA-TE--------i!�U�P �R�,¥'if]=)=;--�� /
HDPE-1B
GE
200KASCCR
1200A MLO
(3)THLC BOA
GE
) THLC
250A
GE
�A
GE
22KASCCR
TEY C/B'S
50A LARGEST
GE
) THLC
225A
) 225AP
225AT
GE
) THLC
250A
PPE-B A
GE
25KASCCR
225A MLO
THE□ C/B'S
50A LARGEST
GE
) THLC
225A
GE
SFL
) 225AP
225AT
GE
) THLC
225A
GE
) SFP
225AP
225AT
PP-1B
GE
100KASCCR
TE D C/B'S
70A LARGEST
GE
) THLC
225A
) 225AP
225AT
STAIR
#1 DN 0 PPE -GB t--->---- PPE-GA t--->--- PPE-GC >--->----ii'.
lll
DRAWING NOTES:
. TEST
'31A
E.K.G. TEST
G -7318
E.K.G.
WAITING
G-731
� ""-PANEL PPE-GB 0
MECHANICAL
EQUIPMENT RM.
G-705
I
@,__P_ 114.f!:-_1._�-..
T_ IA_
L_
_B_U
_IL _D
_ IN_�-- _15_G_ R_ O_ U _N _D_F_LO_ O_R _P _ L_A_N
DRAWING KEYNOTES: 0
1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE
PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS
BEGINNING ON A WEEKEND SHIFT.
1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL RE PLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE.
PLAN
NORTH
H i
AREA
WAY
I
POWER PANEL
RATINGS 225A
MAIN LUGS
) 110A
AC-3
40HP
50FLA
GE
THE□ C/B'S
40A LARGEST
GE
) THE□
110A
SOD
) FA
100A
15-AC-2
40HP
50FLA
SOD
COMB.
@ ��o�:C�A L BUILDING 15 ONE-LINE DIAG R AM
ONE-LINE DIAGRAM NOTES:
PPE-GB
AMPS
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE -LINE DIAGRAM .
PANEL SCHEDULE
LOCATION MECH RM G-705
480Y/277V VOLTS 3 PH
CB. INTERRUPTING RATING
INSTALLATION SURFACE
4 WIRE 60 HZ. - - ,_ GRD. BAR
65kAIC RMS. SYMM. AMPS
YES
MAIN CIRCUIT BREAKER 225A AMPS CONNECTED LOAD - KW, PANEL SIZE 42 SPACES
DESCRIPTION LOAD CB. �IF �IF CB. LOAD DESCRIPTION W/KWIHP AMPS A B C AMPS WIKW/HP
�� �- 2
A/C3 110 f-� �-4 40 AC-3 (40HP ) 5 f-� �-f-� �-Jl EF-26 20 _9_ f-� �-jj)_ 20 AC3-2
11 f-� �- 12 _13 f-� �-J.i
15-PAC-3 45 _15_ f-� �- 16 20 15-P-AC3-2 17 f-� �-f-� �-
AC3 GLYCOL 20 .21 f-� �- 22 20 SPARE(ON) 23 f-� �-24
� f-� �- � SPARE(ON) 20 .II f-� �-
1§_ 20 SPARE(ON)
29 f-� �- 30 ..31 f-
� �- 32 SPACE
SPARE(ON) 20 � f-� �- 34 SPACE
35 f-� �- 36 SPACE SPACE 37 f-� �- 38 SPACE SPACE 39 f-� �- 40 SPACE SPACE 41 f-� �- 42 SPACE
) 110A
AC-4
40HP
50FLA
B15 - GROUND FL - KEY PLAN
PLAN
NORTH
w:i:
NOT TO SCALE
<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL
-1.·. RAMBOLL AMERICAS
f D2X Associates
090890
25° St. Ives Dr.
DATE:
08124/22
Drawing Tltle
TASK ORDERS
PANEL PPE-GB AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e _,, Revisions: Date BING HAMTON, NY 13902 2022_08_17
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-165
Dwg. 70 of 91
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:_:;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;_:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D ft>-m C .5• e
C " 0
.5
!m C u
C
�o
II =
�ID
N
C .5 � 0 a •
C"ID •
e
,E•
§ 00
�v :E .o>• � 0
I n 11 n-
.T.-PAT.W/C
G-667 - I
D
I
SIGNAL TEL.
G-669 G-670
H.A.C.#2 G-668
ELEC .
G-671
------ I ------ � - - I I
L/ � �
-LA_
. TEST EKG. TEST
'31A G-731B c-c-lln I I l J I _J 1-
11 I
I I L/ c!.J
CORRIDOR
w-
�DD
I r--GATE
STAIR
#1 DN
I I
4 5 6 7 8 9
HDPE -1B
GE GE GE GE GE GE
GE
) THLC ) THLC ) THLC ) THLC ) THLC ) THLC
200KASCCR 250A 225A 250A 225A 225A 225A
1200A MLO
I
(3)THLC BOA
fH \ H GE
A
PPE-BA
l ../ GE
GE
SFP
' A 25KASCCR 225AP
UP / - 225A MLO 225AT
GE THEO C/B'S
22KASCCR 50A LARGEST
TEY C/B'S
' 50A LARGEST PP-1B
7, 7
' GE
100KASCCR
TE D C/B'S
I HF H
70A LARGEST
L/ r
GE
SFL
) 225AP )
225AP
225AP
225AT 225AT 225AT
PPE -GB >--->--�- PPE -GA >--->--� 0 PPE -GC >--->--�-
EKG.
WAITING
G-731
EKG. TEST
G-731C
C.G. STOR.
G-731B
ULTRASOUND
G-732
MED. TREATMENT
G-733
I I
I I
II:
I r7 L....J
MECHANICAL
EQUIPMENT RM.
G-705
MECHANICAL
EQUIPMENT RM.
G-705
I
III
Ill I! I
PLAN
NORTH
H
AREA
WAY
AREA
WAY
) 110A
AC-3
40HP
50FLA
GE
THEO GIB'S
40A LARGEST
GE
) THEO
110A
15-AC-2
40HP
50FLA
SOD
FA
100A
SOD
COMB.
@ ��o�:C�A L BUILDING 15 ONE-LINE DIAG R AM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM .
PANEL SCHEDULE
POWER PANEL P P E-GC LOCATION MECH RM G-705 INSTALLATION SURFACE
RATINGS 225A AMPS 480Y/277V VOLTS 3 PH
MAIN LUGS - CB. INTERRUPTING RATING
MAIN CIRCUIT BREAKER 225A AMPS CONNECTED LOAD
DESCRIP TION LOAD CB. �IF �IF WIKW/HP AMP S A B C
-� �- 2
SPARE(ON) 40 -� �-4
5 f--� �--� �-Jl
AC3-P.H. 20 _9_ f-- � �-jj)_
11 -� �- 12 .13 -� �-J.i
15-PAC4 02 .15_ f--� �- 16 17 -� �--� �-
� SPARE(ON) 50 21 -� �- 22
23 -� �-24
SPACE .,. f--� �- 26
SPACE 27 -� �- 28
SPACE 29 -� �- 30
SPACE 31 -� �- 32
SPACE 33 -� �- 34
SPACE 35 f--� �- 36
SPACE 37 -� �- 38
SPACE 39 -� �- 40
SPACE 41 -� �- 42
4 WIRE 60 HZ. - - ,_ GRD. BAR
65kAIC RMS. SYMM. AMPS
YES
- 'i<W, P ANEL SIZE 42 SP ACES
CB . LOAD DESCRIP TION AMP S WIKW/HP
110 AC4(40HP)
20 EF-27
20 SPARE(ON)
40 PCH-1
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
) 110A
AC-4
40HP
50FLA
WORK AREA
@>--P_ 114.f!:-_1._�-..
T_ IA_
L_
_B_U
_IL _D
_ IN_�-- _15_G_ R_ O_ U _N _D_F_LO_ O_R _P _ L_A_N
B15 - GROUND FL - KEY PLAN
PLAN
NORTH
w :i:
DRAWING NOTES:
1. WORK SHOWN THIS DRAWING SHALL BE COORDINATED WITH THE VA TO TAKE
PLACE DURING SHOULDER MONTHS FOR THE HEATING/COOLING SEASONS
BEGINNING ON A WEEKEND SHIFT.
DRAWING KEYNOTES: 0
1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE.
NOT TO SCALE
<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL
-!_·_ RAMBOLL AMERICAS
f D2X Associates
090890
25° St. Ives Dr.
DATE:
08124/22
Drawing Tltle
TASK ORDERS
PANEL PPE-GC AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 P OLY PLACE, BROOKLYN NY 11209
� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-166
Dwg. 71 of 91
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;,,:;;;===;;;:,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D ft>-m C 0 "• .5•
C " 0
.5
!m C
C •• C
�o
II =
ID
N
,E m C 0 "� ·= 0
C
,E • § 00
�v :E .o>• � 0 ii'.
1 2 3
ONSULT. � L/ EXAM EXAM �
#3 #27 #28
G-659 G-658 G-657 CORRIDOR
\ I I y JH □�r \ H
I I I I
EXAM EXAM EXAM
#29 #30 #31
G-660 G-661 G-662 SWITCH -- -
f I\ / - I I I IV, -PAT.W/C
G-666
.T.-PAT.W/C
G-667
H.A.C.#2 G-668
'\ET
L/
I
SIGNAL
G-669
L/ t--
. TEST E.K.G. TEST
'31A G-7318
/7 �
EXAM
#32
G-665
'-di
CORRIDOR ELECTRICAL
SWITCHBOARD
EXAM
#333 G-664
TEL.
G-670 l
DI
ELEC.
G-671
I
SOIL UTIL.
G-663
I I
I I
CORRIDOR
1-
-�PANEL HD
"1CBG)
L/
I
STAIR
#1 DN
P_
114.f!:-_ 1._�-..
T_ IA_
4.
L_ _B _U
_IL _D
_ IN_�-. _15_ G_ R_ O_ U _N _D _F_LO_ O _R _P _ L_A_N
G-672
I
PLAN
NORTH
DRAWING NOTES: DRAWING KEYNOTES: 0
0 HDP-1CB
LPE-1B
GE
14KA SCCR
TEYC/B'S
20A/1 P LARGEST
I RPE-1B
0 PANEL SCHEDULE
) 100AP
100AT
GE
SEP) 100AP
100AT
GE
) TEY
70A
�� 45kVA
I I
) 150A
I LPE-GD I
GE
14KA SCCR
TEYC/B'S
20A LARGEST
ASCO
SERIES 300
W/SOLID NEUTRAL
ATS-2
400A/3P
) 100AP
100AT
GE
TEY I) 100A
I) ��y 70A
�� 45kVA
GE
I ) 150A
I RPE-GD f--1 �---- 225A I
GE
I RPE-1D
125A
60A
GE
I ) 100A
7 8
4 BUILDING 15 MAIN SWITCHGEAR
GE
ifi AKRU-10D-30
) W/MVT+
BOOAF
400AS
400AP
440AT
L,S,I,G o+---------- FROM EDP-B
) 350AP
350AT
) 100AP
100AT
GE
�D
GE
14KA SCCR
TEY C/B'S
20A/1 P LARGEST
) BOAP
BOAT
X-RAY
I LPE-GA I
GE
14KA SCCR
TEYC/B'S
20A LARGEST
) BOAP
BOAT
) 40AP
40AT
30kVA
GE
) 100A
I RPE-TEL le----�I __
GE
GE
I
) TEY
BOA
I) ��y 50A
= 30kVA
150A
I RPE-GA F"""I �I ---
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE MAIN AND BRANCH CIRCUIT
BREAKERS IN SURFACE MOUNTED PANEL INDICATED. DISCONNECT FEEDER AND
BRANCH CIRCUIT CONDUCTORS TO FACILITATE BREAKER REPLACEMENT. FEEDER
AND BRANCH CIRCUIT CONDUCTORS SHALL BE TERMINATED TO REPLACEMENT
CIRCUIT BREAKER. REFER TO PANEL SCHEDULE THIS DRAWING. MAIN AND BRANCH
CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT CURRENT RATING
INDICATED IN PANEL SCHEDULE. CIRCUIT BREAKERS SHALL MATCH EXISTING
MANUFACTURER GE. PANEL IS A GE SPECTRA SERIES PANEL.
POWER PANEL HDP-1CB LOCATION ELEC SWITCHGEAR RM G-<172 INSTALLATION SURFACE
AL BUILDING 15 ONE-LINE DIAGR AM
RATINGS 400A
MAIN LUGS -
MAIN CIRCUIT BREAKER
DESCRIPTION
PANEL LPE-1B
PANEL LPE-BD
SPARE(ON)
AMPS 480Y/277V VOLTS 3 PH
CB. INTERRUPTING RATING
350A AMPS CONNECTED LOAD
LOAD CB. :IF CIF W!',()///HP AMPS A B C
� f-� �- 2
100 d �� �-4 s �� �-
�� �- 8
100 J!. �� �-To 11 �� �-
�� �---11 25 j_5 � �-jft
17 �� �- 18
_4_ WIRE,_§{)__ HZ. GRD. BAR YES
1 00kAIC RMS. SYMM. AMPS
- KW, PANEL SIZE 45" MOUNTING SPACE
CB. LOAD DESCRIPTION AMPS W/twl/HP
100 PANEL LPE-{;D
80 PANEL X-RAY
80 PANEL LPE-<3A
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.
) 125AP
125AT
CT
ROOM
j-9 PANEL RPE-TEL 40
1Q
22 25 24 SPARE(ON) B 15 - GR OUND FL - KEY P LAN
PLAN
NORTH
w :i:
SPARE(ON)
SPARE(ON)
CT ROOM
T7 '20
�� �- 26 NOT TO SCALE
�� �-28 30 SPARE(ON)
f-� �- 32
� �-34 SPACE
�� �- 38 �� �-40 �� �-42
<ri CONSULTANTS: STAMP ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL
-!_·_ RAMBOLL AMERICAS
f D2X Associates
090890
25° St. Ives Dr.
DATE:
08124/22
Drawing Tltle
TASK ORDERS
PANEL HDP-1 B AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
� REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DR IVE Talent, OR 97540 08/24122 BKD e _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-167
Dwg. 72 of 91
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot � Vctu·J11s AffJ1ts
ENGINEERING SOLUTIONS, INC. o,-Ess,o J Issue Date Checked ii:l.,:;;;==============;;;;;;::;;;;;===;;:,;;;;====================================:,:;;;;========;;;;:;;;;;;================================;;;;;.:====================;;;:,:;======;;;;;,;:;;;;;===;;.:;;;===;;;:,:;=======;;;:.:==========.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D m C .5•
�o
0 II =
N
,E m C ·= 0
,E•
�v :E .o>• � 0
ONSULT. �
#3
G-659
EXAM
#27 G-658
EXAM
#28 G-657
2 3
CORRIDOR
\I I y JH \
□�r H I I
- I I
EXAM EXAM EXAM
#29 #30 #31
G-660 G-661 G-662 SWITCH -
:::::::-=====::::::::::==I =I=:'.:::::::::::: 11V"
-PAT.W/C
G-666
.T.-PAT.W/C
G-667 -
H.A.C.#2 G-668
EXAM
#32
G-665
CORRIDOR
EXAM
#333 G-664
SOIL UTIL.
G-663
I I I J r.=1 ===;I :=-
SIGNAL
G-669
TEL.
G-670
� 1_ □ 1_11_
PANEL LS-GB 0
ELEC.
G-671
� r-
I L/
� t--
. TEST E.K.G. TEST
'31A G-7318
/7 �
,'J
CORRIDOR
I ir;;;-
LJ[JI
I
) r--GATE
STAIR
/ #1 DN
I
ELECTRICAL
SWITCHBOARD
G-672
I
I
PLAN
NORTH
@1-- P_ 114 .f!:-_1._�-..
T_ IA_
L_
_B _U _!
l""""""" L_D
_I N_�-. _15_ G_ RO_ U _N _D _F_L_O_O_R_P_ L_A_N \
DRAWING NOTES: DRAWING KEYNOTES: 0
5 6
GE
SFP)
225AP
225AT
7 8
HDP-LSG 1-------�-------�-----�--,----------------------,----------------,---
GE
100KA SCCR
(2)SEP 20AP/AT SPARE
(2)SEP 30AP/AT SPARE
(1)SEP 50AP/AT SPARE
(1)SEP ?OAP/AT SPARE
PANEL SCHEDULE
GE
) SEP
60AP
GOAT
GE
I) !�I
GE
14KA SCCR
TEYC/B'S
50ALARGEST
GE
) SEP
60AP
GOAT
GE
14KA SCCR
TEYC/B'S
20ALARGEST
GE
) SEP
SOAP
80AT
GE
) TEY
I 60A I LS-GA e-l ---'-· �-
14KA ��CR I ) ;:y
60A TEYC/B'S
20ALARGEST
GE
14KA SCCR
TEYC/B'S
20A LARGEST
0 LS-GB
) 30A
GE
SEP) 30AP
30AT
LS-1B
GE
14KA SCCR
TEYC/B'S
30A LARGEST
GE
) SEP
100AP
100AT
) 60AP
60AT
) 50A
GE
SEP
I
) 60AP
I LS-GC rl -�-6, 0A-T
GE I ) ;:y
14KA SCCR 40A
TEYC/B'S
20A/1 P LARGEST
GE
14KA SCCR
TEYC/B'S
20A LARGEST
@ ���2!AL BUILDING 15 ONE-LINE DIAGRAM
ONE-LINE DIAGRAM NOTES:
1. NOT ALL BRANCH/FEEDER CIRCUITS ARE NOT SHOWN ON ONE-LINE DIAGRAM.
GE
) SEP
30AP
30AT
== 15kVA
T
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS. 1. DE-ENERGIZE, DISCONNECT, REMOVE AND REPLACE SURFACE MOUNTED PANEL
INDICATED. DISCONNECT FEEDER AND BRANCH CIRCUIT CONDUCTORS TO
FACILITATE PANEL REPLACEMENT. PROVIDE ALL MATERIAL AND LABOR TO
TERMINATE FEEDER AND BRANCH CIRCUIT CONDUCTORS TO REPLACEMENT PANEL
INCLUDING ANY REQUIRED CABLE EXTENSIONS. REFER TO PANEL SCHEDULE THIS
DRAWING. PANEL AND CIRCUIT BREAKERS SHALL MEET/EXCEED SHORT CIRCUIT
CURRENT RATING INDICATED IN PANEL SCHEDULE.
POWER PANEL LS-GB LOCATION ELEC SWITCHGEAR RM G-ll72 INSTALLATION SURFACE
RATINGS 125A
MAIN LUGS -
MAIN CIRCUIT BREAKER
OESCRIPTION
c<UNJ
�PAREruNI
EXIT L TS, GND FL. INTE R
PANELLS-GC
SPACE
SPACE
SPACE
AMPS 480Y/277V VOLTS 3 PH
CB. INTERRUPTING RATING
90A AMPS CONNECTED LOAD
LOAD CB. CII CII W!,()N/HP AMPS A B C
20 1 r-� �- 2
20 3�� �- 4
20 � r-� �-
.i � � �- 8
50 JI_
r-� �-1o
11 r-� �-
13 r-� �- 14 15 � �- 16 11 �� �- 18 r-� �-
_4_ WIRE,_§{)__ HZ. GRD. BAR YES
42kAIC RMS. SYMM. AMPS
- KW, PANEL SIZE 30 SPACES
CB. LOAD DESCRIPTION AMPS W/twl/HP
20 EXIT LTS, GND FL. SOUTH
20 CORR. GND. FL. SOUTH
20 �fL,,-
30 PANEL LS-1B
SPACE
SPACE
SPACE
SPACE 19
SPACE 21 r-� �-
SPACE � �-
20 SPACE
22 SPACE
24 SPACE B15 - GROUND FL - KEY PLA N
PLAN
NORTH
, r-
SPACE 25 r-� �- 26 SPACE NOT TO SCALE
SPACE 27 �� �- 28 SPACE
SPACE 2• r-� �- 30 SPACE
CONSULTANTS: STAMP
RAMB LL
RAMBOLL AMERICAS
o9089s
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
DATE:
08124/22
Drawing Tltle
TASK ORDERS
PANEL LS-GB AREA PLAN ONE-LINE
DIAGRAM AND SCHEDULE
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Project Number 630A4-16-430
Building Number
Drawing Number
18-01-BK
EP-168
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-Ess,o 259 St. Ives Dr. Issue Date Checked � � REV. 0 ISSUED FOR CONSTRUCTION 08124122 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD e
�l::R;;;evt;;;;';;;si;;;;on;;;s;;;:===========;;;::;D;;;at;;;e===-====;;;B;;;l;;;N ;;;G;;;H;;;AM=TO;;; N;;;,;;;N;;;Y;;;1;;;3;;;9;;;02========================;;!!;==;;;;;;;2;;;0;;;2;;;2_;;;08;;;_;;;17;;;;;==;;!!;;=================================;:_;;;====================:,:;;;======;:,,:;;===;;;;:.:====:,:;;;;;;Dw=g.;;;7;;;3=of=;;;9;;;1=;;;;.:==========.J � Vctu·J11s AffJ1ts
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
C
II
.s
!m C
C • C
�o
II =
N
,E
II
·= 0
C
,E •
II
�v :E .o>• � 0
B-524
STORAGE RM.
369.51
I\ 1---------�-
.....---J B-501
SUPPLY RM.
87.63
I
I I
B-106
MECICAL MEDIA
103.39
I I u
I
B-107
ETO RM
-□ -I_I ________ I __ I r
B-105
CORRIDOR
u
B-108A
SPD GAS STERILIZER
L
3 4 5 u I 11 � 1111
I B-108 CLEAN PREP ROOM I r:=:=::=::::::::::=:::::::::::=::::::::::=::::::===;-;:===1 I
I
G)PANELLPBH
I '-------.I �----�
B-102
AIR CONDITIONING RM.
387.87
I 11
B-104C
DARKROOM
106.89
I B-127
ELEC. FEEDER 'D"
142.61
I I
::======::J( l,::c� ==�������§
� B-104D � B-104B
DRYING ROOM
79.17
DARKROOM
88.13
IX
,:=========iI f' t========:::::::::.===::::t1
I
B-126
CLOSET
42.15
B-128
ANATOMY ROOM
340.18
I
I t.
D-9
I GE
) TJD
400A
SWITCHBOARD DB-D
GE
) THQD
225A
BH
E
SCCR
G
22KA
THHQ
100A LA
BC/B'S
RGEST
GE
) THQD
125A
-BHA
E
SCCR
G
22KA
THHQ
60A/2P
BC/B'S
LARGEST
D-6
I GE
) TKM
I 1200A
I GE
) TJD
400A
GE
) THQD
I LP-1HA :
I 225A
6GE
22KASCCR
THHQB C/B'S
35ALARGEST
THQB C/B'S
30A/2P LARGEST
I LP-1HB I
GE
22KASCCR
225A MLO
THHQB C/B'S B-503
RADIOACTIVE WASTE
95.17
II
'''\ _____ c-L/ � J l-=;::i$ C I�;::::::::::J
20A/2P LARGEST
B-105B- -
MEDICAL MEDIA
L,J
\_ REFIG
32.01
B-504
AUTOPSY AREA
435.40 I I I I -
B-105A
MED. MEDIA
B-104
STUDIO
I
B-104A
PHOTO STUDIO
B-39
WASH ROOM
100.70 t0( � I
I��
TOILET
B-37
HOUSE STAFF OFFICE
141.92
I
GE
) THQD
SA
GE
22KASCCR
THHQB C/B'S
30ALARGEST
1-- -��-T0
R_s!-L�
A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M
DRAWING NOTES:
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .
@1-- -�-�-=1•_�--
T_ IA_
4 _ L _
B_U _!�
L _D
_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N
DRAWING KEYNOTES: @
1. DE-ENERGIZE PANEL LPBH AT SWITCHBOARD DB-D. PERFORM THOROUGH
CLEANING TO REMOVE ALL DEBRIS FROM PANEL ENCLOSURE AND INTERIOR
BREAKERS/BUS. PROVIDE ALL MATERIAL AND LABOR TO INSTALL #3 BARE GROUND
CONDUCTOR FROM METALLIC RACEWAY TO GROUND BAR
PLAN
NORTH
D
PLAN
B1 - BA SEMENT - KEY PLA N NORTH
NOT TO SCALE �
CONSULTANTS: STAMP ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
RAMB LL D2X Associates
DATE:
08124/22
Drawing Tltle
TASKORDER6
BUILDING 1 PARTIAL BASEMENT PLAN
PANEL LPBH AREA
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Project Number
630A4-16-430
Building Number
Drawing Number
RAMBOLL AMERICAS 18-01-BK
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked � EP-169 � REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B Dwg. 74 of 91 �l.S
R e vt;;;· s io n s
Da t e
===-=====B;;;
IN
;;;G;;;HAM=T;;;O;;;
N
N
;;;Y=13;;;90;;;2======================!!;;;;==;!
==;;;!!;==============================:_:;;;;==================�=====;;;:_:;;===;;;:_:;;===;;;:,,:;=======-:=========.J � Vctu·J11s AffJ1ts
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
C
II 0
.s
!m C
C
C
�o
II =
N
,E
II
·= 0
C
,E
II
�v :E .o> • � 0
1 2 u
I
B-107
ETO RM
i===============IT71
B-524
STORAGE RM.
369.51
I\ 1---------�-
L,J
.....---J B-501
SUPPLY RM.
87.63
I
B-503
RADIOACTIVE WASTE
95.17
B-106
MECICAL MEDIA
103.39
I I
-□ -I_I ________ I __ I r
B-105B
MEDICAL MEDIA
B-105
CORRIDOR
B-105A
MED. MEDIA
REFIG
32.01
B-504
AUTOPSY AREA
435.40 I I I I
u
B-108A
SPD GAS STERILIZER
L
4 5 u I 11 � 1111
I B-108 CLEAN PREP ROOM I r:=:=::=::::::::::=:::::::::::=::::::::::=::::::===;-;:===1 I
I
B-102
AIR CONDITIONING RM.
387.87
I 11
B-104C
DARKROOM
106.89
I � f' t========:::::::::.===::::t1
'-------.I �----�
G)G)PANEL LPB-1 � -
I B-127
ELEC. FEEDER 'D"
142.61
I
B-126
CLOSET
42.15
SWITCHBOARD DB-D
:::::::=====::J l,::c� �����
� B-104D � B-104B
DRYING ROOM
79.17
B-104
STUDIO
I
DARKROOM
88.13
IX
,:=========iI
II
B-104A
PHOTO STUDIO
B-39
WASH ROOM
100.70 t0( � I
I��
TOILET
B-128
ANATOMY ROOM
340.18
B-37
HOUSE STAFF OFFICE
141.92
I
I t.
DB-D
GE
(3)THQD SPARE C/B'S
6QQA LARGEST
2Q8V
D-12
I GE
) THQD
15QA
GE
) THQB
QA
SQD
22KASCCR
D-13 D-14
I GE
) THQD
I GE
) THED
2QQA
GE
D-14
MLO
?QA
) THQB
QA
GE
1QKASCCR
THQB C/B'S
7QALARGEST
0 LPB-1
LI NCOL N ELEC BOX
SPLIT PANEL
15QAMLO
(28)2QA
(1)3QA
(1)4QA
(1)5QA
CA 7QAC/B'S
D-10
I GE
) THEO
9QA
1-- -��-T0
R_s!-L�
A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M
DRAWING NOTES:
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .
@1-- -�-�-=1•_�--
T_ IA_
4 _ _L _
B_U _!�
L _D
_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N
DRAWING KEYNOTES: @
1. PROVIDE SINGLE POLE BLANK COVERS ON POLE POSITIONS 1, 4, AND 11. BLANK
COVERS SHALL BE COMPATIBLE WITH EXISTING PANEL PANEL INDICATED IS A
LINCOLN ELECTRIC TYPE NQB PANEL
2. DE-ENERGIZE, DISCONNECT, AND REMOVE (4) SINGLE PHASE 20A CIRCUIT
BREAKERS IN POLE POSITIONS 3, 5, 19, AND 21. PROVIDE (2) 2-POLE 20A CIRCUIT
BREAKER. CIRCUIT BREAKER SHALL BE COMPATIBLE EXISTING PANEL
MANUFACTURER AND MATCH INTERRUPTING RATING.
PLAN
NORTH
D
PLAN
B1 - BA SEMENT - KEY PLA N NORTH
NOT TO SCALE �
CONSULTANTS: STAMP ARCHITECT /ENGINEERS: APPROVED BY:
VJC
RAMB LL D2X Associates
DATE:
08124/22
Drawing Tltle
TASK ORDER 7
BUILDING 1 PARTIAL BASEMENT PLAN
PANEL LPB-1 AREA
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Project Number
630A4-16-430
Building Number
Drawing Number
RAMBOLL AMERICAS 18-01-BK
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked � EP-170 � REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B
Dwg. 75 of 91
�l.SR;;;evt;;;·s�io�n;;;s :===========;;;;Da;;;;t;;;e===-=====B;;;I N
;;;G;;;HAM=T;;;O;;;
N
N
;;;Y=13;;;90;;;2======================!!;;;;==;!2;;;;
Q2
2:;;; _0�8 _;!1;;;;
7 ==;;;!!;==============================:_:;;;;==================�=====;;;:_:;;===;;;:_:;;===;;;:_:;;=======-:=========.J � Vctu·J11s AffJ1ts
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
II =
,E
N
�v :E .o>
� 0
1 2 3 4 5 t===�rnr;:============;-irnr;:==========�rnr;:===========1I rn
B-201
LINEN CHUTE ROOM
186.37
B-200A
ELEC. FEEDER "A"
B-200
EXCHANGE CART STORAGE
2617.33
PANEL LP-BB{D(D
D rn
DB-A
rn
====-lrnl.'.:::::::1:t::::==========:::'..lrn===========�rnt:::::::============1
I
CLOSET
18.07
B-115
CLEAN AREA
283.14
B-111
I
STERILIZER
32.12
I
B-112
STORAGE
77.52
I
STERILE STORAGE AREA
325.61
I
B-115D
DIRTY AREA
308.23
B-113
TOILET
61.55
CORRIDOR SC
1611.11
B-114
TOILET
56.33
B-110
SUPPLY RM. NON-STERILE AREA
1078.96
I
I
I
I
I
I
B-116C
CHIEF OFFICE
108.31
B-116D
ENG. ROOM
B-116A
DUMBWAITER
ELEV. PIT
L ___ _
DB-A
SIE
65KASCCR
208V
SQD
) Q2
�5A
0�
SQD
10KASCCR
QOB C/B'S
60A LARGEST
GE
) TQD
DA
FPE NBC/B'S
60A LARGEST
A-7
I SIE ) HHL
400A
GE
) THQD
OA
GE
22KASCCR
THHQB & THQB C/B'S
50A LARGEST
GE
) THQD
OA
GE
22KASCCR
THQB & TH HQB C/B'S
30A LARGEST
A-1
I SIE ) HHL
400A
I
ELEV. PIT @
f-- -��-T0
R_s!-L�
A_ L_B_U _IL _D_IN_G_1 _O_N_E_-L_IN_ E_D_IA _G_RA_M
DRAWING NOTES:
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .
@f-- -�-�-=1•_�--
T_ IA_
__L _
B_U _!�
L _D
_IN_�-- _ 1 _B_A _SE_ M_EN_ T_F _LO_ O_R_P_LA_N
DRAWING KEYNOTES: @
1. DE-ENERGIZE PANEL INDICATED. DISCONNECT, REMOVE AND REPLACE METAL
PANEL COVER. PANEL COVER SHALL BE A SQUARE D PANEL COVER FOR A NQOB
TYPE PANELBOARD. EXISTING PANEL CATALOG NUMBER IS NQOB-42450-ZM.
COORDINATE EXACT PANEL COVER REQUIREMENTS IN FIELD PRIOR TO PURCHASE.
PANEL COVER REPLACEMENT SHALL INCLUDE A LOCK. COORDINATE EXACT LOCK
WITH VA REPRESENTATIVE PRIOR TO PURCHASE. PAINT EXTERIOR SIDE OF PANEL
COVER TO MATCH EXISTING.
2. DE -ENERGIZE, DISCONNECT, AND REMOVE (3) SINGLE PHASE 20A CIRCUIT
BREAKERS IN POLE POSITIONS 10, 12, AND 14. PROVIDE (1) 3-PHASE 20A CIRCUIT
BREAKER. CIRCUIT BREAKER SHALL MATCH EXISTING PANEL MANUFACTURER AND
INTERRUPTING RATING.
PLAN
NORTH
D
PLAN
B1 - BA SEMENT - KEY PLA N NORTH
NOT TO SCALE �
CONSULTANTS: STAMP
RAMB LL
Qr-NEt,y
CJ. M
ARCHITECT /ENGINEERS:
APPROVED BY:
VJC
D2X Associates
DATE:
08124/22
Drawing Tltle
TASKORDER8
BUILDING 1 PARTIAL BASEMENT PLAN
PANEL LP-BB AREA
Approved: Project Director
Project Title
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
Location 800 POLY PLACE, BROOKLYN NY 11209
Project Number 630A4-16-430
Building Number
Drawing Number
RAMBOLL AMERICAS 18-01-BK
Office of Construction and Facilities Management
� Dep,11 tInr•I1t ot ENGINEERING SOLUTIONS, INC. o,-;�:, 259 St. Ives Dr. Issue Date Checked
EP-171
� REV. 0 ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR. 97540 08/24122 BKD B
Dwg. 76 of 91
� l.=R;;;evt;;;;'s;;;io�n;;;s;;;;: ===========:;D;;;a;;;;te;;;;;;==.;:;;;;;===;;;B;;;IN;;;G;;;H;;;AM=T;;;O;;;N ;;;, N;;;Y;;;1;;;3;;;90;;;2=======================;!!;;;==;;; 2!:;0;!2!;2 -;;;;08;;;; -!;17;;;;;;==:.!;;;;===============================�===================�=====;;;;:,:;;;;;===�===;;_:;;======;;;;:.==========.J � Vctu·J11s AffJ1ts
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
II =
,E
N
�v :E .o>
� 0
STAIR#4
190.95
2-513
THYROID PROBE RM
214.8
2-514
CONFERENCE RM.
314.85
2-515A
COMPUTER ROOM
143.82
2-515
CRASH CART
B
)OM
l
CORRIDOR N/E
421.09
2-507A
DEVELOPMENT RM.
110.37
2-514A
TOILET
20.33
2-507
SCANNING ROOM "B'
745.01
2-515B
TOILET
20.50
PANEL PP-2Q00
168.67
PARTIAL BUILDING 1 SECOND FLOOR PLAN - PANEL PP-2Q WORK AREA
1/4"=1'-0"
DRAWING NOTES:
2' 4'
1. WORK SHOWN THIS DRAWING SHALL TAKE PLACE ON NIGHT/WEEKEND SHIFTS .
2. PANEL DP-D IS IN THE BASEMENT IN FEEDER D ROOM 8-127.
DRAWING KEYNOTES: ©
1. DE-ENERGIZE DISCONNECT AND REPLACE PANEL PP-2Q 150A 3-PHASE MAIN
CIRCUIT BREAKER. CIRCUIT BREAKER SHALL MATCH EXISTING PANEL
MANUFACTURER (SQUARE D TYPE NQOB) AND INTERRUPTING RATING.
3. PANEL PP-2Q HAS AN EXISTING ARC FLASH LABEL IDENTIFIED FOR PANEL PP-2R. 2. DISCONNECT AND REMOVE GROUNDED CONDUCTOR BONDED TO THE NEUTRAL
TERMINAL STRIP. INTERCEPT AND EXTEND AS REQUIRED TO GROUNDING TERMINAL
STRIP.
2-516
PATIENTS WAITING AREA
229.20
2-506
SCANNING ROOM 'A"
675.64
PLAN
NORTH
2-505
COPY ROOM
108.84
2-517
WORK RM.
152.60
OFF
5 6
D-2
GE
) THQD
225A
DB-D
SOD
I
�OA
SOD
22KASCCR
SOD
22KASCCR
SOD
SOD
22KASCCR
D-4
GE
) THQD
200A
D-5
GE
) THQD
150A
SOD
) 02 9�0A
SOD
22KASCCR
SOD
) 02
�SA
SOD
22KASCCR
2 PANEL SECTIONS
SOD
) 02
SA
SOD
22KASCCR
PARTIAL BUILDING 1 ONE-LINE DIAGRAM
NOT TO SCALE
WORK AREA
PLAN
B1 - 2ND FL - KEY PLAN �NOT TO…
This is the start of the file's text. The full file is on GovTribe.